Loading...
R03-078RESOLUTION NO. R03- 07 ~ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING EXECUTION OF AMENDMENT NO 3 TO THE INDUSTRIAL AVENUE CORRIDOR STORMWATER IMPROVEMENTS PROJECT CONSULTANT AGREEMENT IN AMOUNT NOT TO EXCEED $35,000.00; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on July 20, 2000, the City Commission approved a Consultant Agreement for Kimley-Hom & Associates in the amount of $390,390.00, which Agreement icovered tasks for design, permitting, bidding services, and construction management for the ilndustrial Avenue Project; and WHEREAS, this Amendment No. 3, is not seeking additional funding, but is seeking reallocation of previously approved funding and approval to move this funding from the contractor's total allocation to that of the engineer; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. Section 2. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct the approval and execution of Amendment No. 3 to the Industrial Avenue Corridor Stormwater Improvements Project Consultant Agreement. Section 3. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this {_o day of May, 2003. S:\CA\RESO~Agreements\Task - Change Orders~Amendment No. 3 - Kimley-Horn.doc M~yor Vice Mayor ATTEST: I S:\CA\RESO~Agreements\Task - Change Orders~Arrendment No. 3 - Kimley-Horn.doc EXHIBIT A SCOPE OF SERVICES Kimley-Horn and Associates, Inc. has been requested to provide the following additional services by the City of Boynton Beach: Lake Worth Drainage District Annexation Support Services Kimlcy-Horn has previously provided a legal description of the project boundaries for usc by Lake Worth Drainage District (LWDD) in annexing the project into their service area. However, additional complications have arisen related to thc annexation prompting the City to consider whether proceeding with the annexation is the best course of action. In support of the consideration of alternatives, the City requested that Kimley-Horn execute additional stormwater model simulations to evaluate alternatives to the constructed outfall into the FDOT ditch. Kimley-Hom has evaluated the effects of removing the piped connection from Pond B to the FDOT ditch and adding emergency spillways to allow flow only during the most extreme events. Kimley- Horn advised the City of our findings as requested. Kimley-Horn also contacted FDOT and inquired about any permit or other agreement between LWDD and FDOT authorizing the outfall from the FDOT ditch into the E-4 canal. Lake Boynton Estates Water Main Upgrades - Field Engineering Kimley-Horn was previously authorized to design replacement of 6" AC watermain with an 8" DIP watermain through Lake Boynton Estates in order to facilitate future branch watermain and water service improvements in the area. Kimley-Horn requested that the Contractor perform detailed field locates of existing utilities for use in our design. However, the information provided by the Contractor was -1- H:\044349002\contract amendment~AddexA 04-01-03.doc incomplete in several locations. As a result, several field modifications to the design were required. Those modifications included: · Alteration of the tie-in to the Vining's system · Alteration of the tie-in to the existing 6" watermain at the north end of Pond B · Alteration of the tie-ins to existing watermain near Veterans Circle In addition to the engineering revisions, construction of the new watermain and tie- ins lasted considerably longer than expected, resulting in additional field observation and coordination with the City testing lab to test segments of the watermain. Finally, obtaining releases from the Palm Beach County Health Department required additional effort as the Contractor's record drawings were initially incomplete, and some of the test data had expired before being submitted to the Health Department with the request for release. Extension of Construction Phase Services The construction has continued into 2003 and it is likely that Final Completion will be achieved in April. Kimley-Horn has continued to provide construction phase engineering and construction observation at the request of the City. The specific services provided to date are as follows: · Review of MEC Pay Application Nos. 10, 11, 12, and 13. · Conducting and preparing minutes of three (3) Weekly Progress Meetings. · Construction observation by Field Representative during January 2003. · Attending and documenting seven (7) field walk-throughs (including the Substantial Completion walk-through). · Development of punch list after Substantial Completion walk-through. · Development of Field Change Directive Nos. 9, 10, and 11. · Review of Project Record Drawings (including review meetings with City and Contractor). -2- H:\044349002\contract amendmentLAddexA 04-01-03.doc · Clerical support for the services listed. We will continue to provide construction phase through Final Completion of the project in cooperation with the City. The City previously authorized a contingency budget of $22,453.95 in order to provide a source of additional funding to deal with field changes on the Lake Boynton Estates water construction. Approximately $ ! 8,158.87 of the contingency budget remains and could be applied toward our additional effort. -3- H:\044349002\contract amendment~AddexA 04-01-03.doc EXHIBIT B FEE AND BILLING As shown in the attached Exhibit C, Kimley-Hom has expended approximately $28,240.00 through March 31, 2003. We propose to complete our services for a total additional fee (inclusive of all 2003 effort) of $35,000.00. Fees will be invoiced monthly based upon the actual effort expended as of the invoice date. Payment will be due within 25 days of the date of the invoice. -4- H:\044349002\contract amendmentLAddexA 04-01-03.doc EXHIBIT C Industrial Avenue - 2003 Hours Expended Activity MDS Sr. Prof.-Other Prof. Ballum Clerical $120.00 $120.00 $75.00 $50.00 $50.00 Pay App 10 review 4 Pay App 11 review 4 Pay App 12 review & mtgs. 25 Weekly Progress Meetings (3) 10 10 Field Observation/Inspection 26 Field reviews/walkthroughs (7) 25 inc. Sub. Com. Walkthrough Punchlist development/distribution 12 Field Chg. Directive 9 4 Field Chg. Directive 10 4 Field Chg. Directive 11 (unofficial) 10 12 inc. design of drainage fixes LWDD annexation support 5 24 meetings (2), modeling, FDOT (Note $4,000 prelim KHA budget to cover survey and eng.) Record drawings (1st draft, 2nd 48 9 20 draft, letters, mtgs) Clerical (in support of all the above) 50 Total hour~ 151 21 44 36 50 Fee $18,120.00 $2,520.00 $3,300.00 $1,800.00 $2,500.00 .... Note that Sr. Professional is calculated at the same rate as MDS ITotal $28,240.001 H:\044349002\contract amendmentS003 amendments\estimate.xls