R02-140RESOLUTION NO. R02- Iqt~ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 2 TO THE EAST WATER TREATMENT PLANT, PHASE III, PARKING LOT CONSTRUCTION PROJECT (BID NO. 06-2413-02/KR) WITH MEGAN SOUTH, INC., IN THE AMOUNT OF $10,865.35; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, this change order consists of the installation of additional sub-grade, sub-base and ¼" asphalt lift at the north roadway at East Water Treatment Plant site as requested by the Design Engineer;; and; WHEREAS, the City Commission, upon staff's recommendation, has deemed it appropriate, and in the best interests of the public, to approve Change Order 2 to the East Water Treatment Plant, Phase Ill, Parking Lot Construction project with Megan South, Inc., in the amount of $10,865.35; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct the Mayor and City Clerk to approve and execute Change Order No. 2 with Megan South, Inc., in the amount of $10,865.35, for the East Water Treatment Plant, Phase BI Parking Lot Construction project: Section 2. This Resolution shall become effective immediately upon passage. ~f~C,~?~.OEF~~' City Of Boynton Beach .~.1~. artment of Engineering ,~,~.,~.~-.,~-Construction Services Division Change Order A1A Document G701 Distribution: Owner x~ Architect xQ Consultant Q Contractor x~ Field Qx Other Q Project: EWTP Parking lot To: Megan South 6521 Orange Drive Davie, Florida 33314 Change Order Number: 2 Initiation Date: April 26, 2002 Contract Date: Jan. 1, 2002 You are directed to make the following changes in this Contract: Install additional sub-grade, sub-base, and %" asphalt lift at North Roadway on site as requested by the Design Engineer. Contract changes due to: Unforeseen site condition Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including- any adjustment in the Contract Sum or Contract Time, The original (Contract Sum) (Guaranteed Maximum Cost) was $153,200 Net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Cost) will be increased by this Change Order $10,079 $163,279 $ 10,865.35 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order $174,144.35 The Contract Time will be (increased) by 12 Days The Date of Substantial Completion as of the date of this Change Order therefore is July 5, 2002 Dave Kelley Architect/Engineer Meqan South, Inc. Contractor Owner Address: City of Boynton Beach, Director En.qineerinq , Address:6521 Orange Drive Address: Davie, Florida 33314 City of Boynton Beach / /. Boynton Beach, FL 33435 ~ ~ X Gerald F. Broening, Mayo~...~ Distribution: Owner x~ Architect xQ p~~~' City Of Boynton Beach _J;;;;le~artment of Engineering str:uction Services Division Change Order A1A Document G701 Consultant Q Contractor x'QI Field QIx Other Project: EWTP Parking lot To: Megan South 6521 Orange Drive Davie, Florida 33314 Change Order Number: 2 Initiation Date: April 26, 2002 Contract Date: Jan. 1, 2002 You are directed to make the following changes in this Contract: Install additional sub-grade, sub-base, and %" asphalt lift at North Roadway on site as requested by the Design Engineer. Contract changes due to: Unforeseen site condition Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including- any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was Net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Cost) will be increased by this Change Order The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order The Contract Time will be (increased) by The Date of Substantial Completion as of the date of this Change Order therefore is $153,200 $10,079 $163,279 $ 10,865.35 $174,144.35 12 Days July 5, 2002 Dave ,Kelley Architect/Engineer Address: City of Boynton Beach, Director Enqineerin.q Me(~an South, Inc. Contractor Owner Address:6521 Orange Drive Address: Oavie, Florida 33314 City of Boynton Beach I ~ Boynton Beach, FL 33435 ; I "f"~:",,~ m /- , -- Date: L/ %)'~ /t Io~- ,,..ow~to~oa,. O~-O3-Oo% Memo To: Paul Fleming Engineering Division Janet M. Prainito City Clerk r~neS Central File, Ma arka September 4, 2002 Change Order for EWTP Parking Lot- R02-140 Attached is the fully executed original Change Order that was approved by the City Commission on August 20, 2002 at their regular meeting. A copy of this Change Order is on file in the City Clerk's Office. Attachment jmp S:\CC~WFNVlemos~Janet~StaffiCommission Related to StaffiTransmittaJ of Change Order for EWTP from 08-20-02.doc