Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
00-General Information
1 of 2 Sections
A1-1AR Ground 1st Level Area B
A1-1R Area A Floor Plan
A1-2R 1st Level Area A Floor Pl
A1-3 Mezzanine Level A Floor Pl
A1-4 Roof Plan
A1-5 Ground Level C Floor Plan
A1-6 1st Level AreaC Floor Plan
A1-7 Expanded Plans
A2-1 Bldg. Elevation Area A/B
A2-2 Elevations/Window Types
A3 -2 Interior Details
A3 of 3 Window Details
A3-1 Wall/Door Types Frame Elev
A4-1 Wall Sections
A4-2 Wall Sections
A4-3 Wall Sections
A4-4 Exterior Details
A5-1 Stair/Elevator Plan & Sect
A5-2 Stair / Elevator Details
A5-3R Millwork Elevations
A5-4 Millwork Sections
A5-5 Interior Elevations
A6-1R Level A Reflected Ceiling
A6-2 1st Level A/B Refl.Ceiling
A6-3 Mezz. A Refl. Ceiling Plan
A6-4 1st Level C Refl. Ceiling
Boundary Survey
C-0 parking Lot Phasing
C-1 Site Demolotion
C-2 Site & Grading Plan
C-3 Site Layout
C-4 Site Details
Cover Sheet
D-2 Demolition Plan
DA-1 Demolition Plan
DA-3 Area C Demolition Plan
DM1-5 Grnd. Level C HVAC Demoli
DM1-6 1st/Roof Lev.C HVAC Demol
E1-1R Grnd.Level A LightingPlan
E1-2 1st Level A/B LightingPlan
E1-3 Mezz.Level A Lighting Plan
E1-4 Grnd.Level C Lighting Plan
E1-5 1st Level C Lighting Plan
E2-1R Grnd. Level A Power Plan
E2-2 1st Level A/B Power Plan
E2-3 Mezz.Level A Power Plan
E2-4 Grnd.Level C Power/System
E2-5 1st Level C Power Plan
E3-1R Grnd.Level A System Plan
E3-2 1st Level A/B Systems Plan
E3-3 Mezz.Level A Systems Plan
E3-4 1st Level C Systems Plan
E4-1 Electrical Details
E5-1 One Line Riser Diagram
E5-2 Electrical Schedules
EO-1 electrical Symbol Legend
EO-2r Electrical Site Plan
M!-5 Ground Level C HVAC Plan
M1-1R Grnd. Level A/B HVAC Plan
M1-2 1st Level A/B HVAC Plan
M1-3 Mezz. Level A HVAC Plan
M1-6 1st/Roof Lev.C HVAC Plan
M2-1R Grnd.Level A/BPlumb.&Fire
M2-2 1st Lev. A/B Plumb/Fire
M2-3 Mezz. Lev. A Plumb / Fire
M2-5R Grnd.Lev.C Plumb./Fire
M2-6 1st/Roof Lev.C Plumb./Fire
M2-7 Waste & Vent Schematics
M3-1R Grnd.Lev A/B Misc. Piping
M3-2 1st Level A/B Misc. Piping
M3-3 Mezz. Level A Misc. Piping
M3-5 Grnd. Level C Misc. Piping
M3-6 1st/Roof Level C Misc.Pipe
M404 Mech. Sections & Details
M4-2 Mech. Sections & Details
M4-3 Mech. Sections & Details
M4-4 Mech. Sections & Details
M5-1 Mechanical Schedules
MO-0 Mech.Symbols& Abbreviation
MO-1 Site Utility Plan
Paving & Draining Plan
Permit Application
S1-1 Foundation Plan Level A/B
S1-2 Framing Plan 1st Level A/B
S1-3 Framing Plan Mezz. Level A
S1-4 Framing Plan Roof Level A
S1-5 Ground/1st/Roof/Level C
S2-1 Beam Schedule
S2-2 Beam/Column/Footing Sched.
S3-1 Structural Details
S3-2 Structural Details
S3-3 Structural Details
Title Form
Title Form (2)
Title Form (2)-2
Title Form (3)
Title Form (4)
Title Form-2