Loading...
R02-211RESOLUTION NO. R02- ~t.I I A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1, TO TRIO DEVELOPMENT CORPORATION IN THE AMOUNT OF $30,410 FOR ADDITIONAL SERVICES REQUIRED DURING THE LIFT STATION REHABILITATION, BASED ON BID #094-2821-01/CJD; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Commission upon recommendation from staff, deems it to approve this change order, which is primarily related to additional requirements, high ground water levels and bypass pumping associated to the ta Power & Light electrical services;. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does authorize and direct the City Manager and City Clerk to approve and execute e Order no. 1 for Trio Development Corporation in the amount of $30,410 for services required during the lift station rehabilitation of lift stations, based on #094-2821-01/CJD.. Section 2. This Resolution shall become effective immediately upon passage. :\CA\RESO~greements\Change Orders\Change Orders - Trio Dev - Lift Stations.doc PASSED AND ADOPTED this 3 day of December, 2002. Clerk :\CA\RESO~,greernents\Change Orders\Change Orders - Trio Dev - Lift Stations.doc ~ ~' ~CONTRACTMODIFICAYION 'CHzNiHiLL , ~i CHANGE ORDER [] WRITTE~ AMENDMENT MODIFICATION NOl: _ TOCONTI~OTOR: j/Trio Development Corporation ..... PROJ£CT:' 'i PROJ£CTNO: .. Bift~$tation Can iRehabs 094-2821-00 CJD OWNER: City of Boynton Beach .... P...O.# 020184 £NGINEEFI: · CH2M HILL , i ' Ill I II,'T'4 ~1,,.1 ..~[, ,, .,, t.z.. ,M.,,,o, ,, ~iiismlm1~..l I~1P '~"" "' ,,,. i u,,,~.~-.],,,l, t..ll, ,,.'.,~-,.,[* flit., ,,,, · ,.~ L'~",' d~., ,i rd, i~ Demolition work, additional by-passing and excavation. Additional work to Summary sheets, 1.':ift original specifications. stations 601, 604, 606 and 901. Odg~nal Previou~ Contact MoclificatJon(~) .. (A(M/Oecluct) This Contract Modification (Acid/Deduct) Revised Contract Amount $348,946.50 -0-~ $379, 30.;, io.oo.: ~56.50 Contract Tint!l (Calculate Oay~l) OriglnN Duration 360 Previous Contract Modifloation(s) - O- (Ack~cluc:t) _. Days This Contract MoOificadon (Add/Deduct) - 0,.- Days 3 6 0 Days Revised Contract Time The flevised Contract Completion Date is: 9-30-02 Days 1 NumDer IJI MOdi~C~t~MI consecutively. 2 Recommen~ necessary far ChanO'e OrdellI KURT BRESSNER CITY MANAGER · BOYNTON BEACH, FI. Field I CITY OF BOYNTON BEACH LIFT STATION # 601 Bid No. 094-282i-00/CJD ITEM t UNIT UNIT COST QUANITY EXTENDED COST Trench Safety System (5 to 7 Feet) LF 2.00 80.00 160.00 ~Trench Safety System (7 to 10 Feet) LF 4.00 0.00 3. Trench Safety System (10 Feet +) ~ LF 4.00 0.00 Concrete Sidewalk Repair (0 to 20 SF) SF 20.00 0.00 r Concrete Sidewalk Repair (20+ SF) SF t 10.00 0.00 0.00· Asphalt Repair (0to 100 SF) ~ SF ! 5.00. 0.00 ,.Asphalt Repair (100+ SF) , SF 4.00 0.00 ~ 9 EA-ST i10 ' EA-ST EA-ST DY 3.00 12 800.00! 1000.00 1200.00/ 300.00~ 350.00 0.00 8 Sod Repair Pump Installation (0 to 9 HP) Pump Installation (10 to 15 HP) 11 Pump Installation (16 to 25 HP) Bypass Pumping (5 HP) 13, Bypass Pumping (10 HP) 14 Bypass Pumping (25 HP) 0.00 0.00 0.00~ 0.00 0.00 DY i 18 Pipe installation (4-Inch Diameter) 7.00~ 0.00 2100.00 0.00 DY 400.00 i 0.00 0.00 15 Excavation (0 to 5 Feet Deep) CY 110.00t 46.00 5060.00 16 i Excavation (5 to 10 Feet Deep) CY 125.00 ~ 2.001 250.00 17 r Excavation (10 to 15 Feet Deep) CY 200.00 0.00 0,00 LF 100.00 0.00 LF 19 ! Pipe Installation (6-Inch Diameter) 0.00 20 Pipe Installation (8-Inch Diameter) , Concrete Structure Improvements, :Lid Replacement ~ 22 Concrete Structure Improvements, Tube Replacement Remove/Reinsta!!- Chain Link Fence Remove/Reinstall - Wood Fence ' Miscel!aneous Materials Electrical Subcontract Total of Bid Items 0.00 0.00 LF 110.00 120.00 I 5000.001 F ' EA-ST 0.00 0.00~ 0.00' LF I 3350.001 0.00, 0.00! i 25 00: ' 0.00~ !23 LF ~.24 LF ! 35.001 0.00, 0.00~ ~- LS I 0.00 ! i i' I ~ $7,570.00 CITY OF BOYNTON BEACH LIFT STATION # 604 Bid No. 094-2821-00/CJD UNIT UNIT COST QUANITY EXTENDED ,~24 Remove/Reinstall - Wood Fence LF i Misce!laneous Materials LS i .i Electrical Subcontract LS 35.00 L Concrete Sidewalk Repair (0 to 20 SF) Concrete Sidewalk Repair (20+ SF) Asphalt Repair (0 to 100 SF) Asphalt Repair (100+ SF) SY EA-ST 8 I Sod Repair i_ 1~09 ~ump Installation (0 to 9 HP) Pump Installation (10 to 15 HP) i Pump Installation (16 to 25 HP) Bypass Pumping (5 HP) Bypass Pumping (10 HP) Bypass Pumping (25 HP) Excavation (0 to 5 Feet Deep) Excavation (5 to 10 Feet Deep) Excavation (10 to 15 Feet Deep) Pipe instaiiation (4-inch Diameter) Pipe Installation (6-Inch Diameter) Pipe Installation (8-Inch Diameter) Concrete Structure Improvements, d Replacement Concrete Structure Improvements, Tube Replacement Remove/Reinstall- Chain Link Fence DY DY DY ~ CY LF 2.00 LF 4.00' LF 4.00 SF 20.00 SF 10.00 ~ SF 5.00i SF 4.00: 3.00' 800.00! EA-ST 1000.00 EA-ST 1200.00 ! 300.00 350.00, 400.00! 110.00 i 125.00i 200.00 CY i 0.00~ 0.00 LF I00.00 i 0.00 0.0( ~ LF 110.00 0.001 LF i EA-ST LF 120.00 5000,00 3350.00 25.00, 0.00 0.00 0.00 0.00' 0.00 0.00 0.00 10.00! 3000.00 o.ool o.oo I 0.00 40.00 4400.00' o.ool o. ooi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.001 o.ooi 0.00.~ 0.001 0.00~ 0.00 Total of Bid Items ~ ~ i $7,560.0 6 Trench Safety System (5 to 7 Feet) Trench Safety System (7 to 10 Feet) 3/Trench Safety System (10 Feet +) 4 { -- COST 80.00 160.00 CITY OF BOYNTON BEACH LIFT STATION # 606 Bid No. 094-2821-00iCJD i ITEM UNIT UNIT COST I QUANITY EXTENDED COST ~. Trench Safety System (5 to 7 Feet) i2j'Trench Safety System (7 to 10 Feet) · 3 !Trench Safety System (10 Feet +) I' 4 Concrete Sidewalk Repair (0 to 20 SF) I 5 !Concrete Sidewalk Repair (20+ SF) I 6 Asphalt Repair (0 to 100 SF) 7 Asphalt Repair (100+ SF) i 81Sod Repair I 9 Pump Installation (0 to 9 HP) 10 Pump Installation (10 to 15 HP) I11 'Pump Installation (16 to 25 HP) 12 i Bypass Pumping (5 HP) _1_3 Bypass Pumping (10 HP) 14 Bypass Pumping (25 HP) 1~5 Excavation (0 to 5 Feet Deep) 16 Excavation (5 to 10 Feet Deep) I171 Excavation (10 to 15 Feet Deep) 18 Pipe installation (4-inch Diameter) 19= Pipe Installation (6-Inch Diameter) i 201 Pipe Installation (8-Inch Diameter) 21 !Concrete Structure Improvements, J Lid Replacement _221 Concrete Structure Improvements, LF 2.00. LF 4.00i LF 4.00, ~ 24 ' Remove/Reinstall - Wood Fence SF SF SF SF 20.00 [ 10.00 ~ 5.00 80.00 0.00 4.00 ! SY 3.001 EA-ST 800.001 EA-ST 0.00 EA-ST DY DY CY CY CY LF LF lOOO. OO I 1200.00 300.00 350.00 400.00 110.u0 125.00 200.00 100.00 110.00 120.00 5ooo.oo! LF EA-ST 20.00 0.00 4A I~. I"t,lJO 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.00~ 0.00 i 0.00~. i Misce!laneous Materials LS , r i 0.00: i Electrical Subcontract Total of Bid Items i ~ $7,700.001 35.00 LF Tube Replacement LF 3350.00~, 0.00, 0.00~ 23 [ RemovelR,:,,install - Chain I ink Fence LF 25.00 , 0.00 0.00 0.00 1540.00 0.00 0.00 0.00 0.00 0.00 0.00! 0.00 ~ 6000.0(! 0.00 0.00 0.00 0.00 0.00 CITY OF BOYNTON BEACH LIFT STATION # 901 Bid No. 094-2821-00iCJD ITEM 1 ! Trench Safety System (5 to 7 Feet) 2 iTrench Safety System (7 to 10 Feet) UNIT LF LF UNIT COST 2.00 4.00 QUANITY 4O.0O EXTENDED Trench Safety System (10 Feet +) LF 4.00' Concrete Sidewalk Repair (0 to 20 SF) SF 20.00 4.00 CY 51 Concrete Sidewalk Repair (20+ SI=) 61 Asphalt Repair (0 to 100 SF) 7 Asphalt Repair (100+ SF) COST 80.00 0.00 0.0(~ 0.00~ SF 10.00 J 0.0(, SF 5.00 0.001 SF 0.00i i 8 Sod Repair 3.00 ~ 0.00! I 9j Pump Installation (0 to 9 HP) EA-ST , 800.00. ~ 0.001 10, Pump Installation (10 to 15 HP) EA-ST 1000.00 0.00 0.00 i 11 Pump Installation (16 to 25 HP) EA-ST 1200.00 i 0.00 12 Bypass Pumping (5 HP) DY 300.00 I 0.00i ! 13 Bypass Pumping (10 HP) DY 350.00 18.00 6300.00 i 14 Bypass Pumping (25 HP) DY 400.00 0.00 Excavation (0 to 5 Feet Deep) 110.00 CY 125.00 16 17 0.00 CY 0.00 23 0.00 Excavation (5 to 10 Feet Deep) o.oo Excavation (10 to 15 Feet Deep) ! LF 200.00 0.00 0.00 0.00~ 18 Pipe Installation (4-inch Diameter) i LF 100.00 12.00 1200.00' 19 Pipe Installation (6-Inch Diameter) 20 Pipe Installation (8-Inch Diameter) ! LF 120.00 0.00: 21, Concrete Structure Improvements, Lid Replacement '~ EA-ST 5000.00 0.00~ 0.00' 22 1 Concrete Structure Improvements, j Tube Replacement i LF 3350.00 0.00i 0.001 Remove/Reinstall - Chain Link Fence 25.00 0.00 !: Electrical Subcontract ! LS ~ 0.00i Total of Bid Items i Remove/Reinstall - Wood Fence ~I LF 35.00 i 'Miscellaneous Materials I LS i ~ 0.00!