Loading...
Sunbelt HydraulicsPROJECT NAME: Sunbelt Hydraulics ):~q~' APPLICANT'S AGENT: Joseph Houston, Kerns Construction APPLICANT'S ADDRESS: 2720 Windsor Avenue, West Palm Beach, FL 33407 ~ ~/f'~ DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: August 6, 2002 TYPE OF RELIEF SOUGHT: New Site Plan Approval for a 12,480 square foot industrial facility in an M-1 zoning district on a 1.44 acre parcel. LOCATION OF PROPERTY: Lot 9 of Boynton Beach Industrial Park North DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. The Applic. ant ~X~ HAS HAS NOT established by substantial competent evidence a basis for the relief requested. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". The Ap~l!.cant's aplJlication for relief is hereby ~,,. GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. o 7. Other DATED: ~--?~ -"~ ~ '~z.~ ~. City Clerk S:\Planning\SHARED\WP\PROJ ECTS\Sunbelt H~/drauhcs\DO.doc All further development on the property shall be made in accordance with the terms and conditions of this order. LoCation Map Sunbelt Hydraulics EXHIBIT "A" 4OO 0 PU 800 1200 1600 Feet EXHIBIT "B" Z I' -- ~ · , ~ ~.~ ~e [~ > '~ ~ ' ' , ? ll,L' ~ Ii ~ i ~_ ~ ~,.'~" qi~! t (7(-,L ~i CSX RAILROAD  ~;i Oq ~"I ~ 51 ' ~l SUNBELT H~RAUUCS ~ ~ ~ ~ ~t~'~i ~' I~ST NDUSTRIAL AVENUE KERNS CONSTRUCTION EXHIBIT "B" wEST ~NCbSTRIAL EXHIBIT "B" WEST INDUSTRIAL AvE WATER/WASTEWATER PLAN SUNBELT HYDRAULICS W~$T INDUSTRIAL A~NUE CSX R.A~LROAD KERNS CONSTRUCT!ON E!HIBIT "B" EXHIBIT "B" EXHIBIT "C" Conditions of Approval Project name: Sunbelt Hydraulics File number: NWSP 02-008 2nd )lans identified with a June 18 2002 Ptannin date DEPARTMENTS INCLUDE REJECT PUBLIC WORKS- General Comments: None X PUBLIC WORKS- Traffic Comments: None X UTII,ITI]gS Comments: 1. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m, at stated in the LDR Chapter 6, Article IV, Section 16, or the requirement imposed by insurance Underwriters, X whichever is greater (see CODE Section 26-16(a)). In addition, the LDR Chapter 6, Article IV, Section 16 requires that all points of the building will be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition by showing all hydrants. 2. Any water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of twelve (12) feet. X These easements shall be dedicated via separate instrument to the City as stated in CODE Section 26-33(a). Comments: None X POLICE Comments: None X ENGINEERING DMSION Comments: 3. Provide an engineer'.s certification on the drainage plan as specified in the X LDR, Chapter 4, Section 7.F.2. 4. Depict sight triangles on the site and landscape plans (LDR, Chapter 7.5, X Conditions of Approval 2 DEPARTMENTS INCLUDE REJECT Article II, Section 5.H. Site triangle should be placed at the property line on the site plan. This may be provided at the time of permitting. 5. Provide details for handicap parking in'accordance with City Standard X Drawing B-98001. This may be provided at the time of permitting. 6. Reconfigure driveways to 48 feet total w~dth ( 24 either side o property line) X two - 4 foot handicap accessible painted routes are included in the 24 foot measurements. BUILDING DIVISION Comments: 7. At time of permit review, submit signed and sealed working drawings of the X proposed construction. 8. At time of permit review, submit for review an addressing plan for the X project. PARKS AND RECREATION Comments: None X FORE STERfENVIRONMENTAI ,I~T Comments: None X PLANNING AND ZONING Comments: 9. An environmental review permit is required. Apply for an environmental X review permit prior to issuance of building permit. 10. A traffic impact statement meeting the requirements of Palm Beach County X Engineering shall be required prior to issuance of building permit. 11. Correctly show the site triangles on the site plan. X 12. Provide a detail of the proposed outdoor lighting structure(s), including the X dimensions, color, and material. 13. Provide a detail that includes the materials and color of the monument sign. X Colors and materials for.the sign must be approved by the Planning and Zoning Division, prior to issuance of a building permit. Also provide the property address at the top of the monument sign. DEPARTMENTS INCLUDE REJECT 14. The base of the monument sign shall be enhanced with colorful groundcover X plants and a minimum of two (2) colorful shrub species (Chapter 7.5, Article 1I, Section 5.O.). 15. All required trees shall be at minimum 12 feet overall height and 3 caliper X inches when planted (Chapter 7.5, Article II, Section 5.C.2.). 16. All above ground mechanical equipment such as exterior utility boxes, X meters, and transformers, shall be visually screened (Chapter 9, Section 10.C.4.). Equipment placed on the walls of the building shall be painted to match the building color. Place a note on the site plan indicating this requirement. 17D This project will require a cross access agreement for the shared driveway X with the property to the south (Lot 8) prior to issuance of a building permit. 18. If there are any off-site improvements, specifically on Lot 8, the project will X require an agreement / owner authorization. 19. The shared entrance drive is greater than the 32 feet permitted by Code. X Approval of the Director of Development is required. (Ch. 23, Art. II. H.) I 20. On the Landscape plan, correct the plant list by replacing "LO" (Live Oak) to X "PP" (Pigeon Plum). 21. Landscaping at project entrances shall contain a minimum of two (2) colorful X shrub species on both sid6§ of the entrance and a signature tree (Chapter 7.5, Article II, Section 5.N.). Note that signature trees do not contribute toward the total number of required perimeter trees. 22. The front landscape buffer adjacent to West Industrial Avenue shall contain X two layers of plant material. The first layer shall be a combination of colorful groundcover plants and a minimum of two colorful shrub species planted in a continuous row. The 2na layer shall consist of a continuous hedge or decorative site wall. The continuous hedge (2~ layer) shall be a minimum of 24 inches in height, 24 inches in spread and planted with tip-to-tip spacing immediately after planting. The hedge shall be maintained at four (4) feet. If a decorative site wall is used, it shall be constructed not less than three (3) feet in height (Chapter 7.5, ArtiCle II, Section 5.D.). 23. The site plan depicts a median/island at the entrance of the proposed project, X which is not shown on pages 2 of 3 and 3 of 3. Please address accordingly. ADDITIONAL COMMUNITY REDEVELOPMENT AGENCY BOARD CONDITIONS Comments: 24. Recommendation was made for applicant and staff to work together to X include a landscape maintenance agreement for the shared, five-foot Conditions of Approval 4 DEPARTMENTS INCLUDE REJECT landscape strip along the south property line. ADDITIONAL CITY COMMISSION CONDITIONS Comments: 1. To be determined. S:\Planning\SHARE D\WP\PROJ ECTS\Sunbelt Hy:lmutics\COA.doc