R24-186 1 RESOLUTION NO. R24-186
2
3 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON
4 BEACH, FLORIDA, AWARDING INVITATION TO BID NO. CS24-037 FOR THE
5 LAKE BOYNTON ESTATES ROAD RESURFACING AND PEDESTRIAN
6 CROSSING PROJECT TO ATLANTIC SOUTHERN PAVING AND
7 SEALCOATING, LLC; APPROVING A CONSTRUCTION CONTRACT WITH
8 ATLANTIC SOUTHERN PAVING AND SEALCOATING, LLC FOR $1,316,712.95
9 PLUS A 10% CONTINGENCY OF $131,671.30 FOR A TOTAL AMOUNT OF
10 $1,448,384.25;AND FOR ALL OTHER PURPOSES.
11
12 WHEREAS, on July 25, 2024, the Procurement Division received and tabulated four (4)
13 proposals for Road Resurfacing and Pedestrian Crossing Project, with a mandatory pre-bid
14 meeting held on May 22, 2024, to review the project with interested and qualified contractors.
15 The scope of work includes providing all labor, materials, and equipment necessary to complete
16 designated paving projects in Lake Boynton Estates. It was determined that this award be
17 recommended to Atlantic Southern Paving and Sealcoating, LLC; and
18 WHEREAS, in 2019, road scoring was performed, and currently the roads are approaching
19 a D condition rating. The road condition will continue to deteriorate, increasing the repair costs;
20 and
21 WHEREAS, the project will include milling and resurfacing, structural road repairs, milling
22 existing distressed pavement and asphaltic pavement, replacing existing asphalt traffic calming
23 features, all thermoplastic pavement markings, signage, and pavement markings to restore the
24 road to an A-scoring rating.
25 WHEREAS, the repairs are for Lake Boynton Estates NW 1st Avenue, W Ocean Avenue,
26 SW 1st Ct., SW 1st Avenue, West Ocean Drive, along with SW 1st, 2nd, and 3rd Avenues, and
27 NW/SW 7th Street; and
28 WHEREAS, the City Commission, upon recommendation of staff, has deemed it to be in
29 the best interests of the citizens and residents of the City to award Invitation to Bid No. CS24-037
30 for the Lake Boynton Estates Road Resurfacing and Pedestrian Crossing project to Atlantic
31 Southern Paving and Sealcoating, LLC, and approve a Construction Contract with Atlantic
32 Southern Paving and Sealcoating LLC for $1,316,712.95 plus a 10% contingency of $131,671.30
33 for a total amount of $1,448,384.25.
34
35 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON
36 BEACH, FLORIDA, THAT:
37 SECTION 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as
38 being true and correct and are hereby made a specific part of this Resolution upon adoption.
39 SECTION 2. The City Commission of the City of Boynton Beach, Florida, hereby awards
40 Invitation to Bid No. CS24-037 for the Lake Boynton Estates Road Resurfacing and Pedestrian
41 Crossing project to Atlantic Southern Paving and Sealcoating, LLC.
42 SECTION 3. The City Commission of the City of Boynton Beach, Florida, hereby approves
43 the Construction Contract for Lake Boynton Estates Road Resurfacing and Pedestrian Crossing
44 Projects with Atlantic Southern Paving and Sealcoating, LLC, for $1,316,712.95 plus a 10%
45 contingency of $131,671.30 for a total amount of $1,448,384.25 (the "Contract"), in form and
46 substance similar to that attached as "Exhibit A."
47 SECTION 4. The City Commission of the City of Boynton Beach, Florida, hereby
48 authorizes the Mayor to execute the Contract and such other related documents as may be
49 necessary to accomplish the purpose of the Contract and this Resolution.
50 SECTION 5. One fully executed original of the Contract shall be retained by the City
51 Clerk as a public record of the City. A copy of the fully executed Contract shall be provided to
52 Michael Dauta to forward to the Vendor.
53 SECTION 6. This Resolution shall take effect in accordance with law.
54 [signatures on following page]
55
56
57
58
59
60
61
62 PASSED AND ADOPTED this g1D day of4
514 2024.
63 CITY OF BOYNTON BEACH, FLORIDA
64 YES NO
65 Mayor—Ty Pensergapph-
66
67 Vice Mayor—Aimee Kelley
68 t
69 Commissioner—Angela Cruz
70
71 Commissioner—Woodrow L. Hay
72 a/
73 Commissioner—Thomas Turkin
74
75 VOTE 9-0
76 ATTE :
77
78 ,�r�•_ 1• .1 A / ' ``l
79 Maylee D= J: MPA, C pr. Ty Penserga
80 City Clerk Mayor
81
82 APPROVED AS TO FORM:
83 (Corporate Seal)
84 85 ,�hlc )% AQ�°�
86 Shawna G. Lamb
87 City Attorney
CONSTRUCTION CONTRACT
LAKE BOYNTON ESTATES ROAD RESURFACING AND PEDESTRIAN
CROSSING PROJECTS
THIS AGREEMENT is entered into by and between the CITY OF BOYNTON BEACH, a municipal
corporation organized and existing under the laws of Florida, with a business address of 100 East Ocean
Ave., Boynton Beach, FL 33435, hereinafter referred to as "CITY", and Atlantic Southern Paving and
Sealcoating, LLC., authorized to do business in the State of Florida, with a business address of 6301 W.
Sunrise Blvd. Sunrise, FL. 33313, hereinafter referred to as the "VENDOR," each a "Party"and collectively
the"Parties."
WHEREAS, the CITY has selected the VENDOR to perform construction services related the Road
Resurfacing and Pedestrian Crossing Projects Lake Boynton Estates; and,
WHEREAS, at its meeting of August 20, 2024, by Resolution No. R24-186 , the CITY
Commission approved this award to VENDOR and authorized the proper CITY officials to execute
this Agreement hereinafter referred to as Contract No.: CS24-037 and used interchangeably with
"contract".
NOW, THEREFORE, CITY and VENDOR, in consideration of the mutual covenants hereinafter
set forth, agree as follows:
Article 1. SCOJ ]fYO (. VENDOR shall furnish all labor, materials, equipment, services and
incidents necessary to perform all "WORK" described in the Contract Documents (as defined in Article 7
below) and related thereto for the Project.
Article 2. .Q11LULTANT. Shall mean the City of Boynton Beach, which has designed the Project and will
assume all duties and responsibilities and will have the rights and authority assigned to CONSULTANT in
connection with the completion of the WORK in accordance with the Contract Documents.
Article 3.StQMIE& I I1114L IERMOINATIQNi LIQUIDATED QBMAGES.
3.1 Con rac lime. I he WORK will be substantially completedwit in LZjQ) [two hundred seventy]
calendar days from the effective date of this Agreement, when the Contract Time commences to run
as provided in paragraph 2.3 of the General Conditions and completed and ready for final payment in
accordance with paragraph 14.9 of the General Conditions within ¢Q calendar days from the date of
Substantial Completion.
3.2 Termination for Convenience. This Agreement may be terminated by CITY for convenience,
upon providing fourteen(14)business days of written notice to VENDOR for such termination. In the
event of termination, VENDOR shall be paid its compensation for services performed until the
termination date, including services reasonably related to termination. In the event that VENDOR
abandons this Agreement or causes it to be terminated, VENDOR shall indemnify CITY against loss
pertaining to this termination.
3.3 Termination for Cause. In addition to all other remedies available to CITY, this Agreement shall
be subject to cancellation by CITY for cause, should VENDOR neglect or fail to perform or observe
any of the terms, provisions, conditions, or requirements herein contained, if such neglect or failure
shall continue for a period of thirty(30)days after receipt by VENDOR of written notice of such neglect
or failure.
3.4 Liquidated Damages. The CITY and VENDOR recognize and acknowledge that time is of the
essence of this Contract and that the CITY will suffer financial loss if the WORK is not completed
within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance
with Article 12 of the General Conditions. Each of the parties acknowledges that it has attempted to
quantify the damages which would be suffered by the CITY in the event of the failure of VENDOR to
perform in a timely manner, but neither one has been capable of ascertaining such damages with
certainty. CITY and VENDOR also recognize and acknowledge the delays, expense, and difficulties
involved in proving in a legal preceding the actual loss suffered by the CITY if the WORK is not
completed on time. Accordingly, instead of requiring any such proof, the CITY and VENDOR agree
that as liquidated damages for delay (but not as a penalty) VENDOR shall pay the CITY, One
Thousand Dollars ($1,000.00) for each day of that expires after the time specified in paragraphs
3.1 for substantial completion until the WORK is substantially complete. After Substantial
Completion, if VENDOR shall neglect, refuse or fail to complete the remaining WORK within the
Contract Time or any proper extension thereof granted by the CITY, VENDOR shall pay CITY Two
Hundred and Fifty Dollars [$250.00] for each day that expires after the time specified in paragraph
3.1 for completion and readiness for final payment.
Article 4. CONTRACT PRICE.
CITY shall pay VENDOR, for the faithful performance of the Contract, in lawful money of the United States
of America, and subject to the additions and deductions as provided in the Contract Documents, a total
sum as follows:
Based on the Contract prices shown in the Bid Form submitted to the CITY as subsequently revised
and as stated herein, a copy of such Bid Form being a part of the Contract Documents, the aggregate
amount of this Contract (obtained from either the lump sum price, the application of unit prices to the
quantities shown in the Bid Form or the combination of both) not to exceed:
One Million Three Hundred and Sixteen Thousand Seven Hundred and Twelve Dollard and Ninety Five Cents $1,316,712.95
(Written) (Numerical)
Article 5.PAYMENT PROCEDURES.
VENDOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions
CITY will process Applications for Payment as provided in the General Conditions.
1.1 Progress Payments. CONTRACT may submit an Application for Payment as recommended by
CONSULTANT, for WORK completed during the Project at intervals of not more than once a month.
All progress payments will be on the basis of the progress of WORK measured by the schedule of
values established in Paragraph 2.9.1 of the General Conditions and in the case of Unit Price Work
based on the number of units completed or, in the event there is no schedule of values, as provided
in the General Requirements.
1.2 Prior to Substantial Completion progress payments will be made in an amount equal to 90% of
WORK completed, but, in each case, less the aggregate of payments previously made and less such
amounts as CONSULTANT shall determine, or CITY may withhold, in accordance with paragraph
14.5 of the General Conditions.
1.3 VENDOR shall submit with each Application for Payment, an updated progress schedule
acceptable to the CITY and a Warranty of Title/Release of Liens relative to the Work that is the
subject of the Application. Each Application for Payment shall be submitted to the CITY for approval.
The CITY shall make payment to the VENDOR within thirty (30) calendar days after approval by the
CITY of VENDOR'S Application for Payment and submission of an acceptable updated progress
schedule.
1.4 Five percent (5) of all monies earned by the VENDOR shall be retained by the CITY until Final
Completion of the construction services purchased(defined as that point at which one hundred (100)
percent of the construction of the work as defined in the Contract Schedule of Values has been
performed under the contract by the VENDOR) has been reached and acceptance by CITY.
1.5 The CITY may withhold, in whole or in part, payment to such extent as may be
necessary to protect itself from loss on account of:
a. Defective Work not remedied.
b. Claims filed or reasonable evidence indicating probable filing of claims by other parties
against VENDOR.
c. Failure of VENDOR to make payments properly to
SUBCONTRACTORS or for material or labor.
d. Damage to another VENDOR not remedied.
e. Liquidated damages and costs incurred by the CITY for extended construction
administration.
f. Failure of VENDOR to provide any document(s) required by the Contract Documents.
When the above grounds are removed or resolved or VENDOR provides a surety bond or consent of
Surety, satisfactory to the CITY, which will protect the CITY in the amount withheld, payment may
be made in whole or in part
1.6 Final Payment. Upon final completion and acceptance of the WORK in accordance with
paragraph 14.10 of the General Conditions, CITY shall pay the remainder of the Contract Price as
recommended by CONSULTANT as provided in paragraph 14.10.
1.7 All payments shall be governed by the Local Government Prompt Payment Act, as set forth in
Part VII, Chapter 218, Florida Statutes.
Article 6. RETAINAGE.
Within 30 calendar days after reaching the earlier of substantial completion or beneficial occupancy, the
City/Owner and the Vendor will inspect the work and develop a punch list covering those items required to
render complete, satisfactory, and acceptable construction services purchased by the City/Owner. The punch
list will include a schedule of values that provides the estimated cost to complete each item on the punch list. If
the City/Owner and Vendor are unable to agree on an item or value, the City/Owner has final discretion whether
to include an item and the amount for valuation of the cost to complete each item on the punch list. Within 20
business days after the creation of the punch list, the remaining contract balance, including retainage, will be
paid to the Vendor less an amount equal to 150 percent of the cost to complete the items on the punch list.
Upon reaching final acceptance for an item or all items, the 150 percent withheld for each item will be released
with final payment. For projects valued at $10 million or more, the 30-calendar day period may be extended to
45 calendar days.
Article 7. CONTRACTOR GUARANTEE,
VENDOR warrants all work, materials, and equipment shall be free from damages and/or defects owing
to faulty materials or workmanship for a period of one (1)year after completion of the WORK covered by
this Contract. The VENDOR, free of all costs to the CITY, shall replace any part of the equipment,
materials, or work included in this Contract, which proves to be defective by reason of faulty materials,
damages, and/or workmanship within twelve (12) month period.
Article 8.CONTRACT DOCUMENTS.
The Documents hereinafter listed shall form the Contract and they are as fully a part of the Contract as
if attached hereto:
8.1 Request for Bid
8.2 Instructions to Proposers/ Bidders
8.3 Proposal Forms (including the Proposal, Schedule(s), Submission Requirements of Proposer/
Bidder, and all required certificates, affidavits, and other documentation)
8.4 Contract
8.5 VENDOR's Bid Bond, Performance, and Payment Bond
8.6 General Conditions for Construction
8.7 Special Terms and Conditions
8.8 City Construction Standards and Details (available online at: https.//www boynton-
beach orq/engineerinq/new-construction-department-public-works-engineering-division )
8.9 Attachment"A"— Neighborhood Site Plan—Bid Set/Drawings
8.10 Attachment"B"— Loop Road — Bid Set/Drawings
8.11 Attachment"C"—Ocean Drive - Bid Set/Drawings
ARTICLE 9. NOTICE,. All notices required in this Contract shall be sent by certified mail, return receipt
requested, and if sent to CITY shall be mailed to:
Daniel Dugger, City Manager
City of Boynton Beach
100 East Ocean Ave,
Boynton Beach, FL 33435
Telephone No. (561) 742-6000
And if sent to the VENDOR shall be mailed to:
(Atlantic Southern Paving
6301 W.Sunrise Blvd.
Sunrise,Fl.33313
Article 10.INDEMNITY.
10.1 The VENDOR shall indemnify and hold harmless the CITY and its officers, employees,
agents, instrumentalities, and the State of Florida, Division of Emergency Management
from liability, losses or damages, including attorneys' fees and costs of defense through
the conclusion of any appeals, which the CITY or its officers, employees, agents or
instrumentalities may incur as a result of claims, demands, suits, causes of actions or
proceedings of any kind or nature arising out of or resulting from the negligence,
recklessness, or intentional wrongful misconduct of VENDOR, its employees, agents,
partners, principals or subcontractors during the term of this Agreement or resulting
thereafter. The VENDOR shall pay all claims and losses in connection therewith and shall
investigate and defend all claims, suits or actions of any kind or nature in the name of the
CITY, where applicable, including appellate proceedings, and shall pay all costs,
judgments, and attorneys' fees which may issue thereon. The VENDOR expressly
understands and agrees that any insurance protection required by this Agreement or
otherwise provided by the VENDOR shall in no way limit the responsibility to indemnify,
keep and save harmless and defend the CITY or its officers, employees, agents and
instrumentalities as herein provided.
10.2 VENDOR's aggregate liability pursuant to this indemnification provision shall not exceed one
and one-half (1 1/2) times the contract price or One Million Dollars ($1,000,000) per
occurrence, whichever is greater.
10.3 Upon completion of all services, obligations and duties provided for in this Agreement, or in
the event of termination of this Agreement for any reason, the terms and conditions of this
Article shall survive indefinitely.
10.4 CITY reserves the right to select its own legal counsel to conduct any defense in any such
proceeding and all costs and fees associated therewith shall be the responsibility of
VENDOR.
10.5 Nothing contained herein is intended nor shall be construed as a contractual waiver of the
CITY's rights, limits, and immunities under the common law or Section 768.28, Florida
Statutes, as may be amended from time to time, nor a waiver of any defense the CITY
may have and shall not be construed as consent to be sued by third parties based on any
claims arising under this Contract. VENDOR and CITY agree that any liability of the CITY
under this Contract shall be limited to the amounts set forth in Sec. 728.68, Florida
Statutes.
Article 11.REIMBURSEMENT OF CONSULTANT EXPENSES.
Should the completion of this Contract be delayed beyond the specified or adjusted time limit, VENDOR
shall reimburse the CITY for all expenses of consulting and inspection incurred by the CITY during the
period between said specified or adjusted time and the actual date of final completion. All such expenses
for consulting and inspection incurred by the CITY will be charged to the VENDOR and be deducted from
payments due VENDOR as provided by this Contract. Said expenses shall be further defined as
CONSULTANT charges associated with the construction contract administration, including resident
project representative costs.
Article 12. FLORIDA'S PUBLIC RECORDS LAW,
The CITY is a public agency subject to Chapter 119, Florida Statutes. The VENDOR shall comply with
Florida's Public Records Law. Specifically, the VENDOR shall:
1.1 Keep and maintain public records required by the CITY to perform the service;
1.2 Upon request from the CITY's custodian of public records, provide the CITY with a copy
of the requested records or allow the records to be inspected or copied within a reasonable
time at a cost that does not exceed the cost provided in Chapter 119, Florida Statue or as
otherwise provided by law;
1.3 Ensure that public records that are exempt or that are confidential and exempt from public
record disclosure requirements are not disclosed except as authorized by law for the
duration of the contract term and, following completion of the contract, VENDOR shall
destroy all copies of such confidential and exempt records remaining in its possession
once the VENDOR transfers the records in its possession to the CITY; and,
1.4 Upon completion of the contract, VENDOR shall transfer to the CITY, at no cost to the
CITY, all public records in VENDOR's possession. All records stored electronically by
VENDOR must be provided to the CITY, upon request from the CITY's custodian of public
records, in a format that is compatible with the information technology systems of the
CITY.
12.5 IF THE VENDOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES,
TO THE VENDOR'S DUTY TO PROVIDE PUBLIC
RECORDS RELATING TO THIS CONTRACT, CONTACT
THE CUSTODIAN OF PUBLIC RECORDS:
CITY CLERK'S OFFICE
100 E. OCEAN AVENUE
BOYNTON BEACH, FLORIDA 33435
561-742-606
CityClerk(c�bbfl.US
Article 13.E-VERIFY,
13.1 CONTRACTOR certifies that it is aware of and complies with the requirements of
Section 448.095, Florida Statutes, as may be amended from time to time and briefly
described herein below.
13 1.1 Definitions for this Section:
A. "Contractor" means a person or entity that has entered or is attempting to enter into
a contract with a public employer to provide labor, supplies, or services to such
employer in exchange for a salary, wages, or other remuneration. "Contractor"
includes, but is not limited to, a vendor or consultant.
B. "Subcontractor" means a person or entity that provides labor, supplies, or services
to or for a contractor or another subcontractor in exchange for a salary, wages, or
other remuneration.
C. "E-Verify system" means an Internet-based system operated by the United States
Department of Homeland Security that allows participating employers to
electronically verify the employment eligibility of newly hired employees.
13.1.2 Registration Requirement; Termination: Pursuant to Section 448.095, Florida
Statutes, effective January 1, 2021, Contractors, shall register with and use the E-
Verify system in order to verify the work authorization status of all newly hired
employees. Contractor shall register for and utilize the U.S. Department of
Homeland Security's E-Verify System to verify the employment eligibility of:
A. All persons employed by a Contractor to perform employment duties within Florida
during the term of the contract; and
B. All persons (including sub-vendors/sub-consultants/sub-contractors) assigned by
Contractor to perform work pursuant to the contract with the City of Boynton Beach.
The Contractor acknowledges and agrees that registration and use of the U.S.
Department of Homeland Security's E-Verify System during the term of the contract
is a condition of the contract with the City of Boynton Beach; and
C. The Contractor shall comply with the provisions of Section 448.095, Fla. Stat.,
"Employment Eligibility," as amended from time to time. This includes, but is not
limited to registration and utilization of the E-Verify System to verify the work
authorization status of all newly hired employees. Contractor shall also require all
subcontractors to provide an affidavit attesting that the subcontractor does not
employ, contract with, or subcontract with, an unauthorized alien. The Contractor
shall maintain a copy of such affidavit for the duration of the contract. Failure to
comply will lead to termination of this Contract, or if a subcontractor knowingly
violates the statute, the subcontract must be terminated immediately. Any
challenge to termination under this provision must be filed in the Circuit Court no
later than twenty (20) calendar days after the date of termination. Termination of
this Contract under this Section is not a breach of contract and may not be
considered as such. If this contract is terminated for a violation of the statute by
the Contractor, the Contractor may not be awarded a public contract for a period of
one (1) year after the date of termination.
Article 14. PROHIBITION AGAINST CONSIDERING SOCIAL, POLITICAL OR IDEOLOGICAL
INTERESTS IN GOVERNMENT CONTRACTING -- F.S. 287.05701.
VENDOR is hereby notified of the provisions of section 287.05701, Florida Statutes, as
amended, that the CITY will not request documentation of or consider VENDOR's social,
political, or ideological interests when determining if the VENDOR is a responsible
VENDOR VENDOR is further notified that the CITY's governing body may not give
preference to a Vendor based on the VENDOR's social, political, or ideological interests.
Article 15. SCRUTINIZED COMPANIES,
By execution of this Agreement, VENDOR certifies that VENDOR is not participating in a
boycott of Israel. VENDOR further certifies that VENDOR is not on the Scrutinized Companies
that Boycott Israel list, not on the Scrutinized Companies with Activities in Sudan List, and not
on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or has
VENDOR been engaged in business operations in Syria. Subject to limited exceptions
provided in state law, the CITY will not contract for the provision of goods or services with any
scrutinized company referred to above. Submitting a false certification shall be deemed a
material breach of contract. The CITY shall provide notice, in writing, to the VENDOR of the
CITY's determination concerning the false certification. VENDOR shall have five (5) calendar
days from receipt of notice to refute the false certification allegation. If such false certification is
discovered during the active contract term, the VENDOR shall have ninety (90) calendar days
following receipt of the notice to respond in writing and demonstrate that the determination of
false certification was made in error. If the VENDOR does not demonstrate that the CITY's
determination of false certification was made in error then the CITY shall have the right to
terminate the contract and seek civil remedies pursuant to Section 287.135, Florida Statutes,
as amended from time to time.
Article 16. COVENANT AGAINST CONTINGENT FEES.
The VENDOR warrants that it has not employed or retained any company or person, other than a
bona fide employee working solely for the VENDOR, to solicit or secure this Agreement, and that
VENDOR has not paid or agreed to pay any company or person, other than a bona fide employee
working solely for the VENDOR any fee,commission, percentage, brokerage fee, gifts, or any other
consideration contingent upon or resulting from the award or making of this Agreement. For breach
or violation of this warranty, the CITY shall have the right to annul this Agreement without liability
or, in its discretion to deduct from the contract price or consideration, or otherwise recover, the full
amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee.
Article 17. TRUTH IN NEGOTIATION CERTIFICATE.
17.1 Execution of this Agreement by the VENDOR shall act as the execution of a truth-in-
negotiation certificate certifying that the wage rates and costs used to determine the
compensation provided for in this Agreement is accurate, complete, and current as of the
date of the Agreement and no higher than those charged to the VENDOR's most favored
customer for the same or substantially similar service.
17.2 The said rates and cost shall be adjusted to exclude any significant sums should the CITY
determine that the rates and costs were increased due to inaccurate, incomplete, or non-
current wage rates or due to inaccurate representations of fees paid to outside vendors.
The CITY shall exercise its rights under this "Certificate" within one (1) year following
payment.
Article 18.MISCELLANEOUS.
18.1 Any and all legal action necessary to enforce the terms of this Agreement shall be
governed by the laws of the State of Florida. Any legal action arising from the terms of
this Agreement shall be submitted to a court of competent jurisdiction located exclusively
in Palm Beach County.
18.2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the party
sought to be bound; and specifically but without limitation, moneys that may become due
and moneys that are due may not be assigned without such consent(except to the extent
that the effect of this restriction may be limited by law), and unless specifically stated to
the contrary in any written consent to an assignment no assignment will release or
discharge the assignor from any duty or responsibility under the Contract Documents.
18.3 City and VENDOR each binds itself, their partners, successors, assigns and legal
representatives to the other party hereto, their partners, successors, assigns and legal
representatives in respect of all covenants, agreements and obligations contained in the
Contract Documents.
18.4 In the event that either party brings suit for enforcement of this Agreement, each party
shall bear its own attorney's fees and court costs, except as otherwise provided under
the indemnification provisions set forth herein above.
18.5 Prior to final payment of the amount due under the terms of this Agreement, to the extent
permitted by law, a final waiver of lien shall be required to be submitted by the VENDOR,
as well as all suppliers and subcontractors whom worked on the project that is the subject
of this Agreement. Payment of the invoice and acceptance of such payment by VENDOR
shall release City from all claims of liability by VENDOR in connection with this
Agreement.
18.6 At all times during the performance of this Agreement, VENDOR shall protect CITY's
property from all damage whatsoever on account of the work being carried on under this
Agreement.
18.7 It shall be the VENDOR's responsibility to be aware of and comply with all statutes,
ordinances, rules,orders, regulations and requirements of all local, city, state, and federal
agencies as applicable.
18.8 This Agreement represents the entire and integrated agreement between City and
VENDOR and supersedes all prior negotiations, representations or agreements, either
written or oral. This Agreement is intended by the parties hereto to be final expression of
this Agreement, and it constitutes the full and entire understanding between the parties
with respect to the subject hereof, notwithstanding any representations, statements, or
agreements to the contrary heretofore made. In the event of a conflict between this
Agreement, the solicitation and the VENDOR's bid proposal, this Agreement shall govern
then the solicitation, and then the bid proposal.
18.9 This Agreement will take effect once signed by both parties. This Agreement may be
executed by hand or electronically in multiple originals or counterparts, each of which
shall be deemed to be an original and together shall constitute one and the same
agreement. Execution and delivery of this Agreement by the Parties shall be legally
binding, valid and effective upon delivery of the executed documents to the other party
through facsimile transmission, email, or other electronic delivery.
Article 19. DEFAULT OF CONTRACT&REMEDIES.
19.1 Correction of Work. If, in the judgment of CITY, work provided by VENDOR does not
conform to the requirements of this Agreement, or if the work exhibits poor workmanship,
CITY reserves the right to require that VENDOR correct all deficiencies in the work to
bring the work into conformance without additional cost to CITY, and/or replace any
personnel who fail to perform in accordance with the requirements of this Agreement.
CITY shall be the sole judge of non-conformance and the quality of workmanship.
19.2 Default of Contract. The occurrence of any one or more of the following events shall
constitute a default and breach of this Agreement by VENDOR:
19.2.1 The abandonment of the project by VENDOR for a period of more than seven
(7) business days.
19.2.2 The abandonment, unnecessary delay, refusal of, or failure to comply with any
of the terms of this Agreement or neglect, or refusal to comply with the
instructions of the CITY's designee.
19 2.3 The failure by VENDOR to observe or perform any of the terms, covenants, or
conditions of this Agreement to be observed or performed by VENDOR, where
such failure shall continue for a period of seven (7) calendar days after written
notice thereof by CITY to VENDOR; provided, however, that if the nature of
VENDOR's default is such that more than seven (7) calendar days are
reasonably required for its cure, then VENDOR shall not be deemed to be in
default if VENDOR commences such cure within said seven (7) calendar day
period and thereafter diligently prosecutes such cure to completion.
19.2,4 The assignment and/or transfer of this Agreement or execution or attachment
thereon by VENDOR or any other party in a manner not expressly permitted
hereunder.
19.2.5 The making by VENDOR of any general assignment or general arrangement for
the benefit of creditors, or the filing by or against VENDOR of a petition to have
VENDOR adjudged a bankruptcy, or a petition for reorganization or arrangement
under any law relating to bankruptcy (unless, in the case of a petition filed against
VENDOR, the same is dismissed within sixty (60) days); or the appointment of
a trustee or a receiver to take possession of substantially all of VENDOR's
assets, or for VENDOR's interest in this Agreement, where possession is not
restored to VENDOR within thirty (30) days; for attachment, execution or other
judicial seizure of substantially all of VENDOR's assets, or for VENDOR's
interest in this Agreement, where such seizure is not discharged within thirty (30)
days.
19.3 Remedies in Default. In case of default by VENDOR, CITY shall notify VENDOR, in
writing, of such abandonment,delay, refusal, failure, neglect, or default and direct VENDOR
to comply with all provisions of the Agreement. A copy of such written notice shall be mailed
to the Surety on the Performance Bond. If the abandonment, delay, refusal, failure, neglect
or default is not cured within seven (7) days of when notice was sent by CITY, CITY may
declare a default of the Agreement and notify VENDOR of such declaration of default and
terminate the Agreement. The Surety on the Performance Bond shall within ten (10) days
of such declaration of default, rectify or cause to be rectified any mismanagement or breach
of service in the Agreement and assume the work of VENDOR and proceed to perform
services under the Agreement, at its own cost and expense.
19.3.1 Upon such' declaration of default, all payments remaining due VENDOR at the
time of default, less all sums due CITY for damages suffered, or expenses
incurred by reason of default, shall be due and payable to Surety. Thereafter the
Surety shall receive monthly payments equal to those that would have been paid
by the VENDOR had the VENDOR continued to perform the services under the
Agreement.
19.3.2 CITY may complete the Agreement, or any part thereof, either by day labor, use
of a subcontractor, or by re-letting a contract for the same, and procure the
equipment and the facilities necessary for the completion of the Agreement, and
charge the cost of same to VENDOR and/or the Surety together with the costs
incident thereto to such default.
19.3.3 In the event CITY completes the Agreement at a lesser cost than would have been
payable to VENDOR under this Agreement, if the same had been fulfilled by
VENDOR, CITY shall retain such differences. Should such cost to CITY be
greater, VENDOR shall pay the amount of such excess to the CITY.
19.3.4 Notwithstanding the other provisions in this Article, CITY reserves the right to
terminate the Agreement at any time,whenever the service provided by VENDOR
fails to meet reasonable standards of the trade after CITY gives written notice to
the VENDOR of the deficiencies as set forth in the written notice within fourteen
calendar(14) days of the receipt by VENDOR of such notice from CITY.
"This Agreement will take effect once signed by both parties. This Agreement may be signed by
the parties in counterparts, whether signed physically or electronically, which together shall constitute one
and the same agreement among the parties. A facsimile signature shall constitute an original signature for
all purposes."
IN WITNESS WHEREOF, the parties have hereunto set their hands and seals on the day and year
set forth below their respective signatures.
CITY OF BOYNTON BEACH ATLANTIC SOUTHERN PAVING AND
- _ SEALOqTFNG, LLC •
(it);(L(2_
l9f201- .-.:.,-----7-
ki'Ty Penserga,Mayor (Signature),Company
Date: V.20 J aoZ y Terry Smith
Print Name of Authorized Official
COO
Title
7/31/2024
Date
(Corporate Seal)
Attest/Authenticated:
"-!,
—ter.
Witn--s
-illy Gustin
Print Name
Appr ved as to Form
4a 3, 6
Office of the City Attorney
(
Attested/A,th- -to•
I .----
Maylee D-J- ,s, City Cler ;-`"'' ``•
, BOY T �,
N
�0••ORP••• 0.4„
,..,,_,....c,....,,„...0.4„,
.:SEi oR�Te'�r t'
I NC�RPpT I L '=i
I 1 g2Q ATEo:
kk (OR(DPA '
City of Boynton Beach
EXHIBIT A
Neighborhood Site Plan — Bid
Set/Drawings
" Gt" *. rb0141.1 - ■ • ". IR- _ Js PROJECT SCOPE
existinga1/2"/Repave
tSCOPE:
p ve Type s Bl-v1z Th.
- -
` as • Re-rock,level and restore crown&EOP elevations
_
-4,
Bo ton 7 Elewewnl�iiairl. , 4/ 1:rer_.
T •is pel,v; e 9°"• '`° r 1 ir y r ��, cow Re-rock poorly repaired utility cuts&distressed pavement
v y s.', 0 _ _ ' locations identified on the exhibit
__� + ; , NW11 st Aver '•,!;;.,....:!:1.. -" i � Restore roadway edge condition by extending rock base
4 _ NW 1St Avej "
♦ .1, r- R Z (6"min-x 6"Dp)beyond new EOP prior to new
r
1JtI 'ooe1 , . _{ "t'; ,_, .Tt.. - ,i,. �_ 1r' - ' pavement construction
7"��+8 r' ¢ -ice._,-'-r • _ �- .. ,
s •',,,':t�1'` ` v`�- iiJ4 ~ +'JC'-10,-�a .:r4 Ai . tr� : En, 1
umeel ne ontailsr swalestidthsma BBStd
. _ -Mat 1 �4,1*
ocean ve .�, g°�, 'fir ti 'pot 9 9 ( Y rY)
n � 1w a
r` r c-� g�
� �'j �J�-,�� ralr� {� L� � - ���` `y� Place new 1 1/2"Th Type S-III Asphalt pavement
41
'-` L # W +i ,f--g --.* w,r,_-r- fir- • BT ,i,i Remove damaged sidewalk add fill compact and place
{rri X44 �(.,,1,,i ,y. '] new concrete sidewalk
t.' .••. , . 6 `J.4:110 "" ""`.. '� 7a t!�..T '` ,.• , �"l Jif:dr. 1'" �, e'er
♦ S• t(,C'�t,Boy tort
�(gr .. t4w� a l et_., tir'\ I Construct new proposed sidewalk
•
,Beacr F 34-.* rdl, { j � t r
B , ,w,. - ( Construct new concrete ramps to meet ADA
+� • \ --, r?"-,.-�' `t Install ADA Tactile Warning Mats
. --1 f ,rlaf - +r"' ", ,, 1s 4. fl'• n, "`a� t -, i
- }_4L 7 - 1 1 , Restore/replace all sod in disturbed areas from sidewalk
..F SW tat Ave_ SW 1st Ave .� G e Pa. { +n= _ -I-' D .r
r #.' p►;t M r .^ replacement,new sidewalk,and contoured swale
7 rl, ... r lir S rill 1J ,r-.� 's
l..r�--4 • ' g p�.� �g "dam, , rt.:-s { locations
° . r r ' ' <``r-_ gg.--`'^- ".�' - ;� ,ro R•
> See sheet 12 of 12 for CBB Std Details
* � t., �$ " , ,' - F! All newproposed ADA Ramps
r
' ��- 5'W
•
Ocean Orr kW Ocean Dr Trar .I,Yxf'IC �_
';
` A Furnish install pavement markings as indicated
, Inb:;117 101.M� . . r1011 , Jr-.� y"� l ' 1 conforming to PB Co.Std TP-21
e f : ��.. .' 4 i, I 4 W 7 , , iQ?,,crdAr. r.;,,0 ,- LI; SYMBOLS LEGEND:
.T - 114 I, .' ! 4 .' ', , .� ' . iii'' _ ,:,
- 11 Oil . .� - ` + - , till. • Sidewalk Repair location Specified Area for
irst -li - 7 II •-,, - .iii=,#wii .....7211114---F ••'r'i--, ` t "Base"Repair
} cif '.1 7 _�7 i, v C - ' 7 '' , . i) t► ,Thr,„,--4W' _`TA '' New Sidewalk Location for
w
7 trip 7•_it1 t E • r. .....wiT r .. � t ` S d Ik L t I""Edge"Repair
* " -I`'"11- _ .-1 Th - -1-1 7"O`' ► h i : 4 'ill ; n ADA Tactile WarninMat
9
Specified Area for
(-----)Swale Contouring
-
Sheet Key - Task 146 - Lake Boynton Estates DemD Only Sidewalk
north
4
NI,
fs furnish 8 install ' ".°
Construct new 4" 1 new tactile warning r Existing sidewalk 8
sr.e«nro cow v ya _ -.a- Remove exlsbng intersecting ramps Trees removed prev �.•'` A c ".
sidewalk 4 x 56 connect I I construct radius at sidewalk - •"t
to seating n/s sidewalk ( - 'i'intersection w/new ADA ramp& - I
Construct new 4' tactile warning mat Construct new 4" • ;* ADP hon-C-
sidewalk 4 x 93 x .. "'"- 9 ".7411* - sidewalk 4 x 600' as ,X^ I ;n
1,t
r .0 L y..- •.s. ,- • II
•
NW 9(31=N W 1 '•?.w�
.a I d Furnish/Install 1 new �� R mlSNlnsfall nev.
Stop ba 20'Dbl Vlw Z 111
,> Stop bar,20'17 D
'ng curb R 4 PPM:,'i'''' f• •Z f* Furnish/Install new �ti (1 8 4 RPMs(tyv . <
• - - Stop bar,20'Dbl Vlw J rT, I' .n. CD
- ,-'.0 Bee's.'I n* 8,4RPMs(typ.) •P ; - ;new 4 _ ( {
....5
..
fay .� ,,,K 4 x 233' e",,,,-_it -
Construct new street Construct -:dewalk Existing s/w.ramp 'N -- rr• Construct new 4" Extend base 6- at dnveways) 3 )
termination as per CBI- 4 x 100(6' veways) &ADA mat OK sidewalk 4 x 200 beyond EOP bo _. '
Std Engrg Detail"P-13J connect to exsltn nIs 6'at driveways) •
9 ,� ( sides of road e}.. -
sidewalk _ r
Z '1 (typ.-all) R . q.
411.r
NW 1 rst Ave
-------------------------------------------------------------------------------------------------------------------------------- - - - - 4-
i. j I
'•' _ - '- _ 4x} ax5 Ir Repair base End of new
ADA Location-OK Repair base e;` "'_ Repair base I►' "_ at utility cut pavement
' at utility cut --- -- at utility cut x, "� 8 20
4x20 _ 10 x18 • ? ° F ``'8 4x8 (NW 1st Ave)
Furnish/Install new )• 4 /,' 4x4
Stop bar,20'Dbl Vlw - xM t, a i t J �R
` � ••-. �` ICS24-037 Lake Boynton Estates
e.d •'�Y 84 RPMs(typ.) _ a w�vas"r.**biM lSW.e AWw o.M
wY _
'' •r�{-s�+w. W NW , .. -- cv Ivrea.
Construct new 508 ; i"' 't AV(' ��-_-
ramp 8 ADA Mat NO..., _.Si
..� ..., ih ®
I ' Construct new 4x6
sidewalk 4'W x 150' 4x6 ® "- 4x5 ) ym"`°'"'- -'��'
- 0 - - a' I Fuor h/lnstall new
✓: - Extend base 6'beyond
- 4x8 F.; LteY°cr
nd base 6"Dand Stop bar,20'Dbl Vlw
1 f' y Remove existing .- _f` 1 4x8 tons(typ.-all) 3, .!
.....r" ..
__ I+ ,(. . sidewalk 4W x 60• t� 'r, "sip r�� �wr ml.
NWilrst Ave ".. R"...,
Ir. =...............7
I match line=NW 1 rst Ave 1a!ea!our
swale to reflect ,
modified detail"D-14 — �,- �
Mod"as per previous -- �--'-
addendum .•,,' '-'-' •"p 11—
Task 146 - Lake Boynton Estat- _ (5.28.24 CF) y--=-"1 ,MON EM0041111•0 MTN 2
V(ovMoN SWALE REPLAC9.BR DETAIL
Remove existing intersecting ramps
construct radius at sidewalk f♦■
Alk
intersection and construct new ADA ry
ramp w/mat(6 a 8)as shown(4 /
�Y Furnish/Install new - - -•
locations-ryp)
Extend base 6"beyond • ", Stop bar,20'Dbl Ylw Furnish/Install new 4 x 16 I L •..'" L' -
EOP x 6"Th(typ.-all / can 4 8 4 RPMs(typ.) Stop bar,20'Dbl Ylw Construct new 4" iT' _
edge repair locations) ' ----+ &4 RPMs(typ.) -.• i 4 x 6 sidewalk 4 x 170 _ k _ <-• �J3!
fRemove existing and construct Remove existing and construct ' l'..41 (6•) (6"at driveway= ,
'.'r new 4x30iipe'sidewalk(4") ' S new 4'x20'sidewalk(4") _ ?+" \ c s .;
4
_ mr
1010 -
.. .-rt i� ve v
ES L0. ll/,vc t W Occan A_,
1 urib
7 :-..w-.r����� r_. ' ,�L 11 ^.,'�, 4umish/Install new
' l ,-< s ,.' ■ Stop bar,20'Dbl Ytw
Construct new street _.._ - rix Remove existing and constr. ,. t •x 'r 1.i -. l 4 RPMs(typ.)
termination as per CBB - 1'" new 4'030'sidewalk(4"1 @ _,
a 1 'G
Std EngYg Detail"P-8 ', axe(s^}2 i ry s: r.,• 1 ,. L 1010. ' d " °. construct newOD : —
WI
locations 17- Remove existing intersecting ray c1 ._ sidewalk 4 z 50 •O3
�' 1 ;^ construct radius at sidewalk
Fumish/Install i Remove existing and construct - intersection w/new ADA ram mp& 4 0 6
3ea.-case 2 ' new 4'x10'sidewalk(4") - - by mat(4 locations denote "blue" (6") ?•,j,to� Remoe existing and construct
red @ 4'c.t.c - 1 to new pavement surface , / _ ellipse S � new 4'x20'sidewalk(4")
♦ -m
O
West Ocean Ave .=
.a
-m
Extend base 6"beyond Extend base 6"beyond Ai
1 construct new a' ICI
EOP x 6 Th(typ.-all bAH
Furnish/Install EOP x 6"Th(typ-all r'
Z sidewalk 4 x 170 edge repair locations) f
new Stop bar, edge repair locations) -.
3 L (6'at driveways) "
r
Ol 4 20'Dbl Vlw& - COI a,
.� 1010._V 1010 RPMs(typ) •. -C -. - :..r ye _e r.'. I ♦' •4.
IN4. �.4' ,1010. can sr "'"- ,..rr xa.� ■? ... _ 1:'ifSi4
to ee _ rwa ':W10cean
n -
i1 ,10.11 _
XO . 1'
t.
ill
tD ® y tar{
0e�rY (( Grade/re-contour swain to refelct
• �;` y� , BO: to Be 'e oval "�4 ^ CBB Std Engrg Detail D-13 8 ♦ :,r+s�.�
tD �J r 40 _ ; Y _�• ._ re-sod with like type grass
• � "10,10.- ' 1010..
•
Remove existing intersecting ramps I Grade/re-contour swain to refelct
a construct radius at sidewalk —CBB Std Engrg Detail D-13&
■ intersection and construct new ADA re-sod with like type grass
,amp w/mat(5 x 101 as shown
West Ocean Ave
Task 146 - Lake Boynton Estates 3
Ni
N A..... ,•
. Furnish/Install new # Y `" _
Y .� - I FuStop bar,20'Dbl Vlw "
?,s Remove existing intersecting ramps &4 RPMs(typ.)
'p 1 ) 1 -construct radius at sidewalk _ 1
, e.g+,.i _:intersection (NIC construct new ADA 1 f'(,....r r' _
"ay.�� f i �' ramp w/mat(5 x 6)as shown ; - 7
Kr - (typ.-all)) 1 i I 1:11 4x4
• yb4-1^�(,t' f'(
'• . •0 e a.1 I rr" !fr..' . '4 I It:,:*,,4 .
T _ U 4x16 repair to correct
' ( slope for ADA ramp I t
transition/compliance
slpefr ADA
•Mil Lamps of New 4x10 iv 1
Construe new sheet - Pavement 1
transition for newly - - ?- +i
r"'` Furnish/Install new " - 4x10 repair to correct ; ,�,,.
constructed loop road" , f slope for ADA ramp _ -----
connecting to to SW 1st - li Stop bar,20'Dbl Vlw m
`,M
g - &4 RPMs - ' transition/compliance v
Ave See Exhibit r (typ.) J i Y, �a P. f" -
APPendlx Al
•
t
SW lrst Ct.
�, , ,� -.
`._ Re-contour swale as perP, ```� 5x10
r Construct »N( CBB Std En Detail T� — _ Ramp w/
,:... a'.=. 9'g c-. 4x10
R ADA
x 5 ,£; ti,c D-13(6"Deep max.-typ) q,"4;-' 54411.,-"1 mrd 4x4 DA Mat
D
w/Mat ..,_
o'(....., ., ADA Ramp w• 4x4 0%1.;..
5x8w/mat _ • -
mil ti t C t -- '
k R t
■ 11B. Fumish/Install new 4, r
;■ Stop bar,20'Dbl Ylw Ram 5 x10 >...NCCI
mit of New
t &4 RPMs(typ.) - - ' Remove existing intersecting ramps - - . ,,•Pavement
ADA Ramp construct radius at sidewalk Furnish/Install new ".'
r I 5x5 w/ - ',section and construct new ADA ,?M.. Stop bar,20'Dbl Vlw ADA Location-OK
3.7- mat �� . n w/mat(5 x 8)as shown &4 RPMs(typ.)
. ,p.-all) a.
. Fr ^
SW 1 rst Ct.
Task 146 - Lake Boynton Estates 4
Ni
S''t r " �:P,. ;Extend base 6"beyond A ..
q;•.,. Construct new 4"th concrete sidewalk 4x110-connect ; `.EOP both sides of -
. road-except Furnish/Install new
f _
''-';'1,i 4
col ` '� tons(t header curb v
o existing sidewalk along SW 8th (construct s/w
rxls6ng driveways(CBB Std Det."K-14") m s lowtons(typ-all) , Stop bar,20'Dbl Ylw
kJ • fx &4 RPMs(typ.) 444,
"'gyp
a'® y = ax6 `. ax6 )'� axs - Cl
•
�
_fir _ ,�
_ _ Fumish/Install new co " _ .4x6 f�p
I
- " Stop bar,20'Dbl Ylw •- - •- rrwr 1� —
Co�'2 Jct new street - - &4 RPMs .� =C_-,_., �Y I- - zJr f �F ..emove/replace existing 4"th. ' ..r
(typ) r�i �-a
transition for newly .
constructed loop road" t •a.. - - '.. ".connecting to to SW 1 s? .. .; -.' concrete sdewalam construct new
See Exhibit A - N W 8th P� ADA compliant ramps and tactile •
i
PPe^a' - C k warning mala as depicted _ f }}t
Al - ;t�}
-i.i. tel A t _� !-,
SW 1st Ave. .
•
I� -- ten 4x1. I. i „ , ENO OF NEW
�� Remove/replace 4x45 sidewalk Furnish/Install newASPHALT
111 run,re-contour Swale,&re-sod Stop bar,20'Dbl Ylv: -7 qxq
CM
with like-type grass &4 RPMs(typ.) • ax'1
�' - 4x6 ,y Swale 8radius OK
. 4x6 ����� „y:.9 (modified previously)
.
. _ 1jprstA_
: 7U !�o SW 1st'A
u�3G�D.rI _ r �LL.
r
# , , -
"t axe, i ', ,. axe 4x6 ® :x4'� '� � � @fit„ av6 Re-contour Swale as per
rit
"_ ' Scop bar,20 UbI nw !,� - CBB Std Eng'g Detail
"_ &4 RPM5 "*
k (typ.) itt, 'A D-13(6"Deep max.-typ.)
Ai.
SW 1st Ave.
Re-contour swale as per
CBB Std Eng'g Detail
D-13(6"Deep max.-typ.)
5
Task 146 - Lake Boynton Estates
Ni•
3R.' air7u.
}
.. _ . - - _ -Base repair required.0
ti ^ +,�, '-4 �"; �6�a. I address subsided area and /�yJj�
r
iC✓, ^ I{. ponding issue,extend base 6" W r
+ _ I
�) curb and asphalt for 9 lane a s der
i
I s .. '� Modify ezistlng median
.---- ... -_ I ✓. ,' as shown - (x6�
B' l 5,1 y •,�I reconstruct header curb,re-grade 8 mulch 6)
T
�11I r to match e.isting
z??11 ` M
-. 4xfi rAb
Furnish Install new stop bar (PE )1 Std) " r - " . ;~�/. $o .
(Ex.Street 8 Stop Signs OK) „ 4x6 _j -
axtz - ' I"7■ 1 i axs - i Note:see sheet 10 for Sidewalk
axs +x12 , . +• - ramp 8 ADA configuration
Viwil AM MIN ilitilL NOM
w ` . o Wa 1D +
MI
rr ma_ -���r ..my ,Ir t y,a r - -' Edge Lines Furnish/Install iharmo directional arrows an a
�'r s"� STOP bar as shown-conforms to PB Co. - -,•
}� r. - .,iilt „ TP-21 current standards
Sidewalk and ADA '' •
-
requirements N/A(compl.w/ 4x6 *+ • ,,i ;Mt _ Furnish/Install themes chevron area and v'- ii v
SW 8th St contract II"; (6") r'�' '.�'y - - island as shown-conforms to PB Co.TP-21 T
1 ) - - W rit Cit)
f - current standards J
•
•
West Ocean Dr.
.. .
hnliaaV Inn 5®
. Q Ocean w .,_.•
NOTE: ao • ns:n .•
See supplemental Exhibit A2
for road resurfaction of Ocean Dr.
from SW 8th St to congress Ave
Task 146 - Lake Boynton Estates 6
Furnish Install Diamond,placard& C END OF
post(post to conform to CBB Std wNEW N
Alk
SEE SHT 5 for SW lrst Ave Detail G-10 > ASPHALT
(preference fluor-ylw-grn)
- MARE s., t ,�,;,..�.
t., 404 INE A - l !r. _ o�yrf
• li •''' 4'x36'remove 8 replace 4^MM .1I
• concrete sidewalk �� Y Edge Repair along entire swale Extend rock 6"mm beyond EOP& ,
•,/ • t - - •,,, `"P i re-contour swale to reflect D-13(max depth 9")
w
(Existing condition 6 drop from OP to grass Swale)
-- Pavement edge epair 2'x 30' ' r �—""r .Q •
n. k- - - • Y i .0 - w Fill&Recontour Swale at
•„y extend new base 6"min beyond FOP d
d compact to ASHTO T-180(98%D) �^ ! ; "'‘'" AV 11111""19:k backside of existing header to
',..s mitigate 6'drop off from EOP
�r k s/; 1 w+ „. C , (contour to reflect D-13)
d-
•
0
Ave -- ' 111
M shy: 'E
J< r - 4x6
Edge Rnoair along entire swage Extend rock 6"min beyond EOP&
'..' Fumish/Install surface ', / •/f• 4x4
i, re-ca -;wale to reflect D-13(target depth T-max depth 9"`
•Q• mount ADA tactile warning , / � F -
r• 7•« • fid/ A'- N ■M 'qiii _ ;,j .;, , Furnish/Install signs&post as shown
Or Furnish/Install stop bar,2ea.- J1 n 4 !
,9 6"dbl yellow x 20'8 4 rpms +3 ` 16r S ` ;u� Reset"Roundabout'sign&post ��J
(all"stop"conditions-ryp.) • ;14-
..
r Travel lanes ns.5' ~ SW `«t ` -
i (both directions) 4016 remove A.replace 6 th. .p^► .-,. 77F Lr ,' 4x18 �, BIKE LANE
" . concrete sidewalk •
• <fi i 1
R 4'x20' I AHEAD
' , ... ,•7 h r 631 ..jam:. •_ `� -
`. / -xs,. "` i (see detail on sht buffer
lfffor "- - i r C. ' - / lane w/buffer r
« �� • d p .. c tail on sht 11 for �•� -
n t dimensions 8 Pavement < •peas to *� x /r' / r,,. ,-,ensions 8 pavement
, ^ y,, markings) fleet CBB std Engrg Detail +• - rkings)
.. ys •- -- �....�13'8 Re-sod w/Bahia ` 4'2' °.
•
`Y• r A r �• !"4%,„„..„- d "4x6(6") - r
...
r ; C. .. _.. - �atF 1
«" - - , - ,, - Recountour edges of Swale to refelct 12"flat at
` • " EOP and I�fiat at front face of s/w to reflect swale -
• •` - •p - -w. -.® des gn pro)a as a tab is d m CBB Std
- r _ Engineering Doted 0-13 he
s nit A ; 4611 !y .
(itt� • . E 1/a'J,a c .w.., --- ; !T
•
West Ocean Dr./SVii 1st & 2n• es West Ocean Dr.
Remove/replace 4'x 50'sidewalk
_; •
- 11111111
_-_-_ _ _ _•_ Recontour swale area to reflect CBB Std Engineedng
Detail*D-13"
Furnish Install Diamond,placard& . ` ;
post(post to conform to CBB Std match line-SW 2nd Ave(sht 8)
Detail G-10
(preference fluor-ylw-grn)
It j
*A fluorescent yellow-green background color may be used for this sign or plaque.The background color of the plaque
should match the color of the warning sign that 4 supplements.
illTask 146 Lake Boynton Estates
Full width base repair.level rock restore crown
Stabalize and compact prior to placing new asphaltic pavement
•
•
lit F El
t-Tt •''I 7,.;ice - - w c
'irr MeV
363 Construct new street
Y, ' HI I - Construct new 4"thick concrete , termination as per CBB
tiv4i. Pr.."'
Y T `.`' f Std Engrg Detail"P-9"
i • - y, 1 sidewalk 6"at tlriveway locations
110, : ` M' Edge repair 3 x30,install new compactei • (fc=3000 psi @28 days/fiber reinfd) - -
J�" S base.extend 6"min.beyond new EOP 4. r - if (Match exisfing sidewalk at opposing r
ends of run)
-' �'"• i . " ' Furnish/Install
•
� 111' 'S" •.-. •L. r �... ._ -- - red 4'c.t.c
�� SkW 2n• �1, 2nd Aye._ 4'4
7 Ocean Q7 ' .. SW^2nd Ave I axe _ ".
Ili—
„.tg.wti r e �� ''• 'tract new c ;hick concrete 1 ”' �' �•"
y i dewalk wf ADA ramp a mat 6th et �' 3-reflective case 2"red"
Soo sht 11 for SW
Ydr,z _ Q (axle)&(4 x20) I` t� ....,, • I
g
r^ 2 locations as shown • '�• ,C J ''r Construct new a"thickconcrete sidewalkw/ADA ramp .*. *'
conccetlons at 1ac61e warnings as ewal ed A L.ocarnp
3T' d '3'r3 t (fc=3000 psi @2e days/fiber reinTtl)
l" ', r ,_ y - , (Match existing sidewalk at opposing ends of run)
•
•
SW 2nd Ave.
•
•
:3
!m
—
:z
10
iN
•3
ra
iD
rifts
.s
V
8
Task 146 - Lake Boynton Estates
Construct
Omit this portion of 5x8 ADA ramp w/mat
sidewalk only required ) N
on east side of SW 7th
See sheet
Ave.(see sht tONlewport 'nnstruct 5x8•a: rep w/mat for SWW6ttCh t
3)CF 5/22/24
---1 it Radius to 25 as per •, Construct new 4'sidewalk I „... y 1 �' M�,rrtr; `ax16
CBB Std Detail-(Typ_ e�^+.. • 4”Th.(6"Th @ driveways) ) -'?4n18 .«-.. 408
- . All
'0 . T h/In:: r .
I
:::co bar,20'U: I y.w _390' _ _ _.�
.J E.4 RPMs ayP.1 + ` "•S.'aa.. r " .._ _.,w .-..-.,
,iitallrapr
Z�
1, wiat,r �� t't !3rdAv
lle AIN,
>vi_i d Avl• rZ
-4�- rir z err ' t _ ,,,.N
u sua/�
,t tit int. i ) .r
cocia
r_' -'.^ a "'` "'' ;.L c. - '� 30x30 full itlth base ePa remove + -
1 �.1 - asphalt,le eI and restore crown, I 1,
•vaffRepair Base at 4x10 .:,"
, ? tt - recompact:nd test density poor to . .
_ -ns.'-k v7 t s - utility cut location
.
-4J
Construct new 4'sidewalk � -- "^ I t repavingf c .
- _ li---4' 4'
4"Th.(6"Th @ driveways) : P ay 30x15 full width base repair,remove - -'� - „g,
_ R asphalt,level and restore crown,,
450, 1�1..J,1
r'-��, x recompact and test density poor to I/.. . • °paving 'tV i
3-reflective case 2"red"
Remove ex ramp connection See sheet 10 Construct new 4'sidewalk
.4—a'-104—4' re-construct with radius 8 for SW 7th St 4"Th.(6"Th @ driveways) SW 3rd Ave
u . single connector as shown 400"
(Typ.All intersecting sidewalk)
a., Edge repair 3 x50,install new compacted
3-reflective case 2"red" base.extend 6"min.beyond new EOP
NOTE:All new proposed constructed sidewalk locations will require
swale contouring to reflect/comply with CBB StD Engineering Detail"D-13"
Task 146 - Lake Boynton Estates 9
See sheet 5 for ADA&sidealk ramp configs N 1
Bch Blvd •� •�•� _• •- _ Existing
! amp/ADA
I Furnish 8 install new , { Ex ramp/mat-OK , J�Ave'- mat-OK
•standard crosswalk :,-�•eT.• 1�3 �� ,
•
START of new ! "' ! mish/Install
1 .urface mounted
Ravement t r i L ADA Tactile
\ ' " • 1,l• •, i11.
-, warning mat
a - ; REV-See sheet 3 ��1j i
• for ADA Ramp/Mat rA'' _ft Remove/replac
`, Furnish/Install stop ! locations tN .p ' l ; ,, -. existing 5x10 ramp,
•\
I. bar,2 dbl yellow x t , - l kreconstruct w/correct
• n t slope and tactile
20'8 4 rpms(all I - - I
"stop"conditions , A ! A yp wameg mat-all to
5x5 , r. � , �� La I" conform to current ADA
NDJ 1•
• 'r tick l
® I• ---- '• S," Furnish/Install new stop bar. Construct 5x23 new sidewalk w/ADA mat
r r ((II��
•
` See sheet 4 for Rampa&ADA * L" . 20'6"dbl ylw&4 RPMs
A
A. /KUL'E1..1114 ! '1 ! �C t'1t.lr: t
See sheet 2 for ADA ramps I ■■ -'9r• Existing ADA Locations-OK
condition �'iFb y y, ; r-
5x10 �1 /
Replace 5x10 ramp w/new r' , ,4
�•••"' tactile warning mat 8 .... '1'� r _ _} y}�/� _. .
•,1 Ave ! 1f'"t,_•��v' i� .., �•CU1 CaA'J(i.1+.:7 r C7.Al CLII°J
.''�.' r ;• cean 7 •r a 1�_. •., Iwo =;
"�f ! `@ i _. WI l'AS r •s 1 2114 1 a N Bas repair-20 30
sw A�
L 0- . • ..11i
a i- x
p+��r, Z, k , `--� i _ ,1. -.• *� 1 - �• level&restore road crown
•
y.
Rework rock base to mitigate i �{; • '• •J+•
+
4fiai Furnish/Install �M a
.ii
V existing bird bath condition to ,• surface mounted 1 •
'L cul ++ ( 1•
4x12 'r
.•� shed water from ADA v•• " -
N•• ramp/pavement interface J f ADA�Mat`' ; ® y. '
'" t -5x4 ., , ,i. 3[i
1 ♦ �+„• ! M •1•J, I
'4x12,i ..•
Existing curb line to remain " Illg ! Existing curb T r a.
u i , {„r ,
p _ , ! to remain ` •
I (TVP") Construct 5'x273'x 4"new sidewalk w �,. .',,a i.t. -n s*,. •
,
' - ADA mats at end of run as depiOn-
iiiiifill r " i (6"Th.req'd for driveway apron* 1 f '•:� .� ' 1
4x17
I De of !► ,. ,
-* tpment ,. • - r 4 xh Root Pruning �4".
,, ,r--.,
l , Shift sidewalk type
from orig.design5'locationsidewalk
west
IF!,11 `(Vlk Construct type"D'curb and new 5' sidewalk Required for this --_ N7 ! ] location poor to new
. ® to abut EOP,transition at existing drivewayA.,ax1 concrete placementi. kocatlons to match exlstlng elevatlons and _
! cross slopes.Construct ADA conforming • = ..v
r 5x5 •r- •^� ramps at opposing ends.(new location 'x • • cn
Cr 1 shown In black IInewo,k 5.28.24 CF) - - r�
•
•. ..J -lemo&Replace exist
°Q pGip N A ��.:'w'11:1.0::: A 'Ramp 8,
vsj ;W4thAve
`Ramp 8 Mat
SW 1St AVe -,, ei r3 +N / r ,......o.
NW/SW 7th Street END of SW 7th Street Resurfacing
Task 146 - Lake Boynton Estates (north)
10
match Ilne from 6ht 1-6W Ith Ct I ! 3 to
Lane Width
FY 2023-24
;lid :V
d '• S2r d Ave
I 0 STANDARD PLANS
i INDEX
r . Gityl, —_- ....di l. 711-002
.
> L
C
1' t
. ' •It • °V `IS` ll• 1 di :N
1 L6 Ot .....6.........h ....--
6"W.„t,SOCIA Lme
.%.*:•••-..."."-6....--)'‘--
W CV.'J 1:J.A7 0 CJ1A1 Cxl,J 1..1.17 -
1c_t
Tqa.:Ft EF
HIKE STANDARD BUFFERED
- 4x4 .,
s .:.!!f LANE BIKE LANE STRIPING
17C-
6” Whir
• . ---=:0•
( Solid Lme
_
ADA accessiconditons
"OK"(addressed prey.) 63 S.F. 4.2 S.F.
"O9 ;M ",o /■■■■/■■//■■_ ■// ///
■ ■I \■■■/■ Naar gni.'—MUM,II i ■■■■i rs■■■■■
■ ■■■1 \/■
///■..�■■■■■ ■■. ■■
4x10 11"-
■■■■■I 'MINIM NMI ill
■■■■I t■■■■ ■■I I■
UMW /■/■
U. '■
I ■■UMW /■// ■/ •
0 '... •■■■►If •/// ■t
■■/■P num § // / ► 1 0
• ■■//. ,o 1■■■■ to ■I■ ■
me✓' 1111_,\.11 I Ir`u/111 //■ II
IMI II
cl d ■' ak IN t I\ '■ ■■ ■
IF • _ r ■ ■I It 11 N■ ■ ■■ ■
• ■t 11 II U• MI MI II351 Llia IN •r 1&n v ■ ■■ ■
' - ■l /■■1 /11 ' ■■ /
1■M. ./■■/. a■T 1imummassin _ Lim ■
p-a•
HELMETED BICYCLIST SYMBOL BIKE LANE ARROW
Task 146 - Lake Boynton Estates -
.......-....A.. /'''.. ,
1/••me n.srar I
r —mi MEV...,,........4411.1.ffiRENRYBP omme 1-.
mew,.•••••••81•••1•113. Mel
L7P. El 4•11•11MIIRMIW/,'IY'
1.306111rAISZIFI.'
7..'' secraLe=e atg„;r,...,..".•'. ' ' I I.4..
_..... , ....
...., , --
tun
law.fp •••IPI ..."
maw.
r NV..'.- .s... ...ir
NOR•,-.-n I
W'..1.74.7.
ormEv-..,1
me.aro ma-or•w 7,,,,,, ,,, rwt. ..,,,,,,,
4411 111131%11 EMU .
.......",
1 I L... , ,..... ... ,.......AO
I 1 ? ..... • T... %Inns:
ma • --• rr.c.
PM wr•r
/Mr 1
• l• am .R. ••• RN La.
—.....
• .414— 47 ..1 I 1
.., OFSCpc,L.,HThSiO.
WOW RR RCN.
RELIC =Lag,FO 1 'nal' . kr-1
II a.miaow ;PARA r
•POilf•TVINS..,..,.....
.s•A• .t•um
H ....mom................ One.K ME . .. . ...,.n maq.ect,tra.ALL.,...,
—`'„„7-=,':.: —.,.. ITI,CAL SPEED HUMP OILIFNSION,
MISAMIA011111.610. . M....,7.7::.......1......."....". •N.,•,,...•••••••,, _
(SURFACE OFFSETS
. Lr•UNN•ReWer:N•••.= TABLE c•••••••••is ifair,&••47.••CYj,N,_.. ,,,..-r—
_...
=swam= I, — — Mann SLIN-us Pox
, sc.ye:,OF CUM airaN el,.
I NUTT VJAV ?OP
,......,........... - •••••••rut ... ... t4.„.•RIa... •,..,,,,, ,...••••... WOL:star412=0"INOkrolrfr-
•mum••••••mu I•n••••••0 r•Num r. A-O•Inman*ROO*OA.91,1[CM
maw.,Nam
Illikurn sorri••a.m. e yur me
'=.6.7.P.PP 1/326P”'"T•"TT.T .............. I, , ....:,......,rarz•-•.11 croor WOE
=LIM Ai,once-WAY M.•..0 / Mr RI.
•...,.................................. Mitlania= =DOD
•••••••••••tr.•arrorr”ea awns....ft...ammo...Ea Witte'"""'"`"'-`"*"''
• Lro war•Immo no moron grow.aro a•••••=ma •orrrnrom rs....rossEtwes••••avcr Rem.
wrermarrroa enrommo crammer,.
wean ••••••••••••••••••••••••••••••
11011/10N WEN•••••••••••••••• p
1...,....._=" rrorrnmormarerwormarermtrermerra
r.nor b‘i*4 RESIDENTATATT AND L STRE caaPoelrow ...'••;•. 4Iii." ?....”(IP•A STREET SIONISTOP AMR DETAIL .., TRAFFIC CALMING
71.1 , .
ono P-1 r rffe-.4 S/DEWALX CCAISTRUCTICN DETAIL j-O:LIC STANDARD SPED:114AV
SWALE REPLACE-MEM DETAIL --mem- PAS `i, ''.".•'''''
CONSTRUCTION DETAILS lArnIr
D-I3
,........ .7,•...W.,T=141 I ......
I
1W7fr••••
Mr UM aft Mr
lifil maz•NII• t"."'"
r ••
.--..
=IL „er.,....„,. ..,.._-_____—____.- __ M:
r.rtr IL,
.
•-:::,
.,, .,—, ,.,...... r Kr-
A- =''' wr-ow-,„,,,,
11
,......,y A), 40it.iiiite
1 .
if v. ifr-V—.
-
4-. - 414411f ttELOING
1.1.91.6.6.W,
WOO MAE MI-.OPP..
IR I(" .r/ mom Ir."4. PAYDOENT OIARRIVOS FOR SITED
. .,. .
MOWS
1.....1 . Pa''.". ' F..."... ,.
ih'9<9. ens•
in=MI%NNI
.,,, o ,,,,:m..,., ..
N
I 1 I UNE,SPEOEIGTIQNS. WA Will ,
( \-eva.mum-
i. P,T 74 IT: 1 i i _ -.,-7 > - mem,
—.111.11111111 i• rraVv..1.2=itriVorors'''rrr.:,•="'solirkler:r.-relrlir 11 !r.t
•mrimr•mmm Ina=num mos r.••••
r..v. •
•••=••••MONO Mu.NI••-• wanzzacc,•turreIN net>RR It menu 1.•Inman commons
•Emin ror...a.m.&:ram so••••
wor rrrr,o,,..0..A.r.gq.0,...q..0...y.,..n,..,.,..,....pm," WINN • t
0•••......1•••••..I. .•.•.
( 1 tet...=am..6 nor¢••••ow At*•••••••[rat Lam VI
Mean S :Asa.
L.,......1 .--.... Plaltl_Vel• 911111.1kr=7.1.7.117,=..'""'",,,M...,'"""•"'•'"'"-'" ,8, Q
•••••••••-•
AM;.=,.....NITAr•••••••••...ND N R"Ns. il•me•••• 747.442,74•Winggr7.= art„,----prmr,o7rorn, ----
..10,FHLRE 3•go
PA MIENT YAP..MP SPEED
••••••••mown p•••••••
TABLES
•orracore...erranremo•••••••arm
soRnod wu:N.NoNEBNIO•70.0NO OEM.
morwroorrencormarreemramrerrurrreru.
•••••••••••••••=FR•asulo•so Dv..
lioNer••••••••••••••••••••OET•
NT.irq TYPICAL ROADWAY SECTOR
SO'LOCAL STREET 7N__E;_,
?-..L41'6P'" STREET TEM./MON
SHUNT A•WE TURNAROUND 0•1,4,0._,
P-0 ret„m SIDEINAALKT ANDETcullekv:.coNsrnc uano“ Zr .
titifitA MO.ESPAR.WON SUPPORT sysrm I-FZ- TYPICAL PAVEMENT MARKINGS .rarr
as
i•-.:1-
G-10 rtarT'M SPEED MUMPS CO TAKES
P-17 "I•W
Task 146 - Lake Boynton Estates 12
City of Boynton Beach
EXHIBIT B
Loop Road — Bid Set/Drawings
t
r
U)
o
3
Survey staking & elevation markers to provided NIIn
by CBB for new"Loop Road" constructionIIIIII . A
1 1,
sk •"
At 4
(178.5'+b aft - .
.
Rya — � SW tst Ct
-"
(135 25H-
R25'!+'� - .t
V
ii,-, -,,1 I
�20,� _ _ lw
`
''-,"411 Cr" mil" I
0 El Co
r- - ,II v .11-�.
..'...
r
1 r
s
�-50'-►1 ' . I. i A a
/'13925' t I 10111111riktimmowl ia
, .
50
[ M® .4- -- SW 1st Ave
Construct new residential "loop road"
to conform to CBB Std Engineering
Details
Q:
0
Task 146 - Boynton Lakes Estates - Appendix Al-"Loop Road"
riot
City of Boynton Beach
EXHIBIT C
Ocean Drive - Bid Set/Drawings
Furnish/Install ADA mats at drive
crossings as depicted below(6
Fumishllnactil surface read-surface unted) ADA Condition"OK"
AO mounted tactile warning mats
(2reg'dlA
�ttlrr FumisWlnstall - - ewer
START of 5o25 root surface mounted
M.
pruning 5x6 tactile warning mat '
IIIN@W If . A .
..required
_
Pavement Mat ` N _
,,�... A.6'SPUD nil ♦ .— ' ��.r'- 6 SOLD WE ■-.
•1(." -- l —
-- T .... ,..� •
— 2. Ocean Or •
_ __ .. p�..a..v..wt—weals_ O
, .ttlleall axn ti .. - -Ails........ ii.. .r '5 ' E
It'll lit'-_; i Imo' ®m i �.: ': G=6 SKIP WHITE 1W(6'-10') /y lw 2
_.:-..II- ' Fumish/Install all new •
- pavement markings as per ADA Condition"OK"
existing(Conform to PB Co.
Replace all thermoplastic pavement marking as C Standards"7P-21' per existing(post paving operations) '� -
Coordinate traffic loops '. " .0
- w/Palm Beach Co.
Traffic Engineering Mill 1 1/2"&resurface w/Type S-III Asphalt 1 1/2"Th. 1N E
..
Mill 1 1/2•'&resurface w/Type S-III Asphalt 1 1/2"Th. Furnish/Install all new -
.. pavement markings as per �I��
•,. existing(Conform to Pa Co. ,t+»� / ' a
�" rpt' -. Standards'TP-21"
-
- Air v
-
---_,�
Furnish/Install all new ;
2
n�/i�.' pavement markings as per - -
ADA Condition"OK" existing(Conform to PB Co. M
ADA Condition131 ADA Condition"OK"
Standards TP-21' - e
- - ,_ - Replace all thermoplastic pavement marking as c
• .•` t �'^"I 1 1 ," p per existing(post paving operations) .0
1 17 t
.- W w w1 - E
Mir
PROJECT SCOPE: , POW OP„„
Mill existing pavement 1 1/2"/Repave Type S-III-1/12"Th. ' p
/ _ —Eao.o.A.
Remove 8 Replace 12'W x 4"H speed hump _ Y e m3.7'"(12")
post resurfacing operations i:f4?F" re-I-10 OWI
CIENICIR or
Re-rock,level and restore crown&EOP elevations Construction to conform to CBB std engineering details(Ht tolerance+/- c.,0„n,,-„,,„w,”„„,,,„,„,,,,,,,,",w,„,,,,". _v I UNE1/2"),use of a timber screed consistent with Detail P-26 is recommended v
to construct a uniform hump across profile =E
Re-rock poorly repaired utility cuts&distressed pavement NOTE:Existing Hump 8 Hump Ahead Signage OK ' ( .2.1. i
,i ;: i is;;(,--. 6 b, 411:\-..CD110 I
Or
locations identified on the exhibit • J j y 1
c I dna
Place new 1 1/2"Th Type S-III Asphalt pavement ” ”
Remove damaged sidewalk add fill compact and place IN
" ^„” MUTCD FIGURE 36-28. TYPICAL
new concrete sidewalk ,I'j$•g ,P I PAVEMENT MARKINGS FOR SPEED
HUMPS
Task 146 - Lake Boynton Estates-Appendix 2 - Ocean Drive - 1 oft
ro., .IXr..a m
north1
- ' Remove 8 Replace 12'W x 4'H speed hump
-.; - ll
n.,zl resurfacing operations .../'
,truction to conform to CBB std engineering details(Ht tolerance of-1/7). a -n6"
Furnish/Install all new >t a timber screed consistent with Detail P-26 is recommended to construct
1 r
pavement markings as per .;form hump across pm'- t- „
existing(Conform to PB Co. w -sir�.aai ,w �,.�""��
Standards 7P-21' F Existing Hump 8 If OK ...
a
00 .,..._. .tygralar' ate.: o CX3C�ETDf,.. .��...:.�.:.. Y a.
i1 __. '
.......10„,..0•0"`Ivr.
i iiiiiiilla 'u •.
" , j_ MO J Replace all thermoplastic pave nt marking as 1 - 4, .I
.d
Mill 1 1/2"&resurface w/Type S-III Asphalt 1 1/2"Th. B. per ex.=sting In��1 paving operations) ) --
r r_.-
• # ff ![aitC
/ A Condition'OK" to
!� / OM In lea .caressed prey. �h:...
{� 611
MI _ Z under separate .. �.� •"
Replace all thermoplastic pavement marking as contract) M
per existing(post paving operations) CD -
VI� rQ'
7
r
'ilkt� as — .
}4 'w- t ^ 'r" `).1t
y...q v.,y
, "' w. • L • - — t "'
,,
• J - — Fumish/Install all new _,pavement markings as per -
884 Ole axis6ng(Conform to PB Co. ,(!) �`, _
- N — - Standards"TP-21' V':f� row w-cao� �,,.e-.
ra
Mill 1 1/2"&resurface w/Type S-Ill Asphalt 1 1/2"Th. k- _
Illni8 ess e
t r END of New Pavement i C` EamAp.A.
'.-, 4116,\-CM.Of
p m, J'tY «,w".
V 4
MUTED FIGURE 38-26. TYPICAL
PAVEMENT MARKINGS FOR SPEED
HUMPS
Task 146 - Lake Boynton Estates-Appendix 2 - Ocean Drive 2 oft