Loading...
R00-047RESOLUTION R 00- ,P/~' A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING AND DIRECTING THE MAYOR AND CITY CLERK TO EXECUTE A JOINT PARTICIPATION/FUNDING AGREEMENT BETWEEN THE CITY OF BOYNTON BEACH (CITY) AND PALM BEACH COUNTY (COUNTY) IN THE CONSTRUCTION OF LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO ROAD (PALM BEACH COUNTY PROJECT NO. 95511)~ AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the CITY and the COUNTY desire to jointly participate in the construction of utility adjustments to water distribution and/or sewage transmission systems and other improvements, along the right- of-way of Lawrence Road from Gateway Boulevard to Hypoluxo Road roadway improvements; and WHEREAS, both the CITY and the COUNTY declare that it is in the public interest that the work be constructed with the aforementioned PrOject; WHEREAS, the parties heretO mutually recognize the need for entering into an Agreement designating and setting forth the 'esponsibilities of each party; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF rilE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, :lorida does hereby authorize and direct the Mayor and City Clerk to ~xecute a Joint Participation/Funding Agreement between the City of )oynton Beach and Palm Beach County, a copy of which Agreement s attached hereto as Exhibit "A". Section 2. This Resolution will become effective immediately Jpon passage. PASSED AND ADOPTED this ~ day of April, 2000. Vice Mayor Mayor Pro Tom Commissioner- s:cax~, s~c~m'~ty - Joint Pa~icp~io~ding Agr 0328~ % ~'~,o~,,. ~'~/l ~ ' ~ ~x~x R2000 0737 AGREEMENT BETWEEN PALM BEACH COUNTY, FLORIDA AND THE CITY OF BOYNTON BEACH FOR JOINT PARTICIPATION AND PROJECT FUNDING [N CONSTRUCTION OF LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PALM BEACH COUNTY, FLORIDA PALM BEACH COUNTY PROJECT NO. 95511 THIS AGREEMENT, made and entered into this day of JlJ~/ ~ g 2~ ~ by and between PALM BEACH COUNTY, a political subdivision in the State of Florida. herein referred to as "COUNTY" and the "CITY OF BOYNTON BEACH". a municipality in the State of Florida, herein referred to as the "CITY". WITNESSETH: WHEREAS. COUNTY and CITY desire to jointly participate in the construction of utility adjustments to water distribution and/or sewage transmission systems and other improvements, hereinafter referred to as the "Work" along the right-of-way of Lawrence Road from Gateway Boulevard to Hypoluxo Road roadway improvements, hereinafter referred to as the "Project"; and VOtEREAS, Florida Statutes, Section 163.01, allows governmental units to make the most efficient use of their powers by enabling them to cooperate with other localities on a basis of mutual advantage; and WHEREAS, both COUNTY and CITY declare that it is in the public interest that the "Work" be constructed with the aforementioned PROJECT; and NOW, THEREFORE, for and in consideration of the mutual covenants contained herein, the Parties to this Agreement agree as follows: 1. The CITY agrees to pay directly to the COUNTY costs attributable to conswaction of the "Work" along the right-of-way of the "Project" as outlined and shown in the Bid Documents for Palm Beach County Project No. 9551 I. AGREEMENT WITH THE CITY OF BOYNTON BEACH 2. Said summation of costs is stated in the mount of $ 28,519.00 in accordance with the attached bid tabulation (Attachment "A") and summary (Attachment "B"'} for the specified work. 3. Costs shall be adjusted upon actual contract costs and completion of the project using contract unit prices and actual constructed quantities, said quantities being measured by the Palm Beach County Engineering and Public Works Department. 4. The CITY agrees to fund those contributions set forth in Paragraphs 1 through 3 above within thirty (30) days of receiving written notice from the COUNTY that funding ~s required. 5. The COUNTY is to be responsible for administering the funds in accordance with the Agreement. 6. The CITY is to be responsible for, and agrees to provide or cause to be performed all inspection services during construction of the "Work" and final certification for the aforementioned "Work" as it relates to the CITY's work 7. The COUNTY shall obtain CITY approval for any change orders which increase the cost attributable to the construction of utility adjustments to water distribution and/or sewage transmission systems and other improvemems to an amount greater than the contract amount as stated in Paragraph 2 of this agreement. The CITY shall be responsible for any cost caused by the CITY's delays including but not limited to change orders attributable to the roadway improvements as it relates to the CITY's work. 8. In the event that additional work and funding is required, the additional cost attributable to said construction of the "Work" as outlined in the specifications for this project is the responsibility of the CITY. In the event of an under mn attributable to said construction of the "Work", as outlined in the specification, the CITY will be credited the excess amount. AGREEMENT WITH THE CITY OF BOYNTON BEACH 9. Without waiver of limitation as provided for in Section 768.28 ~5), Florida Statutes. and to the extent permitted by law. COUNTY agrees to indemnify and hold harmless the CITY from and against any claims, losses, demands or causes of action of whatsoever kind or nature that the CITY, its agents or employees, may or could sustain as a result of or emanating out of the terms and conditions contained in this agreement that result from the COUNTY's negligence or willful misconduct. Without waiver of limitation as provided for in Section 768.28 (5), Florida Statutes, and to the extent permitted by law, CITY agrees to indemnify and hold harmless the COUNTY from and against any claims, losses, demands or causes of action of whatsoever kind or nature that the COUNTY, its agents or employees, may or could sustain as a result of or emanating out of the terms and conditions contained in this agreement that result from the CITY's negligence or willful misconduct. 10. All provisions of this Agreement tailing for the expenditure of ad valorem tax money by either COUNTY or CITY are subject to annual budgetary funding and should either Party involuntarily fail to fund any of their respective obligations pursuant to this Agreement, this Agreement may be terminated. 11. Any and all notices required or permitted to be given hereunder shall be deemed received three (3) days after same are deposited in U.S. Mail sent via certified mail, remm receipt requested. All notice to the CITY shall be sent to: City of Boynton Beach 100 East Boynton Beach Boulevard Boynton Beach, F1 33435-3838 ATTN: Mr. Peter V. Mazzella Assistant Director of Utilities All notice to the COUNTY shall be sent to: George T. Webb, P.E., County Engineer Engineering and Public Works Department P.O. Box 21229 West Palm Beach, FL 33416-1229 ATTN: ROADWAY PRODUCTION 3 AGREEMENT WITH THE CITY OF BoYNToN BEACH IN WITNESS WHEREOF, the Parties unto this Agreement have set their hands and seals on the day and date first written above. CITY OF BOYNTON BEACH PALM BEACH COUNTY, FLORIDA, BY ITS BOARD OF COUNTY COMMISSIONERS / CH, t R2000 0737 ATTEST: SUZANNE KRUSE, CITY CLERK o / ~ ' ' v~,,,,,~ O ~_6 Y~ ~ (DATE) ATTEST: DOROTHY H. WILKEN, CLERK Board of County Z%9.¥. ............ '-'.,.0.~?;> APPROVED AS TO FORM AND LEGAL LEGAL SUFFICIENCY: APPROVED AS TO FORM AND LEGAL SUFFICIENCY: CITY ATTORNEY _(~)~u'NTY ATT(~RNEY ooo oggOOOgoo D o 8 · Z LU I- m--.~ z~ mO ~om> w~wO >> Z La n, ~> r~ ~d _Zz ATTACHMENT "B" PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 Mora Engineering Contractors, Inc, ITEM QUANTITY/UNITS UNIT PRICE AMOUNq REGULAR ROADWAY PAY ITEMS 17 INLETS (CURB) (TYPE P-5) 1 EA $ 2,173.00 18 INLETS (CURB) (TYPE P-5) 1 EA $ 3,166.00 (CONFLICT) DIFFERENCE BETWEEN 1 $ 993.00 $ 993.00 17& 18 INLETS (CURB) (TYPE P-6) ! EA $ 2,611.00 INLETS (CURB) (TYPE P-6) 1 EA $ 3,400.00 (CONFLICT) DIFFERENCE BETWEEN 1 $ 789.00 $ 789.00 20&21 INLETS (CURB) (TYPE P-9) 1 EA $ 1,450.00 (PARTIAL) INLETS (CURB) (TYPE P-9) 1 EA $ 1,647.00 (PARTIAL) (CONFLICT) DIFFERENCE BETWEEN 1 $ 197.00 $ 197.00 25 & 26 ADJUST MANHOLES 1 EA $ 1,440.00 $ 1,440.00 REGULAR ROADWAY PAY ITEMS SUBTO'~AL $ 3,419.00 2O 21 25 26 36 PROJECT NAME: PROJECT NUMBER: 95511 ITEM 71 ATTACHMENT "B" LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. Mora Engineering Contractors, Inc. QUANTITY/UNITS UNIT PRICE AMOUNT~ CONTINGENCY ITEMS ADJUST VALVE BOX & 5 EA $ COVERS ( INCLUDES CONCRETE COLLAR ) ADJUST AIR RELEASE VALVE 5 EA 72 73 DEFLECT W.M. W/ 200 LF FITTINGS ( 8" ) 74 DEFLECT F.M. W/ 200 LF FITTINGS ( 8" ) 75 SUPPORT & PROTECT W.M. 200 LF & APPURTENANCES (16") 76 SUPPORT & PROTECT F.M. 200 LF & APPURTENANCES (I0") 78 SUPPORT & PROTECT W.M. 100 LF & APPURTENANCES (16") 290.00 $ 1,450.00 $ 550.00 $ 2,750.00 $ 30.00 $ 6,000.00 $ 39.00 $ 7,800.00 $ I3.00 $ 2,600.00 $ 13.00 $ 2,600.00 $ 19.00 $ 1,900.00 CONTINGENCY ITEMS SUBTOTAL $ 25,100.00 GRAND TOTAL $ 28,519.00~ F:\ROADWA~AGRMT~95511BBU~SUM.doc 82000 1735 AMENDMENT TO AGREEMENT DATED JUNE 6, 2000 BY AND BETWEEN CITY OF BOYNTON BEACH AND PALM BEACH COUNTY FOR JOINT PARTICIPATION AND PROJECT FUNDING IN CONSTRUCTION OF LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PALM BEACH COUNTY, FLORIDA PROJECT NO. 95511 OCT 3121 THIS AMENDMENT is made this day of 2000, for the joint participation and project funding of utility system improvements on Lawrence Road from Gateway Boulevard to Hypoluxo Road, hereinafter referred to as "AGREEMENT ", dated 1 June 6, 2000, (R- 2000 -0737) by and between CITY OF BOYNTON BEACH, a Municipality in 1 the State of Florida, hereinafter referred to as "CITY," and the BOARD OF COUNTY ' ' 1 COMMISSIONERS OF PALM BEACH COUNTY, a political subdivision of the State of Florida, hereinafter referred to as "COUNTY." WHEREAS, on June 6, 2000, the COUNTY approved the AGREEMENT with the CITY for the construction of water distribution and /or sewage transmission systems, utility adjustments and other improvements on the COUNTY's Lawrence Road right -of -way in the amount of Twenty Eight Thousand Five Hundred Nineteen and No Cents ($ 28,519.00); and WHEREAS, the COUNTY and the CITY now find it mutually agreeable to amend the above - referenced AGREEMENT. NOW, THEREFORE, and in consideration of the mutual covenants contained herein, the Parties agree as follows: 1. Paragraph 5 (Item No. 2) is hereby amended as follows: Said summation of costs ° is now stated in the amount of $ 87,451.00 in accordance with the bid tabulation (Attachment a "A ") and the amended Summary (Attachment "B ") attached hereto and incorporated herein for the specified work.. 2. It is the intent of the parties hereto that this AMENDMENT to the AGREEMENT shall not become binding until the date executed by the Board of County Commissioners of Palm Beach County. R j 3. Except as expressly modified or amended herein, all terms and conditions of the AGREEMENT dated June 6, 2000, shall remain in full force and effect. 5•. 1 ' I !AMENDMENT TO AGREEMENT WITH THE CITY OF BOYNTON BEACH IN WITNESS WHEREOF, the Parties unto this Agreement have set their hands and 1 1 seals on the day and date first written above. R 0 0 0 1735 CITY OF BOYNTON BEACH, PALM BEACH COUNTY, FLORIDA, BY ITS BY ITS, CITY COMMISSION BOARD OF COUNTY COMMISSIONERS By: I-$ /if ' Chair /, OCT 3 2iN 30,YN7- /. . o %. rr ),* 1. : ATTEST': ATTEST: SUZANNE K kk,'SlIZgPf\AERK DOROTHY H. WILKEN, CLERK 1 B By: 00Z‘bwwillow.) C w i4C•COLowit..) Deputy Clerk .... ! . ..c+,411 (DATE) (DATE) ,r , .* Be C' ÷ G2azolea_..ei /o,aehowei COUNTY f 'IORIDPN 0 ... APPROVED AS TO FORM APPROVED AS TO FORM AND LEGAL SUFFICIENCY: AND LEGAL SUFFICIENCY: 1 \ \-11(-4 O L/L)Is°3 By: — BY: 1 71 /( - 1 City Attorney A sistant County Attorney 11 1 F. \ROADWAY\AGRMT\9551 l-AM-BBU-AGR doc 2 1 PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ROADWAY PRODUCTION DIVISION - BID TABULATION PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 MORA ENGINEERING RYAN, INC. RANGER CONSTRUCTION CONTRACTORS, INC. INDUSTRIES, INC. AVERAGE ITEM QTY. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE REGULAR ROADWAY PAY ITEMS 1 MOBILIZATION 1 LS $237,000.00 $237,000.00 $163,081.00 $163,081.00 $257,250.00 $257,250.00 $219,110.33 2 MAINTENANCE OF TRAFFIC ( INCLUDES PEDESTRIAN M.O.T.) 1 LS $90,480.00 $90,480.00 $235,000.00 $235,000.00 $217,250.00 $217,250.00 $180,910.00 3 NPDES COMPLIANCE (SEE SPECIAL PROVISIONS) 1 LS $29,520.00 $29,520.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $13,840.00 4 CLEARING AND GRUBBING 1 LS $120,080.00 $120,080.00 $175,000.00 $175,000.00 $129,000.00 $129,000.00 $141,360.00 5 REGULAR EXCAVATION 28,755 CY $2.23 $64,123.65 $3.00 $86,265.00 $3.60 $103,518.00 $2.94 6 EMBANKMENT ( COMPACTED IN PLACE) 29,660 CY $3.22 $95,505.20 $4.00 $118,640.00 $2.60 $77,116.00 $3.27 7 TYPE C STABILIZATION (FBV 75) 41,320 SY $2.00 $82,640.00 $3.00 $123,960.00 $2.80 $115,696.00 $2 60 8 BASEROCK ( 8" ) ( 2 - 4" LIFTS) 42,243 SY $6.87 $290,209.41 $7.00 $295,701.00 $7.50 $316,822.50 $7.12 9 TYPE S ASPHALTIC CONCRETE (AVG. 3.5 ") 7192.1 TN $47.75 $343,422.78 $42.00 $302,068.20 $43.50 $312,856.35 $44.42 10 TYPE S -III ASPHALT CONCRETE (1.0 ") 86,624 SY $2.47 $213,961.28 $2.10 $181,910.40 $2.20 $190,572.80 $2.26 11 TYPE S -1 ASPHALTIC CONCRETE ( 1.50 ") 59,542 SY $3.50 $208,397.00 $3.00 $178,626.00 $3.10 $184,580.20 $3.20 12 CLASS 1 CONCRETE (INCLUDES REINFORCEMENT STEEL) 208 CY $415.24 $86,369.92 $370.00 $76,960.00 $430.00 $89,440.00 $405.08 13 CONTROL STRUCTURES 2 EA $3,358.00 $6,716 00 $3,000.00 $6,000.00 $4,000.00 $8,000.00 $3,452.67 14 INLETS ( CURB ) ( TYPE P -1 ) 2 EA $1,635.00 $3,270.00 $2,560.00 $5,120.00 $2,800.00 $5,600.00 $2,331.67 15 INLETS ( CURB) ( TYPE P -1 ) ( >10') 1 EA $2,013.00 $2,013.00 $2,690.00 $2,690.00 $3,000.00 $3,000.00 $2,567.67 16 INLETS ( CURB ) ( TYPE P -2 ) ( >10') 1 EA $2,262.00 $2,262.00 $2,700.00 $2,700.00 $3,100.00 $3,100.00 $2,687.33 17 INLETS ( CURB ) ( TYPE P -5) 8 EA $2,173.00 $17,384.00 $2,000.00 $16,000.00 $2,400.00 $19,200.00 $2,191.00 18 INLETS ( CURB) ( TYPE P -5) (CONFLICT) 2 EA $3,166.00 $6,332.00 $2,100.00 $4,200.00 $2,900.00 $5,800.00 $2,722.00 19 INLETS ( CURB ) ( TYPE P -5 ) ( >10') 9 EA $2,830.00 $25,470.00 $2,200.00 $19,800.00 $2,800.00 $25,200.00 $2,610.00 20 INLETS ( CURB ) ( TYPE P -6) 20 EA $2,611.00 $52,220.00 $2,200.00 $44,000.00 $2,500.00 $50,000.00 $2,437.00 21 INLETS ( CURB ) ( TYPE P -6 ) (CONFLICT) 8 EA $3,400.00 $27,200.00 $2,425.00 $19,400.00 $3,000.00 $24,000.00 $2,941.67 22 INLETS ( CURB ) ( TYPE P -6) ( >10') 4 EA $2,900.00 $11,600.00 $2,560.00 $10,240.00 $2,900.00 $11,600.00 $2,786.67 23 INLETS ( CURB ) ( TYPE 6 ) (PARTIAL) 3 EA $2,460.00 $7,380.00 $1,800.00 $5,400.00 $2,200.00 $6,600.00 $2,153.33 24 INLETS ( CURB ) ( TYPE J -6) 4 EA $3,498.00 $13,992.00 $7,650.00 $30,600.00 $4,800.00 $19,200.00 $5,316.00 25 INLETS ( CURB ) ( TYPE P -9 ) (PARTIAL) 3 EA $1,450.00 $4,350.00 $1,200.00 $3,600.00 $1,100.00 $3,300.00 $1,250.00 26 INLETS ( CURB ) ( TYPE P -9 ) (PARTIAL) (CONFLICT) 1 EA $1,647.00 $1,647.00 $1,220.00 $1,220.00 $1,500.00 $1,500.00 $1,455.67 27 INLETS ( CURB ) ( TYPE P -9) 3 EA $1,790.00 $5,370.00 $1,620.00 $4,860.00 $1,700.00 $5,100.00 $1,703.33 H 28 YARD DRAINS 1 EA $1,590.00 $1,590.00 $770.00 $770.00 $730.00 $730.00 $1,030.00 H 29 INLETS ( DITCH BOTTOM ) ( TYPE F) 4 EA $1,750.00 $7,000.00 $1,525.00 $6,100.00 $1,800.00 $7,200.00 $1,691.67 n 30 INLETS ( DITCH BOTTOM ) ( TYPE F ) ( >10') 1 EA $2,298.00 $2,298.00 $1,820.00 $1,820.00 $2,200.00 $2,200.00 $2,106.00 31 MANHOLE ( TYPE P -7) 8 EA $2,086.00 $16,688.00 $1,370.00 $10,960.00 $1,500.00 $12,000.00 $1,652.00 32 MANHOLE ( TYPE P -7 ) ( >10') 4 EA $2,725.00 $10,900.00 $1,750.00 $7,000.00 $1,800.00 $7,200.00 $2,091.67 33 MANHOLE ( TYPE P -7 ) ( PARTIAL) 14 EA $1,070.00 $14,980.00 $1,000.00 $14,000.00 $900.00 $12,600.00 $990.00 34 MANHOLE ( TYPE J -7) 1 EA $2,670.00 $2,670.00 $13,100.00 $13,100.00 $5,800.00 $5,800.00 $7,190.00 35 JUNCTION BOX ( PARTIAL) 1 EA $1,490.00 $1,490.00 $900.00 $900.00 $1,100.00 $1,100.00 $1,163.33 36 ADJUST MANHOLES 1 EA $1,440.00 $1,440.00 $1,425.00 $1,425.00 $520.00 $520.00 $1,128.33 37 TEMPORARY 24" CMP (UTILITY POLE LOCATIONS) 540 LF $33.00 $17,820.00 $44.00 $23,760.00 $29.50 $15,930.00 $35.50 38 CONCRETE PIPE CULVERT (12 ") 14 LF $46.00 $644.00 $47.50 $665.00 $54.10 $757.40 $49.20 39 CONCRETE PIPE CULVERT (15 ") 74 LF $38.00 $2,812.00 $43.00 $3,182.00 $59.00 $4,366.00 $46.67 40 CONCRETE PIPE CULVERT (18 ") 4,514 LF $24.00 $108,336.00 $36.00 $162,504.00 $32.20 $145,350.80 $30.73 41 CONCRETE PIPE CULVERT (24 ") 3,496 LF $29.00 $101,384.00 $37.00 $129,352.00 $33.50 $117,116.00 $33.17 42 CONCRETE PIPE CULVERT ( 36 ") 485 LF $46.00 $22,310.00 $49.00 $23,765.00 $51.40 $24,929.00 $48.80 43 CONCRETE PIPE CULVERT ( 60 ") 142 LF $91.00 $12,922.00 $150.00 $21,300.00 $120.00 $17,040.00 $120.33 44 CONCRETE PIPE CULVERT (72" ) 194 LF $141.00 $27,354.00 $175.00 $33,950.00 $190.00 $36,860.00 $168.67 1 of 5 F \ROADWAY \QPRO\BIDSY5\9551IBT, xh 19- Sep4I4 111 29 AM PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ROADWAY PRODUCTION DIVISION - BID TABULATION PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 MORA ENGINEERING RYAN, INC. RANGER CONSTRUCTION CONTRACTORS, INC. INDUSTRIES, INC. AVERAGE ITEM QTY. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE 45 TRENCH SAFETY COMPLIANCE (30" OR LESS) 8,604 LF $1.30 $11,185.20 $1.00 $8,604.00 $2.10 $18,068.40 $1.47 46 TRENCH SAFETY COMPLIANCE (> 30" ) 821 LF $6.50 $5,336.50 $2.00 $1,642.00 $2.40 $1,970.40 $3.63 47 MITERED END SECTION ( 24 ") 1 EA $259.00 $259.00 $550.00 $550.00 $640.00 $640.00 $483.00 48 MITERED END SECTION ( 36 ") 1 EA $400.00 $400.00 $650.00 $650.00 $3,900.00 $3,900.00 $1,650.00 49 FRENCH DRAINS (18 ") (INCL. BALLAST ROCK & FILTER FABRIC) 197 LF $65.00 $12,805.00 $57.00 $11,229.00 $51.40 $10,125.80 $57.80 50 FRENCH DRAINS (24 ") ( INCL. BALLAST ROCK & FILTER FABRIC) 309 LF $73.00 $22,557.00 $63.00 $19,467.00 $61.70 $19,065.30 $65.90 51 PIPE HANDRAIL ( ALUMINUM) 1058.5 LF $29.00 $30,696.50 $22.00 $23,287.00 $24.40 $25,827.40 $25.13 52 CONCRETE CURB & GUTTER ( TYPE F) 32,752 LF $7.70 $252,190.40 $7.20 $235,814.40 $7.30 $239,089.60 $7.40 53 CONCRETE VALLEY GUTTER 200 LF $8.70 $1,740.00 $8.49 $1,698.00 $9.90 $1,980.00 $9.03 54 CONCRETE CURB ( HEADER) 100 LF $9.80 $980.00 $12.00 $1,200.00 $13.20 $1,320.00 $11.67 55 CONCRETE CURB ( TYPE D) 534 LF $9.20 $4,912.80 $7.00 $3,738.00 $8.60 $4,592.40 $8.27 56 TRAFFIC SEPARATOR CONC ( SPECIAL ) ( VARIABLE WIDTH) 19 LF $40.00 $760.00 $50.00 $950.00 $47.20 $896.80 $45.73 57 CONC SIDEWALK (4" THICK) 6,859 SY $21.00 $144,039.00 $15.00 $102,885.00 $16.30 $111,801.70 $17.43 58 CONC SIDEWALK (6 "THICK) (DRIVEWAYS) 614 SY $25.00 $15,350.00 $20.00 $12,280.00 $21.90 $13,446.60 $22.30 59 RIP -RAP ( SAND - CEMENT) 82 CY $297.00 $24,354.00 $230.00 $18,860.00 $390.00 $31,980.00 $305.67 60 TYPE B FENCE (6' HIGH) (W/TOP RAIL & BARB WIRE) INCL. POS 1,934 LF $11.20 $21,660.80 $7.80 $15,085.20 $9.40 $18,179.60 $9.47 61 FENCE GATE (TYPE B) ( W/TOP RAIL) (12' WIDE) 2 EA $1,130.00 $2,260.00 $650.00 $1,300.00 $740.00 $1,480.00 $840.00 62 SODDING 22,085 SY $4.50 $99,382.50 $2.80 $61,838.00 $3.40 $75,089.00 $3.57 63 RECORD DRAWINGS ( SEE SPECIAL PROVISIONS) 1 LS $17,250.00 $17,250.00 $25,000.00 $25,000.00 $4,100.00 $4,100.00 $15,450.00 64 STORM SEWER PUMPING (EXISTING) ( 24" OR LESS ) (SEE S. P.) 3,500 LF $2.10 $7,350.00 $4.00 $14,000.00 $3.50 $12,250.00 $3.20 65 STORM SEWER PUMPING (EXISTING) (72 ") (SEE S. P.) 90 LF $30.00 $2,700.00 $10.00 $900.00 $18.90 $1,701.00 $19.63 66 1 - 2" PVC CONDUIT ( SCH 40) (UNDER SIDEWALK) 9,473 LF $2.70 $25,577.10 $5.80 $54,943.40 $6.00 $56,838.00 $4.83 67 1 - 2" PVC CONDUIT ( SCH 40) (UNDER PAVEMENT) 805 LF $2.90 $2,334.50 $18.30 $14,731.50 $16.20 $13,041.00 $12.47 68 LITTORAL PLANTINGS (SEE SPECIAL PROVISIONS) 1 LS $8,200.00 $8,200.00 $2,650.00 $2,650.00 $27,000.00 $27,000.00 $12,616.67 69 MONITORING, MAINTENANCE & REPORTS (SEE SP's) 1 LS $4,000.00 $4,000.00 $3,150.00 $3,150.00 $5,900.00 $5,900.00 $4,350.00 70 TREE SPADE UNITS (TSU) (SEE SPECIAL PROVISIONS) 20 EA $425.00 $8,500.00 $430.00 $8,600.00 $290.00 $5,800.00 $381.67 TOTAL REGULAR ROADWAY PAY ITEMS $3,128,333.54 $3,218,647.10 $3,309,084.05 CONTINGENCY ITEMS 71 ADJUST VALVE BOX & COVERS ( INCLUDES CONCRETE COLLAR 5 EA $290.00 $1,450.00 $400.00 $2,000.00 $250.00 $1,250.00 $313.33 72 ADJUST AIR RELEASE VALVE 5 EA $550.00 $2,750.00 $325.00 $1,625.00 $510.00 $2,550.00 $461.67 73 DEFLECT W.M. W /FITTINGS (8 ") 200 LF $30.00 $6,000.00 $30.00 $6,000.00 $26.30 $5,260.00 $28.77 74 DEFECT F.M. W /FITTINGS ( 8 ") 200 LF $39.00 $7,800.00 $40.00 $8,000.00 $26.30 $5,260.00 $35.10 75 SUPPORT & PROTECT W.M. & APPURTENANCES (16 ") 200 LF $13.00 $2,600.00 $25.00 $5,000.00 $6.30 $1,260.00 $14.77 76 SUPPORT & PROTECT F.M. & APPURTENANCES (10 ") 200 LF $13.00 $2,600.00 $25.00 $5,000.00 $5.80 $1,160.00 $14.60 77 SUPPORT & PROTECT BURIED CABLE (SOUTHER BELL) 100 LF $19.00 $1,900.00 $25.00 $2,500.00 $5.10 $510.00 $16.37 78 SUPPORT & PROTECT W.M. & APPURTENANCES (16 ") 100 LF $19.00 $1,900.00 $25.00 $2,500.00 $6.30 $630.00 $16.77 79 FLOWABLE FILL 10 CY $249.00 $2,490.00 $105.00 $1,050.00 $170.00 $1,700.00 $174.67 80 TYPE B FENCE (4' HIGH ) (W/TOP RAIL) 600 LF $10.00 $6,000.00 $7.25 $4,350.00 $9.40 $5,640.00 $8.88 81 STORM SEWER CLEANING (EXISTING) ( 24" OR LESS ) (SEE S. P.) 3,500 LF $7.40 $25,900.00 $3.00 $10,500.00 $3.80 $13,300.00 $4.73 82 STORM SEWER CLEANING (EXISTING) (72 ") (SEE S. P.) 90 LF $46.00 $4,140.00 $7.50 $675.00 $21.80 $1,962.00 $25.10 TOTAL CONTINGENCY ITEMS $65,530.00 $49,200.00 $40,482.00 TOTAL BID $3,193,863.54 $3,267,847.10 $3,349,566.05 2 of 5 PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ROADWAY PRODUCTION DIVISION - BID TABULATION - PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. . PROJECT NUMBER: 95511 COMMUNITY ASPHALT HUBBARD CONSTRUCTION CORPORATION COMPANY ITEM QTY. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT REGULAR ROADWAY PAY ITEMS 1 MOBILIZATION 1 LS $300,000.00 $300,000.00 $320,000.00 $320,000.00 2 MAINTENANCE OF TRAFFIC ( INCLUDES PEDESTRIAN M.O.T. 1 LS $285,000.00 $285,000.00 $70,000.00 *70,000.00 3 NPDES COMPLIANCE (SEE SPECIAL PROVISIONS) 1 LS $2,500.00 $2,500.00 $20,000.00 $20,000.00 4 CLEARING AND GRUBBING 1 LS $320,000.00 $320,000.00 $353,000.00 *353,000.00 5 REGULAR EXCAVATION 28,755 CY $3.50 $100,642.50 $4.00 $115,020.00 6 EMBANKMENT ( COMPACTED IN PLACE) 29,660 CY $3.70 $109,742.00 $5.00 $148,300.00 7 TYPE C STABILIZATION (FBV 75) 41,320 SY $1.65 $68,178.00 $2.00 $82,640.00 8 BASEROCK (8" ) ( 2 - 4" LIFTS) 42,243 SY $6.75 $285,140.25 $6.00 $253,458.00 9 TYPE S ASPHALTIC CONCRETE (AVG. 3.5 ") 7192.1 TN $40.10 $288,403.21 $41.00 *294,876.10 10 TYPE S -III ASPHALT CONCRETE (1.0 ") 86,624 SY $2.05 $177,579.20 *2.35 $203,566.40 11 TYPE S -1 ASPHALTIC CONCRETE ( 1.50") 59,542 SY $2.95 $175,648.90 $3.25 $193,511.50 12 CLASS 1 CONCRETE (INCLUDES REINFORCEMENT STEEL) 208 CY ;250.00 $52,000.00 $400.00 *83,200.00 13 CONTROL STRUCTURES 2 EA $3,740.00 $7,480.00 $4,700.00 $9,400.00 14 INLETS ( CURB ) ( TYPE P -1) 2 EA *2,585.00 $5,170.00 $2,800.00 *5,600.00 15 INLETS ( CURB ) ( TYPE P -1 ) ( >10') 1 EA $2,780.00 $2,780.00 $3,200.00 $3,200.00 16 INLETS ( CURB ) ( TYPE P -2 ) ( >10') 1 EA $2,850.00 $2,850.00 $3,900.00 $3,900.00 17 INLETS ( CURB) ( TYPE P-5) 8 EA $2,180.00 $17,440.00 $2,200.00 $17,600.00 18 INLETS ( CURB ) ( TYPE P -5 ) (CONFLICT) 2 EA $2,640.00 $5,280.00 $3,200.00 $6,400.00 19 INLETS ( CURB ) ( TYPE P -5 ) ( >10') 9 EA $2,555.00 $22,995.00 $2,700.00 $24,300.00 20 INLETS ( CURB) ( TYPE P4) 20 EA $2,290.00 $45,800.00 $2,400.00 $48,000.00 21 INLETS ( CURB ) ( TYPE P4 ) (CONFLICT) 8 EA $2,790.00 $22,320.00 $4,900.00 *39,200.00 22 INLETS ( CURB ) ( TYPE P4 ) ( >10') 4 EA $2,680.00 $10,720.00 $2,800.00 *11,200.00 23 INLETS ( CURB ) ( TYPE 6 ) (PARTIAL) 3 EA $2,060.00 $6,180.00 $1,800.00 $5,400.00 24 INLETS ( CURB) ( TYPE J-6) 4 EA $4,470.00 $17,880.00 $3,600.00 $14,400.00 25 INLETS ( CURB ) ( TYPE P -9 ) (PARTIAL) 3 EA $1,025.00 *3,075.00 $1,000.00 $3,000.00 26 INLETS ( CURB) ( TYPE P-9 ) (PARTIAL) (CONFLICT) 1 EA *1,370.00 $1,370.00 $2,300.00 $2,300.00 27 INLETS ( CURB) ( TYPE P -9) 3 EA $1,575.00 *4,725.00 $1,500.00 *4,500.00 28 YARD DRAINS 1 EA $670.00 $670.00 $800.00 $800.00 29 INLETS ( DITCH BOTTOM ) ( TYPE F) 4 EA *1,705.00 $6,820.00 $1,300.00 $5,200.00 30 INLETS ( DITCH BOTTOM ) ( TYPE F ) ( >10') 1 EA $2,045.00 $2,045.00 $1,500.00 $1,500.00 31 MANHOLE ( TYPE P -7) 8 EA $1,400.00 $11,200.00 $1,600.00 $12,800.00 32 MANHOLE ( TYPE P -7 ) ( >10') 4 EA $1,705.00 *6,820.00 *2,000.00 $8,000.00 33 MANHOLE ( TYPE P -7 ) ( PARTIAL) 14 EA $830.00 $11,620.00 $800.00 *11,200.00 34 MANHOLE ( TYPE J -7) 1 EA $5,340.00 $5,340.00 $2,500.00 $2,500.00 35 JUNCTION BOX ( PARTIAL) 1 EA $995.00 $995.00 $700.00 *700.00 36 ADJUST MANHOLES 1 EA $483.00 $483.00 $400.00 $400.00 37 TEMPORARY 24" CMP (UTILITY POLE LOCATIONS) 540 LF $27.25 *14,715.00 $35.00 $18,900.00 38 CONCRETE PIPE CULVERT ( 12 ") 14 LF *50.00 $700.00 $30.00 $420.00 39 CONCRETE PIPE CULVERT ( 15 ") 74 LF $54.50 $4,033.00 *50.00 $3,700.00 40 CONCRETE PIPE CULVERT ( 18 ") 4,514 LF $29.70 $134,065.80 $43.00 $194,102.00 41 CONCRETE PIPE CULVERT ( 24 ") 3,496 LF $30.95 $108,201.20 $45.00 $157,320.00 42 CONCRETE PIPE CULVERT ( 36 ") 485 LF $47.45 $23,013.25 $50.00 *24,250.00 43 CONCRETE PIPE CULVERT ( 60 ") 142 LF *115.00 $16,330.00 $250.00 $35,500.00 44 CONCRETE PIPE CULVERT ( 72 ") 194 LF $172.00 *33,368.00 $350.00 *67,900.00 3 of 5 PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ROADWAY PRODUCTION DIVISION - BID TABULATION PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 COMMUNITY ASPHALT HUBBARD CONSTRUCTION CORPORATION COMPANY ITEM QTY. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT 45 TRENCH SAFETY COMPLIANCE ( 30" OR LESS) 8,604 LF $1.90 $16,347.60 $2.00 $17,208.00 46 TRENCH SAFETY COMPLIANCE (> 30" ) 821 LF $2.25 $1,847.25 $5.00 $4,105.00 47 MITERED END SECTION ( 24 ") 1 EA $595.00 $595.00 $700.00 $700.00 48 MITERED END SECTION (36 ") 1 EA $3,585.00 $3,585.00 $900.00 $900.00 49 FRENCH DRAINS (18 ") ( INCL. BALLAST ROCK & FILTER FAB 197 LF $47.50 $9,357.50 $50.00 $9,850.00 50 FRENCH DRAINS (24 ") ( INCL. BALLAST ROCK & FILTER FAB 309 LF $57.00 $17,613.00 $55.00 $16,995.00 51 PIPE HANDRAIL ( ALUMINUM) 1058.5 LF $23.40 $24,768.90 $20.00 $21,170.00 52 CONCRETE CURB & GUTTER ( TYPE F) 32,752 LF $6.40 $209,612.80 $5.50 $180,136.00 53 CONCRETE VALLEY GUTTER 200 LF $7.50 $1,500.00 $6.00 $1,200.00 54 CONCRETE CURB ( HEADER) 100 LF $9.00 $900.00 $10.00 $1,000.00 55 CONCRETE CURB ( TYPE D) 534 LF $7.50 $4,005.00 $9.00 $4,806.00 56 TRAFFIC SEPARATOR CONC ( SPECIAL) ( VARIABLE WIDTH 19 LF $47.00 $893.00 $14.00 $266.00 57 CONC SIDEWALK (4" THICK) 6,859 SY $15.00 $102,885.00 $14.00 $96,026.00 58 CONC SIDEWALK (6 "THICK) (DRIVEWAYS) 614 SY $20.00 $12,280.00 $19.00 $11,666.00 59 RIP -RAP ( SAND - CEMENT) 82 CY $364.00 $29,848.00 $350.00 $28,700.00 60 TYPE B FENCE (6' HIGH ) (W/TOP RAIL & BARB WIRE) INCL. 1,934 LF $7.00 $13,538.00 $7.00 $13,538.00 61 FENCE GATE (TYPE B) (W/TOP RAIL) (12' WIDE) 2 EA $450.00 $900.00 $500.00 $1,000.00 62 SODDING 22,085 SY $3.20 $70,672.00 $1.70 $37,544.50 63 RECORD DRAWINGS ( SEE SPECIAL PROVISIONS) 1 LS $3,000.00 $3,000.00 $1,500.00 $1,500.00 64 STORM SEWER PUMPING (EXISTING) (24" OR LESS ) (SEE S. 3,500 LF $3.25 $11,375.00 $4.00 $14,000.00 65 STORM SEWER PUMPING (EXISTING) (72 ") (SEE S. P.) 90 LF $10.00 $900.00 $20.00 $1,800.00 66 1 - 2" PVC CONDUIT ( SCH 40) (UNDER SIDEWALK) 9,473 LF $5.60 $53,048.80 $5.50 $52,101.50 67 1 - 2" PVC CONDUIT ( SCH 40) (UNDER PAVEMENT) 805 LF $15.00 $12,075.00 $15.00 $12,075.00 68 LITTORAL PLANTINGS (SEE SPECIAL PROVISIONS) 1 LS $8,000.00 $8,000.00 $15,000.00 $15,000.00 69 MONITORING, MAINTENANCE & REPORTS (SEE SP's) 1 LS $3,000.00 $3,000.00 $3,000.00 $3,000.00 70 TREE SPADE UNITS (TSU) (SEE SPECIAL PROVISIONS) 20 EA $300.00 $6,000.00 $200.00 $4,000.00 TOTAL REGULAR ROADWAY PAY ITEMS $3,339,865.16 $3,431,451.00 CONTINGENCY ITEMS 71 ADJUST VALVE BOX & COVERS ( INCLUDES CONCRETE COL 5 EA $245.00 $1,225.00 $300.00 $1,500.00 72 ADJUST AIR RELEASE VALVE 5 EA $510.00 $2,550.00 $800.00 $4,000.00 73 DEFLECT W.M. W /FITTINGS (8 ") 200 LF $26.20 $5,240.00 $50.00 $10,000.00 74 DEFECT F.M. W /FITTINGS (8 ") 200 LF $26.20 $5,240.00 $80.00 $16,000.00 75 SUPPORT & PROTECT W.M. & APPURTENANCES (16 ") 200 LF $6.30 $1,260.00 $7.00 $1,400.00 76 SUPPORT & PROTECT F.M. & APPURTENANCES (10 ") 200 LF $5.75 $1,150.00 $7.00 $1,400.00 77 SUPPORT & PROTECT BURIED CABLE (SOUTHER BELL) 100 LF $5.10 $510.00 $7.00 $700.00 78 SUPPORT & PROTECT W.M. & APPURTENANCES (16 ") 100 LF $6.30 $630.00 $7.00 $700.00 79 FLOWABLE FILL 10 CY $285.00 $2,850.00 $300.00 $3,000.00 80 TYPE B FENCE (4' HIGH ) (W/TOP RAIL) 600 LF $5.00 $3,000.00 $5.00 $3,000.00 81 STORM SEWER CLEANING (EXISTING) ( 24" OR LESS ) (SEE 3,500 LF $3.75 $13,125.00 $4.00 $14,000.00 82 STORM SEWER CLEANING (EXISTING) (72 ") (SEE S. P.) 90 LF $22.00 $1,980.00 $22.00 $1,980.00 TOTAL CONTINGENCY ITEMS $38,760.00 $57,680.00 TOTAL BID $3,378,625.16 $3,489,131.00 4 of 5 PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 NOTES: THE PAY ITEMS AND QUANTITIES, AS LISTED ABOVE, SHALL TAKE GOVERN OVER THE PLANS. ALL STRUCTURE BOXES ARE <10 FEET IN DEPTH, UNLESS OTHERWISE NOTED. ITEM #2 M.O.T. INCLUDES PEDESTRIAN M.O.T. IN ACCORDANCE WITH GP -18. ITEM #5 REGULAR EXCAVATION INCLUDES 22,819 C.Y. OF DETENTION POND EXCAVATION. ITEM # 12 - CLASS I CONC. - INCLUDES A CONTINGENT AMOUNT OF 170 CY. ITEMS *8-11, 79 & 80 INCLUDES BITUMINOUS MATERIAL & TACK COAT AS REQUIRED. ITEM #37 (24" CMP) - INCLUDES COMPACTED FILL TO COVER, AS REQUIRED (SEE SP-8 FOR LOCATIONS AND SCOPE). ITEMS *38- *44 COST OF BREAKING INTO EXISTING STRUCTURES IS INCIDENTAL TO COST OF PIPE. ITEM # 51 - PIPE HANDRAIL (ALUMINUM) - INCLUDES A CONTINGENT AMOUNT OF 800 LF. ITEM* 60, # 61 & # 80 - (TYPE B FENCE) - THE MESH SHALL BE COVERED WITH GREEN VINYL CLAD FABRIC. ITEM *62 (SODDING) - SHALL BE IN ACCORDANCE WITH GP-31 OF THESE SPECIFICATIONS. ITEMS *66 & *67 -PVC CONDUITS (TRAFFIC) INCLUDE PULL BOXES & FITTINGS AS INDICATED ON PLANS. ITEM *69 - (M/M &R)- REPORTS SHALL BE PAID IN FOUR (4) EQUAL INSTALLMENTS OF THE LUMP SUM UNIT PRICE. " +" Denotes corrected number where applicable. Working days to complete Three Hundred Sixty ( 360) calender days. Bids as read at opening January 18, 2000. All bids subject to O.E.O. compliance and Board Approval. Prepared by : JaeAnn Dean Checked by: WIllie Flohs 5 of 5 ** *AMENDED * ** ATTACHMENT "B" PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 Mora Engineering Contractors, Inc. ITEM QUANTITY /UNITS UNIT PRICE AMOUNT REGULAR ROADWAY PAY ITEMS 17 INLETS (CURB) (TYPE P -5) 1 EA $ 2,173.00 18 INLETS (CURB) (TYPE P -5) 1 EA $ 3,166.00 (CONFLICT) DIFFERENCE BETWEEN 1 $ 993.00 $ 993.00 17 & 18 20 INLETS (CURB) (TYPE P -6) 1 EA $ 2,611.00 21 INLETS (CURB) (TYPE P -6) 1 EA $ 3,400.00 (CONFLICT) DIFFERENCE BETWEEN 1 $ 789.00 $ 789.00 20 & 21 25 INLETS (CURB) (TYPE P -9) 1 EA $ 1,450.00 (PARTIAL) 26 INLETS (CURB) (TYPE P -9) 1 EA $ 1,647.00 (PARTIAL) (CONFLICT) DIFFERENCE BETWEEN 1 $ 197.00 $ 197.00 25 & 26 36 ADJUST MANHOLES 1 EA $ 1,440.00 $ 1,440.00 REGULAR ROADWAY PAY ITEMS SUBTOTAL $ 3,419.00 1 ** *AMENDED * ** ATTACHMENT "B" PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 Mora Engineering Contractors, Inc. ITEM QUANTITY /UNITS UNIT PRICE AMOUNT CONTINGENCY ITEMS 71 ADJUST VALVE BOX & 5 EA $ 290.00 $ 1,450.00 COVERS ( INCLUDES CONCRETE COLLAR ) 72 ADJUST AIR RELEASE VALVE 5 EA $ 550.00 $ 2,750.00 73 DEFLECT W.M. W/ 200 LF $ 30.00 $ 6,000.00 FITTINGS ( 8" ) 74 DEFLECT F.M. W/ 200 LF $ 39.00 $ 7,800.00 FITTINGS ( 8" ) 75 SUPPORT & PROTECT W.M. 200 LF $ 13.00 $ 2,600.00 & APPURTENANCES (16 ") 76 SUPPORT & PROTECT F.M. 200 LF $ 13.00 $ 2,600.00 & APPURTENANCES (10 ") 78 SUPPORT & PROTECT W.M. 100 LF $ 19.00 $ 1,900.00 & APPURTENANCES (16 ") CONTINGENCY ITEMS SUBTOTAL $ 25,100.00 2 ** *AMENDED * ** ATTACHMENT "B" PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 Mora Engineering Contractors, Inc. ITEM QUANTITY /UNITS UNIT PRICE AMOUNT ALTERNATE CONTINGENCY ITEMS *ALT ALTERNATE NO. 1.- J -9 3 EA $ 5,411.00 $ 16,233.00 #1 PRECAST STRUCTURE WITH TOP SLAB AND USF 5130 -6016. *ALT ALTERNATE NO. 2.- J -9 3 EA $ 4,907.00 $ 14,721.00 #2 PRECAST BOTTOM AND TOP SLABS AND USF 5130 -6016, BUILT IN PLACE CONCRETE BRICK STRUCTURE. *ALT ALTERNATE NO. 3.- P -7 3 EA $ 4,057.00 $ 12,171.00 #3 PRECAST CONFLICT MANHOLE AND USF 170 -X. *ALT ALTERNATE NO. 4.- P -5, P -6 3 EA $ 5,269.00 $ 15,807.00 #4 OR P -9 PRECAST CONFLICT STRUCTURE W /DOT THROAT AND USF 5160 -6310. ALTERNATE CONTINGENCY ITEMS SUBTOTAL $ 58,932.00 GRAND TOTAL $ 87,451.00 For *ALT #1, *ALT #2, ALT34 and ALT #4 see attached the quotation from Mora Engineering Contractors, Inc. dated August 22, 2000. F \ROADWAY\AGRMT\95511- AM -BBU -SUM doc 3 . lr! 1 C rnora engineering contractors, inc. BC 87-977 CGC 040142 FL CERT DBE / MBE August 22, 2000 Mr. Carl R. Miller, Director Palm Beach County Engineering and Public Works Construction Coordination Division . P. O. Box 21229 West Palm Beach, Florida 33416 -1229 Fax: (561) 684 -4165 re • Lawrence Road Q,,-:,TG.,,9 Gateway Boulevard to Hypoluxo Road Palm Beach County Project No. 95511 Palm Beach County, Florida subj. Conflict Structures Alternates Dear Mr Miller For your consideration and approval, the following is the unit price cost breakdown to furnish and install conflict structures as required. Alternate No. 1.- J -9 precast structure with top slab and U S F 5130 -6016 1 - Precast structure, top slab and casting $ 1,462 00 2 - Miscellaneous materials sand, cement, brick, etc $ 200 00 3.- Steel casing $ 800 00 4 - Equipment and Labor $ 2,652 00 5.- Layout and as- builts $ 197 00 6.- M. O. T. $ 100 00 Total cost Alt. No. 1 $ 5,411.00 Alternate No 2 - J -9 precast bottom and top slabs and U S F 5130 -6016, built in place concrete brick structure. 1 - Precast bottom, top slab and casting $ 1,037 00 2 - Miscellaneous materials sand, cement, brick, etc $ 563.00 3.- Steel casing $ 800 00 4 - Equipment and Labor $ 2,210 00 5 - Layout and as- builts $ 197 00 6.- M 0 T. $ 100 00 Total cost Alt. No. 2 $ 4,907.00 9600 W. Sample Rd., Suite 401 • Coral Springs, Florida 33065 (954) 752 -8065 • Fax (954) 345 -9268 MORA ENGINEER! 1 CONTRACTORS, INC. Mr. Carl R. Miller, Director Palm Beach County Engineering and Public Works Construction Coordination Division Conflict Structures Alternate Page 2 of 2 8/23/2000 Alternate No. 3.- P -7 precast conflict manhole and U S F 170 -X 1 - Precast Manhole $ 1,086.00 2 - Miscellaneous materials sand, cement, brick, etc $ 300 00 3 - Steel casing $ 800.00 4 - Equipment and Labor $ 1,574 00 5 - Layout and as -butts $ 197 00 6 - M. O. T. $ 100.00 Total cost Alt. No. 3 $ 4,057.00 Alternate No. 4 - P -5, P -6, OR P -9 precast conflict structure w/ DOT throat and U S F 5160- 6310. 1.- Precast Manhole $ 1,562.00 2 - Miscellaneous materials sand, cement, brick, etc $ 400.00 3.- Steel casing $ 800.00 4.- Equipment and Labor $ 2,210.00 5 - Layout and as- bunts $ 197.00 6 -M 0. T. $ 100.00 Total cost Alt. No. 4 $ 5,269.00 If we may be of further assistance or if there should be any additional information required, please contact me at your convenience Sincerely yours, MORA ENGINEERING CONTRACTORS, INC. ...../ . /Michel E Noury Vice President 2 KGiO - ATTACHMENT 2 2000 073 AGREEMENT BETWEEN PALM BEACH COUNTY, FLORIDA AND THE CITY OF BOYNTON BEACH FOR JOINT PARTICIPATION AND PROJECT FUNDING IN CONSTRUCTION OF LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PALM BEACH COUNTY, FLORIDA PALM BEACH COUNTY PROJECT NO. 95511 THIS AGREEMENT, made and entered into this day of JUN - 5 200 2669; by and between PALM BEACH COUNTY, a political subdivision in the State of Florida, herein referred to as "COUNTY" and the "CITY OF BOYNTON BEACH ", a municipality in the State of Florida, herein referred to as the "CITY ", WITNESSETH: WHEREAS, COUNTY and CITY desire to jointly participate in the construction of utility adjustments to water distribution and /or sewage transmission systems and other improvements, hereinafter referred to as the "Work" along the right -of -way of Lawrence Road from Gateway Boulevard to Hypoluxo Road roadway improvements, hereinafter referred to as the "Project "; and WHEREAS, Florida Statutes, Section 163.01, allows governmental units to make the most efficient use of their powers by enabling them to cooperate with other localities on a basis of mutual advantage; and WHEREAS, both COUNTY and CITY declare that it is in the public interest that the "Work" be constructed with the aforementioned PROJECT; and NOW, THEREFORE, for and in consideration of the mutual covenants contained herein, the Parties to this Agreement agree as follows: 1. The CITY agrees to pay directly to the COUNTY costs attributable to construction of the "Work" along the right of the "Project" as outlined and shown in the Bid Documents for Palm Beach County Project No. 95511. AGREEMENT WITH THE CITY OF BOYNTON BEACH 2. Said summation of costs is stated in the amount of $ 28,519.00 in accordance with the attached bid tabulation (Attachment "A ") and summary (Attachment "B ") for the specified work. 3. Costs shall be adjusted upon actual contract costs and completion of the project using contract unit prices and actual constructed quantities, said quantities being measured by the Palm Beach County Engineering and Public Works Department. 4. The CITY agrees to fund those contributions set forth in Paragraphs 1 through 3 above within thirty (30) days of receiving written notice from the COUNTY that funding is required. 5. The COUNTY is to be responsible for administering the funds in accordance with the Agreement. 6. The CITY is to be responsible for, and agrees to provide or cause to be performed all inspection services during construction of the "Work" and final certification for the aforementioned "Work" as it relates to the C1TY's work 7. The COUNTY shall obtain CITY approval for any change orders which increase the cost attributable to the construction of utility adjustments to water distribution and/or sewage transmission systems and other improvements to an amount greater than the contract amount as stated in Paragraph 2 of this agreement. The CITY shall be responsible for any cost caused by the CITY's delays including but not limited to change orders attributable to the roadway improvements as it relates to the CITY's work. 8. In the event that additional work and funding is required, the additional cost attributable to said construction of the "Work" as outlined in the specifications for this project is the responsibility of the CITY. In the event of an under run attributable to said construction of the "Work ", as outlined in the specification, the CITY will be credited the excess amount. i; 2 AGREEMENT WITH THE CITY OF BOYNTON BEACH 9. Without waiver of limitation as provided for in Section 768.28 (5), Florida Statutes, and to the extent permitted by law, COUNTY agrees to indemnify and hold harmless the CITY from and against any claims, losses, demands or causes of action of whatsoever kind or nature that the CITY, its agents or employees, may or could sustain as a result of or emanating out of the terms and conditions contained in this agreement that result from the COUNTY'S negligence or willful misconduct. Without waiver of limitation as provided for in Section 768.28 (5), Florida Statutes, and to the extent permitted by law, CITY agrees to indemnify and hold harmless the COUNTY from and against any claims, losses, demands or causes of action of whatsoever kind or nature that the COUNTY, its agents or employees, may or could sustain as a result of or emanating out of the terms and conditions contained in this agreement that result from the CITY's negligence or willful misconduct. 10. All provisions of this Agreement calling for the expenditure of ad valorem tax money by either COUNTY or CITY are subject to annual budgetary funding and should either Party involuntarily fail to fund any of their respective obligations pursuant to this Agreement, this Agreement may be terminated. 11. Any and all notices required or permitted to be given hereunder shall be deemed received three (3) days after same are deposited in U.S. Mail sent via certified mail, return receipt requested. • All notice to the CITY shall be sent to: City of Boynton Beach 100 East Boynton Beach Boulevard Boynton Beach, Fl 33435 -3838 ATTN: Mr. Peter - V. Mazzella Assistant Director of Utilities All notice to the COUNTY shall be sent to: George T. Webb, P.E., County Engineer Engineering and Public Works Department P.O. Box 21229 West Palm Beach, FL 33416 -1229 ATTN: ROADWAY PRODUCTION 3 11 AGREEMENT WITH THE CITY OF BOYNTON BEACH IN WITNESS WHEREOF, the Parties unto this Agreement have set their hands and seals on the day and date first written above. CITY OF BOYNTON BEACH PALM BEACH COUNTY, FLORIDA, BY ITS BOARD OF COUNTY COMMISSIONERS BY: /G� -( . / com BY: )g 0 7. :t CHAIR ; � n -w R200 0 Jut,- 4 Zuud ATTEST: ATTEST: SUZANNE KRUSE, CITY CLERK DOROTHY H. WILKEN, CLERK Board of County Commissioners \ \ \`\\1 w111 ///1 fs i r • ,I - 4, : r P Y /, Lo "),,�� COI -Lk (DATE) Clerk J!Ity I00 (DATE);; 10 / 111111 1 , � , /_ �� _ j `•__ APPROVED AS TO FORM AND LEGAL APPROVED AS TO FORM AND LEGAL SUFFICIENCY: LEGAL SUFFICIENCY: (. ' BY: i, JZL BYE CITY ATTORNEY •• TY ATTORNEY ■1 11 ROADWAY\AGRM1'95511130U- J2F.doc i 4 • Ii • D� 410R1.91" 1 JUL 1 8 2000 Department of Engineering and Public Works June 22, 2000 PO Box 21229 West Palm Beach FL 33416 -1229 Mr. Pete Mazzella, Assistant Dllector of Utilities (561) 684 -4000 City of Boynton Beach 100 East Boynton Beach Boulevard www co palm -beach fl us Boynton Beach, FL 33435 • RE: JOINT PROJECT PARTICIPATION/FUNDINGAGREEMENT IN THE CONSTRUCTION OF LAWRENCE ROAD FROM GATEWAY BOULEVARD TO HYPOLUXO ROAD Palm Beach County PALM BEACH COUNTY PROJECT NO. 95511 Board of County Commissioners Dear Mr. Mazzella Maude Ford Lee, Chair Warren H Newell, Vice Chairman Enclosed is an executed agreement for the above referenced project approved by the Board of County Commissioner- on June 6, 2000. Karen T Marcus Carol A Roberts Sincerely, Mary McCarty J Burt Aaronson i4 evrt.X. Tony Masilotti O melio A. Fernandez, . E., y . r'. Director Engineering & Public Works Oper. OAF: 1 County Administrator Enclost�',3 Robert Weisman pc: Edwin A Tack. P.E., Deputy County Engineer Marlene Everitt, Assistant County Attorney -w /attach. Tanya N. McConnell, P.E., Five Year Road Program Manager. Roadway Production Div. Steven B. Carrier, P.E., Special Projects Mgr., Roadway Production Div. William R. Sears, P.E.. Project Engineer, Roadway Production Div. Carl Miller, Director, Construction Coordination -w /attach Evelyn Andrews, Director, Administrative Services -w /attach Carl Hussey. P.E.. Utility Coordinator, Roadway Production - Vr " atta .,1 . _ y o_c1_:n� tor, Roadv�u Production _ Joseph F. Bergeron, CPA, Capital Budget Manager /OPMB F •ROADW AVA ,RM T '155: i -b6 ,xe do. 'An Equal Opportunity Affrrmahve Achon Employer" = 4 :11 pnnted on recycled paper 11 Re ,e).7 ` ! i 1 1 1 R2000 0737 AGREEMENT BETWEEN PALM BEACH COUNTY, FLORIDA i AND { THE CITY OF BOYNTON BEACH FOR JOINT PARTICIPATION AND PROJECT FUNDING ' IN CONSTRUCTION OF 1 i LAWRENCE ROAD - j GATEWAY BLVD. TO HYPOLUXO RD. 1 i PALM BEACH COUNTY, FLORIDA PALM BEACH COUNTY PROJECT NO. 95511 1 THIS AGREEMENT, made and entered into this day of 1 JUN - 6 2000 2699; by and between PALM BEACH COUNTY, a political subdivision i in the State of Florida, herein referred to as "COUNTY" and the "CITY OF BOYNTON BEACH ", a municipality in the State of Florida, herein referred to as the "CITY ", WITNESSETH: I i WHEREAS, COUNTY and CITY desire to jointly participate in the construction of utility adjustments to water distribution and/or sewage transmission systems and other improvements, hereinafter referred to as the "Work" along the right -of -way of Lawrence Road from Gateway Boulevard to Hypoluxo Road roadway improvements, hereinafter referred to as the "Project "; and ' WHEREAS, Florida Statutes, Section 163.01, allows governmental units to I make the most efficient use of their powers by enabling them to cooperate with other localities on a basis of mutual advantage; and WHEREAS, both COUNTY and CITY declare that it is in the public interest that the "Work" be constructed with the aforementioned PROJECT; and I i NOW, THEREFORE, for and in consideration of the mutual covenants i I contained herein, the Parties to this Agreement agree as follows: I 1. The CITY agrees to pay directly to the COUNTY costs attributable to construction 1 of the "Work" along the right -of -way of the "Project" as outlined and shown in the Bid 1 Documents for Palm Beach County Project No. 95511. 1 1 1 1 i I! } AGREEMENT WITH THE CITY OF BOYNTON BEACH 2. Said summation of costs is stated in the amount of $ 28,519.00 in accordance with the attached bid tabulation (Attachment "A ") and summary (Attachment "B ") for the specified work. 3. Costs shall be adjusted upon actual contract costs and completion of the project using contract unit prices and actual constructed quantities, said quantities being measured by the Palm Beach County Engineering and Public Works Department. 4. The CITY agrees to fund those contributions set forth in Paragraphs 1 through 3 above within thirty (30) days of receiving written notice from the COUNTY that funding is required. 5. The COUNTY is to be responsible for administering the funds in accordance with the Agreement. 6. The CITY is to be responsible for, and agrees to provide or cause to be performed all inspection services during construction of the "Work" and final certification for the aforementioned "Work" as it relates to the CITY's work 7. The COUNTY shall obtain CITY approval for any change orders which increase the cost attributable to the construction of utility adjustments to water distribution and /or sewage transmission systems and other improvements to an amount greater than the contract amount as stated in Paragraph 2 of this agreement. The CITY shall be responsible for any cost caused by the CITY's delays including but not limited to change orders attributable to the roadway improvements as it relates to the CITY's work. 8. In the event that additional work and funding is required, the additional cost attributable to said construction of the "Work" as outlined in the specifications for this project is the responsibility of the CITY. In the event of an under run attributable to said construction of the "Work ", as outlined in the specification, the CITY will be credited the excess amount. 2 1 AGREEMENT WITH THE CITY OF BOYNTON BEACH 9. Without waiver of limitation as provided for in Section 768.28 (5), Florida Statutes, and to the extent permitted by law, COUNTY agrees to indemnify and hold harmless the CITY from and against any claims, losses, demands or causes of action of whatsoever kind or nature that the CITY, its agents or employees, may or could sustain as a result of or emanating out of the terms and conditions contained in this agreement that result f from the COUNTY's negligence or willful misconduct. 1 Without waiver of limitation as provided for in Section 768.28 (5), Florida Statutes, and to the extent permitted by law, CITY agrees to indemnify and hold harmless the COUNTY from and against any claims, losses, demands or causes of action of whatsoever kind or nature that the COUNTY, its agents or employees, may or could sustain as a result of or emanating out of the terms and conditions contained in this agreement that result from the 1 i CITY's negligence or willful misconduct. 10. All provisions of this Agreement calling for the expenditure of ad valorem tax money by either COUNTY or CITY are subject to annual budgetary funding and should either Party involuntarily fail to fund any of their respective obligations pursuant to this Agreement, this Agreement may be terminated. 11. Any and all notices required or permitted to be given hereunder shall be deemed received three (3) days after same are deposited in U.S. Mail sent via certified mail, return receipt requested. All notice to the CITY shall be sent to: City of Boynton Beach ' 100 East Boynton Beach Boulevard Boynton Beach, F133435 -3838 ATTN: Mr. Peter V. Mazzella Assistant Director of Utilities All notice to the COUNTY shall be sent to: George T. Webb, P.E., County Engineer Engineering and Public Works Department P.O. Box 21229 . West Palm Beach, FL 33416 -1229 ATTN: ROADWAY PRODUCTION 3 1i AGREEMENT WITH THE CITY OF BOYNTON BEACH IN WITNESS WHEREOF, the Parties unto this Agreement have set their hands and seals on the day and date first written above. CITY OF BOYNTON BEACH PALM BEACH COUNTY, FLORIDA, BY ITS BOARD OF COUNTY COMMISSIONERS /2 , BY: BY );( 06- 7F)'4 , CH AIR R2000 073 J u — b butt ATTEST: ATTEST: SUZANNE KRUSE, CITY CLERK DOROTHY H. WILKEN, CLERK Board of County Commissioners I V' B /si/l1 � I► CQQCk (DATE) i t o r Clerk J; / (DATE)• / 111111 1 '� -7-Da '1 0 i ktl APPROVED AS TO FORM AND LEGAL APPROVED AS TO FORM AND LEGAL SUFFICIENCY: LEGAL SUFFICIENCY: J i 4 BY: �J B Lrtrti CITY ATTORNEY lir TY ATTORNEY F \ROAD WAY\AGRMT\95511 BBU -)2 F doc 4 1. 1Rr, .DW AY1QPHO\BIDS I I B r1 .2,2 22,4.n -411N 42 AM PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ROADWAY PRODUCTION DIVISION - BID TABULATION PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 MORA ENGINEERING RYAN, INC. RANGER CONSTRUCTION CONTRACTORS, INC. INDUSTRIES, INC. AVERAGE ITEM QTY. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE REGULAR ROADWAY PAY ITEMS 1 MOBILIZATION 1 LS $237,000.00 $237,000.00 $163,081.00 $163,081.00 $257,250.00 $257,250 00 $219,110.33 2 MAINTENANCE OF TRAFFIC ( INCLUDES PEDESTRIAN M.O T.) 1 LS $90,480.00 $90,480.00 $235,000.00 $235,000.00 $217,250.00 $217,250.00 $180,910.00 3 NPDES COMPLIANCE (SEE SPECIAL PROVISIONS) 1 LS $29,520.00 $29,520.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $13,840.00 4 CLEARING AND GRUBBING 1 LS $120,080 00 $120,080.00 5175,000.00 $175,000.00 $129,000.00 $129,000.00 $141,360.00 5 REGULAR EXCAVATION 28,755 CY $2.23 564,123.65 53 00 586,265.00 $3.60 5103,518.00 52.94 6 EMBANKMENT ( COMPACTED IN PLACE) 29,660 CY $3.22 $95,505.20 $4.00 $118,640.00 $2.60 $77,116.00 $3.27 7 TYPE C STABILIZATION (FBV 75) 41,320 SY $2.00 582,640.00 53.00 $123,960.00 $2.80 $115,696.00 52.60 8 BASEROCK ( 8" ) ( 2 - 4" LIFTS) 42,243 SY 56.87 5290,209.41 57.00 5295,701.00 57.50 5316,822.50 $7.12 9 TYPE S ASPHALTIC CONCRETE (AVG. 3.5 ") 71921 TN $47.75 $343,422.78 $42.00 $302,068.20 $43.50 $312,856.35 $44.42 10 TYPE S -11I ASPHALT CONCRETE ( 1.0 ") 86,624 SY $2.47 $213,961.28 $2.10 5181,910.40 $2.20 5190,572.80 $2.26 11 TYPE S -1 ASPHALTIC CONCRETE ( 1.50 ") 59,542 SY $3.50 $208,397.00 $3.00 $178,626.00 53.10 5184,580.20 $3.20 12 CLASS 1 CONCRETE (INCLUDES REINFORCEMENT STEEL) 208 CY $415.24 586,369.92 $370.00 $76,960.00 $430.00 589,440.00 5405.08 13 CONTROL STRUCTURES Z EA $3,358.00 $6,716.00 53,000.00 $6,000.00 54,000.00 58,000.00 $3,452.67 14 INLETS ( CURB ) ( TYPE PA ) 2 EA $1,635.00 $3,270.00 52,560.00 $5,120.00 $2,800.00 55,600.00 $2,331.67 15 INLETS ( CURB) ( TYPE PA ) ( >10') 1 EA $2,013.00 $2,013.00 52,690.00 $2,690.00 53,000.00 $3,000.00 $2,567.67 16 INLETS ( CURB ) ( TYPE P -2 ) ( >10') 1 EA $2,262.00 $2,262.00 52,700.00 $2,700.00 $3,100.00 53,100.00 52,687.33 17 INLETS ( CURB ) ( TYPE P -5) 8 EA $2,173.00 517,384.00 52,000.00 516,000.00 $2,400.00 519,200.00 52,191.00 18 INLETS ( CURB ) ( TYPE P -5 ) (CONFLICT) 2 EA $3,166.00 $6,332.00 $2,100.00 $4,200.00 52,900.00 $5,800.00 52,722.00 19 INLETS ( CURB ) ( TYPg P -5 ) ( >10') 9 EA 52,830.00 $25,470.00 52,200.00 $19,800.00 $2,800.00 $25,200.00 $2,610.00 20 INLETS ( CURB ) ( TYPE P-6) 20 EA 52,611.00 552,220.00 $2,200.00 544,000.00 $2,500.00 $50,000.00 $2,437.00 21 INLETS ( CURB ) ( TYPE P-6 ) (CONFLICT) 8 EA $3,400.00 $27,200.00 52,425.00 519,400.00 53,000.00 524,000.00 52,941 67 22 INLETS ( CURB) ( TYPE P-6 ) ( >10') 4 EA 52,900.00 $11,600.00 52,560.00 $10,240.00 $2,900.00 511,600.00 $2,786.67 23 INLETS ( CURB ) ( TYPE 6 ) (PARTIAL) 3 EA 52,460.00 $7,380.00 $1,800.00 55,400.00 $2,200.00 56,600.00 52,153.33 24 INLETS ( CURB) ( TYPE J-6) 4 EA 53,498.00 $13,992.00 57,650.00 $30,600.00 54,800.00 519,200.00 $5,316.00 25 INLETS ( CURB ) ( TYPE P -9 ) (PARTIAL) 3 EA 51,450.00 $4,350.00 $1,200.00 $3,600.00 51,100.00 $3,300.00 51,250.00 26 INLETS ( CURB ) ( TYPE P -9 ) (PARTIAL) (CONFLICT) 1 EA $1,647.00 51,647.00 51,220.00 $1,220.00 $1,500.00 51,500.00 51,455.67 27 INLETS ( CURB ) ( TYPE P -9) 3 EA $1,790.00 $5,370.00 51,620.00 54,860.00 51,700.00 $5,100.00 $1,703.33 28 YARD DRAINS 1 EA 51,590.00 51,590.00 $770.00 5770.00 $730.00 5730.00 $1,030.00 29 INLETS ( DITCH BOTTOM ) ( TYPE F) 4 EA $1,750.00 $7,000.00 51,525.00 $6,100.00 $1,800.00 $7,200.00 $1,691.67 30 INLETS ( DITCH BOTTOM ) ( TYPE F) ( >10') 1 EA $2,298.00 $2,298.00 51,820.00 $1,820.00 52,200.00 52,200.00 52,106.00 31 MANHOLE ( TYPE P -7) 8 EA $2,086.00 $16,688.00 51,370.00 $10,960.00 $1,500.00 $12,000.00 51,652.00 32 MANHOLE ( TYPE P -7 ) ( >10') 4 EA $2,725.00 510,900.00 51,750.00 $7,000.00 $1,800.00 57,200.00 $2,091.67 33 MANHOLE ( TYPE P -7) ( PARTIAL) 14 EA $1,070.00 $14,980.00 51,000.00 514,000.00 5900.00 $12,600.00 $990.00 34 MANHOLE ( TYPE J -7) 1 EA $2,670.00 $2,670.00 513,100.00 $13,100.00 $5,800.00 $5,800.00 $7,190.00 y 35 JUNCTION BOX ( PARTIAL) 1 EA $1,490.00 $1,490.00 $900.00 $900.00 $1,100.00 51,100.00 51,163.33 H 36 ADJUST MANHOLES 1 EA $1,440.00 $1,440.00 $1,425.00 $1,425.00 $520.00 5520.00 $1,128 33 1 37 TEMPORARY 24" CMP (UTILITY POLE LOCATIONS) 540 LF 533.00 $17,820.00 $44.00 $23,760.00 529.50 515,930.00 $35.50 38 CONCRETE PIPE CULVERT ( 12 ") 14 LF 546.00 $644.00 $47.50 $665.00 $54.10 $757.40 $49.20 39 CONCRETE PIPE CULVERT (15 ") 74 LF 538.00 $2,812.00 $43.00 $3,182.00 $59.00 $4,366.00 $46.67 40 CONCRETE PIPE CULVERT (18 ") 4,514 LF $24.00 $108,336.00 $36.00 $162,504.00 $32.20 $145,350.80 $30.73 r. 41 CONCRETE PIPE CULVERT (24 ") 3,496 LF 529.00 5101,384.00 537.00 $129,352.00 533.50 5117,116.00 533.17 P. 42 CONCRETE PIPE CULVERT ( 36 ") 485 LF 546.00 $22,310.00 $49 00 $23,765.00 551.40 524,929.00 $48.80 43 CONCRETE PIPE CULVERT ( 60 ") 142 LF $91.00 $12,922.00 5150.00 $21,300.00 5120.00 517,040.00 5120 33 44 CONCRETE PIPE CULVERT ( 72 ") 194 LF 5141.00 $27,354 00 5175.00 533,950.00 $190.00 $36,860.00 5168.67 1 of 5 1 ti.vADWAt I IBiI -h2 26-.1.-0. UY JX AM PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ROADWAY PRODUCTION DIVISION - BID TABULATION PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 MORA ENGINEERING RYAN, INC. RANGER CONSTRUCTION CONTRACTORS, INC. INDUSTRIES, INC. AVERAGE ITEM QTY. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE 45 TRENCH SAFETY COMPLIANCE (30" OR LESS) 8,604 LF 51.30 511,185.20 $1.00 58,604.00 52.10 518,068.40 $1.47 46 TRENCH SAFETY COMPLIANCE (> 30" ) 821 LF 56.50 55,336.50 52.00 51,642.00 52.40 51,970.40 53 63 47 MITERED END SECTION ( 24 ") 1 EA 5259.00 5259.00 $550.00 5550 00 5640.00 5640.00 $483.00 48 MITERED END SECTION ( 36 ") 1 EA 5400.00 5400.00 5650.00 5650.00 53,900.00 53,900.00 51,650.00 49 FRENCH DRAINS (18 ") ( INCL BALLAST ROCK & FILTER FABRIC) 197 LF 565.00 512,805.00 557.00 511,229.00 551.40 510,125.80 557.80 50 FRENCH DRAINS (24 ") ( INCL. BALLAST ROCK & FILTER FABRIC) 309 LF 573.00 522,557 00 563.00 519,467.00 561.70 519,065.30 565.90 51 PIPE HANDRAIL ( ALUMINUM) 1058.5 LF 529.00 530,696.50 522.00 523,287.00 524.40 525,827.40 525.13 52 CONCRETE CURB & GUTTER ( TYPE F) 32,752 LF 57.70 5252,190.40 57.20 5235,814.40 57.30 5239,089.60 57.40 53 CONCRETE VALLEY GUTTER 200 LF 58.70 51,740.00 58.49 51,698.00 59.90 51,980.00 59.03 54 CONCRETE CURB ( HEADER) 100 LF 59.80 5980.00 512.00 51,200.00 513.20 51,320.00 511.67 55 CONCRETE CURB ( TYPE D) 534 LF 59.20 54,912.80 57.00 53,738.00 58.60 54,592.40 58.27 56 TRAFFIC SEPARATOR CONC ( SPECIAL ) ( VARIABLE WIDTH) 19 LF 540.00 5760.00 550.00 5950.00 547.20 5896.80 545.73 57 CONC SIDEWALK (4" THICK) 6,859 SY 521.00 5144,039.00 515.00 5102,885.00 516.30 5111,801.70 517.43 58 CONC SIDEWALK (6 "THICK) (DRIVEWAYS) 614 SY 525.00 515,350.00 520 00 512,280.00 521.90 513,446.60 522.30 59 RIP -RAP ( SAND - CEMENT) 82 CY $297.00 524,354.00 5230.00 518,860 00 5390.00 531,980 00 5305.67 60 TYPE B FENCE (6' HIGH ) (W/TOP RAIL & BARB WIRE) INCL. POS 1,934 LF 511.20 521,660.80 57.80 515,085.20 59.40 518,179 60 59.47 61 FENCE GATE (TYPE B) (W/TOP RAIL) (12' WIDE) 2 EA 51,130.00 52,260.00 5650.00 51,300.00 5740.00 51,480.00 5840 00 62 SODDING 22,085 SY $4.50 599,382.50 $2.80 561,838.00 53.40 575,089.00 53.57 63 RECORD DRAWINGS ( SEE SPECIAL PROVISIONS) 1 LS 517,250.00 517,250.00 525,000.00 525,000.00 54,100.00 54,100.00 515,450.00 64 STORM SEWER PUMPING (EXISTING) ( 24" OR LESS ) (SEE S. P.) 3,500 LF 52.10 57,350.00 54.00 514,000.00 53.50 512,250.00 53.20 65 STORM SEWER PUMPING (EXISTING) (72 ") (SEE S. P.) 90 LF 530.00 52,700.00 510.00 5900.00 518.90 51,701.00 519.63 66 1 - 2" PVC CONDUIT ( SCH 40) (UNDER SIDEWALK) 9,473 LF 52.70 525,577.10 55.80 554,943.40 56.00 556,838.00 54.83 67 1 - 2" PVC CONDUIT ( SCH 40) (UNDER PAVEMENT) 805 LF 52.90 52,334.50 518.30 514,731.50 516.20 513,041.00 512.47 68 LITTORAL PLANTINGS (SEE SPECIAL PROVISIONS) 1 LS 58,200.00 58,200.00 52,650.00 52,650.00 527,000.00 527,000.00 512,616.67 69 MONITORING, MAINTENANCE & REPORTS (SEE SP's) 1 LS 54,000.00 54,000.00 53,150.00 53,150.00 55,900.00 ;5,900.00 54,350.00 70 TREE SPADE UNITS (TSU) (SEE SPECIAL PROVISIONS) 20 EA 5425.00 58,500.00 5430.00 58,600.00 5290.00 55,800.00 5381.67 TOTAL REGULAR ROADWAY PAY ITEMS 53,128,333.54 53,218,647.10 $3,309,084.05 CONTINGENCY ITEMS 71 ADJUST VALVE BOX & COVERS ( INCLUDES CONCRETE COLLAR 5 EA 5290.00 51,450.00 5400.00 52,000 00 5250.00 51,250.00 5313.33 72 ADJUST AIR RELEASE VALVE 5 EA 5550.00 52,750.00 5325.00 51,625.00 5510.00 52,550.00 5461.67 73 DEFLECT W.M. W /FITTINGS ( 8 ") 200 LF 530.00 56,000.00 530.00 56,000.00 526.30 55,260.00 528.77 74 DEFECT F.M. W /FITTINGS ( 8 ") 200 LF 539.00 57,800.00 540.00 58,000.00 526.30 55,260.00 535.10 75 SUPPORT & PROTECT W.M. & APPURTENANCES (16 ") 200 LF 513.00 52,600.00 525.00 55,000.00 56.30 51,260.00 514.77 76 SUPPORT & PROTECT F.M. & APPURTENANCES (10 ") 200 LF 513.00 52,600.00 525.00 55,000.00 55 80 51,160.00 514.60 77 SUPPORT & PROTECT BURIED CABLE (SOUTHER BELL) 100 LF 519.00 51,900.00 525.00 52,500.00 55.10 5510.00 516.37 78 SUPPORT & PROTECT W.M. & APPURTENANCES (16 ") 100 LF 519.00 51,900.00 525.00 52,500.00 56.30 5630.00 516.77 79 FLOWABLE FILL 10 CY 5249.00 52,490.00 5105.00 51,050.00 5170.00 51,700.00 5174.67 80 TYPE B FENCE (4' HIGH ) (W/TOP RAIL) 600 LF 510.00 56,000.00 $7.25 54,350.00 59.40 55,640.00 58.88 81 STORM SEWER CLEANING (EXISTING) (24" OR LESS ) (SEE S. P.) 3,500 LF 57.40 525,900.00 53.00 510,500.00 53.80 513,300.00 54.73 82 STORM SEWER CLEANING (EXISTING) (72 ") (SEE S. P.) 90 LF 546.00 54,140.00 57.50 $675 00 $21.80 51,962.00 525.10 TOTAL CONTINGENCY ITEMS 565,530.00 549,200.00 540,482.00 TOTAL BID 53,193,863.54 $3,267,847.10 53,349,566.05 2 of 5 .w1 VAV I B f2 .I,226-J.18I AM PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ROADWAY PRODUCTION DIVISION - BID TABULATION PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 COMMUNITY ASPHALT HUBBARD CONSTRUCTION CORPORATION COMPANY ITEM QTY. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT REGULAR ROADWAY PAY ITEMS 1 MOBILIZATION 1 LS 5300,000.00 $300,000.00 5320,000 00 5320,000 00 2 MAINTENANCE OF TRAFFIC ( INCLUDES PEDESTRIAN M.O.T. 1 LS $285,000.00 $285,000.00 $70,000.00 $70,000.00 3 NPDES COMPLIANCE (SEE SPECIAL PROVISIONS) 1 LS $2,500 00 $2,500.00 $20,000.00 $20,000.00 4 CLEARING AND GRUBBING 1 LS $320,000.00 $320,000.00 $353,000.00 $353,000.00 5 REGULAR EXCAVATION 28,755 CY $3.50 $100,642 50 $4.00 $115,020.00 6 EMBANKMENT ( COMPACTED IN PLACE) 29,660 CY $3.70 $109,742.00 55 00 $148,300 00 7 TYPE C STABILIZATION (FBV 75) 41,320 SY $1.65 $68,178.00 $2.00 582,640.00 8 BASEROCK ( 8" ) ( 2 - 4" LIFTS) 42,243 SY $6.75 $285,140.25 $6.00 5253,458.00 9 TYPE S ASPHALTIC CONCRETE (AVG. 3.5 ") 7192.1 TN $40.10 $288,403.21 $41.00 $294,876.10 10 TYPE S -III ASPHALT CONCRETE (1.0 ") 86,624 SY $2.05 $177,579.20 $2.35 $203,566.40 11 TYPE S -1 ASPHALTIC CONCRETE ( 1.50 ") 59,542 SY $2.95 5175,648.90 53.25 $193,511.50 12 CLASS 1 CONCRETE (INCLUDES REINFORCEMENT STEEL) 208 CY $250.00 552,000.00 $400.00 583,200.00 13 CONTROL STRUCTURES 2 EA $3,740.00 57,480.00 $4,700.00 $9,400.00 14 INLETS ( CURB ) ( TYPE P -1) 2 EA $2,585.00 55,170.00 52,800.00 55,600.00 15 INLETS ( CURB) ( TYPE P -1 ) ( >10') 1 EA $2,780.00 52,780.00 $3,200.00 $3,200.00 16 INLETS ( CURB ) ( TYPE P -2 ) ( >10') 1 EA $2,850.00 $2,850.00 $3,900.00 53,900.00 17 INLETS ( CURB) ( TYPE P -5) 8 EA 52,180.00 $17,440.00 $2,200.00 517,600.00 18 INLETS ( CURB ) ( TYPE P -5 ) (CONFLICT) 2 EA 52,640.00 55,280.00 53,200.00 $6,400.00 19 INLETS ( CURB) ( TYPE P -5) ( >10') 9 EA 52,555.00 $22,995.00 $2,700 00 $24,300.00 20 INLETS ( CURB ) ( TYPE P-6) 20 EA $2,290.00 $45,800.00 $2,400.00 548,000.00 21 INLETS ( CURB ) ( TYPE P-6) (CONFLICT) 8 EA $2,790.00 $22,320.00 $4,900.00 539,200.00 22 INLETS ( CURB ) ( TYPE P-6 ) ( >10') 4 EA 52,680.00 $10,720.00 $2,800.00 511,200.00 23 INLETS ( CURB ) ( TYPE 6) (PARTIAL) 3 EA 52,060.00 56,180.00 $1,800.00 $5,400.00 24 INLETS ( CURB ) ( TYPE J-6) 4 EA $4,470.00 517,880.00 53,600.00 $14,400.00 25 INLETS ( CURB ) ( TYPE P -9) (PARTIAL) 3 EA 51,025.00 53,075.00 51,000.00 53,000.00 26 INLETS ( CURB ) ( TYPE P -9 ) (PARTIAL) (CONFLICT) 1 EA $1,370.00 $1,370 00 $2,300.00 52,300.00 27 INLETS ( CURB) ( TYPE P -9) 3 EA $1,575.00 $4,725.00 51,500.00 $4,500.00 28 YARD DRAINS 1 EA 5670.00 5670.00 5800.00 $800.00 29 INLETS ( DITCH BOTTOM ) ( TYPE F) 4 EA $1,705.00 $6,820.00 $1,300.00 $5,200.00 30 INLETS ( DITCH BOTTOM ) ( TYPE F ) ( >10') 1 EA $2,045.00 $2,045.00 51,500.00 $1,500.00 31 MANHOLE ( TYPE P -7) 8 EA $1,400.00 $11,200.00 $1,600.00 512,800.00 32 MANHOLE ( TYPE P -7 ) ( >10') 4 EA $1,705.00 $6,820.00 $2,000.00 $8,000.00 33 MANHOLE ( TYPE P -7) ( PARTIAL) 14 EA $830.00 $11,620.00 $800.00 $11,200.00 34 MANHOLE ( TYPE J -7) 1 EA $5,340.00 55,340.00 $2,500.00 $2,500.00 35 JUNCTION BOX ( PARTIAL) 1 EA $995.00 $995 00 $700.00 $700.00 36 ADJUST MANHOLES 1 EA $483.00 5483.00 $400 00 $400.00 37 TEMPORARY 24" CMP (UTILITY POLE LOCATIONS) 540 LF $27.25 $14,715.00 $35.00 $18,900.00 38 CONCRETE PIPE CULVERT (12 ") 14 LF $50.00 $700.00 $30.00 $420.00 39 CONCRETE PIPE CULVERT ( 15 ") 74 LF $54.50 $4,033.00 $50 00 $3,700.00 40 CONCRETE PIPE CULVERT (18 ") 4,514 LF $29.70 $134,065.80 $43.00 $194,102.00 41 CONCRETE PIPE CULVERT ( 24 ") 3,496 LF $30.95 $108,201.20 $45.00 $157,320.00 42 CONCRETE PIPE CULVERT ( 36 ") 485 LF $47.45 $23,013.25 $50.00 $24,250.00 43 CONCRETE PIPE CULVERT (60 ") 142 LF $115.00 $16,330.00 $250.00 $35,500.00 44 CONCRETE PIPE CULVERT ( 72 ") 194 LF $172 00 $33,368 00 5350.00 $67,900.00 3 of 5 . ....AL99AV \QPRU\BIDS194 \ 94911B 42 -h2 2,14n 119 49 AM PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT ROADWAY PRODUCTION DIVISION - BID TABULATION PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 COMMUNITY ASPHALT HUBBARD CONSTRUCTION CORPORATION COMPANY ITEM - QTY. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT 45 TRENCH SAFETY COMPLIANCE ( 30" OR LESS) 8,604 LF $1.90 $16,347.60 $2.00 $17,208.00 46 TRENCH SAFETY COMPLIANCE (> 30" ) 821 LF $2.25 $1,847.25 $5.00 $4,105.00 47 MITERED END SECTION ( 24 ") 1 EA $595.00 $595.00 $700.00 $700.00 48 MITERED END SECTION ( 36 ") 1 EA $3,585.00 $3,585.00 $900.00 $900.00 49 FRENCH DRAINS (181 ( INCL. BALLAST ROCK & FILTER FAB 197 LF $47.50 $9,357.50 $50.00 $9,850.00 50 FRENCH DRAINS (24 ") ( INCL. BALLAST ROCK & FILTER FAB 309 LF $57.00 $17,613.00 $55.00 $16,995.00 51 PIPE HANDRAIL ( ALUMINUM) 1058.5 LF $23.40 $24,768.90 $20.00 $21,170.00 52 CONCRETE CURB & GUTTER ( TYPE F) 32,752 LF $6.40 $209,612.80 $5.50 $180,136.00 53 CONCRETE VALLEY GUTTER 200 LF $7.50 $1,500.00 $6.00 $1,200.00 54 CONCRETE CURB ( HEADER) 100 LF $9.00 $900.00 $10.00 $1,000.00 55 CONCRETE CURB ( TYPE D) 534 LF $7.50 $4,005.00 $9.00 $4,806.00 56 TRAFFIC SEPARATOR CONC ( SPECIAL) ( VARIABLE WIDTH 19 LF $47.00 $893.00 $14.00 $266.00 57 CONC SIDEWALK (4" THICK) 6,859 SY $15.00 $102,885.00 $14.00 $96,026.00 58 CONC SIDEWALK (6 "THICK) (DRIVEWAYS) 614 SY $20.00 $12,280.00 $19.00 $11,666.00 59 RIP -RAP ( SAND - CEMENT) 82 CY $364.00 $29,848.00 $350.00 $28,700.00 60 TYPE B FENCE (6' HIGH ) (W/TOP RAIL & BARB WIRE) INCL 1,934 LF $7.00 $13,538.00 $7.00 $13,538.00 61 FENCE GATE (TYPE B) ( W/TOP RAIL) (12' WIDE) 2 EA $450.00 $900.00 $500.00 $1,000.00 62 SODDING 22,085 SY $3.20 $70,672.00 $1.70 $37,544.50 63 RECORD DRAWINGS ( SEE SPECIAL PROVISIONS) 1 LS $3,000 00 $3,000.00 $1,500 00 $1,500.00 64 STORM SEWER PUMPING (EXISTING) (24" OR LESS ) (SEE S. 3,500 LF $3.25 $11,375.00 $4.00 $14,000.00 65 STORM SEWER PUMPING (EXISTING) (72 ") (SEE S P.) 90 LF $10.00 $900.00 $20.00 $1,800.00 66 1 - 2" PVC CONDUIT ( SCH 40) (UNDER SIDEWALK) 9,473 LF $5.60 $53,048.80 $5.50 $52,101.50 67 1 - 2" PVC CONDUIT ( SCH 40) (UNDER PAVEMENT) 805 LF $15.00 $12,075.00 $15.00 $12,075.00 68 LITTORAL PLANTINGS (SEE SPECIAL PROVISIONS) 1 LS $8,000.00 $8,000.00 $15,000.00 $15,000.00 69 MONITORING, MAINTENANCE & REPORTS (SEE SP's) 1 LS $3,000.00 $3,000.00 $3,000.00 $3,000.00 70 TREE SPADE UNITS (TSU) (SEE SPECIAL PROVISIONS) 20 EA $300.00 $6,000.00 $200 00 $4,000.00 TOTAL REGULAR ROADWAY PAY ITEMS $3,339,865.16 $3,431,451.00 CONTINGENCY ITEMS 71 ADJUST VALVE BOX & COVERS ( INCLUDES CONCRETE COL 5 EA $245.00 $1,225.00 $300.00 $1,500.00 72 ADJUST AIR RELEASE VALVE 5 EA $510.00 $2,550.00 $800.00 $4,000.00 73 DEFLECT W.M. W /FITTINGS ( 8 ") 200 LF $26.20 $5,240.00 $50.00 $10,000.00 74 DEFECT F.M. W /FITTINGS (8") 200 LF $26.20 $5,240.00 $80.00 $16,000.00 75 SUPPORT & PROTECT W.M. & APPURTENANCES (16 ") 200 LF $6.30 $1,260.00 $7.00 $1,400.00 76 SUPPORT & PROTECT F.M. & APPURTENANCES (10 ") 200 LF $5.75 $1,150.00 $7.00 $1,400.00 77 SUPPORT & PROTECT BURIED CABLE (SOUTHER BELL) 100 LF $5.10 $510.00 $7.00 $700.00 78 SUPPORT & PROTECT W.M. & APPURTENANCES (16 ") 100 LF $6.30 $630.00 $7.00 5700.00 79 FLOWABLE FILL 10 CY $285.00 $2,850.00 $300.00 $3,000.00 80 TYPE B FENCE (4' HIGH ) (W/TOP RAIL) 600 LF 55.00 $3,000.00 $5.00 $3,000.00 81 STORM SEWER CLEANING (EXISTING) ( 24" OR LESS ) (SEE 3,500 LF $3.75 $13,125.00 $4 00 $14,000.00 82 STORM SEWER CLEANING (EXISTING) (72 ") (SEE S. P.) 90 LF $22.00 $1,980.00 $22.00 $1,980.00 TOTAL CONTINGENCY ITEMS $38,760.00 $57,680.00 TOTAL BID $3,378,625 16 $3,489,131.00 4 of 5 \ROADWAY \QPROMMDM451 4411 BT I w hl 26-444-110 IN 14 AM PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 NOTES: THE PAY ITEMS AND QUANTITIES, AS LISTED ABOVE, SHALL TAKE GOVERN OVER THE PLANS. ALL STRUCTURE BOXES ARE <10 FEET IN DEPTH, UNLESS OTHERWISE NOTED ITEM #2 M O.T. INCLUDES PEDESTRIAN M.O.T. IN ACCORDANCE WITH GP -18. ITEM #5 REGULAR EXCAVATION INCLUDES 22,819 C.Y. OF DETENTION POND EXCAVATION ITEM # 12 - CLASS I CONC. • INCLUDES A CONTINGENT AMOUNT OF 170 CY. ITEMS # 8 -11, 79 & 80 INCLUDES BITUMINOUS MATERIAL & TACK COAT AS REQUIRED. ITEM #37 (24" CMP) - INCLUDES COMPACTED FILL TO COVER, AS REQUIRED (SEE SP -8 FOR LOCATIONS AND SCOPE). ITEMS #38- #44 COST OF BREAKING INTO EXISTING STRUCTURES IS INCIDENTAL TO COST OF PIPE. ITEM # 51 - PIPE HANDRAIL (ALUMINUM) - INCLUDES A CONTINGENT AMOUNT OF 800 LF. ITEM # 60, # 61 & # 80 - (TYPE B FENCE) - THE MESH SHALL BE COVERED WITH GREEN VINYL CLAD FABRIC. ITEM #62 (SODDING) - SHALL BE IN ACCORDANCE WITH GP -31 OF THESE SPECIFICATIONS. ITEMS #66 & #67 -PVC CONDUITS (TRAFFIC) INCLUDE PULL BOXES & FITTINGS AS INDICATED ON PLANS. ITEM #69 - (M /M &R)- REPORTS SHALL BE PAID IN FOUR (4) EQUAL INSTALLMENTS OF THE LUMP SUM UNIT PRICE. " +" Denotes corrected number where applicable. Working days to complete Three Hundred Sixty ( 360 ) calender days. Bids as read at opening January 18, 2000. All bids subject to O.E.O. compliance and Board Approval. Prepared by : JaeAnn Dean Checked by: Willie Flohs 5 of 5 ATTACHMENT "B" PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 Mora Engineering Contractors, Inc. ITEM QUANTITY /UNITS UNIT PRICE AMOUNT REGULAR ROADWAY PAY ITEMS 17 INLETS (CURB) (TYPE P -5) 1 EA $ 2,173.00 18 INLETS (CURB) (TYPE P -5) 1 EA $ 3,166.00 (CONFLICT) DIFFERENCE BETWEEN 1 $ 993.00 $ 993.00 17 & 18 20 INLETS (CURB) (TYPE P -6) 1 EA $ 2,611.00 21 INLETS (CURB) (TYPE P -6) 1 EA $ 3,400.00 (CONFLICT) DIFFERENCE BETWEEN 1 $ 789.00 $ 789.00 20 & 21 25 INLETS (CURB) (TYPE P -9) 1 EA $ 1,450.00 (PARTIAL) 26 INLETS (CURB) (TYPE P -9) 1 EA $ 1,647.00 (PARTIAL) (CONFLICT) DIFFERENCE BETWEEN 1 $ 197.00 $ 197.00 25 & 26 36 ADJUST MANHOLES 1 EA $ 1,440.00 $ 1,440.00 REGULAR ROADWAY PAY ITEMS SUBTOTAL $ 3,419.00 1 ATTACHMENT "B" PROJECT NAME: LAWRENCE ROAD - GATEWAY BLVD. TO HYPOLUXO RD. PROJECT NUMBER: 95511 Mora Engineering Contractors, Inc. ITEM QUANTITY /UNITS UNIT PRICE AMOUNT CONTINGENCY ITEMS 71 ADJUST VALVE BOX & 5 EA $ 290.00 $ 1,450.00 COVERS ( INCLUDES CONCRETE COLLAR ) 72 ADJUST AIR RELEASE VALVE 5 EA $ 550.00 $ 2,750.00 73 DEFLECT W.M. W/ 200 LF $ 30.00 $ 6,000.00 FITTINGS (8" ) 74 DEFLECT F.M. W/ 200 LF $ 39.00 $ 7,800.00 FITTINGS (8" ) 75 SUPPORT & PROTECT W.M. 200 LF $ 13.00 $ 2,600.00 & APPURTENANCES (16 ") 76 SUPPORT & PROTECT F.M. 200 LF $ 13.00 $ 2,600.00 & APPURTENANCES (10 ") 78 SUPPORT & PROTECT W.M. 100 LF $ 19.00 $ 1,900.00 & APPURTENANCES (16 ") CONTINGENCY ITEMS SUBTOTAL $ 25,100.00 GRAND TOTAL $ 28,519.00 F: \ROADWAY\AGRMT\9551 1 BBU -SUM doc 2