R02-211RESOLUTION NO. R02- ~t.I I
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORIDA,
AUTHORIZING THE CITY MANAGER TO EXECUTE
CHANGE ORDER NO. 1, TO TRIO DEVELOPMENT
CORPORATION IN THE AMOUNT OF $30,410 FOR
ADDITIONAL SERVICES REQUIRED DURING THE
LIFT STATION REHABILITATION, BASED ON BID
#094-2821-01/CJD; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City Commission upon recommendation from staff, deems it
to approve this change order, which is primarily related to additional
requirements, high ground water levels and bypass pumping associated to the
ta Power & Light electrical services;.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION
THE CITY OF BOYNTON BEACH, FLORIDA, THAT:
Section 1. The City Commission of the City of Boynton Beach, Florida does
authorize and direct the City Manager and City Clerk to approve and execute
e Order no. 1 for Trio Development Corporation in the amount of $30,410 for
services required during the lift station rehabilitation of lift stations, based on
#094-2821-01/CJD..
Section 2. This Resolution shall become effective immediately upon passage.
:\CA\RESO~greements\Change Orders\Change Orders - Trio Dev - Lift Stations.doc
PASSED AND ADOPTED this 3 day of December, 2002.
Clerk
:\CA\RESO~,greernents\Change Orders\Change Orders - Trio Dev - Lift Stations.doc
~ ~' ~CONTRACTMODIFICAYION
'CHzNiHiLL ,
~i CHANGE ORDER [] WRITTE~ AMENDMENT MODIFICATION NOl: _
TOCONTI~OTOR: j/Trio Development Corporation .....
PROJ£CT:' 'i PROJ£CTNO: ..
Bift~$tation Can iRehabs 094-2821-00 CJD
OWNER: City of Boynton Beach .... P...O.# 020184
£NGINEEFI: · CH2M HILL
, i ' Ill I
II,'T'4 ~1,,.1 ..~[, ,, .,, t.z.. ,M.,,,o, ,, ~iiismlm1~..l I~1P '~"" "' ,,,. i u,,,~.~-.],,,l, t..ll, ,,.'.,~-,.,[* flit., ,,,, · ,.~ L'~",' d~., ,i rd, i~
Demolition work, additional by-passing and excavation.
Additional work to
Summary sheets, 1.':ift
original specifications.
stations 601, 604, 606 and 901.
Odg~nal
Previou~ Contact
MoclificatJon(~) ..
(A(M/Oecluct)
This Contract Modification
(Acid/Deduct)
Revised Contract Amount
$348,946.50
-0-~
$379,
30.;, io.oo.:
~56.50
Contract Tint!l (Calculate Oay~l)
OriglnN Duration 360
Previous Contract
Modifloation(s) - O-
(Ack~cluc:t) _. Days
This Contract MoOificadon
(Add/Deduct) - 0,.- Days
3 6 0 Days
Revised Contract Time
The flevised Contract Completion Date is:
9-30-02
Days
1 NumDer IJI MOdi~C~t~MI consecutively.
2 Recommen~ necessary far ChanO'e OrdellI
KURT BRESSNER
CITY MANAGER ·
BOYNTON BEACH, FI.
Field I
CITY OF BOYNTON BEACH
LIFT STATION # 601
Bid No. 094-282i-00/CJD
ITEM
t UNIT
UNIT COST
QUANITY
EXTENDED
COST
Trench Safety System (5 to 7 Feet) LF 2.00 80.00 160.00
~Trench Safety System (7 to 10 Feet) LF 4.00 0.00
3. Trench Safety System (10 Feet +) ~ LF 4.00 0.00
Concrete Sidewalk Repair (0 to 20 SF) SF 20.00 0.00
r Concrete Sidewalk Repair (20+ SF) SF t 10.00 0.00 0.00·
Asphalt Repair (0to 100 SF) ~ SF ! 5.00. 0.00
,.Asphalt Repair (100+ SF) , SF 4.00 0.00
~ 9 EA-ST
i10 ' EA-ST
EA-ST
DY
3.00
12
800.00!
1000.00
1200.00/
300.00~
350.00
0.00
8 Sod Repair
Pump Installation (0 to 9 HP)
Pump Installation (10 to 15 HP)
11 Pump Installation (16 to 25 HP)
Bypass Pumping (5 HP)
13, Bypass Pumping (10 HP)
14 Bypass Pumping (25 HP)
0.00
0.00 0.00~
0.00
0.00
DY
i 18 Pipe installation (4-Inch Diameter)
7.00~
0.00
2100.00
0.00
DY 400.00 i 0.00 0.00
15 Excavation (0 to 5 Feet Deep) CY 110.00t 46.00 5060.00
16 i Excavation (5 to 10 Feet Deep) CY 125.00 ~ 2.001 250.00
17 r Excavation (10 to 15 Feet Deep) CY 200.00 0.00 0,00
LF 100.00 0.00
LF
19 ! Pipe Installation (6-Inch Diameter)
0.00
20 Pipe Installation (8-Inch Diameter)
, Concrete Structure Improvements,
:Lid Replacement
~ 22 Concrete Structure Improvements,
Tube Replacement
Remove/Reinsta!!- Chain Link Fence
Remove/Reinstall - Wood Fence
' Miscel!aneous Materials
Electrical Subcontract
Total of Bid Items
0.00
0.00
LF
110.00
120.00
I
5000.001
F
' EA-ST
0.00
0.00~
0.00'
LF I 3350.001 0.00, 0.00!
i 25 00: ' 0.00~
!23 LF
~.24 LF ! 35.001 0.00,
0.00~
~- LS I 0.00
! i
i' I ~ $7,570.00
CITY OF BOYNTON BEACH
LIFT STATION # 604
Bid No. 094-2821-00/CJD
UNIT
UNIT COST
QUANITY
EXTENDED
,~24 Remove/Reinstall - Wood Fence LF
i Misce!laneous Materials LS
i .i Electrical Subcontract LS
35.00
L
Concrete Sidewalk Repair (0 to 20 SF)
Concrete Sidewalk Repair (20+ SF)
Asphalt Repair (0 to 100 SF)
Asphalt Repair (100+ SF)
SY
EA-ST
8 I Sod Repair
i_ 1~09 ~ump Installation (0 to 9 HP)
Pump Installation (10 to 15 HP)
i Pump Installation (16 to 25 HP)
Bypass Pumping (5 HP)
Bypass Pumping (10 HP)
Bypass Pumping (25 HP)
Excavation (0 to 5 Feet Deep)
Excavation (5 to 10 Feet Deep)
Excavation (10 to 15 Feet Deep)
Pipe instaiiation (4-inch Diameter)
Pipe Installation (6-Inch Diameter)
Pipe Installation (8-Inch Diameter)
Concrete Structure Improvements,
d Replacement
Concrete Structure Improvements,
Tube Replacement
Remove/Reinstall- Chain Link Fence
DY
DY
DY
~ CY
LF 2.00
LF 4.00'
LF 4.00
SF 20.00
SF 10.00 ~
SF 5.00i
SF 4.00:
3.00'
800.00!
EA-ST 1000.00
EA-ST 1200.00 !
300.00
350.00,
400.00!
110.00 i
125.00i
200.00
CY i 0.00~ 0.00
LF I00.00 i 0.00 0.0(
~ LF 110.00 0.001
LF
i EA-ST
LF
120.00
5000,00
3350.00
25.00,
0.00
0.00
0.00
0.00'
0.00
0.00
0.00
10.00! 3000.00
o.ool o.oo
I 0.00
40.00 4400.00'
o.ool o. ooi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
0.001
o.ooi
0.00.~
0.001
0.00~
0.00
Total of Bid Items ~ ~
i $7,560.0
6
Trench Safety System (5 to 7 Feet)
Trench Safety System (7 to 10 Feet)
3/Trench Safety System (10 Feet +)
4
{ -- COST
80.00 160.00
CITY OF BOYNTON BEACH
LIFT STATION # 606
Bid No. 094-2821-00iCJD
i
ITEM
UNIT UNIT COST
I QUANITY
EXTENDED
COST
~. Trench Safety System (5 to 7 Feet)
i2j'Trench Safety System (7 to 10 Feet)
· 3 !Trench Safety System (10 Feet +)
I' 4 Concrete Sidewalk Repair (0 to 20 SF)
I 5 !Concrete Sidewalk Repair (20+ SF)
I 6 Asphalt Repair (0 to 100 SF)
7 Asphalt Repair (100+ SF)
i 81Sod Repair
I 9 Pump Installation (0 to 9 HP)
10 Pump Installation (10 to 15 HP)
I11 'Pump Installation (16 to 25 HP)
12 i Bypass Pumping (5 HP)
_1_3 Bypass Pumping (10 HP) 14 Bypass Pumping (25 HP)
1~5 Excavation (0 to 5 Feet Deep)
16 Excavation (5 to 10 Feet Deep)
I171 Excavation (10 to 15 Feet Deep)
18 Pipe installation (4-inch Diameter)
19= Pipe Installation (6-Inch Diameter)
i 201 Pipe Installation (8-Inch Diameter)
21 !Concrete Structure Improvements,
J Lid Replacement
_221 Concrete Structure Improvements,
LF 2.00.
LF 4.00i
LF 4.00,
~ 24 ' Remove/Reinstall - Wood Fence
SF
SF
SF
SF
20.00 [
10.00 ~
5.00
80.00
0.00
4.00 !
SY 3.001
EA-ST 800.001
EA-ST 0.00
EA-ST
DY
DY
CY
CY
CY
LF
LF
lOOO. OO I
1200.00
300.00
350.00
400.00
110.u0
125.00
200.00
100.00
110.00
120.00
5ooo.oo!
LF
EA-ST
20.00
0.00
4A I~.
I"t,lJO
0.00
0.00
0.00
0.00
160.00
0.00
0.00
0.00~
0.00 i
0.00~.
i Misce!laneous Materials LS , r
i 0.00:
i Electrical Subcontract
Total of Bid Items i ~ $7,700.001
35.00
LF
Tube Replacement LF 3350.00~, 0.00, 0.00~
23 [ RemovelR,:,,install - Chain I ink Fence LF 25.00 , 0.00
0.00
0.00
1540.00
0.00
0.00
0.00
0.00
0.00
0.00!
0.00 ~
6000.0(!
0.00
0.00
0.00
0.00
0.00
CITY OF BOYNTON BEACH
LIFT STATION # 901
Bid No. 094-2821-00iCJD
ITEM
1 ! Trench Safety System (5 to 7 Feet)
2 iTrench Safety System (7 to 10 Feet)
UNIT
LF
LF
UNIT COST
2.00
4.00
QUANITY
4O.0O
EXTENDED
Trench Safety System (10 Feet +) LF 4.00'
Concrete Sidewalk Repair (0 to 20 SF) SF 20.00
4.00
CY
51 Concrete Sidewalk Repair (20+ SI=)
61 Asphalt Repair (0 to 100 SF)
7 Asphalt Repair (100+ SF)
COST
80.00
0.00
0.0(~
0.00~
SF 10.00 J 0.0(,
SF 5.00 0.001
SF
0.00i
i 8 Sod Repair 3.00 ~ 0.00!
I 9j Pump Installation (0 to 9 HP) EA-ST , 800.00. ~ 0.001
10, Pump Installation (10 to 15 HP) EA-ST 1000.00 0.00 0.00
i 11 Pump Installation (16 to 25 HP) EA-ST 1200.00 i 0.00
12 Bypass Pumping (5 HP) DY 300.00 I 0.00i
! 13 Bypass Pumping (10 HP)
DY 350.00 18.00 6300.00
i 14 Bypass Pumping (25 HP) DY 400.00 0.00
Excavation (0 to 5 Feet Deep) 110.00
CY
125.00
16
17
0.00
CY
0.00
23
0.00
Excavation (5 to 10 Feet Deep)
o.oo
Excavation (10 to 15 Feet Deep)
! LF
200.00
0.00
0.00
0.00~
18 Pipe Installation (4-inch Diameter) i LF 100.00 12.00 1200.00'
19 Pipe Installation (6-Inch Diameter)
20 Pipe Installation (8-Inch Diameter) ! LF 120.00 0.00:
21, Concrete Structure Improvements,
Lid Replacement '~ EA-ST 5000.00 0.00~ 0.00'
22 1 Concrete Structure Improvements, j
Tube Replacement
i LF 3350.00 0.00i 0.001
Remove/Reinstall - Chain Link Fence 25.00
0.00 !:
Electrical Subcontract ! LS ~ 0.00i
Total of Bid Items
i Remove/Reinstall - Wood Fence ~I LF 35.00
i
'Miscellaneous Materials I LS
i ~ 0.00!