Loading...
81-RR A P~ESOLUTION OF THE CITY OF BOYNTON BEACH, FLORIDA, REDUCING PERFORMANCE BOND FOR BOYNTON LAKES, PLAT I. WHEREAS, a request has been received including a break- down of bonded items and reflecting the percentage of work complete and ~qIEREAS, concurred with these amounts and to reduce the bond accordingly. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THt CITY OF BO~TON~ BEACH, FLORIDA: Section 1. The surety bond in the amount of $916,804 )reviously posted with the City in con~unction with Boynton Lakes, ~lat I, is hereby released in lieu of a new Performance Bond being furnished the City of Boynton Beach in the total amount of $415,114 PASSEO ~ ADOPTED T~IS ~ day of ~ , 19eli the City Engineer and~irector of Utilities have have made their recommendations ~TTEST: D¢~fy City Clerk CITY OF BOY~TOI~ BEACH, FLORIDA Mayor ~und i l~f~ ~r Council Me~ber (Corp. Seal) PROPOSED REDUCTION OF SURETY 7/28/81 PAVING & DRAINAGE: $421,131 303,799 $117,332 Bonded Amount Work Completed Remaining + (305.799 x 10%) ~e~a~nage WATER DISTRIBUTION SYSTEM: $147,712 $156,714 x 50% Retainage ................ = 78,357 SEWAGE FORCE MAIN & LIFT STATION: 100% Aerial Crossing over LWDD L-19 = 5,000 100% 16" x 16" x 10" Tapping Tee & Valve = 1,200 Lift Station $40,000 x 50% = 20,000 10" Force Main & Valves $36,735 x 50% = 18,367 Gravity Sewer System $187,392 x 20% = 37,478 STREET LIGHTING: RECREATIONAL FACILITIES: 7,000 100,000 AMOUNT OF NEW SURETY REQUIRED $415,114