Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
A0.0 ACCESSIBILITY REQUIREMENTS
A1.1 CONSTRUCTION & REFLECTED CEILING PLANS
A1.2 FINISH & EGRESS PLANS
A1.3 FURNITURE
A2.0 ELEVATIONS
A3.0 FINISH & DOOR SCHEDULES
A4.0 CONSTRUCTION DETAILS & ELEVATIONS
A4.1 DETAILS
CERT OF OCCU
CVR COVER SHEET
DRAWINGS
E-1 POWER PLAN
E-1 POWER PLAN (2)
E-2 LIGHTING PLAN
E-3 ELECTRICAL DETAILS
E-3 ELECTRICAL DETAILS (2)
FP-1 FIRE PROTECTION PLAN
FP-2 FIRE PROTECTION SCHEDULE
M-1 MECHANICAL PLAN
M-1 MECHANICAL PLAN (2)
M-2 MECHANICAL SCHEDULES & DETAILS
M-2 MECHANICAL SCHEDULES & DETAILS (2)
P-1 PLUMBING PLAN
P-1 PLUMBING PLAN (2)
P-2 PLUMBING SCHEDULE & ISOMETRICS
P-2 PLUMBING SCHEDULES & ISOMETRICS
PERMIT
PERMIT APPLICATION
PRODUCT APPROVAL