Loading...
63-BBRESOLUTION No. 63- BB A RESOLUTION OF THE CITY OF BOYNTON BEACH, FLORIDA, AMENDING RESOLUTION NO. 62-H OF SAID CITY, AUTHORIZING AND ORDERING THE CONSTRUCTION OF CERTAIN ADDITIONS TO THE PENDING MUNICIPAL ~W:AG.~ EXPANSION PROJECT RELATING TO PORTIONS OF WOODCREST MANOR SUBDIVISION. WHEREAS, the CITY OF BOYNTON BEACH, FLORIDA, is presently in the process of expanding its municipal sanitary sewage system; and WHEREAS, after thorough investigation and advice of its Consulting Engineers, the City Council deems it tothe best interest of the City that the original plans and specifications covering subject project be expanded to include certain portions of Woodcrest Manor Subdivision within said City as more particularly set forth in the contract modification des- cription and sketch attached hereto; NOW, THEREFORE, be it resolved by the City Council of the City of Boynton Beach, Florida: SECTION 1: That Resolution 62-H, enacted by the City Council of the CITY OF BOYNTON BEACH, FLORIDA, on February 12, 1962 authorizing construction and initiation of the basic sewage expansion program in accordance with plans and specifications therefor, is hereby amended by adding thereto in Section I, an additional district to be designated "DISTRICT NO. 12" to consist of materials and cover area more particularly described in the contract rnodif~[cation estimate and sketch pertaining thereto which is attached hereto and hereby made a part hereof. SECTION 2: An amendment to the existing construction contract between the City and RONLEE, INC., by appropriate change order, to accom plish the above indicated addition, is hereby authorized and Mayor JOHN L. ARCHIE, is hereby authorized to sign any necessary documents relative thereto on behalf of the City. SECTION 3: The above change order is specifically subjecl to approval by the Florida State Board of Health and the United States^Health Service, said approval to be obtained by the City's Consulting Engineers, RUSSELL & AXON. PASSED and ADOPTED this ~ day of June, A. D. 1963. (CORPORATE SEAL) ATTEST: ~--- ............ ' Vice Mayor - Councilman (:7 /' / Counc~an Councilman -2- Date ~? ~ ~ Contract ]Jo. hture of Chan~ Ohan~ Or~r l~qu~t ~o.' Pro~ect ~o. Sewage Wor~ 1 or ~dJ~fimt~on Extend m~ni~ sewers to ~rt~on of Wood.rest ~or Subdiv~si_~_ Bloc~ i through 10 - location dravin~= at_'~_~_hc~_ for ~: To p~de addit~onal s~e~ se~ce to Wood--st ~_r Subdiv~ai~ Blocks 1 - 10 It~tion of Proposed Chan6e and ~a~la for l~t (Ymcludes pertin~t d~in~ and spec~fi~tio~, ~he~e necessary) Cost (1) Material or ~ta~e, e~cavate & ~c~fill, 8,10 & 12" ~l~e: 0 - 6' Cat 6-8' cat 8 -10' Cat 10 -12' Cat Total Quantit[ Cost Contact 1,055 2. O0-/L.F. 2,110.00 ~+7~ ~_.OO/L.~. 1,~.oo 550 6.O0/L.F. 3, 300.00 Furnish & in~tall: 8" V.C. Pipe 4,070 ~# V.C. Pipe 3,200 6" V.C. Pipe 1, 500 8" x 6" V.C. Wyes 100 Construct: Shall~ Mamboles 4 Std. Manholes 8 Addtl. Vert. Depth 30 FurnJ. sh & ~ns'~,l.l: ' Plug~ad Stuba 2 10 24 Misc. ~n~te Aaph. Pave.Rep~ac. 1,100 Ooac.Pave.Replmc. 150 Sidewalk ~eplac. 50 ~ & Gutter ~pac. 60 (3) La, or C~ges, if any 1.70/L.F. 6,919.00 1.62~L.F. 5,184.00 1.80/L.F. 2,700.00 30.O0/L.F. 900.00 15.0o ~a. 3O.OO ~5-OO/C.X. ~50.00 ~o.op/c.x. ~4o.oo s.5o/s.x, a,75o, oo 9.00/S.Y. 1,350.00 ~.~/s.x. ~oo.oo 2. O0/L.F. 120.00 _ (~) ~ot~a~ m m Fre~ent ~tract Price T~ls Change, Addition e~-~e~e~&em, Total (2) Proposed P~vised Coutract Price Additional funds, if required, are to be provlde~ in the following manner: City Resources Estimated Ad~ltional Contract Time Requ/red by C~e: 25 days This Change is Acceptable Approval of Change as Requested Contractor " ~-- ' Engl. nee~.~- O~ner By Title La~or charges included in unit coat. Unit cost taken from base Contract.