Loading...
R24-150 RESOLUTION NO. R24-150 2 3 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, APPROVING THE FINAL RANKINGS FOR REQUEST FOR 5 QUALIFICATIONS (RFQ) NO. CW24-001 FOR GENERAL ENGINEERING 6 CONSULTING SERVICES AS RECOMMENDED BY THE SELECTION 7 COMMITTEES AND AUTHORIZING STAFF TO CONDUCT NEGOTIATIONS 8 WITH THE RECOMMENDED TOP-RANKED PROPOSERS IN EACH OF THE TEN 9 (10) SCOPE CATEGORIES TO ESTABLISH CONTRACTS IN ACCORDANCE 10 WITH SECTION 287.055, FLORIDA STATUTES; PROVIDING AN EFFECTIVE 11 DATE; AND FOR ALL OTHER PURPOSES. 12 13 WHEREAS, on December 19, 2023, pursuant to the Consultants' Competitive Negotiation 14 Act (CCNA), the Procurement division received a total of eighty-one (81) proposals in response to 15 the Request for Qualifications (RFQ) No. CW24-001 for General Engineering Consulting Services. 16 This RFQ was issued seeking qualifications from firms interested in providing general engineering 17 consulting services on an as-needed basis to the City; and 18 WHEREAS, the General Engineering Consulting Services were separated into eleven (11) 19 scope categories: Scope A—Water Plant Modifications, Capacity, and Operation Evaluation; Scope 20 B—Infrastructure Improvements and Evaluations; Scope C —Ancillary Studies and Services; Scope 21 D — Transportation Services; Scope E — Architectural and Design Services, Scope F - 22 Hydrogeological Services; Scope G- Green Infrastructure, Sustainability, and Resiliency Services; 23 Scope H - Geotechnical Services; Scope J - Civil Land Development Consulting Services;and Scope 24 K - Recreation and Parks Services; and 25 WHEREAS, Scope I - Structural Engineering Services was canceled because the City did 26 not receive a sufficient number of proposals; and 27 WHEREAS, after reviewing all proposals in accordance with the evaluation criteria 28 contained in the RFQ, in ten (10) different public meetings, the selection committees scored and 29 ranked the firms and shortlisted the following firms: 30 SCOPE A INITIAL 1ST RANKING Carollo Engineering, Inc. 1st Jacobs Engineering Group, Inc. 2nd Globaltech, Inc. 3rd McKim & Creed 4th CHA Consulting, Inc. 5th McCafferty Brinson Consulting, LLC 6th 31 SCOPE B INITIAL 1ST RANKING Baxter &Woodman, Inc. 1st Kimley-Horn and Associates, Inc. 2nd Carollo Engineering, Inc. 3rd Black& Veatch Corporation Tie (4th) CDM Smith, Inc. Tie (4th) CES Consultants, Inc. 6th 32 SCOPE C INITIAL 1ST RANKING CDM Smith, Inc. 1st Carollo Engineering, Inc. 2nd GHD Services, Inc. 3rd CHA Consulting, Inc. 4th 33 SCOPE D INITIAL 1ST RANKING Kimley-Horn and Associates, Inc. 1st Baxter &Woodman, Inc. 2nd Johnson, Mirmiran & Thompson 3rd The Corradino Group, Inc. 4th 34 SCOPE E INITIAL 1ST RANKING West Architecture + Design, LLC 1st BEA Architects, Inc 2nd CPZ Architects, Inc. 3rd Kanthan Design Corporation 4th 35 SCOPE F INITIAL 1ST RANKING Jacobs Engineering Group, Inc. 1st Hazen and Sawyer 2nd South Florida Engineering and 3rd Consulting 36 SCOPE G INITIAL 1ST RANKING EXP U.S. Services, Inc. 1st GHD Services, Inc. 2nd Baxter &Woodman, Inc. 3rd Chen Moore and Associates 4th 37 SCOPE H INITIAL 1ST RANKING • Colliers Engineering & Design, Inc. 1st Tierra South Florida, Inc. 2nd RADISE International, LC 3rd GFA International, Inc. dba Universal 4th Engineering Sciences 38 SCOPE J INITIAL 1ST RANKING Keith and Associates, Inc. 1st Craven Thompson &Associates, Inc. 2nd Caulfield &Wheeler, Inc. Tie (3rd) HBC Engineering Company Tie (3rd) 39 SCOPE K INITIAL 1ST RANKING Kimley-Horn and Associates, Inc. 1st Miller Legg 2nd Keith and Associates, Inc. 3rd Colliers Engineering & Design, Inc. 4th 40 41 WHEREAS, in accordance with the process outlined in the RFQ, the shortlisted firms and 42 their teams were invited to participate in oral presentations/interviews. Subsequent to the 43 interviews, the selection committees independently re-scored each proposal, including the 44 material presented in the interviews/presentation, and disclosed their final scores for each firm; 45 and 46 WHEREAS, the Committee unanimously voted to accept the scores and rankings based 47 on the final scores. The Final Rankings are as follows: 48 SCOPE A - Water Plant Modifications, FINAL RANKING Capacity&Operational Evaluations Carollo Engineering, Inc. 1st Jacobs Engineering Group, Inc. 2nd McKim & Creed 3rd 49 SCOPE B - Infrastructure Improvements & FINAL RANKING Evaluations CDM Smith, Inc. 1st Carollo Engineering, Inc. 2nd Baxter &Woodman, Inc. 3rd Kimley-Horn and Associates, Inc. 4th 50 SCOPE C - Ancillary Studies and Services FINAL RANKING Carollo Engineering, Inc. 1st CDM Smith. Inc. 2nd 51 SCOPE D - Transportation Services FINAL RANKING Johnson, Mirmiran & Thompson, Inc 1st Kimley-Horn and Associates, Inc. 2nd Baxter &Woodman, Inc. 3rd 52 SCOPE E - Architectural Design Services FINAL RANKING CPZ Architects, Inc. 1 st West Architecture + Design, LLC 2nd BEA Architects, Inc. 3rd 53 SCOPE F - Hydrogeological Services FINAL RANKING Jacobs Engineering Group, Inc. 1st Hazen and Sawyer 2nd South Florida Engineering and 3rd Consulting 54 SCOPE G - Green Infrastructure,' FINAL RANKING Sustainability, and Resiliency Services EXP US 1st GHD Services, Inc. 2nd Chen Moore and Associates 3rd 55 SCOPE H - Geotechnical Services FINAL RANKING Colliers Engineering & Design, Inc. 1st Radise International, LC 2nd Tierra South Florida, Inc. 3rd 56 SCOPE J - Civil Land Development Consulting FINAL RANKING Svs Keith and Associates, Inc. 1st Craven Thompson &Associates, Inc. 2nd Caulfield &Wheeler, Inc. 3rd 57 SCOPE K - Recreation and Parks Services FINAL RANKING Miller Legg 1st Keith and Associates, Inc. 2nd Kimley-Horn and Associates, Inc. 3rd Colliers Engineering & Design, Inc. 4th 58 59 WHEREAS, it was recommended by consensus to prepare an agenda item for the City 60 Commission recommending approval of these rankings and authorization to proceed with 61 negotiating contracts with the highest-ranked firms per scope category; and 62 WHEREAS, the City Commission, upon recommendation of staff, has deemed it to be in 63 the best interests of the citizens and residents of the City to approve the final rankings as 64 recommended by the Selection Committees and authorize staff to conduct negotiations with the 65 recommended top-ranked proposers in each of the ten (10) Scope Categories to establish 66 contracts in accordance with the Request for Qualifications (RFQ) No. CW24-001 for General 67 Engineering Consulting Services and section 287.055, Florida Statutes. 68 69 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON 70 BEACH, FLORIDA, THAT: 71 SECTION 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 72 being true and correct and are hereby made a specific part of this Resolution upon adoption. 73 SECTION 2. The City Commission of the City of Boynton Beach, Florida, does hereby 74 approve the final rankings as recommended by the Selection Committees and authorize staff to 75 conduct negotiations with the recommended top-ranked proposers in each of the ten (10) Scope 76 Categories to establish contracts in accordance with the Request for Qualifications (RFQ) No. 77 CW24-001 for General Engineering Consulting Services and section 287.055, Florida Statutes. 78 SECTION 3. This Resolution shall take effect in accordance with law. 79 80 81 [signatures on following page] 82 PASSED AND ADOPTED this 16th day of July 2024. 83 CITY OF BOYNTON BEACH, FLORIDA 84 YES NO 85 Mayor-Ty Penserga Ab5enk" 86 7 87 Vice Mayor-Aimee Kelley 88V 89 Commissioner-Angela Cruz 90 / 91 Commissioner-Woodrow L. Hay ✓ 92 93 Commissioner-Thomas Turkin -AbSit '- 94 95 VOTE 3-0 96 AT ST: 97ft% 98 --• 1. __�► 99 Maylee •: J- s, MPA, MC Ty 12 , 100 City Clerk Mayr 101 102 --01.-01 WON ‘ APPROVED AS TO FORM: 103 (Corporate Seal) ;'t� ;•QORdr••.F_ k O •c.,0 .4 ..-7 1� 104 ; S /A L :_�, %rib 105 U. TED: $ P!, (l f c if ; 1NCO FORA : i 106 . S• 1g2° : . Shawna G. Lamb 107 •••.•••••••.:P City Attorney FLOW