R02-170 " RESOLUTION NO.~02- , 70 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING AND APPROVING A SECOND AMENDMENT TO AGREEMENT BETWEEN THE CITY OF BOYNTON BEACH AND KIMLEY-HORN AND ASSOCIATES, INC., FOR THE INDUSTRIAL AVENUE CORRIDOR STORMWATER IMPROVEMENTS PROJECT; AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE SAID AGREEMENT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Commission, upon recommendation of staff, has deemed it to e in the best interests of the citizens and residents of the City of Boynton Beach to approve he Second Amendment to the Consultant Agreement between the City of Boynton Beach d Kimley-Hom and Associates in the amount of $134,218.15, for additional construction hase engineering services for Industrial A venueILake Boynton Estates Infrastructure provement Project; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF HE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does ereby authorize and approve the Second Amendment to the Consultant Agreement between he City of Boynton Beach and Kimley-Hom and Associates in the amount of$134,218.15, or additional construction phase engineering services for Industrial AvenueILake Boynton states Infrastructure Improvements Project, which Second Amendment is attached hereto as xhibit "A". Section 2. The Mayor and City Clerk are authorized and directed to execute said greement. Section 3. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this fl- day of September, 2002. CITY ?F B~1];.oN J;l'EACH, ~LORIDA ~~ - ;2~/ ~A7 ~~/ ~ '-v:~--:T- ~~s_~o:ert . ~ c..J~ Commissioner ~ ~ _..u\',I\I\\ \111/11</1' Corpo,~~".e,_() .j'lc', <:; /. ~ ..,..... IV .:. :-";:"'0. 00 ()'" ,- :;: 0 ,"o.~ A..1~." :;; ::::::.r F.'.' ~ =::,).. :~ ~o\ S ~ I- !- ~ --r- :: cal~~. Ki.,leyh.l''l"l~odJen;; ~ ~ .... -, t1LU.l [g- ........ -0. .0' S:' -<-:;;, ............ ~ ~ <11/ f:"LOF\\\.) ,~ II/i', \\\" "'!jnill\'li\\ Roa- 170 SECOND AMENDMENT TO AGREEMENT THIS IS A SECOND AMENDMENT TO AGREEMENT, dated the J.:L day of Se.pr~ be(' ,2002, between: CITY OF BOYNTON BEACH, a municipal corporation of the State of Florida, hereinafter referred to as "City," and KIMLEY HORN AND ASSOCIATES, INC., a North Carolina corporation authorized to do business in the State of Florida, its successors and assigns, hereinafter referred to as "Consultant." WHEREAS, on July 18, 2000, by Resolution No, ROO-lOS, the City Commission authorized the proper City officials to execute an Agreement with Consultant authorizing the performance of services for the Industrial Avenue Corridor/Lake Boynton Estates Infrastructure Improvements Project ("Project"), said Agreement dated July 20,2000 ("Agreement"); and WHEREAS, on November 20,2001, by Resolution No, RO 1-308, the City Commission authorized the proper City officials to execute a First Amendment to Agreement, providing for additional engineering services in connection with the Project; and WHEREAS, on September 17, 2002, by Resolution No, R02- (10, the City Commission authorized the proper City officials to execute this Second Amendment to said Agreement authorizing Consultant to provide additional and continuing services for the Project for an amount not-to-exceed $134,218.15; and WHEREAS, Consultant represents that it possesses the knowledge, ability, professional skills and qualifications to perform services and covenants to carry out the terms of the Agreement and this Amendment; NOW, THEREFORE, in consideration ofthe mutual promises and covenants contained herein, and other good and valuable consideration, the receipt and adequacy of which are acknowledged, the parties agree as follows: Section 1. into this Agreement. The foregoing recitals are true and correct and are hereby incorporated S:\CA\AGMTS\Consulting\Kimley Horn Amendment2.doc - 1 - Section 2, That the Agreement is hereby amended to provide for additional work to be completed by Consultant in connection with the Project, as more specifically described in Composite Exhibit "1," which is attached hereto and incorporated herein by reference. Consultant shall be paid for these additional services in accordance with the Agreement, and in an amount not to exceed $134,218.15. Payment shall include full payment for all services and costs, including direct labor, overhead, other costs, subconsultant fees and profit. Section 3, In all other respects the original Agreement between the parties dated July 20, 2000, and all amendments thereto are hereby ratified, reaffirmed and shall remain in full force and effect as provided by their terms. IN WITNESS OF THE FOREGOING, the parties have set their hands and seals the day and year first written above. WITNESSES: CITY 07071ZH By ~: ' " -- / Mayor! --- ~7~~ ~.~ (CORPORATE SEAL) \\\ \ \ \ \I 1111 1111111 ~. \.\. '\j' 0 ',' ^, 'Ii:.'#. A'T'~ . 'v 1": ~,;. t~ "'''''>0, 0 ':'J,e .,'i ,:~;~0' P .....,. ,t.' ,'. """" ',' 11'" WITNESSES: KIMLEY HORN AND ASSOCIATES, INe. a~~ l>resideHt 4,v,"t ,~. S:\CA\AGMTS\Consulting\Kimley Horn Amendment2.doc - 2 - ATTEST: " -.-...,\\, . .,----' --- (CORPORATE SEAL) STATE OF flo,.: J ~ : COUNTYOF~8e(l"~ : BEFORE ME, an officer duly authorized by law to administer oaths and take acknowledgments, personally appeared before me this October 3 2002, David R. Bardt and Michael D. Spruce as Assistant Secretary and Assistant Secretary , respectively, ofKIMLEY HORN AND ASSOCIATES, INC" a North Carolina corporation, and acknowledged they executed the foregoing Agreement as the proper officials ofKIMLEY HORN AND ASSOCIATES, INC" for the use and purposes mentioned in it and they affixed the official seal of the corporation, and that the instrument is the act and deed of that corporation. (SEAL) otary Public, State of Florida (Signature of Notary taking ......... ..~'<t!'.y.:Iift:' Marilyn E. Carran Acknow ledgment) [*(t!i.":~ MY COMMISSION If CC998647 EXPIRES ~1'~~'1 February 4, 2005 . "'~iIii;I\.~'" aONotO fHRV TROY FAIN INSURANC~ INC. Marllyn E. Carran Name of Notary Typed, Printed or Stamped My Commission Expires: February 4, 2005 Commission Number OC998647 S:\CA\AGMTS\Consulting\Kimley Horn Amendment2.doc - 3 - EXHIBIT A SCOPE OF SERVICES Kimley-Hom and Associates, Inc, has been requested to provide the following additional services by the City of Boynton Beach: Additional Construction Phase Services Kimley-Hom has been providing Construction Phase Services in support of the City on the Industrial Avenue Corridor Stonnwater Improvement Project since January 2002. We have worked closely with the City's Project Manager to determine the level of engineering support, construction observation, and clerk-of-the-works services that are required to adequately oversee construction of this important project. The level of effort to date has been significantly greater than that anticipated during the original scoping of the project. The following paragraphs provide justification for the increased level of effort. The original contract between Kimley-Hom and the City included a budget of $54,780.00 for Task 5 - Construction Phase Services, It was anticipated that the project could be constructed in 3.5 months. However, the scope of construction grew substantially during design phase as we added several elements to the project. The additional elements of work included: · Construction of approximately 1,350 feet of 8" DIP water main, new fire hydrants, and new service connections for the businesses along Industrial A venue · Construction of water main improvements within Lake Boynton Estates · Construction of an extension of the right-turn lane from West Industrial A venue to Boynton Beach Boulevard · Construction of additional drainage improvements along West Industrial Avenue (the original plan did not include significant underground piping and drainage structures) · Construction of improvements to the FDOT ditch connecting Detention Pond B to the E-4 canal - I - H:\044349002\contract amendment\AddexA 08-02-02,doc · Construction of additional sidewalk. improvements in the Industrial Park and near Detention Pond B . Construction of a new outfall for the drainage from Southwest 2nd, 3rd, and 4th A venues in Lake Boynton Estates to the FDOT ditch in response to FDOT comments These increases in the scope of construction were accompanied by an increase in contract duration due to the additional work required. In addition, the project phasing was altered to reduce the impacts on the business owners and residents in the area, At the time of the bid, the contract duration was established at 270 days (9 months), This constitutes a 5.5-month increase in contract duration over that originally scoped. The City elected not to amend Kimley-Hom's Construction Phase scope at the time of the design changes. Kimley-Hom agreed to commence our Construction Phase services on the basis of the original scope and budget to avoid any unnecessary delays in the proposed construction start date. We agreed that we would readdress any required budget increases at a later date. As of the date of this Request for Contract Supplement, Kimley-Hom has expended the entire Construction Phase budget. The services required of Kimley-Hom have been increased as follows: · The City has asked that our field representative be available on a full-time basis to observe the Contractor's progress. This is due largely to concerns about the quality of the work and compliance with the contract documents. In addition, the Contractor frequently is working six days per week to recover schedule, so our inspector is working more than a standard work week. The original budget considered that field observations would be performed by both City and Kimley- Horn personnel. We anticipated a division of work between Kimley-Horn and the City that would allow a half-time inspector for Kimley-Hom and minimal field visits by the Engineer of Record. We submit that a 9-month assignment for a full- time field inspector constitutes a substantial increase in the level of effort required of Kimley-Horn. - 2- H:\044349002\contract amendment\AddexA 08-02-02.doc · It follows that the engineering and office support requirements have been increased substantially: · The number of weekly Progress Meetings and engineering site visits has increased significantly. · The amount of project correspondence and maintenance of the project records has also increased. · The original budget considered reviews of four pay applications. We have already processed five pay applications and expect to review at least 12 total pay applications before final closeout. · The original budget considered reviews of up to 15 RFIs, To date we have responded to 34 RFIs, and we expect to receive several more as the contractor begins work in the Industrial Park area, · The original budget considered reviews of up to 20 submittals, To date we have reviewed approximately 30 submittals (including resubmittals of incomplete or incorrect shop drawings). · The original budget considered processing of up to two Change Orders, To date we have received 11 Change Order Requests and have prepared five official Change Orders for signature by the City and the Contractor, We anticipate that several more Change Order Requests will be received, · The Contractor has changed their designated Project Manager and Construction Superintendent, as well as several crew foremen, so the field engineering requirements have increased as we have worked to acclimate the new personnel to the project, the project documentation requirements, and our expectations for quality. · Despite considerable efforts to coordinate with other utility owners during design phase, we have expended substantial effort during construction to coordinate relocation of both underground and above-ground facilities to facilitate construction. We believe that we have developed a strong and mutually beneficial working relationship with the City Project Manager and other City staff on this project, We - 3 - H:\044349002\contract amendment\AddexA 08-02-02,doc have coordinated closely on nearly every activity during design, bid, and construction, For example, the engineering estimate of construction costs was nearly $2.8 million. The City Project Manager and Kimley-Horn worked together to clearly define the scope of work in discrete pay items, and the successful base bid was less than $2,6 million. We also coordinated to create alternative bid items to facilitate better pricing of the drainage pipes. The resulting bid on the alternative bid items was $2.51 million, This cooperative effort saved the City nearly $86,000 over the base bid, Our cooperative efforts during construction phase have included numerous site visits to identify and solve potential problems before the Contractor encounters them, This proactive approach will certainly provide a benefit to the City and the Contractor in terms of schedule and project cost. We have also identified additional opportunities for infrastructure improvements within the project boundaries that will provide a great benefit to the residents and business owners in the area. In particular, we have coordinated with the City to identify opportunities for needed water main upgrades in the Lake Boynton Estates area. Because the Contractor is already mobilized on site and Kimley-Horn is actively participating on the project, the City will save money on engineering and construction of these improvements and will minimize future construction impacts to the residents in the area. We have also coordinated closely with the Contractor in an effort to expedite construction. We believe th~t our open communication with the Contractor has resulted in field engineering changes that have improved the quality of work and benefited the project schedule. We believe that we have demonstrated our commitment to client service and a quality work product time and time again, However, we recognize that our additional effort comes at a price to the City. In recognition that the engineering costs have grown beyond our original estimates, Kimley-Horn has agreed to lower the agreed-upon hourly billing rate for our field inspector from $65/hr to $50/hr on this project. We -4- H:\044349002\contract amendment\AddexA 08-02-02.doc point out that that our most experienced field inspectors typically bill at substantially higher rates. Over the life of the project we expect the City to realize a savings of more than $23,000 as a result of this rate change. We have also written off $9,850 of engineering effort expended during construction phase, We request that the City recognize our efforts on your behalf and grant us the proposed additional fees to complete the project. - 5 - H:\044349002\contract arnendment\AddexA 08-02-02,doc EXHIBIT B FEE AND BILLING The original budget for Construction Phase Services was established at $54,780.00, Kimley-Horn and Associates, Inc. proposes to provide the additional services described in Exhibit A on an hourly basis using the hourly billing rates defined in Exhibit C. We will provide these additional services for an additional fee not-to- exceed $134,218.15. Total fee for Construction Phase Services will be $188,998.15. Exhibit C is a detailed breakdown of the effort expended to date and the proposed fees to provide additional services through final closeout. The not-to-exceed fee includes labor costs and direct expenses as well as items such as local cellular phone, in-house duplicating and blueprinting, facsimile, local mileage, telephone charges, postage, and computer expenses. All permitting, application, and similar project fees will be paid directly by the Client. Alternatively, Kimley-Horn will agree to pay these fees with the understanding that the City will reimburse us for these expenses. Fees will be invoiced monthly based upon the actual effort expended as of the invoice date. Payment will be due within 25 days of the date of the invoice. -6- H:\044349002\contract amendrnenMddexA 08-02-02.doc EXHIBIT A SCOPE OF SERVICES Kimley-Horn and Associates, Inc. has been requested to provide the following additional services by the City of Boynton Beach: Additional Construction Phase Services Kimley-Horn has been providing Construction Phase Services in support of the City on the Industrial Avenue Corridor Stormwater Improvement Project since January 2002. We have worked closely with the City's Project Manager to determine the level of engineering support, construction observation, and clerk-of-the-works services that are required to adequately oversee construction of this important project. The level of effort to date has been significantly greater than that anticipated during the original scoping of the project. The following paragraphs provide justification for the increased level of effort. The original contract between Kimley-Horn and the City included a budget of $54,780.00 for Task 5 - Construction Phase Services. It was anticipated that the project could be constructed in 3.5 months. However, the scope of construction grew substantially during design phase as we added several elements to the project. The additional elements of work included: . Construction of approximately 1,350 feet of 8" DIP water main, new fire hydrants, and new service connections for the businesses along Industrial A venue . Construction of water main improvements within Lake Boynton Estates · Construction of an extension of the right-turn lane from West Industrial A venue to Boynton Beach Boulevard · Construction of additional drainage improvements along West Industrial Avenue (the original plan did not include significant underground piping and drainage structures) · Construction of improvements to the FDOT ditch connecting Detention Pond B to the E-4 canal - I - H:\044349002\contract amendment\AddexA 08-02-02,doc · Construction of additional sidewalk improvements in the Industrial Park and near Detention Pond B · Construction of a new outfall for the drainage from Southwest 2nd, 3rd, and 4th A venues in Lake Boynton Estates to the FDOT ditch in response to FDOT comments These increases in the scope of construction were accompanied by an increase in contract duration due to the additional work required. In addition, the project phasing was altered to reduce the impacts on the business owners and residents in the area. At the time of the bid, the contract duration was established at 270 days (9 months), This constitutes a 5.5-month increase in contract duration over that originally scoped, The City elected not to amend Kimley-Horn's Construction Phase scope at the time of the design changes. Kimley-Horn agreed to commence our Construction Phase services on the basis of the original scope and budget to avoid any unnecessary delays in the proposed construction start date. We agreed that we would readdress any required budget increases at a later date, As of the date of this Request for Contract Supplement, Kimley-Horn has expended the entire Construction Phase budget. The services required of Kimley-Horn have been increased as follows: · The City has asked that our field representative be available on a full-time basis to observe the Contractor's progress, This is due largely to concerns about the quality of the work and compliance with the contract documents, In addition, the Contractor frequently is working six days per week to recover schedule, so our inspector is working more than a standard work week. The original budget considered that field observations would be performed by both City and Kimley- Horn personnel. We anticipated a division of work between Kimley-Horn and the City that would allow a half-time inspector for Kimley-Horn and minimal field visits by the Engineer of Record. We submit that a 9-month assignment for a full- time field inspector constitutes a substantial increase in the level of effort required of Kimley-Horn. - 2- H:\044349002\contract amendment\AddexA 08-02-02.doc · It follows that the engineering and office support requirements have been increased substantially: · The number of weekly Progress Meetings and engineering site visits has increased significantly. · The amount of project correspondence and maintenance of the project records has also increased. · The original budget considered reviews of four pay applications, We have already processed five pay applications and expect to review at least 12 total pay applications before final closeout. · The original budget considered reviews of up to 15 RFIs, To date we have responded to 34 RFIs, and we expect to receive several more as the contractor begins work in the Industrial Park area. · The original budget considered reviews of up to 20 submittals, To date we have reviewed approximately 30 submittals (including resubmittals of incomplete or incorrect shop drawings). · The original budget considered processing of up to two Change Orders, To date we have received 11 Change Order Requests and have prepared five official Change Orders for signature by the City and the Contractor, We anticipate that several more Change Order Requests will be received, · The Contractor has changed their designated Project Manager and Construction Superintendent, as well as several crew foremen, so the field engineering requirements have increased as we have worked to acclimate the new personnel to the project, the project documentation requirements, and our expectations for quality, · Despite considerable efforts to coordinate with other utility owners during design phase, we have expended substantial effort during construction to coordinate relocation of both underground and above-ground facilities to facilitate construction, We believe that we have developed a strong and mutually beneficial working relationship with the City Project Manager and other City staff on this project. We - 3- H:\044349002\contract amendment\AddexA 08-02-02.doc have coordinated closely on nearly every activity during design, bid, and construction, For example, the engineering estimate of construction costs was nearly $2,8 million. The City Project Manager and Kimley-Horn worked together to clearly define the scope of work in discrete pay items, and the successful base bid was less than $2.6 million. We also coordinated to create alternative bid items to facilitate better pricing of the drainage pipes. The resulting bid on the alternative bid items was $2.51 million. This cooperative effort saved the City nearly $86,000 over the base bid. Our cooperative efforts during construction phase have included numerous site visits to identify and solve potential problems before the Contractor encounters them, This proactive approach will certainly provide a benefit to the City and the Contractor in terms of schedule and project cost. We have also identified additional opportunities for infrastructure improvements within the project boundaries that will provide a great benefit to the residents and business owners in the area. In particular, we have coordinated with the City to identify opportunities for needed water main upgrades in the Lake Boynton Estates area. Because the Contractor is already mobilized on site and Kimley-Horn is actively participating on the project, the City will save money on engineering and construction of these improvements and will minimize future construction impacts to the residents in the area. We have also coordinated closely with the Contractor in an effort to expedite construction, We believe th~t our open communication with the Contractor has resulted in field engineering changes that have improved the quality of work and benefited the project schedule. We believe that we have demonstrated our commitment to client service and a quality work product time and time again, However, we recognize that our additional effort comes at a price to the City. In recognition that the engineering costs have grown beyond our original estimates, Kimley-Horn has agreed to lower the agreed-upon hourly billing rate for our field inspector from $65/hr to $50/hr on this project. We -4- H:\044349002\contract amendment\AddexA 08-02-02.doc point out that that our most experienced field inspectors typically bill at substantially higher rates, Over the life of the project we expect the City to realize a savings of more than $23,000 as a result of this rate change, We have also written off $9,850 of engineering effort expended during construction phase, We request that the City recognize our efforts on your behalf and grant us the proposed additional fees to complete the project. - 5- H:\044349002\contract amendment\AddexA 08-02-02.doc EXHIBIT B FEE AND BILLING The original budget for Construction Phase Services was established at $54,780,00, Kimley-Horn and Associates, Inc, proposes to provide the additional services described in Exhibit A on an hourly basis using the hourly billing rates defined in Exhibit C, We will provide these additional services for an additional fee not-to- exceed $134,218.15. Total fee for Construction Phase Services will be $188,998.15. Exhibit C is a detailed breakdown of the effort expended to date and the proposed fees to provide additional services through final closeout. The not-to-exceed fee includes labor costs and direct expenses as well as items such as local cellular phone, in-house duplicating and blueprinting, facsimile, local mileage, telephone charges, postage, and computer expenses. All pennitting, application, and similar project fees will be paid directly by the Client. Alternatively, Kimley-Horn will agree to pay these fees with the understanding that the City will reimburse us for these expenses, Fees will be invoiced monthly based upon the actual effort expended as of the invoice date. Payment will be due within 25 days of the date of the invoice. -6- H:\044349002\contract amendment\AddexA 08-02-02.doc I- o w .., o a: D. I- Z W :: w > o a: D. :iE a: w I- <C == :: a: o I- en a: o o a: a: o o w ::) z w > <C ..J", <Cfl a: .~ I-~ enGl ::)= Of'5 Z 8 i - = to U 0 020 .13 8,!!!' t= 0 ~ ED ~~ J:~g' ><'6~ W ~~ 000088 0 ~r .., iC!C!C!C! . . 0 ..... u.."'ll)ll)ll)00 g COOCO a:i I"-I"-C\lC\lll)ll) ~ ll)'" '" " "':"!."1."":.":.1"- "!. ll)CO'" .., GlC\I<OO>O>COM 0 wmeD ....: E ~ o '" CO) ..... ~ "H~ "H'H'H~ .,. ~~0 0 000000 iG :t:iG GlC!C!C!C!C!C! -;000000 0 00 1I:ll)ll)ll)ll)ll)ll) .ii GI_ iG ::::.a 0 ~~~~.,..,. :l .. :l 0 :=0 ... Ll)Ll)LOLt)Lt)Ll) '" "''';'';cOC\i1''-1''- '" !;V('I)C)OOT"" GI ...J 0 '5 X 0 Gl '" 0 0 E 1l '0' .. .= 0.. "iii ..c !!!. t:: CI 0 :l N e a. 0 0 .2 a. :5 0 :l N -; rn ~ t: 000000 " 0 0 CO) GI 999999 c: 0 >- '" ..cL.,L.,>'C-S '" (II '5 .a If~~~~"" Ol .. 0 .!: '" ..., :l .c e Q) CI CI ~ Q) :l :l c: -< 0 u 'is> :5 2 c: ;,; -; W GI 1:: e -< If 0 0 J: li 0 l<: " S iG u Gl .:! '0' u n. -< ~ N ..... 0 CO) ~ 0 0 0 0 ~ ..... ~ C\I co C\I <Xl <Xl!:: .., '<t ~ I"- ~ a; ~ 0 0 0 f!!O 00 0 .!lll) ~'<t ~ u ~ ~~ 0 0 1: 0 0 ~ ll) C\I "iii ~ ~ ..... .,. 0 :> t.!:: (/l 0 0 0 0 ~ Oll) e: 0 :> ~.,. .., 0 0 0 0 ~ 0.... e: 0 .. ~.,. (/l ~8 o . 0 0 '2l~ ll) ll) .. etl} <L 0 15 0 :;; 0 00 ~<Xl ~ C\I '<t <Xl CO <Xl '" .. 'E~ ..... " 0 '0 u " ~~ W 0 0 <Do 0 ~ .. ll) o " ~ ~ g .,. (/l w II: '-;; J: :; iiJ -;: 0<:: ... I~ !! -< k 0 u s! II: 0 ~ U 0 0 ~ ., .. .. E .c.c ~ 1.8 ::J ::J en en j ~ ...... l!!'<= CO CO III III .<= '" 1::!:: 0 '0 " '" '" '0 a: :ii 0 - I~ a:W ., o g u:: W E a: l!! ~ ~ ,J .<= ... '" .<= @ .. ~ .<= E ~ :> ~r~ gj <Ii I~ " ~ 1: ~ ./' ~ .~ ~lj ~ ., '" .. ~,r,~) (, ' B'ii ~:2 = .. .. .'} u:: E ~T"" 15 2i c........ ! '0 ... '5 '" -l! :c '4"'\ " .. .Q co .. u - '" E I~ ~ " :.r ~ iil .. ? E '. ~$ r :> u " 13 ~ .2 '. .. I..! -g I~ ~ g ~ .' ,,;.. 0'" a: lI:! ~ E '5 , .. 'iil .2 gj ~ 5: " .. li1 ~ ~ o ~ ~ m E !i oJ ~ .Q ~ (3 :> ~Ig !!1 jij j;j 8 ci: u:: '" e :> .E a: <L <L (/lIL ni .Q U ,; cD -' C o .a '" ....I ;~~ ; m~ N cD ~ .; co.., CO) ..... ..... 00 0 - '" Gl iG :l IT Oa; GI II: "'01 1i -" ~:l 01 _1Xl " ~-< :l 0.. X III ,,~ "iii Gl_ e '" '" ~ o e 0..- '6 0.2l .. .. " 0..0 -< .,?",,1 ~~.. (v (:., ~_)(~_ t. ...," Q)i (....., \' Lc'" ~ 1 ('J' ,,'t'_i " fJ) x <Ii Q) ~ " Q) U CD 'e 2- c: Q) E " c: CD E '" U ~ E o .9 C\I o o 0> '<t M '<t '<t 9 I