Minutes 01-07-93#INUTES OF THE SPECIAL CITY COMMISSION NEETING HELD IN CONNISSION
CHANBERS, CITY HALL, BOYNTON BEACH, FLORIDA, ON
THURSDAY, JANUARY 7, 1993 AT 5:30 P.N.
PRESENT.
Arline Weiner, Mayor
Jose Aguila, Commissioner
Edward Harmening, Commissioner
Robert Walshak, Commissioner {arrived late}
Carrie Parker, Assistant City
Manager
James Cherof, City Attorney
Sue Kruse, City Clerk
CALL TO ORDER
Mayor Weiner called the meeting to order at 5:30 p.m. She announced that due to
illness, Vice Mayor Matson would not be present. Commissioner Walshak had not
yet arrived.
REVIEW OF COMMUNITY DESIGN PLAN
Planning and Zoning Director Chris Cutro explained that at Commissioner Aguila's
request, the City Commission authorized staff to review the Community Design
Plan and make recommendations regarding necessary adjustments. A slide presen-
tation was prepared to assist in the explanation of some of the recommendations.
The present Community Design Plan is an adopted Ordinance in Chapter 5 of the
building section of the Code. This Plan, adopted in 1990, set a specific list
of architectural styles for certain areas throughout the City. The styles
include mediterranean, modern and coastal village. The coastal village theme is
primarily located in the eastern portion of the City; however, some areas in the
western portion of the City also follow this theme. The mediterranean theme is
used in the Congress Avenue corridor as well as along Boynton Beach Boulevard
and Woolbright Road. The modern theme is used in various areas, especially
near Bethesda Hospital.
Mr. Cutro used slides to show specific areas throughout the City. The first
slide depicted the BP Service Station and two other buildings east of the sta-
tion located on Woolbright Road. He pointed out that although the architectural
style of this area should be mediterranean, there is only a slight hint of this
style in the area.
Mr. Cutro explained that pedestrian orientation was emphasized in the Community
Design Plan; however, in many areas, these features are inappropriate. A slide
was viewed of Boynton Beach Boulevard across from City Hall. It showed how the
Plan forced the Kentucky Fried Chicken building to be moved out to the sidewalk
while all other buildings in the area are oriented to vehicular parking in front.
Mr. Cutro also stated that the current Community Design Plan does not place any
emphasis on buildings being compatible with each other from site to site. In
order to comply with Code, builders are being forced to incorporate an architec-
tural style. He used the Office Depot building as an example. ,This building
recently added a Spanish tile roof, but the building is a 1950s type building
- 1 -
'NINUTE$ - SPECIAL CITY CONNI$$ION NEETING
BOYNTON BEACH, FLORIDA
JANUARY 7, 1993
which had possibilities for highlighting or banding. Those possibilities have
been obliterated completely. The slide further showed how the building next to
Office Depot was not styled in relation to the complex and sits there like a
large box. Further, there is no flexibility built into the Community Design
Plan. There are no variance or appeal procedures in place. The review proce-
dure is spread throughout three sections of the Code; part in Chapter 19, part
in Chapter 5 and the remainder is in Appendix "A".
With regard to principles of good design, Mr. Cutro displayed a slide depicting
Espanola Way in Miami. The stretch of buildings are pedestrian oriented.
Sidewalks are wider than normal with the streets only approximately 15 feet
wide. The buildings are located on the front setback line. The buildings are
only two to three stories in height and contain matching decaling and banding.
Further, all of the colors work with each other and the landscaping compliments
the buildings.
Mr. Cutro explained that the proposed new Code does not advocate one architec-
tural style. It would be extremely difficult to impose a particular style since
so many architectural styles currently exist. What is stressed in this new Code
is that the architecture of the structure must relate to the architecture around
it. If a predominant style already exists, then that style should follow
through. The detailing of the building should be based on the use and buffering
will be stressed.
Further, internal compatibility will be stressed. Mr. Cutro explained that
internal compatibility means the wall materials will match the materials used
for the building. Lights will have relationship to the size of the building and
the signs and landscaping should relate to and enhance the structure, not
overwhelm it. A formal review process has been incorporated into this new Code
in an effort to eliminate some unneeded reviews. On a major review, the City
Commission and Planning and Development Board will review it. On a minor
review, staff will make a ruling on whether or not it complies. The City
Commission, Planning and Development Board and City Manager will then be
notified that it was approved and there will be an appeal period.
The new guidelines will deal more realistically with a "built" environment. The
requirments for details are not a necessity. Mr. Cutro is of the opinion that
many of the current Code requirements are unnecessary. The review process can
be made easier for smaller existing developments by widening their palette of
choices. For new buildings, the architects will be given more design freedom.
By stressing the need to bring the entire block into play, their ability to
design is enhanced.
Staff is seeking authorization to work with the City Attorney to clarify this
proposal. It will then go before the Planning and Development Board and be
brought back to the City Commission for consideration as an Ordinance or as
guidelines.
Commissioner Harmening feels the inception of this Plan might cause a great deal
of dissension among the business corrmunity because they will be required to make
many changes when a repair is necessary. Mr. Cutro pointed out that is what
-2-
*#~NUTE$ - SPECIAL CITY C01~$$~0N #EET~NG
BOYNTON BF..ACH, FLORIDA
JANUARY 7, 1993
happens now. Coffl~issioner Aguila feels this Plan will change that procedure.
He explained that he objects to the requirements of the current Ordinance where-
in a specific address requires a specific architectural style. Commissioner
Aguila originally intended to suggest eliminating the entire Community Design
Plan, but he realized that would create more problems. This proposed Plan lists
some good design guidelines which will establish patterns. Corrmissioner Aguila
feels anyone wanting to make positive changes should be permitted to do so
without having to do anything more than he wants to do. However, any substan-
tial changes would have to go through a review process so that a determination
can be made that they are moving in a positive direction. This plan would pro-
vide criteria for use by the Planning and Development Board. Commissioner
Aguila further explained that nothing new is being created by this Plan. All
this Plan does is provide the designer or developer with good-taste guidelines.
Mr. Cutro said it will be easy to establish parameters on what is covered by
this new Plan. It will be necessary to establish what is a minor change as
opposed to what is a major change. Maintenance situations should probably not
be reviewed, but a full renovation of a building should be reviewed.
Commissioner Aguila thinks it should be staff's responsibility to deal with the
Code issues, and the Planning and Development Board and City Commission should
deal with how the development fits into the community.
Mayor Weiner wondered if this Plan would make it easier for a person to develop
his lot the way he wishes. Commissioner Aguila believes it will while
Commissioner Harmening feels there is no definitie answer since this is a very
subjective matter. He feels this is an architectural review. Commissioner
Aguila feels that by taking over the responsibilities of the Community
Appearance Board, the Planning and Development Board should be looking for how
the aesthetic quality will affect the community. He feels this Plan will be a
step in the right direction.
Again, Commissioner Aguila stated that people tend to forget that what'they do
within their property lines affects everyone around them. He feels people must
be made to realize how their buildings will impact the community. These guide-
lines will begin to deal with that situation.
Commissioner Harmening referred to Section 4a of the proposed Plan and pointed
out that saving existing landscaping or natural vegetation is not always good.
That decision should be made based on what type of vegetation is on site. Mr.
Cutro will clear up this language. Commissioner Aguila suggested encouraging
the use of materials which are on the South Florida Water Management District
list. That list.contains non-native trees which are good xeriscape-type trees.
Hotlon
Commissioner Aguila moved to authorize the Planning Director to move ahead.
Commissioner Harmening seconded the motion which carried 4-0.
MAYOR WEINER DECLARED A RECESS UNTIL 6:30 P.M.
-3-
MINUTES - SPECIAL CITY COMMISSION #EETING
BOYNTON BEACH, FLORIDA
~IANUARY 7, 1993
STORNWATER UTILITY AND NANAGENENT PLAN
Nike Kazunas, Utility Engineer, explained that the purpose of this meeting is to
review the Master Plan and Utility Rate Study. These two items are related and
yet, independent. The Master Plan is a requirement of the Comprehensive Plan
and at some point, must be adopted. Mr. Kazunas distributed copies of the ini-
tial Task Order and Contract.
Armando Perez~ of Canq), Dresser & NcKee introduced Llsa Abernethy, Alan Wetepny
of Nook, RoDs & Associates, and John Goldman. Mr. Perez used an overhead pro-
jection presentation.
The Stormwater Master Plan has several major tasks associated with it. The
tasks involve data inventory, assistance in obtaining data, a mapping effort for
identifying basins and pipes, a capacity analysis which led to calculating capi-
tal costs for the recommendations, and a discussion of best management practices
which will play an increasing role in the Federal NPDES program as it develops.
An overhead map was displayed depicting the City priority areas which were iden-
tified for the study.
Priority Area #1
This area encompasses the Post Office and Dunkin' Donuts on Boynton Beach
Boulevard. There are two drainage systems in this area which are part of the
D.O.T. system. It was determined that the pipes are large enough to handle the
required flows. The problem is one of maintenance. There is a sag in the road-
way which may have been the result of construction. Mr. Perez recommends having
this problem corrected through D.O.T. In the area of Dunkin' Donuts, the
problem involves a great deal of pipe clogging and it can be resolved by having
D.O.T. clean out the pipes.
Mr. Perez recommends working with D.O.T., a program of regular maintenance and,
perhaps, the addition of an inlet in the Post Office area. The addition of the
inlet is something D.O.T. should handle.
Mayor Weiner reported an enormous problem on the south side of Boynton Beach
Boulevard, while Commissioner Walshak spoke of a problem on the north side of
the road. He wondered how many laterals were in that area. Mr. Goldman
explained that there are inlets on both sides of the road. The roadway grades
into a "V" pattern. If the trunk system is clogged, the water will back up
through both pipes.
Commissioner Walshak reported that D.O.T. was asked to clean out the system and
he thought their response indicated the City would be reimbursed for the
cleaning. Mr. Goldman stated that he spoke with D.O.T. and there was no mention
of reimbursement.
In response to Commissioner Aguila's question, Mr. Kazunas stated the City pro-
vided the four priority areas which were part of the Task. Commissioner Aguila
said there is a problem on the roadway in front of Paz Plaza which is located
west of the Post Office. Mr. Perez said that area was not studied.
-4-
#INUTES - SPECIAL CITY CONNISSION #EETING
BOYNTON BEACH, FLORIDA
~IANUARY 7, 1993
This area involves West Industrial Avenue in the location of 1-95 and Boynton
Beach Boulevard. The problem in this area involves flooding and lack of storm-
water conveyances to remove the water. There is piping along Boynton Beach
Boulevard, but there were concerns about its capacity. The study investigated
handling the water prior to its discharge into the pipe. A collection system
was developed. The water would be collected in a pond and percolated down into
the ground and only during very large storm events would there be an overflow of
the pond into the system. The pond would be located on a piece of property in
the northwest quadrant. The cost of that piece of property would be approxi-
mately $250,000.' Cormaissioner Aguila questioned the research which was done to
learn whether or not that property could be purchased for the purpose intended
and how the figure was derived. Mr. Perez said general research was done of
prices in the area. Commissioner Aguila wondered if an alternate plan was pre-
pared in the event the property owner did not wish to sell. Mr. Perez responded
that there is a possibility exfiltration trenches could be used in such a
situation; however, because of the good percolation capacity of the soils, it
would be more efficient to have the percolation take place in one location.
In response to Commissioner Harmening's question, Mr. Goldman said it would be
possible to use a percolation pond one third smaller than the one planned. Mr.
Perez pointed out, however, that it would be to the City's advantage to design
the pond larger than that required by the South Florida Water Management
District so that a larger storm can be captured.
The estimated cost for Priority Area #2 is just over $1.2 million.
Responding to Commissioner Harmening's question about the usefulness of swales,
Mr. Perez stated there was a very small area for swales in this location.
Commissioner Aguila feels the swales would be destroyed because of the use in
the area and Commission Walshak stated that all the curb cuts and driveways are
in place.
Prtort~ Are~ #3
This area is bounded by Boynton Beach Boulevard and Seacrest Boulevard. This
area experiences a great deal of flooding. No outfall is available and the area
is characterized by sand dunes. There are percolation trenches along some of
the streets, but they are smaller than they should be.
The study recommends a program of exfiltration trenches which should be done in
a phased manner. They would begin with two systems and expand outward to addi-
tional Streets. Systems would then be installed to the east as well. The ca-
pacity of this soil to absorb water is good.
The estimated cost of this program for Priority Area #3 is $1.2 million.
Commissioner Harmening questioned Mr. Perez with regard to the life expectancy
of exfiltration trenches. Mr. Perez explained that maintenance plays an impor-
tant part in the life expectancy, but with no maintenance whatsoever, the life
expectancy is approximately five years.
-5-
*#INUTE$ - SPECIAL CITY CONNIS$ION #EETING
BOYNTON BEACH, FLORIDA
~IANUARY 7, 1993
Priority Area #4
This area involves 1-95 and Boynton Beach Boulevard. Although there are flood-
ing problems in this area, the flooding is concentrated around the inlets. An
analysis of the stormwater system was done and it was found that the collection
system is adequate to handle most storms. However, peak storms cannot be
handled. The first idea considered was enlarging the pipes along Boynton Beach
BoUlevard, but because of the uncertainty involved in future connections, it was
decided to investigate different means of handling the stormwater.
A determination was made to 9o with exfiltration systems at different locations.
Since there is not a great deal of flow, the system would be able to handle it
except in peak storms. Another alternative was to redo the piping and convey
part of the flow northward to the Boynton Canal. Commissioner Harmening pointed
out that there is already a system in that location. The current system would
have to be reconfigured to handle additional flow; however, from the standpoint
of permitting, the City would exceed the amount of flow which is currently being
discharged and that may create resistance from the agencies who would review it.
It is recommended that an exfiltration system be used.
The estimated cost for this recommendation is $100,000.
In response to Commissioner Harmening's question with regard to overflow, Mr.
Perez stated the system will overflow at the peak of a three-year and five-year
storm.
RECOI~tENDATION$:
1. Area #1 - Work with D.O.T. to minimize the costs to the City.
2. Area #2 - (Industrial Area) - Installation of a system of new pipes and
a percolation pond at a cost of $1.2 million.
Area #3 - (area southwest of City Hall) - Installation of exfiltration
trenches at a cost of approximately $1.2 million. Further, a phased
approach is recommendation beginning with the worst streets.
4. Area #4 - Installation of exfiltration trenches at a cost of $84,000.
With regard to best management practices, the report contains a discussion with
regard to water quality oriented type situations which should be considered.
Some of these items include streetsweeping and swales. More specifications will
have to be developed upon implementation of the stormwater requirements.
It was confirmed by Bob Eichorst, Public Works Director, that the anticipated
date of delivery for the City's streetsweeper is February, 1993.
Commissioner Walshak raised the discussion of the flooding problem being
experienced by the residents of the Costa Bella subdivision. This subdivision
is located on the north side of Old Boynton Beach Road just east of the Sky Lake
subdivision. It was explained to the Commission that the Master Plan cannot
anticipate flooding problems and this area was not included in that Master Plan.
-6-
''#INUTES - SPECIAL CITY COMMISSION MEETING
BOYNTON BEACH, FLORIDA
dANUARY 7, 1993
Commissioner Walshak explained that this area should be considered a priority
because of the problems which have been created for the residents in the area.
Mr. Kazunas stated that although certain Priority Areas.were selected for the
study, there is no reason why the City cannot handle Costa Bella as its Priority
Area #1. Commissioner Walshak asked Mr. Kazunas to keep this situation in mind.
FUNDING STUDY
Mr. Perez explained that the objective of the funding study is to look at
funding mechanisms to provide the different functions related to stormwater.
Those functions include maintenance, construction and water quality. The Study
consisted of two phases.
The first phase is a funding study which is similar to a water and sewer rate
study. The objective is to calculate approximately what rate would have to be
charged to cover the costs identified.
The second phase is the implementation phase which consists of working with the
CitY to develop the mechanics of sending out bills, preparing data for calcu-
lating the charges and working with Data Processing to get the information onto
a data base.
Mr. Perez quoted the definition of a stormwater utility from the Florida
Administrative Codes. He pointed out that there is a relationship between the
amount of the charge and the contribution of runoff as opposed to a tax on the
value of the property.
The report contains charts with funding alternatives. The charts depict the
required functions. Mr. Perez reported that, in his opinion, there are only two
funding mechanisms capable of carrying out the functions. Those two funding
mechanisms are the Stormwater Utility and the General Fund. The charges would
be based on unit rate times a billing unit. On-stormwater, the billing unit is
based on a "yardstick" which is the amount of impervious {paved) area.
There are two systems of calculating the "yardstick". The first one is the SFU
{Single-Family Unit} which consists of the average impervious area of all the
single-family parcels in the City. The average impervious area for single-
family was approximately 2,500 square feet.
The other method of calculation is ERU {Equivalent Residential Unit). This
figure is based on the average impervious area for all of the residential par-
cels combined. That includes single family, multifamily, mobile homes, condos
and apartments. The average square footage was estimated at approximately 1,900
square feet.
Mr. Perez reported that the system most favored is the ERU system because it is
the easiest system to implement. Using this system, every housing unit is
billed the same amount of money. In the SFU method, all single-family units are
charged the same amount of money, but it is necessary to calculate individual
bills for multifamily, mobile homes and condominiums.
-7-
'MINUTES - SPECIAL CITY C01414I$$ION #EETING
80YNTON BEACH, FLORIDA
·]ANUARY 7, 1993
In response to Commissioner Aguila's question, Mr. Perez explained that individ-
ual bills are calculated for commercial properties because of the variation of
impervious areas involved in this category. Commissioner Aguila further pointed
out that with most single-family and multifamily dwellings, the runoff fills
their retention ponds and when that is full, the remainder of runoff is handled
by a drainage system. This is not really impacting the drainage system in the
manner in which commercial properties impact the system. Mr. Perez explained
that during the calculations, the directly-connected impervious areas have been
separated out. These directly-connected impervious areas are rooftops which
will drain down into the soil. This calculation was done for all of the cate-
gories of residential and when this is calculated proportionately, the values
are comparable for the different residential categOries. Therefore, the conclu-
sion is that in the residential category, the charges are equally distributed.
The calculations for commercial property are entirely different. Non-
residential is individually calculated by taking the impervious area and
dividing it by the yardstick ERU. Mr. Perez noted that as development in the
City grows, the numbers will change.
In looking at 1992, there were approximately 35,900 ERUs. If $1.00 per ERU is
charged, the City would derive a revenue of approximately $400,000.
Calculations were also provided for areas outside of the City.
Lisa Abernethy reviewed the calculations of possible charges for Boynton Beach.
~r meetings with staff, percentages were developed based on the departments'
involvement with the stormwater utility functions. The departments involved are
Public Works, Streets, and Utilities. She displayed charts showing the budget
over a five-year period. The total stormwater budget developed for 1991/92
amounted to $290,000.
Two scenarios were developed to provide a low and a high end of what can be done
with the stormwater utility.
In Scenario #1, using 35,900 ERUs, if the City maintains the current funding
through the General Fund, the City would add an additional 90¢ per unit per
month to the utility bill. From the $324,000 of generated revenue, it would be
necessary to deduct the projected expenses. The rate would increase during the
fourth year.
In Scenario #2, the ultimate level of an enhanced program is considered. This
enhanced program would be handling the four Priority Areas. The customer base
is the same, but the rate is higher. During the first year of such a program,
there will be a $98,000 carryover. To keep the costs level, this money could
be brought into the next fiscal year for operating expense use. The enhanced
program would allow bringing on line all of the necessary equipment and it would
provide consideration for the NPDES costs.
With regard to alternative billing methods, non ad valorem assessments is a
single line item which appears on the tax bill. There are many constraints
behind this method. Further, an in-house, separate system can be instituted as
an attachment to the utility bill or a vendor could be used. The problem with
using a vendor is collection. When the charge is incorporated into the utility
bill, if it is not paid, the water service can be turned off.
-8-
~ ~ MINUTES - SPECTAL CITY COMt41'SSION #EETING
BOYNTON BEACH, FLORIDA
,,1AHUARY 7, 199:3
Camp, Dresser & McKee concludes that the customer base should be the developed
parcels within the incorporated areas of the City. The billing mechanism to
attach the stormwater fee to the existing utility bill and the user charge
should be the enhanced program or some variation of that program. Further, they
recommend the ERU methodology since it is the easiest system to administer.
With regard to implementation, in order to produce revenue in the next fiscal
year, the City Commission would authorize going forward with Phase II implemen-
tation. This implementation will take approximately six to eight months. If
Phase II was started in February, with the help of City staff with regard to
verification, an Ordinance would have to be adopted establishing the utility
by June, 1993. Billing and collection procedures would be developed during this
process. The fee would be integrated into the existing system by July, 1993 and
the first bills would be issued in August, 1993.
Commissioner Harmening remarked that at least one or two months is needed to
absorb the information which was presented. Mayor Weiner was assured that there
is no risk to the City if this project is delayed for the time being.
Mayor Weiner thanked the representatives for the presentation and stated the
Commission will take this under advisement and get back to them in the future.
Commissioner Harmening congratulated them for a good Master Plan. However, he
did note that the cost was somewhat high.
ADJOURNMENT
There being no further business to come before the Commission, Commissioner
Aguila moved to adjourn the meeting at 7:45 p.m. Commissioner Harmening
seconded the motion which carried unanimously.
ATTEST:
Ci t~y~;~C1 erk
~9/cor lng Secretary
~' (Two Tapes)
THE CITY OF BOYNTON BEACH
Mayor
Vice Mayor
~ssioner
-9-