Loading...
R03-012 II RESOLUTION NO. R03- Ola A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING EXECUTION OF T ASK ORDER NO.4, WITH ENGINEERING CONSULTANT HARTMAN & ASSOCIATES, INC., IN THE AMOUNT OF $112,150.00 TO PREP ARE AN INFILTRATION AND INFLOW PROGRAM FOR MASTER LIFT STATION 309 BASIN; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, this Task Order was prepared to plan an infiltration and inflow program that will const effectively remove extraneous flows from the wastewater system; and WHEREAS, Master Lift Station 309 is located next to Hester Center and serves the wastewater needs north ofthe C-16 Canal and east ofI-95; and WHEREAS, the City Commission, upon staffs recommendation, has deemed it appropriate, and in the best interests of the public, to approve Task Order No.4 for Hartman & Associates, Inc., in the amount of $112,150.00, to prepare an infiltration and inflow program for Master Lift Station 309 Basin; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct execution of Task Order No.4 for Hartman & Associates, Inc., in the amount of $112,150.00, to prepare an infiltration and inflow program for Master Lift Station 309 Basin. Section 2. This Resolution shall become effective immediately upon passage. S:\CA\RESO\Agreements\Task - Change Orders\Change Order - Hartman & Associates.doc II PASSED AND ADOPTED this 2.' day of January, 2003. it): lerk \\\\\\ \\ 1111111//11 .::;..\\\ O'{ NT 0; /1/// ~ ,,,. . iV/.- ~ /~ V ~.e.e..u"..'l~~ -:9". '/.';:" -.. :"(, "",,~OR.1":' '~.\ / ,2: 0 ..~. o"{,~ F :\"\, '~',7 :::: '- ,(j '0. t..) ", i~{ ~ t~ \ 'i ~~~ :~: "0 \. 1020 / -:;. .... ......,. ,.' 'W~~'" O.lII......".rtj..". .~~ >.. f:"/ n rI"\) '^ ""),.- J ACH, FLORIDA \. S:\CA\RESO\Agreements\Task - Change Orders\Change Order - Hartman & Associates.doc R0'3-01~ CITY OF BOYNTON BEACH TASK ORDER NO.4. PS-309 BASIN III PROGRAM December 4, 2002 I. GENERAL The City of Boynton Beach (City) Master Pump Station 309 service area encompasses the northeast quadrant of the City's service area and is approximately bounded by Hypo1uxo Road, the Intracoastal Waterway, C-16 Canal and 1-95. The City retained Metcalf & Eddy (M&E) to prepare a preliminary sewer system evaluation report on this area. This report provided some night flow data and other information concerning the service area. The City has contracted Hartman & Associates, Inc. (HAl) to prepare a program that will cost effectively remove extraneous flows from the system, as identified by M&E. The sub-basins to be evaluated and repaired under this task order shall be 201, 202, 203, 303, 306 and 310 (approximately 55,000 L.F., 225 manholes). This shall include both inflow and infiltration. The goal of this program is to maximize City funds expended on actual repairs to the City's system, including main lines, laterals and manholes. II. SCOPE OF SERVICES The following services shall be provided by HAl: A. Prepare contract bid documents, on a unit cost basis, for the selection of a lead III contractor(s). The bid form shall include the following items: 1. Pipe cleaning by pipe diameter and degree of cleaning required 2. Pre-Construction, Post-Construction, and Warranty Mainline color video inspection by pipe diameter 3. Lateral color video inspection 4. Joint testing 5. Joint sealing - mainline 6. Lateral sealing 7. Grout, per gallon pumped 8. In-situ point repairs 9. Manhole grouting by the gallon MAG/jem/wordproc/2000/00-197.m6/TaskOrderr#4 10f4 12/4/02 10. Installation of clean-outs 11. Lateral root treatment 12. Mainline root treatment 13. Manhole rehabilitation - cementous 14. Manhole rehabilitation - epoxy 15. Manhole rehabilitation - HDPE liner 16. Smoke testing 17. Manhole ring and cover reinstalling 18. Manhole ring and cover replacement 19. By-pass pumping 20. Manhole-to-manhole lining 21. Open cut B. Review M&E report and maps of each sub-basin. Field verify extent and location of gravity sewers. Assist City in collecting night flow data. C. HAl shall prepare a report of findings that shall include: 1. With the assistance of City staff, a pay-back period for the project. This value will be used in determining the cost effectiveness of repairing each pipe reach or manhole, based on flow (gpm) per foot of pipe within a lift station sub-basin (gpm/foot). 2. Estimated III reduction based on pay-back period developed. 3. An estimated annual cost reduction, for pumping and treatment to City as a result of these improvements. D. After receipt of bids, HAl shall reVIew for conformance with the contract documents and recommend award. E. After selection of a lead III contractor, HAl shall provide the following services: 1. Evaluate the cost effectiveness, based on contractor provided video tape, of each gravity sewer reach, leaking lateral and manhole for III reduction. 2. Evaluate each gravity sewer reach for structural problems. HAl shall direct the contractor to make necessary repairs to those lines structurally deemed as being in need of repair. 3. HAl shall provide a RPR with contractor repair crews to oversee contractor's work and conformance with the contract documents. III, PROJECT SCHEDULE A. Task A - Prepare Contract Documents MAG/jem/wordproc/2000/00-197.m6/TaskOrderr#4 20f4 12/4/02 1. Prepare draft review documents within 60 days of Notice To Proceed. 2. Complete documents within 30 days of receipt of City draft review comments. B. Task B - Data Collection and Review 1. Complete review of data within 45 days of receipt of all requested data from City. C. Task C - Cost Analysis 1. Complete cost analysis data review within 30 days of receipt from City. 2. Prepare draft report of findings within 45 days of completion of Task B and Task C.1. 3. Prepare final report within 15 days of receipt of City comments. D. Task D - Bidding and Award 1. Within 10 days of bid opening, provide City with bid analysis and award recommendation. E. Task E - Services During Construction 1. Services during construction are based on a 60 day construction schedule requiring R.P.R. services. IV COMPENSATION A. Services for professional engineering services are estimated as follows: 1. 2. 3. 4. 5. 6. Task A: Task B: Task C: Task D: Task E: Misc. Expenses: $20,420.00 9,600.00 15,620.00 5,680.00 60,330.00 500.00 $112,150.00 Services shall be billed based on actual time charged to the project and billed monthly. Total estimated cost will not be exceeded without prior written approval by the City. MAG/jem/wordproc/2000100-197.m6/TaskOrderr#4 30f4 12/4/02 APPROVED BY CITY OF BOYNTON BEACH, FLORIDA By: ~~ Ci~'f MA~ Approved as to Form: ~ 00 ~ t\. ..-City Attorney 1~:). SUBMITTED BY HARTMAN & ASSOCIATES, INC. By: aIo1d E. Schmidt, J ., PE., DEE Vice President MAG/jem/wordproc/2000/00-197.m6/TaskOrderr#4 40f4 OI-QI-03 Date /~~ December 4, 2002 12/4/02