Loading...
The Watershed DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: The Watershed APPLICANT'S AGENT: Gary J. Rito, Codina Development Corp. APPLICANT'S ADDRESS: 2200 North Commerce Pkwy. Suite 110 Weston, FL 33315 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: November 6, 2002 TYPE OF RELIEF SOUGHT: New Site Plan Approval for a 332 bed rehabilitation hospital on a 6.48 acre parcel in a PID. LOCATION OF PROPERTY: Lots 48A, 48B, 48C, and 48D Quantum Park P.I.D DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. E.r,t G Occ. L/c_ X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant ~ HAS HAS NOT established by substantial competent evidence a basis for the relief requested. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". The Applicant's application for relief is hereby __~ GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. and conditions of this order. 7. Other ~ v ..'aeon".. All further development on the property shall be made in accordance with the terms Location Map EXHIBIT I'A" The Watershed _QUAN_TUM B _dp_-:- - EDIT C3 PID LWDD E-4 CA IAL RIAA -- z 0 ..... QUANT~_M_:PARK ..... PID SITE; --~' U,i U,I EXHIBIT EXHIBIT "B" .J 'lVl~NO.J,.NAOg I I I EXHIBIT "B" EXHIBIT "B" EXHIBIT "B" EXHIBIT "B" EXHIBIT "B" EXHIBIT "B" ~ EXHIBIT "B" EXHIBIT "B" .] EXHIBIT "B" z~ EXHIBIT "B" ,I EXHIBIT "B" EXHIBIT "B" EXHIBIT "B" i ii~i ;, .-'., !. i..i: - ii! - , iiijjJ, I! JJJ EXHIBIT "B" EXHIBIT "C" Conditions of Approval Project name: The Watershed File number: NWSP 02-015 Reference: 2® review plans identified as a New Site Plan with an October 8. 2002 Planning & Zoning date stamp marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS- General Comments: 1. A clear area of 10 feet x i0 feet is not provided in the interior of the dumpster X enclosure per the enclosure detail. Please correct discrepancies at time of permitting. PUBLIC WORKS- Traffic Comments: 2. Widen the ingress and egress lanes at the north driveway to a minimum of 12 X foot each at time of permitting. The type F curb and gutter does not count as driving surface. 3. An administrative waiver from Engineering will be required for both the X north and south driveways, which are in excess of the maximum allowable width of 36 feet UTILITIES Comments: 4. Palm Beach County Health Department permits will be required for the X water and sewer systems serving this project (CODE, Section 26-12). 5. Fire flow calculations will be required demonstrating the City Code X requirement of 1,500 g.p.m, as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (see CODE, Section 26-16(b)). 6. The CODE, Section 26-34(E) requires that a capacity reservation fee be X paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. FIRE Comments: None X Conditions of Approval DEPARTMENTS INCLUDE REJECT POLICE Comments: None X ENGINEERING DIVISION Comments: 7. An Excavation & Fill permit will be required for this development. X 8. All invert callouts for catch basins were not indicated on the plans. Please X complete the callouts for Catch Basin #6, 7, 8, 11,12, 13, 16, and the existing catch basins at time of permitting. 9. Show existing and proposed position of street lights to be relocated on Beta X Drive at time of permitting. 10. Provide feather/taper detail from Section C-C to Section B-B (Sheet C-2 of X 6) at time of permitting. 11. Identify timing of the proposed phases for this project. Will all X infrastructure be constructed during Phase One? Please clarify on the plans at time of permitting. BUILDING DIVISION Comments: 12. At time of permit review, provide a completed and executed City of X Boynton Beach Unity of Title form. The form shall describe all lots, parcels or tracts combined as one lot. A copy of the recorded deed with legal descriptions, of each property that is being unified, is required to be submitted to process the form. The property owner that is identified on each deed shall match. 13. At time of permit review, submit signed and sealed working drawings of the X proposed construction. 14. At time of permit review, submit for review an addressing plan for the X project. 15. The number of patient rooms required to be handicap accessible shall X comply with Chapter 11-6 of the 2001 Florida Building Code. PARKS AND RECREATION Comments: None X DEPARTMENTS INCLUDE REJECT FORESTER/ENVIRONMENTALIST Comments: None X PLANNING AND ZONING Comments: 16. Height exception is required for the tower features on the main Phase 1 X building. (Ch.2, Section 4.F.) 17. Provide a letter of approval for the Quantum Park Architectural Review X Committee prior to the Planning & Development Board meeting. ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 18. Project is to be limited to one (1) site sign. X Reference the procedural agreement executed between the City's Fire Chief, X Bill Bingham and Mr. Bill Russell, Chief Operating Officer/Vice President of The Watershed Treatment Pro,am. ADDITIONAL CITY COMMISSION CONDITIONS Comments: 19. Provide additional tall trees to further buffer the south side of Phase I for X adjacent residents across the canal. S:\Planning\SHARED\WP\PROJECTS\The Watershed Act II, Inc\NV~P 02~015\Condition of Approval 2 page revised 2002 brm.doc