R25-146 1 RESOLUTION NO. R25-146 2 3 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, APPROVING A PURCHASE ORDER TO ATLANTIC 5 SOUTHERN PAVING AND SEALCOATING IN THE AMOUNT OF 6 $411,846.40 FOR TASK 225 FOR CHAPEL HILL RESURFACING PROJECT 7 IN THE AMOUNT OF $411,846.40, PLUS A 10% CONTINGENCY OF 8 $41,184.64, FOR A TOTAL NOT TO EXCEED $453,031.04; AND FOR ALL 9 OTHER PURPOSES. 10 11 WHEREAS, at the March 18, 2025, City Commission Meeting, the Commission reviewed 12 and approved the FY2025 Paving Plan. Among the approved tasks was the resurfacing of Chapel 13 Hill; and 14 WHEREAS, resurfacing is required due to the deterioration of the existing micro-surfacing 15 pavement treatment to restore the roadway to safe and serviceable standards; and 16 WHEREAS, the City Commission, upon the recommendation of staff, has deemed it in the 17 best interests of the City's citizens and residents to approve a Purchase Order to Atlantic Southern 18 Paving and Sealcoating in the amount of $411,846.40 for Task 225 for Chapel Hill Resurfacing 19 Project in the amount of $411,846.40, plus a 10% contingency of $41,184.64, for a total not to 20 exceed $453,031.04. 21 22 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON 23 BEACH, FLORIDA, THAT: 24 SECTION 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 25 being true and correct and are hereby made a specific part of this Resolution upon adoption. 26 SECTION 2. The City Commission of the City of Boynton Beach, Florida, does hereby 27 approve a Purchase Order to Atlantic Southern Paving and Sealcoating in the amount of 28 $411,846.40 for Task 225 for Chapel Hill Resurfacing Project in the amount of $411,846.40, plus a 29 10% contingency of $41,184.64, for a total not to exceed $453,031.04, as further detailed to that 30 attached as Exhibit A. 31 SECTION 3. This Resolution shall take effect in accordance with the law. 32 reA 33 PASSED AND ADOPTED this 6 day of 3011‘Q__ 2025. 34 CITY OF BOYNTON BEACH, FLORIDA 35 YE✓, NO 36 Mayor- Rebecca Shelton 37 38 Vice Mayor-Woodrow L. Hay t/- 39 ✓- 40 Commissioner-Angela Cruz 41 42 Commissioner-Thomas Turkin ✓ 43 44 Commissioner-Aimee Kelley 45 46 OTE GrO 47 ATT'S ' 48 VI I il 49 �: 1. /A 50 Maylee D- ;sus, MPA, MC 'ebecca Shelton 51 City Cle Mayor 52 _ ` 53 �----eV? gOYNTpti%%11 APPROVED AS TO FORM: 54 (Corporate Seal) ;�,'���PCR4TF' F��It 55 s SEAL - 56 �� ; INCORPORATED; f A/id/14Killi ' ' 1920 ' ' 57 'i Shawna G. Lamb 58 ,'\ •FLORIDP _ City Attorney Mill and Pave Proposal City Of Boynton Beach Public Works Carl Frumenti Project: Chapel Hill Resurfacing Task 225 Mission Hill Rd Boynton Beach, FL 33435 ATLANTICSOUTHERN PAVING AND SEALCOATING Rich Atzert Page 1 Account Manager Our Company Company Info Contact Person ATLANTICSOUTHERN AND StALCOATINC Rich Atzert Atlantic Southern Paving and Sealcoating Account Manager 6301 West Sunrise Blvd Rich@atlanticsouthernpaving.com Sunrise, Florida 33313 Cell: 954-299-6114 Office 954-581-5805 P: 954-581-5805 F: 954-581-0465 http://www.atlanticsouthernpaving.com About Us We Solve Problems and Make Complicated Simple! We understand that as a manager, owner or investor of properties all over the United States, you need a partner to develop a strategic plan that will preserve your investment for the long term for the least amount of money. Atlantic Southern Paving & Sealcoating provides pavement design, maintenance & construction services to the commercial, recreational and industrial markets throughout the United States. Please find the enclosed proposal and do not hesitate to call us with any questions. Watch a Video About Us: CLICK HERE FDOT Certified Contractor Page 2 Proposal: Chapel Hill Resurfacing Task 225 ATLANTICSOUTHERN PAVING AND SEALCOATING MOT 1. Item 20 - Flagmen 336 hours @ $26.25 per hour $8,820.00 2. Item 16 - Message boards 4- 14 days each day @ $27.00 each day $1,512.00 Total Price: $10,332.00 Mill and Pave 1. Item 48- 6" limerock 56 SY @ $15.00 Per SY $840.00 2. Item 88 - 1 1/2" milling 26,699 SY @ $3.60 per SY $96,116.40 3. Item 72- 1 1/2" asphalt 2,243 tons @ $130.00 per ton $291,590.00 4. Item 97 - speed hump 2 @ $4,000.00 each $8,000.00 Total Price: $396,546.40 Striping 1. Item 102-6" yellow 460 LF@ $1.80 per LF $828.00 2. Item 111 - 24"white 276LF @ $10.00 per LF $2,760.00 3. Item 121 -Y/Y RPMs 92 @ $15.00 each $1,380.00 Total Price: $4,968.00 Page 3 Proposal: Chapel Hill Resurfacing Task 225 ATIANTICSOUTHERN LVING AND SEALCOATING Exhibit 4 NORTH FERWOW DR CAN/U.4 DR P.t ; , n Hui Rd ,.• r � `� , iiiii* i ,,) 4 Iv Ivor r lok t 4- h it ip J.-- ,:„, • , ` _ , ...,,,,a,. r . ...,sial.rani ••= sial S. add ire Noel 4 vr...........o. _ •••orb»� . . . RIDGE LN. p CHURCHILL DR. a-� R. sial. sial. !� M ' sial ,n sial. t w MiscienlHlUlRd ircci�r Hill Rd _�Missian1Hill P- m z s moi} 111% iii3r ' lit - ib;. 9 4111i ?. ` .a 7; i sial• � a....r.nr : O Ir Allillh v ..a 2 TASK 225 — Chapel Hill Resurfacing Notes: Page 4 Proposal: Chapel Hill Resurfacing Task 225 pnpNTIC50UTHERN I.N;NG AND SFAICOATING Exhibit A NORTH I .*:. !Ilfi 'hN1M see KH r a ` ` P • ;7:46„ 0., 4.1..---• I. Pi r..4i. r,,L., IFIF '..101*Yl iR 5� � G • 1. caesau f>_i-0'O4 v► ._..i .rr.9+w.wya �' 'rpM Ly GneMM r W 4i. - r '• . Ai •1 .� `r 4 A_ ; -f .f 0 10=.IT7)'U _ t (t•'' {{ � wwu.r.1 .a New •..j r t .f 1.' w .�ieMei4r ,!_� W hicDenng Pines Tic:: _. •-411. �. t :Is r;11, `� Id fl. Wm ft N77-wwww"WI A ir cam 1 .tt tai.rr t nellea S I 1�_ JR ii Il 0°1 f f Hiflnrst Rd nil � r - nr, NOM il. I r �. , `■ ro co 1 Ln•-seeSHT2 _._.. �._. 1 ..t_._..... r �� Guo•IQ;n1Hil1 Rd t ss+c�1H1111R" Mfs'slo`n1Hll1 Rd »a 3 TASK 225 — Chapel Hill Resurfacing Notes: Page 5 Proposal: Chapel Hill Resurfacing Task 225 ATLANTICSOUTHERN PAVING AND SEALCOATING Exhibit A e NORTH Churchill ala IMAM s1 Sur:et Dr coma sop SMI6 .. j,....:`.w.. ......... .. ..._.... .. _ .._.--- .�. - ,.-_N...... mat 'spe i:.....- i+' ......._ - • -, sunset Rd t }r it r r-.- t Rd _ r ! r ' 1: a 4 :If Ill 1 acs�nse�Rd r Rfiltit i .11�"'_I'� a �.,.qwk-., 0 ir mr. pm . n .44 f♦ .r' - ..�. .= achy d" �:. IIK, :mill CLLnrn_ni atloct., s' ^ ' a �. _ it. . te.. 41 114711 t Ira o - rr r, .�� Rrw Swetwa.r 4. P a / 7..,, . a use ssi SHT s f� ♦ 1+ ij Pi } Chapel Hill E31vd"- � Chapel Hill Blvd ----Resurfaced Oct•a NIC TASK 225 — Chapel Hill Resurfacing Notes: Page 6 Proposal: Chapel Hill Resurfacing Task 225 ATLANTICSOUTHERN PAVING AND SEALCOATING Exhibit 4 NORTH End of Asphalt R•$urtacing at Churchill aka SW 4th St Sunset DrconVd s»SHY 6 .... .2. ....to" ......... ._ .•-. - - ,. . ^.. .. .... mat -SPP 6` T✓. - '!�- - • l 14 Of$ !�C Itilt Vt. wir . t ild iir - s i Rd + r / r ....-7.-„,:- . a� a unset Rd rill! r'"► .. . ,. di a I ' '{ '111VI *' f L1 111 - .ata .ral.,...a.". 7 N^A 4':ti rr a Will I ? •� . j TPA,It*Caw... 7 4 . ` " l 0 C,�Hlue Sky �mrn.:r;lcation O`� II - IS It.illho' k • -.;---.. Illi' . - t-�"tie+ at.a i r , >� /� n' - • t, #Chapel H+II Blvd '0 .i� Y.F_)1, — — tcgnne.see ..3.._... - . ... -- - ........ �. a. .. .. ... ... A....... .(. 7.peu•Be fiii�'i1 elialla Chapel Hai Blvd Resurfaced Oct 74 MC TASK 225 —Chapel Hill Resurfacing Notes: Page 7 Price Breakdown: Chapel Hill Resurfacing Task ATLANTICSOUTHERN PAVING AND SFAICOATING 225 Please find the following breakdown of all services we have provided in this proposal. This proposal originated on May 13, 2025. Item Description Cost 1. MOT $10,332.00 2. Mill and Pave $396,546.40 3. Striping $4,968.00 Total: $411,846.40 Authorization to Proceed & Contract The above prices, specifications and conditions are hereby accepted.You are authorized to do the work as specified. Payment will be made as outlined. When signed, this document becomes a contract. E&OE We understand that if any additional work is required different than what is stated in this proposal/contract, it must be in a new contract or added to this contract. The parties also acknowledge that the time for performance of the work may be impacted by market conditions beyond contractor's control in which event the contract time shall be extended. Please see all attachments for special conditions that may pertain to aspects of this project. This price of this contract is based upon completion of the work within thirty days from the date hereof, thus the price is good for a period of up to 30 days from the date listed herein. If the work is not completed within thirty days, and the contractor experiences price increases for materials in excess of those upon which the price of this contract were based as of the date hereof, the contract price shall be increased by the amount of the documented price increase. Page 8 Proposal: Chapel Hill Resurfacing Task 225 ATLANTICSOUTHERN diNG AND SEALCOATING Acceptance We agree to pay the total sum or balance in full upon completion of this project. No deposit required. Date: Carl Frumenti I Project Manager Rich Atzert I Account Manager City Of Boynton Beach Public Works Atlantic Southern Paving and Sealcoating 222 NE 9th Ave 6301 West Sunrise Blvd Boynton Beach, FL 33435 Sunrise, Florida 33313 frumentic@bbfl.us E: Rich@atlanticsouthernpaving.com C: 561-512-4408 C: 954-299-6114 0: 561-512-4408 P: 954-581-5805 F: 954-581-0465 http://www.atlanticsouthernpaving.com Page 9 Capital Improvement Program rr `= Project Information& Financial Plan Form J J= Project Name: Task 225-Chapel Hill Resurfacing Dept./Location: Public Works 4 oo�r Project 8: RP Project Type: Improv/Renovatior Amount Project G/1.#: 302-4905-541.63-08 S 453,031 Project Manager: Carl Frumenh S - S - Project Duration: 90 days PROJECT DESCRIPTION/SCOPE I PROJECT PICTURE C,r and Paste or Insert - Neighborhood resurfacing project of select roads that will not be impacted by forthcoming Utilities Project. ..."'".4— ter. 7- �-. Exisiting road riding surface layer is coming apart.The microsilica treated road segments arc over the ,� �.:i^�-p�� intended life expectancy for the material resulting in a poor riding surface and loose aggregates on the - ♦ • a- .\. V „'s•\ roadway. , 0, /"-� • 5.. tilt , BUSINESS CASE/JUSTIFICATION ,:.•1''..,-...: Failure to act now the conditions will worsen and with the pending rain season coming and the potential for N}8] •(p� i .; v infiltration exposure accelerate deterio by comprimising the base and sub base layers of the road construction. -6s s' II s• e . a'1 g „ 7• DISTRICT I 3 I-, .�:rr1 ' PROJECT SCHEDULE PROJECT CRITERIA Start Completion Estimated Actual Estimated Actual Replacement of Facilities/Equipment(New) Planning/Study Expansion of Facilities(Modification) Design Enhance Service to Public x Contract Advertise/Award Regulatory or Commission Mandate Construction July'25 August'25 Reduce Costs Project In Service Date Generate Revenue Health&Safety x PROJECT PRIORITY I High x etitieal,tied to nundalea or safety Security/Fire Control - Medium Maintain k,el o5 sm.,operaeoral savings ADA Complaincc - Low Moderate Misfit RISK/CHALLENGES I The curent roadway condition can be a risk to pedestrains and bicycle taffic due to the loose particle of aggreate,as the surface layer is coming apart and beyond it's useful life. SOURCE OF FUNDS I Prior Years FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 I Project Total General Gov't CIP Fund(302) SO $453,031 SO SO SO SO S453,031 Local Gov't Surtax Cap Fund(303) SO SO SO SO 50 SO SO Transfers In General Fund(00l) SO SO 50 SO SO SO SO Local Option Gas Tax(104) SO SO SO SO SO SO SO Parks&Rec Trust Fund(141) SO SO SO SO SO SO SO Rcc Program Revenue Fund(172) SO SO SO SO SO SO SO Public Service Debt Fund(207) SO SO 50 SO SO SO SO Utility Cap Improv Fund(403) SO SO SO SO SO SO SO Utility Cap Fccs(404) SO SO SO SO SO SO SO Golf Fund(412) SO SO SO SO SO SO SO Debt(Current or New ) SO SO 50 SO SO SO SO Grant(Name & %shirt SO SO SO SO SO SO SO TOTAL I SO $453,031 I SO SO SO SO I $453,031 USE OF FUNDS I Prior Years FY 25/26 I FY 26/27 FY 27/28 FY 28/29 FY 29/30 1 Project Total Planning/Design SO SO SO SO SO SO SO Construction SO $453,031 SO SO SO SO $453,031 Furniture&Equipment SO SO SO SO SO $0 SO Technology Software/Hardware SO SO SO SO SO SO SO Art(1%of Construction) SO SO SO SO SO SO SO Contingency SO SO SO SO SO SO SO Program Management/Administration SO SO SO SO SO SO SO TOTAL I SO 5453,031 I SO I SO I SO SO I $453,031 Impact on Operating Budget I Prior Years FY 25/26 1 FY 26/27 1 FY 27/28 I FY 28/29 FY 29/30 Revenues(List. ) SO SO SO SO SO SO Personnel SO SI) SO SO SO SO Other Operating SO SO SO SO SO SO Supplies SO SO SO SO SO SO Capital Outlay SO S453,031 SO SO )rl ,1' TOTAL I SO I $453,031 I SO I SO I SO I SO Submitted by:Andrew Mack may 15,2025 Dept.Director: Department Director May 15,2025 s:VPVW P1erinAge"1 re}iia'Caaanc OP'C1{e111,I11504.2.2225 C55.I 1411 RratcK FY1425 Y%M S..(COOS) ^' NORTH? �SW 23rd Ave . 1Ye" F SCOPE OF WORK Bap . Beti Mill existing Asphalt surface 1 1/2" Deep L Forest .0 vs in ills Park N N = Identify any areas of exposed base, remove any mud or deleterious materials a and add new base rock material as needed to provide a flat level substrate ti �, for new asphalt base y y 5 �a`DU Re-compact exposed or corrected areas of base as needed prior to new SW 27th Terrace asphalt placement SW 28th Ave SE 28th Ave Re-pave road segments as indicated with Type S-III asphaltic pavement 1 1/2" Th. 4 SE 3Gth A Furnish new Stop Bar and 6" Dbl Yellow x 20' Lg./ w 4ea -RPMS ( Typ. All • Chapel0elid SE 31st Ave Stop Conditions) 3 Replace any damaged sod from operations as needed that may be damaged from equipment. staging, trucking or otherwise. ILIP. Seae-est Scrub Mission Hill Rd 2 Natural Area Contractor will be responsible for any damage to residential irrigation systems VICINITY MAP/SHEET KEY Remove & Re-install Traffic Calming Spped Hump where indication to conform to CBB Std engineering detail s P-26 & P-30 NOTE:Use caution during milling and tacking operations at paver driveway locations,contractor will be reponsible for any damage or cleanup associated with these operations. 1 TASK 225 — Chapel Hill Resurfacing MH Lids shall be cleaned of any asphaltic materials as a result of paving operations NORTH? FERWOOD DR. CANAL; DR. _ .. matchiinc.sre SHTJ ........... ..............................t..,e...fy...,�. '...........•.......... .•.•........ .S ` 4. �,` G !.' �I END - tx a _T-" r'- ' I .1 New Pavement _ b - ,� lo ‘, %, , fig. -..::‘ _ , It . m 'r ` _{I t it. Furnish/Install New Stop Z m el r ^ j � MIC gip ' L.a' • Bar,20'6Db1 Ylw,4 RPMs M■ "illi ` Q Resurfaced _ •0 4.1'25 �. (Typ-All Stop Conditions v r (/�5 4,4 - (Q 4'08'base repair at f•5 a tlir �. V '• } vane location adjacent ;.-► n 4 to mailbox-remove all - ,�` i y .- -- unsuitable material. • E -" add baso level& . re-compact prior to plating freash asphalt. 3'x8Foge Rep.,- Remove any unsuitable materials.level base& re-compact Prior to placing RIDGE LN. fres°asphalt CHURCHILL DR. f hline-sI T 3 •(/1.• !. ngtc ... 416nta tisam...... ..... Q Ccli lest • . 4 '''' i ..„,llik 4 I ..4, . i 0 Natural • i M. ill Rd "ii4f si ilIIRd Missicn Hill I-4 R , I Furnish/Install New Stop ' DART Bar,20'-6 0b1 Vlw.4 RPMs t ,4 In: (Typ-All Stop Contlitions - Furnish/Install206bNew Stop - II Z ¢II " - - Bar.20'E'Dbl YAv,4 RPMs ti� _ ex t , (Typ-All Stop Conditlons nl. : „,....•a I � s -I- • i. 'r 10'010'base repair at .� turnout-remove all . K unsuitable material, s 0 4add base level& re-compact prior to placing freash asphalt. 2 TASK 225 — Chapel Hill Resurfacing NORTHt 4f i -. Cha[7eIHi/l 8020 baserepairat r- I 7 r ' *�► �► + - B/Vd- unsuitable removeallC .'f, � material. _ N� add base level Resurfaced (it >• re-compact prior to �A w - - -I • 311,. T ar . placing fresh asphalt i Oct'24 ...47.-- 61 'n �chline-see3HT4R 1 t:r. � law *y• '� _. .. :._._._..._._..._._.'�- e._._._._._._._._.-•-._._._._._._.- - - - - - - - - -._..._._. _Chapel-Hill Blvd - =I 6.6 base repair at • r Chapel Hill Blvd _ �. •.•_ -' �' ¢ - '815'-remove all �!�y• r unsuitable material, .: v `, -7 G • • add base level 8 Fumist✓Install New Stop •�- _ re-compact poor to • _ Bar,20'-8'DW Vlw,4 RPMs y b _ placing fresh asphalt. 66. 'r• (Typ-All Stop Conditions - - .� • tr r, �.ui(aI �i-�—� CFumish/lnstall New Stop And .s3Bar,20'-4 ON Ylw,4 RPMs ' j:, ah• • ,. - ;- Tommy 0�� (Typ-Afl stop Conic bons `I . �► �r . w� S _ e . { ►t 4012 base repair at L.L. ..3122 � t ..r'/ / n. :.�. p ` - •3100'-remove all - - New unsuitable material, i r` ^ a� I" .� I V .r I NIC add base level& 1 "- I�U _ _ --1 C h U yre-ccompact poor to W h is p e rl n_ ' • .. Resurfaced � � 4J rte- I' w � d _ Oct'24 AI nt - placing fresh asphalt. r — �- - w F . Gust north dnVeway ps. , t' r - :-)it : � .'11 _ � y apron) ��C 10x10 base mD9tr 81 ' -4.414Y n- ,_ ,� '3122'-romove au rr•. unsuitable material. - r)I _ < add Dose level 8 .3! _ 'vlit d• - 1 De s i g n S•B re�ompactpriorto I tiIII1 • •� placing fresh asphalt w • .7 _ (at turnout radius as s- ,r ,L f deed) T' 1 i '*. Furnish/Instal New Stop _ irli t--- Hillcrest Rd a Ai w .:� Bar.20'fi'DblVw,4RPlds ar. - i i '1 • (Tye-All Stop Conditions t t ii° + PkIIIIII -r Furnish/Install New Stop . '="7., ',J` ilk Of 1 . _ fD Bar,20'-6•Dbl Vlw,4 RPMs 1E� - rr _ (Tye-A8 Stop Conditions - r F t 1. cL, Aria P s I � .. �: d: Q OMNI .1 I� �� x 0 . it ii J �I hline-see SHT 2 -. '' Gyle; 111-11:111 �t an Hill R - Missicn Hill Rd • ,rr�ra�l� r 3 TASK 225 — Chapel Hill Resurfacing NORTH4 t End of Asphalt Resurfacing at Sunset Dr. / Churchill aka SW 4th St cont'd see SHT 5 ..........._......7r.......... .�u,......-.........................._.... a :.e..IC:':...!►.........2..._. .... .0r�,..._y. I: 11:2I End New matc see - 5' (-) �e lam { • I • Pavement ✓!�. 1 -iiit End av New r . !� p , , - Pavements Skof Rd �' ' J •. _ Sun a�Rd #. A ` Sunset Rd 1 ,� _> Y ; y��a • 4'1'i Remove existing Speed 1 ",b4� `, v/!" 'DiYA _ * Hump 6 repave after '' r ' ` K Jr' _ resurfedng operetlons as . j ag per CBB Std Details P26 .- AV n-la �� d�' 3P30 III ' ..ensh/Install New Stop ^,) - , - Bar,20'fi'Dbl Vivo,4 RPMs i ( ►0 .. Furnish/Install New Stop ( e (7yp-AE Stop CoMitions w L j. . Bar,20'-6'top Y1w,4 RPMs _ . " ireic " a n (Typ-All Stop Conditions m' 0 Blue Sky Cornmunication rt. to III —4 , . ii , ..,_ ,- Cr ..„ 0 co li it t, it^�"' . Chapel Hit: J.1 I _ -i - 7 .h. , �._ �' a `: _ .lemitr 67 _. -�� ! '- e w- FumisWlnstall New Stop ; Ali. 6 ' Bar.20'-6 'Dbl Ylw.4 RPMs A ° , u _ _ ` '�i (Typ-A9 Stop Conditions 1111L.. 0 t 111iltr 4PIaY matchlme-see SHT 3 _... ..1. _._... -el I .. �1..'................ Chapel Hill Blvd- a . Niiiiii i Chapel Hill Blvd Resurfaced Oct'24 NIC 4 TASK 225 — Chapel Hill Resurfacing NORTH r=cn !vIrit • SW 5th 4SW�Sth St SW 5th St 4,1110?rill r7 L �,. , ` _40SW 5th St ,,, .. .„:„. .; ,,. .111 it -iirtil* . ,, . , pi , . •� iiiiv,„ iist Remove ezistlng Speed • 1 t *Nur' ' Hump 8 replace after "Ay I 4) 'J _ - s . resurfacing operations as /� {' . , . law . ter s .r er CBB Std Details P26 ► + • , i It I. tigi- 'I f !E•1`M� - 1 4.1 gilt- ). '''-`4 ell 'if' '�Churchil .{ - "� _ /SW/4th ct �C Gatew�ay t S�^J 4th St ' • .l�rSW Xh S>"..t ;;jjrch �._ r t , �1 ;i y _ IF A • itiVkiloiktitnill' 01 ..714 up 14.161 .1‘10.,-„i P itil' I e allir. 00-." I ' el ... Ap oi f Apappe, s ,/ ! ` r �,n • Biu'Sk J Ail.a • l I~r Til �� I . • ti4 Ailill 7 j �. 1 j� M 4. rX 81 ..- .� V . f 01:14 ---- l SW 4th�St� • SW/4thSty _r Remove existing Speed End of Asphalt ('__ L. -- '�tit:4", 1 1414111.1)Hump& a after ' resurfacingng operations eretlons as Resurfacing � � per CM Std Details P26 &P30 a••• l I ` . 4 . i 5 TASK 225 — Chapel Hill Resurfacing ROADWAY DESIGN CRITERIA 4 2011 MAIM amort 200.w0. Ma 11410164 Ma 1/0021111 010106'In h1) OFMD 06114.21 00 12106-10:(1,10aE 216 11-I0014 11010 TABLE OF MAH41M TERIALSAMCOJCTIOMSTANDAMS'. It) UIO da p 1rS++? (n M rar r a 0011.4.4 1+N• RESIDENTIAL ACCESS ALOCAL STREETS wow ram to 2 0-.4 am-t.. 1+N' Sr1 1a2(60•MOM r t to W-ta 1 IM 1 1/P m 120 m(4 20200 or t r 2m-so 1 N _ I yr w 000212001 MOWN 200Is002-112.)• r a r aaa- 1 vr I 4.• w 1011010 a Pat /026303600 r 10.0 a pa) am-.. 1+/r +Y.• w w (') mama CO anC0 6q raaa +r a p.a.1 r a) aaa-ta 1 WV r w w-1-0 fns 1-1/r a w ROTA Io MA 1 2-t a 1111001T C01006406. yr •to a la.1E1201m 6206 OM M•0r..1W0 IIR/Dar.NO a/6 110 6-6/lellC Ow Val I-1� 0 w Os 02•101 la�tot 116060116622/1103910116 RIEp6 Macaws). _ _ 100100 r 40102020 0 calm r 020002 IR102 m:�10m1a ma..000 r MOW MOM to 020012 w 1 Nub•a 00.02 2100 10 20 1.166 0 Mama 0s0210.210 m 0200 01 006106 00.2020 Nub 166.E 111 ammo Dam a s 000 40000 11.20. L 0364,10 WY a 12000w air w a 11,001102 Maar 003310 6 ROM Or am Ir 0211 w 01000111121131011 Aa.loam 01101 M 10012-004 1 a WY Mlle TM.a.UM •0101 TO Caa'�aala 00 2 06100.10110 S MaVIII.020101.K)Ma as as, 0[011 Fa/ moo so 0221.x.a room W miaow M 0100 co M tar.Tswana m aro Ho 00121 0220trut.01110121 00012 000 M 11D7a14er ae 11120 Oma 006212121 010121 60011001 1 [I) • - 1140017 oelkiesal 0 : ran. a 0003 ail 02 0200100 01 0021106 OF 0 Lai.•00020101!ROI;NOON 216 a>M I 0.000.26016 swan. MI a 0600014 100 a 200010 0001012. T.00.1011 FOM•206.61011 mar •u 0204 ala 606 0000 01 baba 010 M I 12: 021010002 101NY 0 Haaa0ll0r 6102•Ma •a aa02aM all 411 la elle a 600 Or•Tat 0M 001•war Mae OF a M. I•: 2002 10,..aid2:iR 11.1.000 a mak L OOa 006 Mal to SOW a M 0060111112112611 Or M 000106E 10100 0 2210.210 r A 6027 00 2012.2016 COMM 2002 01116 aloal 02002 Afire. 14 f-123 2141 fti3 a a 006112120 wI t-1•1-00 norawar. Jr a-+La mama Da 026 arra*04 f-as arm We as•war or 1-4.. 1t Y.101100 pa FOOT a1101 ac s-It3 Ma 1-1/0 120•Molal 0 a-+R' BOYNTON BEACH END.EERaSO STA/DAM DETAIL BOYNTON BEACH ENO EEAa 3 STAMARD DETAL aano PAVEMENT COMPOSITION 02 01 102 U`r 01_0110700 ROADWAY DESIGN CRITERIA p-�..•u• I 1.0 OYNTON 41 0 ►B EAC HBEACH RESIDENTIAL ACCESS AND LOCAL STREETS P-2 6 TASK 225 — Chapel Hill Resurfacing a*... {11AV 1607110 11011 jEROMWAY I no.431 roAt 1 Pt OM) A\\\\R\h,. L's ITT1) (TMa.) ��d CALMED r 0.0 I 4m- :rt If/.RAO.Wa .EE/IX C SPEED AREA '.-E V f1UMP 41100 SPEED SPEED aiuifND ROOM - OF WIT oast 014.1 E �'�. m■ ...CORM OF LW NPI .,W ,o. 6, X CROSS SECTION AND HUMP DIMENSIONS ((\ 9�w..► 20 `�"°"•T v. w Um Wr tom 4 \/ arem IWO WOE LWOW l'QUO Yg10 OWq ■M 96aat ,.$3 on In 000 •n 40D' MU EGO FIGURE.TB-2B TYPICAL o t2D 223 SOD on o o' oKAI NOWT RPF'tYAt ADVANCED o an tN OW xa S00 aov PAVEMENT MARKINGS FOR SPEED S SPECIALSITRAFFIC HUMPS CALMED AREA illii. SIGNS eO1�"• ta�+�sawRc mrr+trAnat Y sway*VOO.Toe IDA.mono mote o onw of auto onto nt s.nn.A,: T+�TT B 7 (T4 ft antler OF •%O FOOT. IMA00 TOM Ta FOOT Tomo a*TOW sTown03 root amok CdaA oxo it (e n) TeAtu Ix 104000Ip a*unuTT mato..oT or VAN moo**ono oop,watt.not , Tone OM Ito 0r or ocroorto N !tool no or In mat.stp,Wp. 2 no 101070141 NO 07130 OF 1101¢04 00,000%WOO*FALL OE w COM010400;RIO TYPICAL SPEED HUMP DIMENSIONS MOW.0,1 .. n.: ALL 110000.0111C MOOR tomo 9N tomt:N 03100.7041 ser on 7.1 Or mt Fno.. (SURFACE OFFSETS 5 IN.,4 IN., AND 3 IN) OM Y•XI„ EOE ; ��IMO OM=*001.442NnauaTaIRO KIP 0atomnTwrcTeat N ruto m:onw�ut R a"now ofrowoo taa000.�..w.r n,amt s+®,trt u* HUMP SURFACE S III7 E a 110104 Own MOONS.R to At len o 0a,tMTrlar m Toa.a..s*m HEIGHT RADIUS LIM17 ��,igg aAlomt Tore wtm 11..47 4*tato.a4 wean ra«m to,. r 47.47 t5 E ROADWAY I ``T� W®MAA TTA!.a stntm weN A;a:•p `` (�y� .I Mt NOM"RY4i M.=90i0iK.T At.am Od 0064 TITTO au.M4 to uto 67 y 0 % lDa MIY.Ye.1os • •' 5A21 20 3EA0•0 tAAlf t. 134 Loom tcco04•O An OF 960 Sat R V noon N rot MICR Y Tl.tY ?! ry 9 ♦ Mw O SOO KAPP NTC TooeemOIL OMIT oWOULD so M no woo I tenTOTon w w MUTCD FIGURE JB-29.. TYPICAL t. o,Mommlro4''u°vneTOT OMR`mm'Iae®"mm.Te Mane Woo v®Kan Ow a PAVEMENT MARKINGS FOR SPEED BOYNTON NEAP.ENGINEERING STANDARD DUAL TABLES TRAFFIC CALMING PS h BOYNTON BEACH DOWERING STANDARD OCTAL BOYNTON REACH ENGINEERING STANDARD OCTAL BOMIRON STANDARD SPEED HUMP — , To.TT B!A t M CONSTRUCTION DETAILS P-26 TYPICAL PAVEMENT MARKINGS ov10 TRAFFIC CALMING STANDARDS el, BOYNTON s E A t SPEED HUMPS OR TABLES P 1G s E A c= AND SIGNAGE DETAILS DMA� 7 TASK 225 — Chapel Hill Resurfacing