Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R24-243
1 RESOLUTION NO. R24-243 2 3 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, APPROVING THE PURCHASE OF PRESSURE 5 WASHING SERVICES FROM ET PRESSURE CLEANING LLC FOR THE 6 MAIN ROADWAY SIDEWALK PRESSURE CLEANING PROJECT BY 7 WAIVING THE PROCUREMENT POLICY FOR AN AMOUNT OF 8 $77,246.40; AND FOR ALL OTHER PURPOSES. 9 10 WHEREAS, at the direction of the Commission, staff solicited local pressure cleaning 11 vendors to obtain quotes for City of Boynton Beach Main Roadway Sidewalk Pressure Cleaning 12 Project with the goal to provide business to local vendors; and 13 WHEREAS, the quotes included work to be performed in the following areas: 14 • Congress Ave 15 • Seacrest Blvd 16 • Federal Highway 17 • Lawrence Road (From Hypoluxo South to Gateway) 18 • Gateway Blvd 19 • Boynton Beach Blvd 20 • Woolbright Road; and 21 WHEREAS, the final tabulation of quotes are as follows: 22 1. ET Pressure Cleaning - $70,224 in 57 days 23 2. A to Z Pressure Cleaning - $91,290 in 31 days 24 3. AAC Pressure Cleaning - $98,356 in 30 days 25 4. Justin Cox - $111,664 in 68 days 26 5. Majic Touch - $115,250.00 in 122 days; and 27 WHEREAS, the Procurement policy states that any solicitation over $50,000 requires a 28 formal bid. The Commission may waive this if it is determined to be in the best interest of the City. 29 If the Commission decides to follow procurement policy and solicit a formal bid, there is no 30 guarantee that a local vendor will be selected; and 31 WHEREAS, the City Commission, upon the recommendation of staff, has deemed it in the 32 best interests of the city's citizens and residents to approve the purchase of pressure washing 33 services from ET Pressure Cleaning LLC for the Main Roadway Sidewalk Pressure Cleaning Project 34 by waiving the procurement policy for an amount of $77,246.40. 35 36 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON 37 BEACH, FLORIDA, THAT: 38 SECTION 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 39 being true and correct and are hereby made a specific part of this Resolution upon adoption. 40 SECTION 2. The City Commission of the City of Boynton Beach, Florida, does hereby 41 approve the purchase of pressure washing services from ET Pressure Cleaning LLC for the Main 42 Roadway Sidewalk Pressure Cleaning Project by waiving the procurement policy for an amount of 43 $77,246.40, as further detailed in "Exhibit A." 44 SECTION 3. The City Commission of the City of Boynton Beach, Florida, hereby 45 authorizes the City Manager or designee to execute any ancillary documents necessary to 46 accomplish the purposes of this Resolution. 47 SECTION 4. This Resolution shall take effect in accordance with law. 48 49 [signatures on the following page] 50 SiNIII PASSED AND ADOPTED this /J day of /�0:10/,-1- ,"TU 2024. 52 CITY OF BOYNTON BEACH, FLORIDARI 53 YEE NO 54 Mayor-Ty Penserga 55 56 Vice Mayor-Aimee Kelley I/ 57 58 Commissioner-Angela Cruz t/ 59 60 Commissioner-Woodrow L. Hay l/ 61 62 Commissioner-Thomas Turkin C S 64 64 VOTE LI ' 65 AT ES 66 , .. 1 67 I1 � �%- _Iro / 0zat 68 Maylee •: esus, MPA, . MC _ Ty �4rga 69 City Cler1ON Ma 70 �' O QORArf.,Fq�,�11+ 71 ; o; A� • �� APPROVED AS TO FORM: 72 (Corporate Seal) $ >- $v„, c, ,10 73 Iv •:\\ A9.--O : i 74 it •... l' ••*<- ! 4dead ,144,146 75 %% •l -t' Shawna G. Lamb 76 City Attorney PRESSURE LOCAL WASHERS BOYNTON BEACH NEEDED VENDORS ONLY Prequalification Requirements: I. Equipment Needed: I I-- Minimum 4000 psi pressure washer Minimum 300-gallon portable water tank Certificate of Insurance Requirements: General Aggregate $ 1,000,000.00 Products-Comp/Op Agg. $ 1,000,000.00 Personal&Adv. Injury $ 1,000,000.00 Each Occurrence S 1,000,000.00 Fire Damage (any one fire) $ 50,000 00 Tied. Expense (ani-one person) $ 5,_000 00 . Description of Operation: The City of Boynton �" N - , Beach, its officers, employees, and agents are included as additional insured where required by written contract. Prequalifying Meeting: Certificate Holder: Must have the City listed as August 28th, 2024, 3:00 PM additional insured. City Hall City of Boynton Beacr 100 E Ocean Avenue P.Q. Box 310, Boynton Beach, FL 33425-0310 Room 115 City of Boynton Beach 100 E.Ocean Ave,Boynton Beach FL 33435 Contact Info W-9 Tax Form Stephen Hewett (561) 742-6251 City of Boynton Beach Main Roadway Sidewalk Pressure Cleaning Project: Contractors are to use the attached Take Off Sheet for pricing. Contractors are required to provide all tools, equipment, manpower, and supplies (including water) to complete this work. Contractors are responsible for establishing a MOT and safety while performing this work. Contractors are to price each segment individually. Contractor may be selected for any one segment or multiple segments. Contractor is to submit an individual schedule for each segment. City of Boynton Beach Main Roadway Sidewalk Pressure Cleaning Project: Contractors are to use the attached Take Off Sheet for pricing. Contractors are required to provide all tools, equipment, manpower, and supplies (including water) to complete this work. Contractors are responsible for establishing a MOT and safety while performing this work. Contractors are to price each segment individually. Contractor may be selected for any one segment or multiple segments. Contractor is to submit an individual schedule for each segment. North and South Roads: Total Square feet of sidewalks on NQS Roads : 924,528 Square Feet Congress Ave .).09 miles —32,155 Linear Feet — 160,776 Square Feet (5' sidewalks), both sides of road => 321,552 Square Feet of sidewall $ Days to complete: Justin Cox: $22,508.00-14 days AAC Pressure Cing $22,560.00-8 days A to Z Pressure Clng $20,900.00-7 days ET Pressure Cing $16,077.60-13 days Majic Touch $25,900.00-21 days Seacrest Blvd 5.24 Miles— 2/,6b7 Linear Feet — 138,336 Square Feet (5' sidewalks), both sides of road => 276,672 Square Feet of sidewalk $ Days to complete: Justin Cox: $22,000.00-12 days AAC Pressure Cing $19,360.00-5 days A to Z Pressure Clng $17,984.00-6 days ET Pressure Cing $13,833.60-11 days Majic Touch $23,550.00-21 days Federal Hwy. 4.42 Miles — 23,337 Linear Feet — 116,688 Square Feet (5' sidewalks), both sides of road => 233,376 Square Feet of sidewall $ Days to Complete: Justin Cox: $18,366.00-10 days AAC Pressure Cing $16,336.00-4 days A to Z Pressure Clng $15,169.00-5 days ET Pressure Cing $11,668.80 — 9 days Majic Touch $19,000.00 —14 days Lawrence Rd (From Hypoluxo South to Gateway) 1.76 Miles—9,292 Linear Feet— 46,464 Square Feet (5' sidewalks), uoth siaes of roaa => 92,928 Square Feet of sidewalks _ $ Days to complete: Justin Cox: $7,000.00-4 days AAC Pressure Cing $6,504.00-2 days A to Z Pressure Cing $6,040.00-2 days ET Pressure CIng $4,646.40— 4 days Majic Touch $7,650.00 — 10days East and West Roads: Total Square feet of sidewalks on E/W Roads : 479,952 Square Feet Gateway Blvd 3.72 Miles 19,461 Linear Feet —98,208 Square Feet (5' sidewalks), ..)oth sides of rL. :d => 196,416 Square Feet of sidewalks $ Days to complete: Justin Cox: $18,000.00-10 days AAC Pressure Cing $13,749.00-5 days A to Z Pressure Cing $12,767.00-5 days ET Pressure Cing $9,820.80 — 8 days Majic Touch $16,200.00— 18 days Boynton Beach Blvd 2.72 Miles 14,361 Linear Feet — 71,808 Square Feet (5' sidewalks), both sides of road => 143,616 Square Feet of sidewalk $ Days to complete: Justin Cox: $12,000.00-10 days AAC Pressure Cing $10,053.00-4 days A to Z Pressure Cing $9,335.00-3 days ET Pressure Cing $7,180.80— 6 days Majic Touch $11,650.00 — 14 days Woolbright Road 2.65 Miles— 13,992 Linear Feet —69,960 Square Feet (5' sidewalks), both sides of road => 139.920 Square Feet of sidewaR $ Days to complete: Justin Cox: $11,790.00-8 days AAC Pressure Cing $9,794.00-2 days A to Z Pressure Cing $9,095.00-3 days ET Pressure Cing $6,996.00 — 6 days Majic Touch $11,300.00 — 14 days Tabuation: Justin Cox 68 days $111,664.00 AAC Pressure Cing 30 days $98,356.00 A to Z Pressure CIng 31 days $91,290.00 ET Pressure CIng. 57 days $70,224.00 Majic Touch 122 days $115,250.00 Takeoffs were done per the blue lines (including areas outside of current city limits) H oli. Hypoluxo Rd " T YP _ 1 c ra �, Hypoluxo au a SII. ._ d • . . -- • • .....i itswilTpl Al I 'Pie l r I I ( Bent Tree • ,..i • Boy ton • Be . it w Bo, 1 ocean Ridge CG I VI '41 > fu ft3 J 1 i 41 • v O I _b • O Quail Ridge I iiBreezes Country Club jX 1 • • c Golf I ' • se • or11 • ` Gulf Stream _-• A4 "d • "... Seacrest .. huh Rainberry 3-05,)'7A/ CCN North and Southlitoth1194 ku@idget of sidewalks on N S Roads : 924.528 Sguare Fg 1 ConA v 6.09 miles 32,155 linear Feet - 160,776 Square i eet (5'sidewalks), both (ides of road ->)21L62 Square Feet of sidewel. $ Days to complete: I�d 4a Seacrest Blvd 24 Miles 17,667 Linear Feet 138,336 Square Feet (5' sidewalks), both sides of roa ->i76.672 Squ;... .,..ee r� .,t, ,` $�— ' 00,PC) Days to complete:, Federal H4.42 Miles-23,337 Linear Feet - 116,688 Square Feet (5' sidewalks), both sides of road=>, 3a1376 Square Feet of sidewalks$ tx 0• 11Q Days to complete: o o!a Lawrence Rd iFrom Hypoluxo South to Gateway) 1.76 Miles-9,292 pf Linearsidewalks Feet 1 �., Feet 46,464 Square Feet (5,sidewalks), ooth sides of road -> `2 �- Days to complete: East and West Roads: Total Square feet of sidewalks on E W Roads : 479,952 Sg are Feet Gatewau Bivd 3 72 Miles - 19,461 Linear Feet p 98;208 Square Feet (5'sidewalks), UGi"l siries ct iced=> 196,416 Square rrr'i ,,f ci {rte. ill c$ le, Olpr,00 Days to complete: 10 d'y5 Boynton Beach Blvd :.72 Miles- 14,361 Linear Feet-71,808 Square Feet (5' sidewalks), both sides of road => j.4 ,616 Square Feet of sidewalks$ fat 'OD Days to complete: 10 dates Woolbright Road 2.65 Miles - 13,991 Lineal Feet —69,960 Square Feet (5' sidewalks), both sides of road => 139,920 Square Feet of side) $ 790. 00 Days to complete: 4,15 Takeoffs were done per the blue lines(including areas outside of current city limits) C QR c LE-mit/37x. AND So F7iJosi4, LLe. l(c7.3d.b aerowdo- sou►4d way 13oy6-i-19r• igett.ck, FL . 3 3 Y 3 6 bbl- 7o�c—� a 5OS 099 North and.South Roads:Total Square feet ot,sidewalks on dsw S/g1S? Square poet Congress Ave 6.09 miles-32,155 linear Feet- 160,776 Square Feet (5'sidewalks),both „ 01 => 321,55Square Feat of sidevbaiks$ )004 o) Days to complete: Seacrest Blvd 5.24 Miles- 27,667 Linear Feet - 138,336 Square Feet (5'sidewalks),both sides of road=>17647: • # . , $ )q 360107) Days to complete: .— Federal Hwy. 4.42 Miles-23,337 Linear Feet 116,688 Square Feet (`: sidewalks), both sides of road=>,233,376 Square Feet of idewaikK$ 1 6/ 336.an Days to complete: ti Lawrence Rd (From Hypoluxo South to Gateway) 1.76 Miles-9,292 linear Feet- 4f,'t64 square fee siuew&ls), =-,cih si;:es of road=>92,,9922}�8'ySwoare Feet of sidewalks JV ! f 0 V Days to complete: East and West Roads:Total Square feet of sidewalks on EJW Roads :479952 Square Feet Gateway Blvd 3.72 Mlles—19,461 Linear Feet 98,208 iquaeFeel('sidewalks). both sides of road=>t96 416 Square Feet of sidewalks$ s Days to complete: povnton Beach Blvd 2.72 Miles-14,361 linear Feet 71,808 Square Feet (5 sidev.alks), both sides of road x>143,616 Square Feet of sidewalks$ 1000521072 Days to complete: Woolbright Road 7 bS Miles 13.99?Linear fret 69,9609, Square 1 elt (5 139,42.,Q at,Ea'e 1 of_sidewalks$ 9 2 q q.cv Days to complete: L Takeoffs were done per the blue lines(Including areas outside of current city limits) Ramsey, Kevin MOM: A-TO-I PRE!lURE CLEANINE<MEIIINCEROMEIlACINC.IQUAREUP.COM> SENT: FRIDAY,!EPTEMOIR 06,!0!410:07 AM TO: RAMIFY,KEVIN !'UDIECT: YOU RECEIVED A NEW ESTIMATE! (x1306) This Message Is From an External Sender This message came from outside your organization. E A-to-Z Pressure Cleaning New Estimate $91290 . 00 Estimate expires on October 4, 2024 View Estimate Estimate #1306 sent September 6, 2024 Customer Kevin Ramsey City of Boynton Beach RamseyK@bbfl.us (561) 929-0558 100 East Ocean Ave Boynton Beach, FL 33435 Message 1 Thank you for choosing A-to-Z Pressure Cleaning. Please review the estimate below. Pricing for individual line items if project is to be broken up. If you are ready to proceed, you may accept the estimate electronically and someone will contact you for scheduling. Please contact us directly with any questions or work adjustments you may have. A current Certificate of Insurance is attached to this estimate (see link below). We are licensed and insured, always come prepared and arrive on time. We look forward to serving you :) Phone: 561-373-2979 1440 Via de Pepi Boynton Beach, FL 33426 Email: atozpressurecleaningllc@gmail.com "The bitterness of poor quality remains long after the sweetness of low price is forgotten." - Benjamin Franklin Pressure Cleaning One (1) per month $20,900.00 Congress Pressure Cleaning One (1) per month $17,984.00 Seacresl 6 Pressure Cleaning One (1) per month $15,169.00 2 Pressure Cleaning One (1) per month $6,040.00 Hypoluxo Pressure Cleaning One (1) per month $12,767.00 Pressure Cleaning One (1) per month $9,335.00 Pressure Cleaning One (1) per month $9,095.00 Subtotal $91,290.00 Total $91,290.00 A-to-Z Pressure Cleaning atozpressurecleaninglic(agmail.com (561) 373-2979 Please contact A-to-Z Pressure Cleaning about its privacy practices. ❑ 3 Ramsey, Kevin MOM: A-TO-T PRESSURE CLEANING<MESSENGEROMETIACINC.SQUAREUP.COM> TENT: FRIDAY,SEPTEMBER 06,20?4 10:07 AM TO: RAMSEY,KEVIN SUBJECT: YOU RECEIVED A NEW ESTIMATE!($tI?05) This Message Is From an External Sender This message came from outside your organization. EH A-to-Z Pressure Cleaning New Estimate $75, 023 . 52 Estimate expires on October 4, 2024 poil_ , , Estimate#1305 sent September 6, 2024 Customer Kevin Ramsey City of Boynton Beach RamseyK@bbfl.us (561) 929-0558 100 East Ocean Ave Boynton Beach, FL 33435 Message 1 Thank you for choosing A-to-Z Pressure Cleaning. Please review the estimate below. Pricing on this estimate is if the project is awarded in 2 parts. North and south and east and west. If you are ready to proceed, you may accept the estimate electronically and someone will contact you for scheduling. Please contact us directly with any questions or work adjustments you may have. A current Certificate of Insurance is attached to this estimate (see link below). We are licensed and insured, always come prepared and arrive on time. We look forward to serving you :) Phone: 561-373-2979 1440 Via de Pepi Boynton Beach, FL 33426 Email: atozpressurecleaningllc@gmail.com "The bitterness of poor quality remains long after the sweetness of low price is forgotten." - Benjamin Franklin Pressure cleaning/flatwork $46,226.40 ($0.05/Sq Ft) x 924528 Sq Ft North and south roads 1 8days Pressure cleaning/flatwork $28,797.12 ($0.06/Sq Ft) x 479952 Sq Ft Price if only awarded east and west 10 days Subtotal $75,023.52 2 Total $75,023.52 A-to-Z Pressure Cleaning atozpressurecleaninglIc(@gmail.com (561) 373-2979 Please contact A-to-Z Pressure Cleaning about its privacy practices. 3 Ramsey, Kevin PROM: A-TO-1 PRESSURE MLEANINE<ME!lENEERCAMES!ACING.SQUAREUP.COM> SENT: PRIDAY,SEPTEMBER 06,107410:07 AM TO: RAMSEY,KEVIN SUBJECT: YOU RECEIVED A NEW ESTIMATE!(a13O4) This Message Is From an External Sender This message came from outside your organization. [1:1 1 A-to-Z Pressure Cleaning New Estimate $70 ,224. 00 Estimate expires on October 4, 2024 PIIIIIIIIMIIIIIIIIIII Estimate#1304 sent September 6, 2024 Customer Kevin Ramsey City of Boynton Beach RarnseyK@bbfi.us (561) 929-0558 100 East Ocean Ave Boynton Beach, FL 33435 Message 1 Thank you for choosing A-to-Z Pressure Cleaning. Please review the estimate below. The pricing for this estimate is if awarded the project in its entirety. If you are ready to proceed, you may accept the estimate electronically and someone will contact you for scheduling. Please contact us directly with any questions or work adjustments you may have. A current Certificate of Insurance is attached to this estimate (see link below). We are licensed and insured, always come prepared and arrive on time. We look forward to serving you :) Phone: 561-373-2979 1440 Via de Pepi Boynton Beach, FL 33426 Email: atozpressurecleaningllc@gmail.com "The bitterness of poor quality remains long after the sweetness of low price is forgotten."-Benjamin Franklin Pressure cleaning/flatwork $46,226.40 ($0.05/Sq Ft) x 924528 Sq Ft North and South roads per map 18 days Pressure cleaning/flatwork $23,997.60 ($0.05/Sq Ft) x 479952 Sq Ft East and west roads per map 10 days Subtotal $70,224.00 2 Total $70,224.00 Attachments Boynton Beach COl.pdf View Attachments A-to-Z Pressure Cleaning atozpressurecleaningllc©gmail.com (561) 373-2979 Please contact A-to-Z Pressure Cleaning about its privacy practices. Ei 01 P. 3 9/6/24, 11:09 AM Joist-View Document Sign and Approve — Print IJ Download Finance Your Home Project PAYMENTS STARTING FROM $720/month Get Started Checking rates won't affect credit score Acorn A marketplace of top knders ATTACHMENTS (https://s3.amazonaws.com/joist-uploads-document- attachments/538A7D7A-092D-4B5C-8057- httpswww.pdf� 42211C058B94/httpswww.boynton- 89kb beach.orgDocumentCenterView1875Pressure-washer- flyer-newbidld=.pdf) (https://s3.amazonaws.com/joist-uploads-document- City insura....pdf4, attachments/6D963D13-3091-4853-B696- 521kb 6F4840082197/City%20insurance.pdf) (https://s3.amazonaws.com/joist-uploads-document- fw9.pdfA attachments/6D7D7156-EF00-4135-9941- 196kb 046655A2078 B/fw9.pdf) ESTIMATE https://ciient.joistapp.com/estimates/da2cd09ea5847332b2a5df33 1/4 9/6124, 11:09 AM Joist-View Document E1egiersdL freClear ing Lic Estimate # 406 •t'. '8•-'' Ba Kevin Ramsey (tel:(561) 317-5771 pate EigkallpRORFAIRitglIc@gmail.com ( ailtQ:etpr q,sur cleaningllc@gmaii.com�24 e W61b) ® icom (//clean561 .com) usiness I ax (561) 742-6986 82-2601895 Description Total Congress Ave 13 days for completion $16,077.60 6.09 miles - 32,155 linear feet - 160776 square feet (5' sidewalks), both sides of the road =>321,552 square feet of sidewalks Seacrest blvd 11 days for completion $13,833.60 5.24 Miles - 27,667 Linear Feet - 138,336 Square Feet (5' sidewalks), both sides of road => 276,672 Square Feet of sidewalks Federal hwy 9 days for completion $11,668.80 . 4.42 Miles - 23,337 Linear Feet - 116,688 Square Feet (5' sidewalks), both sides of road => 233,376 Square Feet of sidewalks Lawrence Rd 4 days for completion $4,646.40 (From Hypoluxo South to Gateway) 1.76 Miles - 9,292 Linear Feet - 46,464 Square Feet (5' sidewalks), both sides of road => 92,928 Square Feet of sidewalks Gateway Blvd 8 days for completion $9,820.80 3.72 Miles - 19,461 Linear Feet - 98,208 Square Feet (5' sidewalks), both sides of road = 196,416 Square Feet of sidewalks Boynton Beach Blvd 6 days for completion $7,180.80 2.72 Miles - 14,361 Linear Feet - 71,808 Square Feet (5' sidewalks), both sides of road => 143,616 Square Feet of sidewalks Woolbright Road 6 days for completion $6,996.00 2.65 Miles - 13,992 Linear Feet - 69,960 Square Feet (5' sidewalks), both sides of road => 139,920 Square Feet of sidewalks https:/Iclient.joistapp.com/estimates/da2cd09ea5847332b2a5df33 2/4 9/6/24, 11:09 AM Joist-View Document Subtotal $70,224.00 Total $70,224.00 Notes: ET pressure cleaning will provide all tools, equipment, manpower, and supplies (including water) to complete this work. We will use a city rented meter for hydrant supply. We will be responsible for our safety and establishing a proper MOT when needed. Will submit proper scheduling upon approval. However days selected will be Monday-Saturday. If we are selected to oversee the whole project we are capable of speeding up dates with additional manpower to meet our Halloween deadline. We will document any damage to sidewalks with photos and gps locations. Payment is due upon completion of each section. No draws or deposit needed. https://client.joistapp.com/estimates/da2cd09ea5647332b2a5df33 3/4 e _4d) North and yuth R ei24,525 01_4,$cpiligisa of sklewalks on NADRALik.:, Con Ay ". •h" " 1/1 • 1.-$ ca)5, 9 cii:P±P Days to complete: a) 2,1Milr-, ine=, ;5t 1,ce;ar; h,rovc .1•1‘ • -• - ,672 Wual f...±_rA Of pe $ Qtal CST) Days to complete: c I Federal Hwy. .1-4 23331 Linear I eel lib 6E3 Square h-e'(5 Adewils's . • ;yes.'t 2R,32115q;lare Feet of sidewalks$ 19 COO Days to complete: ILci Lawrence Rd(From HYPOIUX0 South to Gateway) 1.76 Miles-9.292 lir‘sa- '5,z.Clare Feet(5 ,idewalks) both sides of road >91,926 Square Feet of siclv;i11.,s. $ 7,tS() Days to complete: JO East and West Roads:Total Square feet of sidewalks on ON Roads:479 952 Square Feet Gateway Blvd 3,72 Miles-19.461 Linear Feet-98.238 Sq;uare Feet;,5 ; •- ac=>196,416 Square Feet of sidewalks$ Pir1bei 00 Days to complete: /41 Boynton Beach Blvd 2.72 Miles-14 361 linear Feet-71 80F Square 7-eet isnewalac.9).:: tort; les of'oad=>143,616 Square Feet of sidewalks$ I I SD Days to complete: I Woo/bright Road 2 65 Miles-13 992 linear Feet-69 960 Square ree Z:•' -• 1 r-7, roan= 139 920 Square Feet of sidewalks$ 1 1, Days to complete: IL/ Takeoffs were done per the blue lines(Including areas outside of current city ,ts. • *kb%