Minutes 05-04-27459
SPECIAL LELTIEG OF MAY 4th, 192~.
A S~ecial I;~e ~
e .... ng of the ~oard of Go%missioners
of the Tcwr_ of Boynton, Flori0~., was held at the Town Rall
of the Tov.n of moYnton, Florida, on %,ednes.day ~iorning, L, ay
4th, a. ~. 1927, at 10:30 a'ciock A. k.
Present; ~. 0. lycra, ~ayor
'harry ~ens on, Vice-~ayor
~. L. ~,inchester,ToWn Oierk
The above constituting the entire Board of
Co~':~missioners of the Town of Boynton,. Florida.
. T..e following proposal for the paving 'of Ocean
Avenue aha Cocoa Street was receivea from the ~,hite Oonstruc_
tion Oompany. .
PROPOSAL
We, the u~dersignea, propose to mo the following ammitional
wor~ in the Town of ooynton, in accordance with plans and spe-
cifications by T~e Riddle Engineering Company attached hereto,
at and for the sums stated herein:
COCOA S.R=~, center line' of Edith Street to south line ex-
tended of Ocean Avenue. Length 597,; 30' back to back of curbing.
700 cu. yas. earth excavation
~150 cu. Fas. solid rock excavation
607 lin. ft. 5"x14" header curb
1588 lin. ft. c~rb and gutter
i~6~8 tons ~" compact waterbound base
1.1910 sq. vds. 2" Larrenite Oituiithic
5.00 V50.00
· 55 33g.85
1.27 805.5'6
4.40 2,807.20
2.v5 _. .5252.5o
~10,448.11
DCEA~ AVELUE - COCOa STkEET - 0CEAL BOULEVAkL ILTEESECTI0i.:
50 cu. yds. earth excavation
~50 5% .~as. sc~,ily~n~ & reshaping
roam¥,'a/
[2 lin. ft. curb & gutter
~40 tons case rock
~0 sq. yas. ~arrenite oituiitnic
.II 2~.50
· 55 4~.50
1.27 t7.54
4.40
$ 1,944.04
0C;..al: AVENUE, from east end Canal bringe to 55' west of east
curb line of 0ocoan Street. Length 1650,; wicth 30' back to
back of curbing.
900 cu. yds. earth excavation
2V50 sq. yds. scarifying & reshaping
present roadway
100 lin. ft. 15" diameter sewer pipe,
· culverts,elastite joints,
in place
3300 lin. tf. 5"x14" header curb
2.- 4' diameter catch basins with gra'te,
complete on 2" pipe
1800 tons base roci~
~ $o. 7~ ~ 6~. oo
. ll 302.50
.72 372. O0
· 55 1,815.00
96.00 192.00
4'40 V,920.00
5500 sq. yds. 2 course surfac~ treatment,
prime and seal type ',~5 .... ~i.;~
OCEAIf AVENUE, from west line Powell Street to east .~Si[' of
S. A. L. hallway (40, wide), .... -~.~.-:
1000 cu..,ds earth excavation
450 cu. yds. borrow- e~cavation
0.5 acre clearing and grubbing ·
i2500 lin. ft. 5~'x14" header, curb
!lglO ton~ base rock ~1205 lin.ft.)
V520 sq. yds. 2 course surface treat-
ment, prime and seal t~rpe
V$3'sq. ft. 5' concrete ~alk 4" -thick
7,964.00
2,632.00
228.90
$~9,'109.05
770. O0
1.00 '~, 450.00
75. O0 37.50
· 55 1,3V5.00
4.40
.35
.30
'I~p',AND ~TAL ......... . ...............................
Respectfully submitted,
TH~ WHITE CONST. RUCTI0~ C0~PAt~Y, I~C.,
By ~- ~. ~nite, . Vice ~,~ ~s ident.
0n motion ma~e by Co~issioner Benson, sec(m6ed
Oo.:~mission~r ~,inchester ant duly carried, 2he '~ayor was
tuthori~.ed and instructed to enter into a con2ract aha the
~own Clerk was authorized and instructed to attest said
ontrar, t with the ~hite Construction Oompamy for the paving
Ocean Avenue and Cocoa Street as set forth in the pro-
· sal P?'esented by the ~',hlte 0onstruction 0ompany.
C 0~; TEAC T
.For the ~',ork provided for in the plans an~ speci-
'460
461
fications attached hereto and named and cescribed in the
proporal forming a part of this contract and attached hereto,
all of whi_ch are made a .part of this contract.
A',~]0U~iT OF BID $40,O75.-~5 ($ubj;ect to increase or decrease as
(specified.
· THIS AGREE~E,~T, .Nad~ entered into this 4th day of ~lay, ~.D.
1927, by .and between the Town of Boynton, party of the first
part,/and the White ConStruction Company, its heirs, executors,
administrators, successors or assigns, par?y of the second
pa.rt ~
WITNE~EETM, That for and in consiceration of the P~ayment and
agreements stated in the proposal hereto attached :to be made
and Perfor~,~ed by the Party of the first part and accorCing to
the terms expressed in the bonds referring to these Presents,
the party .of the second P~.art agrees with saia party of the
first part at his own ~proper cost an~ expense to ~o all the
work, furnish all'mat~eria'~s an~ laoor necessax~y to ac the
work as recited hereinbefore in the specifications in accor-
;,dance wigh the plan~ and mpecific~tions herein0efore ~escrioed
::and in full compliance wlth all t-~.e terms of this agreement
~'ana the requirements of the kngineer Under it
It is also understood and agreed that the ·proposal, specifi-
Cations, and plans hereto attachem, or hereinbefore referred
o, are all essential documents of' this contract-and are a
art thereof.
$ITUESSETU That t~e pa. ents are to be dame as follows: 'ksti_
~tes on 90~ of :~,~ateria~ furnished and work completed will 0e
ado monthly and upon final coz~[;i~tion and approval of the
°rk outlined in the plans anc~
o~-.~cificatic~s a' fi~.,al estiz~']ate
to '~e made and aPproved Dy t-,~e ~'~gi~eer az~a I'iiea with tr~e
462
Town Co,.~ssioners, pa:anent of which shall become due within
thirty days thereafter. ?ayments to be made in Lien Certifi-
cates of the Town of Boynton.
II{ WITNESS WHEREOF, the parties hereto have set their hands
'on the date first above named.
TOWN OF BOYNTON, FLOEIDA.
Attest: h.O. M[ers ,Mayor~:.
~. L. ¥,inchester~ ~
Town Clerk. ' ~ ~
WHITE CONSTRUCTION
E. %~'. White
There being no further business, th%..
~ .
~ad .·. ourned.