R03-102 RESOLUTION NO. R03- / A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING EXECUTION OF WORK AUTHORIZATION NO. 2. SCOPE OF SERVICES AND FEES FOR FIRE STATION NO. 4; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, this authorization provides for architectural and engineering services pertaining to eight (8) separate tasks regarding the construction of Fire Station No. 4, as follows: (1) Pre Design, (2) Schematic design; (3) Design development, (4) Construction documents, (5) Permitting, (6) Bid assistance, (7) Construction phase services, and (8) Post Construction services for a 8000 square foot fire station; and WHEREAS, the approval o fthis authorization No. 2 Scope of Services and Fees, will allow the process to begin for construction of a fourth fire station to be located in the SE quadrant of the City; and WHEREAS, the City Commission, upon staff's recommendation, has deemed it appropriate, and in the best interests of the public, to approve CH2Mhill Work Authorization No. 2, Scope of Services and Fees for Fire Station No. 4. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. Section 2. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct the approval and execution of CH2M Hill Work Authorization No. 2, Scope of Services and Fees for Fire Station No. 4, in the SE Quadrant of the City. S:\CA\RESO~,greements\Task - Change Orders\CH2M Hill Work Author No. 2 - BBFD Station 4.doc Section 3. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this / 7-:0~ day of June, 2003. Commissioner ATTEST: S:\CA\RESO\Agreements\Task - Change Orders\CH2M Hill Work Author No. 2 - BBFD Station 4.doc CH2MHILL CH2M HILL One Harvard Circle West Palm Beach, FL 33409-1923 Tel 561.515.6500 Fax 561.515.6502 WORK AUTHORIZATION NO. 2 SCOPE OF SERVICES FOR CITY OF BOYNTON BEACH FIRE STATION NO. 4 BOYNTON BEACH PROJECT NO. CH2M HILL PROJECT NO. Project Description: A new one story +/- 8,000 SF 3-Bay 1/ire Station to be located on approximately 1.9 acre site which fronts on the west side of Federal Highway and is just south of Southeast 18t~ Avenue (site also has partial frontage on Southeast 18t~ Avenue). Description of Services: Provide Architectural and Engineering Pre Design, Schematic Design, Design Development, Construction Documents, Bidding Assistance and Construction Administration Services for Station # 4. Adjacent utilities on Federal Highway and required median cut for Emergency Vehicle egress is included. Work Not Included: No traffic study, signalization, off-site work, Technical Review Committee (TRC) site plan approval, no demolition of existing building and sitework, site analysis, telephone, data, cable TV and security system is included in Scope of Services. Task 1: Pre-Design Services: A. Geotechnical Services (Provided by City) . $0 Site Survey Prepare topographic site survey locating property lines, existing known utilities, adjacent roadways sidewalks and other relevant site information (Provided by City) $0 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 2 January 13, 2003 C. Programming: C. 1. Based on interviews with appropriate City Management and Fire Department Staff, prepare a building space program indicating required assigned and support spaces for the building. $1,880 C.2. Concept drawings and meetings. Provide concept site plan and building sketches; and prepare for and attend one (1) review meeting with City and (1) meeting with neighborhood/community appearance group. Expenses: Programming submission to include six (6) Sets of Program Requirements, black line concept Site Plan and Building Sketches And Conceptual S.F. Cost Estimate T~k2: $3,035 Schematic Design $ 65 TOTAL TASK 1 LUMP SUM Based on approved pre-design services provide further developed conceptual floor plan, site plan, exterior elevation drawings and preliminary construction cost estimates. Up to three meetings with Fire Department personnel will be held to review, revise and finalize the schematic design. Written approval of the work in this task will be required because, except for minor revisions, the floor plan will be considered "frozen" in order to avoid additional work in future tasks. $16,5~ Expenses: Schematic Design submission to include six (6) sets of drawings and cost estimate. Colored Rendering $ 245 $ 2,750 $ 4,980 TOTAL TASK 2 LUMP SUM $ 19,495 Ddavis I 0kproposals~Boynton Beach # 4_1-13-02 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 3 January 13, 2003 Task 3: Design Development Based on an approved schematic design, detailed architectural and · engineering drawings will be prepared. General information approximately 60% architectural, structural, mechanical, electrical and civil engineering systems and cost estimate. Up to two meetings will be held with City staff to review, revise and finalize the design development. Written approval of the work in this task will be required prior to proceeding with Task 4. $44,080 Expenses: Design Development Submission to include Six (6) sets of drawings, cost estimates and outline specifications. $ 585 TOTAL TASK 3 LUMP SUM Task 4: Construction Documents Based on an approved Design Development Package, final drawings Specifications, cost estimate, interior room finish material selection and equipment schedule will be prepared. All architectural and engineering systems listed in Task 3 and Attachment B will be finalized. Up to three meetings with City Staff will be held to review, and finalize the construction documents. $ 63,465 $ 44,665 Expenses: Construction Documents submission to include six (6) sets of drawings, cost estimate and specifications $ 810 TOTAL TASK 4 LUMP SUM $ 64,275 Ddavisl0~prolxxsals~Boynton Beach # 4_1-13-02 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 4 January 13, 2003 Task 5: Permitting Assist City in preparation of permit applications and processing those applications to the City of Boynton Beach Building Department, Tech Review Committee, Palm Beach County Health Department (water distribution and sanitation), FDOT (driveway connections, utilities in the right-of-way) and Drainage permit. *Hourly estimated Labor and Expenses not to exceed without prior written authorization $ 8,000 TOTAL TASK 5 HRLY ESTIMATE NOT TO EXCEED $ 8,000* Task 6: Bidding Assistance Distribute Bid Documents and conduct one pre-bid conference with prospective bidders. Assist the City in answering questions, prepare Addendums, assist City in bid analysis and Recommendations. $ 4,000 TOTAL TASK 6 LUMP SUM $ 4,000 Task 7: Construction Phase Services Conduct the pre-construction meeting. Attend bi-monthly progress meetings, miscellaneous on-site review meetings, coordinate office administration, (shop drawings, change orders, proposed requests/ RFI's, review monthly pay applications, etc.) conduct substantial and final completion inspections and certification. ( See attachment A for breakdown). $ 52,200 TOTAL TASK 7 LUMP SUM $ 52,200 Task 8: Post Construction Services Provide record CADD drawings (electronic file) based upon contractor's marked up changes and provide 1 year warranty walk thru. $ 4,670 TOTAL TASK 8 LUMP SUM $ 4,670 Ddavis 10~pmpo~ls~Boynton Beach # 4_1-13-02 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 5 January 13, 2003 Task 9: Additional ServicJ a) Demolition of existing building structure and site improvements. b) Communication systems selection, specifications or design. c) Interior designs or enhancements and furnishing selection.. d) Off site design beyond the project boundaries/property lines. e) Emergency signal design. f) Traffic Study. g) Permit Fees h) Extension of Tasks 1-8 beyond that described herein. i) Management of sub-consultants associated with additional services. j) Revisions to previously approved work. TOTAL SERVICES (TASK 1-8) $ o2, s Ddavisl0~proposalskBoynton Beach # 4_1-13-02 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 6 January 13, 2003 C. Schedule: CH2M I4TLL shall commence services immediately upon authorization and complete Task 14 services requested by the CITY within a period of 26 weeks for programming design and construction documents from receipt of "Notice to Proceed," not inclusive of any review periods required by City Staff. Bidding/pricing anticipated to be four (4) week period and construction is estimated at 7 months. D. Compensation for Services: The total amount to be paid to CH2M HILL by the CITY under this work authorization for services (not including additional services) shall not exceed the amount of Two Hundred Two Thousand Two Hundred Eighty Five Dollars ($202,285). The CH2M HII.IJ will invoice the CITY on a monthly basis as required for payment. APPROVAL OF SCOPE & FEES CITY OF BOYNTON BEACH FLORIDA CH2M HILL KURI BRESSNER-- ~ CITY MANAGER BOYNTON BEACH, FL Date: Title: CITY ATTORNEY Date: Ddavis 10~proposals~Boynton Beach # 4_1 - 13-02 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 7 January 13, 2003 ATTACHMENT A BOYNTON BEACH FIRE STATION # 4 TASK 7: CONSTRUCTION PHASE SERVICES Construction Phase (Basic Services Based on 30 week/7 month construction period). Construction Phase Services include the following: Schedule A Hours Rates Total Prepare for and Attend Pre-Construction Meeting 4 P.M. $110 Office administration (correspondence, RFI's, change orders, Shop drawing review, proposal requests, and review of Monthly pay applications, phone, fax, etc.) Architect/Engineer (Ave. 4 hrs/wk) 120 Shop Drawing Review: Architectural 40 Mechanical 20 Plumbing/Fire Protection 16 Electrical 24 Structural 20 Civil 16 Landscaping 16 152 Bi-Monthly Meetings: Equivalent of (1) 8 hour visit every two (2) weeks to include travel, 4-hours minimum on site and prepare and distribute Meeting Minutes and Monthly Pay Application Miscellaneous Engineering Site Visits: To include Civil, Landscaping, Mechanical, Structural, Plumbing and Electrical Engineer to attend Progress Meeting as needed Prof $75 $ 9,000 Prof $ 75 $11,400 120 Sr. Prof. $90 120 Sr. Prof $90 $440 $20,400 $10,800 $10,800 Ddavis 10~proposals~oynton Beach # 4._1-13-02 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 8 January 13, 2003 Attachment A Boynton Beach Fi~'e Station # 4 Page 2 Substantial Completion & Punch List Architect/PM Mechanical Electrical Civil Landscaping Clerical Final Completion/Close Out Architect/PM Clerical · Expenses: TOTAL 12 P.M. $110 $ 1,320 8 Sr. Prof.$ 90 $ 720 8 Sr. Prof. S 90 $ 720 12 Sr. Prof.$ 90 $ 1,080 8 Sr. Prof.$ 90 $ 720 4 $ 35 $ 140 52 588 16 P.M. $110 $ 1,760 4_ $ 35 $ 140 20 $ 4,700 $ 1,900 $ 3,160 $52,200 Ddavis 10~proposals~Boynton Beach # 4_1 - 13-02 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 9 January 13, 2003 Discipline Site Survey Civil Landscape/Irrigation Architecture ATTACHMENT B Boynton Beach Fire Station # 4 Boynton Beach Project No. Scope of Services/Estimated Drawings (Schematic Design through Construction Documents) Est. # of Sheets Sheet Title T-1 Title, Index, Location Map T-2 Code Information, Abbreviations S " Symbols SS Site Survey C-1.1 Site Plan C-2.1 Paving, Grading & Drainage C-2.2 Horizontal Control C-2.3 Utilities Plan C-3.1 Civil Details C-3.2 Civil Details C-3.3 Civil Details 'C-3.4 Lift Station C-3.5 Civil Details C-3.6 Civil Details L-I.1 L-1.2 L-1.3 Landscape Plan Landscape Details & Plant List Landscape & Irrigation Specs A-I.1 A-2.1 A-2.2 A-2.3 A-2.4 A-2.5 A-2.6 A-3.1 A-4.1 A-4.2 A-5.1 A-6.1 Site Details Floor Plan Casework & Interior Elevations Equipment Plan Reflected Ceiling Plan Wall Types Plan Room Finish Sched / Pattern Plan Exterior Elevations Roof Plan Roof Details Building Sections Wall Sections Ddavisl0~pmposals~Boynton Beach # 4_1-13-02 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 4 Page 10 January 13, 2003 A-6.2 A-7.1 A-7.2 A-7.3 Discipline Est. # of Sheets Structural Mechanical S-I.1 S-2.1 S-2.2 S-3.1 S-3.2 S-3.3 S-3.4 MI.1 M2.1 M3.1 M3.2 M3.3 M4.1 ~umb~g Pl.1 P2.1 P3.1 P3.2 P4.1 Fire Protection FP. 1 FP. 1 FP.2 Electrical El.1 El.2 E2.1 E3.1 FA. 1 E5.1 E6.1 E7.1 E7.2 E8.1 E8.2 Ddavis 10¥roposala~Boynton B~ach # 4_ 1 - 13-02 Wall Sections Door & Window Schedules Door & Window Details Architectural Details Sheet Tffie General Structural Notes Foundation, and Floor Framing Plan Attic, Roof Framing Plans Typical. Details & Schedules Sections & Details Sections & Details Sections & Details Mechanical Legend HVAC Floor Plan I-IVAC Details Mechanical Sections & Details I-IVAC Controls HVAC Scheduels Plumbing Legend & Abbreviations Plumbing Floor Plan Plumbing Stack Diagram Plumbing Water Riser Diagram Plumbing Details Site Plan Fire Protection Floor Plan Fire Protection Roof Plan Fire Protection Legend & Abbreviations Electrical Site Plan Lighting Plan Power Plan Communications Plan Risers & Room Enlargement One Line Diagram Electrical Details Electrical Details & Risers Schedules Panel Schedules