M & L RoofingDEVELOPMENT ORDER OF THE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORIDA
PROJECT NAME:
APPLICANT'S AGENT:
APPLICANT'S ADDRESS:
M & L Roofing
Riza N. AItan, P.E. / Turquoise, Inc.
1253 Okeechobee Road, Suite A-2 West Palm Beach, FL
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: August 6, 2002
TYPE OF RELIEF SOUGHT: Major Site Plan Modification
LOCATION OF PROPERTY: 630 West Industrial Avenue
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
33401
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings
and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the relief
sought by the applicant and heard testimony from the applicant, members of city administrative staff and
the public finds as follows:
Application for the relief sought was made by the Applicant in a manner consistent with the
requirements of the City's Land Development Regulations.
The Applicant
X' HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set forth
on Exhibit "C" with notation "In cluded".
The Applicant's application for relief is hereby
j~' GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
All further development on the property shall be made in accordance with the terms and
conditions of this order.
7. Other
DATED:
S:\Planning\SHARED\WP\PROJECTS\M&L
Clerk
Location Map
M & L ROOFING
EXHIBIT "A"
NW '-/'TH:
0 400
4~30 800 1200 1600 Feet ~,
W~ E
S
TURQUOISE, ..... Inc.
EXHIBIT "B"
TURQUOISE, Inc.
EXHIBIT "B~.
[?
]
EXHIBIT "C'
Conditions of Approval
Project name: M & L Roofing
File number: MSPM 02-003
Reference: rewew plans ldent~fied as Malor Site Plan Modification file # 02-003 with a May 10, 2002
Planning and ZOning Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORK,q - General
Comments:
1 City Ordinance (CODE, Chapter 10) requires that arrangements be made X
with the Public Works Department for any waste disposal associated with
this site plan. Please contact the Public Works Department (561-742-6200)
regarding the storage and handling of refuse. Roll-out trash pickup will be
allowed in lieu of a dumpster and enclosure. The applicant represents that
use of roll-out pickup is adequate to meet the needs of this commercial
establishment now and in the future. No more than two (2) roll-outs will be
allowed for this site, to coincide with the one utility service provided. The
applicant acknowledges that changes to this site and building use, resulting
in an increase in trash volume and/or building occupancy, will require re-
evaluation of the need for a dumpster and enclosure. Should said changes
occur in the future it will be the sole responsibility of the applicant to
provide the needed facilities (i.e. dumpster and enclosure). Multiple roll-
outs for multiple tenants shall not be allowed.
PUBLIC WORKS - Traffic
Comments: None X
UTII,ITIES
Comments:
2. Fire flow calculations will be required demonstrating the City Code X
requirement of 1,500 g.p.m, as stated in the LDR Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (see CODE section 26-16(a)).
Comments: None X
POLICE
Comments: None X
COA
08/12/02
DEPARTMENTS INCLUDE REJECT
ENGINEERING DMSION
Comments:
3. A lighting plan including photo metrics, pole wind loading, and pole details X
in conformance with the LDR, Chapter 6, Article IV, Section 11, Chapter
23, Article 1, Section 5.B.7 and Chapter 23, Article II, Section A will be
required at the time of permitting. If possible please provide this information
as part of your TRC plan submittals - it is much easier to identify and correct
any deficiencies now than while you are waiting on a permit.
4. At the time of permitting, specify inlet types, etc. on drainage plan. Indicate X
invert elevations for all structures. Indicated grade of storm sewer segments.
Provide details for proposed inlets (LDR, Chapter 6, Article IV, Section
S.A.2.f).
BUILDING DIVISION
Comments:
5. Add a labeled symbol to the site plan drawing that represents and delineates X
the path of travel for the accessible route that is required between the
accessible parking spaces and the accessible entrance doors to each tenant
space. The symbol that is required to be installed along the path shall start at
the accessible parking spaces and terminate at the accessible entrance doors
to the building. The symbol shall represent the location of the path of travel,
not the location of the detectable warning or other pavement markings. The
location of the accessible path shall not compel the user to travel in a
drive/lane area that is located behind parked vehicles. Identify on the plan
the width of the accessible route. (Note: The minimum width required by the
code is forty-four (44) inches). Add text to the drawing that would indicate
that the symbol represents the accessible route and the route is designed in
compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and
Passenger Loading Zones) of the Florida Accessibility Code for Building
Construction. Please note that at time of permit review, the applicant shall
provide detailed documentation on the plans that will verify that the
accessible route is in compliance with the regulations specified in the Florida
Accessibility Code for Building Construction. This documentation shall
include, but not be limited to, providing finish grade elevations along the
path of travel.
6. Identify within the site data the finish floor elevation (lowest floor elevation) X
that is proposed for the building. Verify that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues [Section 3107.1.2, Chapter 31 of the
2001 Florida Building Code]:
a) The design professional-of-record for the project shall add the following
COA
08/12/02
3
DEPARTMENTS INCLUDE REJECT
text to the site data. "The proposed finish floor elevation __ NGVD
is above the highest 100-year base flood elevation applicable to the
building site, as determined by the South Florida Water Management
District's surface water management construction development
regulations.
b) From the F/RM map, identify in the site data the title of the flood zone
that the building is located within. Where applicable, specify the base
flood elevation. If there is no base flood elevation, indicate that on the
plans.
c) Identify the floor elevation that the design professional has established for
the building within the footprint of the building that is shown on the
drawings titled site plan, floor plan and paving/drainage (civil plans).
7. Indicate on the site plan within the floor area of the new and existing X
building the primary use of the stmcture/facili .ty.
8. At time of permit review, submit signed and sealed working drawings of the X
proposed construction.
9. At time of permit review, submit for review an addressing plan for the X
project.
10. Add to all plan view drawings of the site a labeled symbol that represents the X
location and perimeter of the limits of construction proposed with the subject
request.
PARKS AND RECREATION
Comments: None X
FORESTER
Comments: None X
PLANNING AND ZONING
Comments:
11. The subject property's designated Future Land Use designation is Industrial X
(I) and Official Zoning district is Light Industrial (M-l) and should be
indicated as such in the site plan tabular data.
12. The survey (or site plan) must identify the Official Zoning District and X
Future Land Use designation for the adjacent properties (Chapter 4, Section
A.3.).
13. Pr ' d t' e o osedoutdoorli fin stmctur s includin the
COA
08/14/02
4
DEPARTMENTS INCLUDE REJECT
dimensions, color, and material.
14. Include a color rendering of all elevations prior to the Community X
Redevelopment Agency meeting (Chapter 4, Section 7.D.2.).
15. All above ground mechanical equipment such as exterior utility boxes, X
meters, transformers, shall be visually screened (Chapter 9, Section 10.C.4.).
Equipment placed on the walls of the building shall be painted to match the
building color.
ADDITIONAL COMMUNITY REDEVELOPMENT AGENCY COMMENTS
Comments:
16. Continue the mansard roof along the entire north and west side elevations. X
17. The color used is "Soft Cranberry- Benjamin Moore #2094-40". X
18. The eight and one-half (8 ½) inch by 11 inch version of the elevations X
drawings (shown at the CRA meeting) shall be used as the tree
representation of the project.
ADDITIONAL CITY COMMISSION COMMENTS:
Comments:
19. To be determined. ~ ~
S:\Planning\SHARED\WP\PROJ ECTS\M&L Roo~ng\COA.doc