Loading...
R03-103 RESOLUTION NO. R03- / (? ,_2 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING EXECUTION OF WORK AUTHORIZATION NO. 1 SCOPE OF SERVICES AND FEES FOR FIRE STATION NO. 2; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, this authorization provides for architectural and engineering services pertaining to nine (9) separate tasks regarding the construction of Fire Station No. 2, as follows: (1) Pre Design, (2) Schematic design; (3) Design development, (4) Construction documents, (5) Permitting, (6) Bidding assistance, (7) Construction phase services, and (8) Post Construction services, and (9) Additional services for a 17,000 square foot facility, housing a 7,500 foot square fire station, 7,500 sq. ft. fire administration facility, and 2,000 sq. ft. training/community roorn/EOC; and WHEREAS, the approval o fthis authorization No. 1 Scope of Services and Fees, will allow the process to begin for relocation of the current fire station 2 and fire administration offices; and WHEREAS, the City Commission, upon staff's recommendation, has deemed it appropriate, and in the best interests of the public, to approve CH2Mhill Work Authorization No. 1, Scope of Services and Fees for relocation of Fire Station No. 2. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. Section 2. The City Commission of the City of Boynton Beach, Florida does S:\CA\RESO~Agreements\Task - Change Orders\CH2M Hill Work Author No. 1 - BBFD Station 2.doc hereby authorize and direct the approval and execution of CH2M Hill Work Authorization No. 1, Scope of Services and Fees for relocation of Fire Station No. 2. Section 3. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this / ~day of June, 2003. ATTEST: C omm~'i'ssirn~r S:\CA\RESO~Agreements\Task - Change Orders\CH2M Hill Work Author No. 1 - BBFD Station 2.doc CH2MHILL CH2M HILL One Harvard Circle West Palm Beach, FL 33409-1923 Tel 561.515.6500 Fax 561.515.6502 WORK AUTHORIZATION NO. 1 SCOPE OF SERVICES FOR CITY OF BOYNTON BEACH FIRE STATION NO. 2 BOYNTON BEACH PROJECT NO. CH2M HILL PROJECT NO. Project Description: A new two story 3-Bay Fire Station of approximately 17,000 Square Feet including 7,500 SF of Administrative Offices and a 2,000 Training Lab. The site is approximately a 3 Acre parcel located on the north side of Woolbrighi Road, just west of Congress Avenue. Description of Services: Provide Architectucal and Engineering Pre Design, Schematic Design, Design Development, Construction Documents, Bi. dd;_ng Assistance and Construction Administration Services for Station # 2. Adjacent utilities across Woolbright Road and a required median cut for Emergency Vehicle egress is included. Work Not Included: No traffic study, signalization, off-site work, Technical Review Committee (TRC) site plan approval, site analysis, telephone, data, cable TV and security system is included in Scope of Services. Task 1: Pre-Design Services: Geotechnical Secvices (Provided by City) Site Survey Boundary and topographic site survey locating property lines, existing known utilities, adjacent roadways sidewalks and other relevant site information (Provided by City) Ddavisl0/proposals/Boynmn Beach Prop Dated 6-04-03 $0 $0 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 2 Page 2 June 4, 2003 C. Programming: C. 1. Based on interviews with appropriate City Management and Fire Department Staff, prepare a building space program indicating required assigned and support spaces for the building. $2,840 C.2. Concept drawings and meetings. Provide concept site plan and building sketches; and prepare for and attend one (1) review meeting with City and (!) meeting with neighborhood/community appearance group. Expenses: Programming submission to include six (6) Sets of Program Requirements, black line concept Site Plan and Building Sketches And Conceptual S.F. Cost Estimate Task 2: $3,295 Schematic Design $ 165 TOTAL TASK 1 LUMP SUM Based on approved pre-design services provide further developed conceptual floor plan, site plan, exterior elevation drawings and preliminary construction cost estimates. Up to three meetings with Fire Department personnel will be held to review, revise and finalize the schematic design. Written approval of the work in this task will be required because, except for minor revisions, the floor plan will be considered "frozen" in order to avoid additional work in future tasks. $30,428 Expenses: Schematic Design submission to include six (6) sets of drawings and cost estimate. Colored Rendering $ 320 $ 2,750 TOTAL TASK 2 LUMP SUM Task 3: Design Development Based on an approved schematic design, detailed architectural and engineering drawings will be prepared. General information approximately 60% architectural, structural, mechanical, electrical and civil engineering systems and cost estimate. Up to two meetings will be held with City staff to review, revise and finalize the design development. Written approval of the work in this task will be required prior to proceeding with Task 4. $ 62,879 $ 6,300 $ 33,498 Ddavisl0\proposalskBoynton Beach # 2_6-04-03 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 2 Page 3 June 4, 2003 Expenses: Design Development Submission to include Six (6) sets of drawings, cost estimates and outline specifications. $ 830 TOTAL TASK 3 LUMP SUM $ 63,709 Task 4: Construction Documents Based on an approved Design Development Package, final drawings Specifications, cost estimate, interior room finish material selection and equipment schedule will be prepared. All architectural and engineering systems listed in Task 3 and Attachment B will be finalized. Up to three meetings with City Staff will be held to review, and finalize the construction documents. $ 99,792 Expenses: Construction Documents submission to include six (6) sets of drawings, cost estimate and specifications $ 1,100 TOTAL TASK 4 LUMP SUM $100,892 Task 5: Permitting Assist City in preparation of permit applications and processing those applications to the City of Boynton Beach Building Department, Tech Review Committee, Palm Beach County Health Department (water distribution and sanitation), FDOT (driveway connections, utilities in the right-of-way), and Drainage permit. *Hourly estimated Labor and Expenses not to exceed without prior written authorization $ 8,000 TOTAL TASK 5 HRLY ESTIMATE NOT TO EXCEED $ 8,000' Task 6: Bidding Assistance Distribute Bid Documents and conduct one pre-bid conference with prospective bidders. Assist the City in answering questions, prepare Addendums, assist City in bid analysis and Recommendations. $ 6,500 TOTAL TASK 6 LUMP SUM $ 6,500 Ddavisl0\proposals\Boynton Beach # 2_6-04-03 Work Authorization No. I Scope of Services For Boynton Beach Fire Station 2 Page 4 June 4, 2003 Task 7: Construction Phase Services Conduct the pre-construction meeting. Attend bi-monthly progress meetings, miscellaneous on-site review meetings, coordinate office administration, (shop drawings, change orders, proposed requests/ RFI's, review monthly pay applications, etc.) conduct substantial and final completion inspections and certification. ( See attachment A for breakdown). $ 72,490 TOTAL TASK 7 LUMP SUM $ 72,490 Task 8: Post Construction Services Provide record CADD drawings (electronic file) based upon contractor's marked up changes and provide 1 year warranty walk thru. $ 4,670 TOTAL TASK 8 LUMP SUM $ 4,670 Task 9: Additional Services a) Design / Documents for additional Hardening of +/- 2,000 SF of Emergency Operations Areas. b) Communication systems selection, specifications or design. c) Interior designs or enhancements and furnishing selection.. d) Off site design beyond the project boundaries/property lines. e) Emergency signal design. f) Traffic Study. g) Permit Fees h) Extension of Tasks 1-8 beyond that described herein. i) Management of sub-consultants associated with additional services. j) Revisions to previously approved work. TOTAL SERVICES '(TASK 1-8) $296,059 Ddavis 10\proposals\Boynton Beach # 2_6-04-03 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 2 Page 5 June 4, 2003 C. Schedule: CH2M HILL shall commence services immediately upon authorization and complete Task 1-4 services requested by the CITY within a period of 26 weeks for programming design and construction documents from receipt of "Notice to Proceed," not inclusive of any review periods required by City Staff. Bidding/pricing anticipated to be four (4) week period and construction is estimated at l0 months. D. Compensation for Services: The total amount to be paid to CH2M HILL by the CITY under this work authorization for services (not including additional services) shall not exceed the amount of Two Hundred Ninety Six Thousand Fifty Nine Dollars ($296,059). The CH2M HILL will invoice the CITY on a monthly basis as required for payment. APPROVAL OF SCOPE & FEES CITY OF BOYNTON BEACH KURT BRESSNER CITY MANAGER BOYNTON BEACH. FI. Date: CH2M HILL Date:~O ~' Ddavis lO\proposals~Boynton Beach # 2_6-04-03 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 2 Page 6 June 4, 2003 ATTACHMENT A BOYNTON BEACH FIRE STATION # 2 TASK 7: CONSTRUCTION PHASE SERVICES Construction Phase (Basic Services Based on 35 week/8 month construction period). Construction Phase Services include the following: Schedule A Hours Rates · Prepare for and Attend Pre-Construction Meeting 4 P.M. $110 Office administration (correspondence, RFI's, change orders, Shop drawing review, proposal requests, and review of Monthly pay applications, phone, fax, etc.) Architect/Engineer (Ave. 4 hrs/wk) Shop Drawing Review: Architectural Mechanical Plumbing/Fire Protection Electrical Structural Civil Landscaping 168 Prof $75 48 28 20 32 28 20 20 196 Prof $12,600 $ 75 $14,700 Bi-Monthly Meetings: Equivalent of (1) 8 hour visit every two (2) weeks to include travel, 4-hours minimum on site and prepare and distribute Meeting Minutes and Monthly Pay Application 207 Sr. Prof. $90 Miscellaneous Engineering Site Visits: To include Civil, Landscaping, Mechanical, Structural, Plumbing and Electrical Engineer to attend Progress Meeting as needed 168 Sr. Prof $90 Total $440 $27,300 $18,630 $15,120 Ddavisl 0\proposals\Boynton Beach # 2_6-04-03 Work Authorization No. 1 Scope of Services For Boynton Beach Fire Station 2 Page 7 June 4, 2003 Attachment A Boynton Beach Fire Station # 2 Page 2 Substantial Completion & Punch List Architect/PM Mechanical Electrical Civil Landscaping Clerical Final Completion/Close Out Architect/PM Clerical Expenses: TOTAL 12 P.M. $110 $ 1,320 8 Sr. Prof.$ 90 $ 720 8 Sr. Prof. S 90 $ 720 12 Sr. Prof.$ 90 $ 1,080 8 Sr. Prof.$ 90 $ 720 4 $ 35 $ 140 52 815 16 P.M. $110 $ 1,760 4_ $ 35 $ 140 20 $ 4,700 $ 1,900 $ 4,400 $72,490 Ddavis 10\proposals\Boynton Beach # 2_6-04-03 CH2MHILL CH2M HILL One Harvard Cimle West Palm Beach, FL 33409-1923 Tel 561.515.650~ Fax 561.515.6502 June 5, 2003 Mr. James Ness Deputy Fire Chief Of Administration City of Boynton Beach 100 E. Boynton Beach BouleVard Boynton Beach, Florida 33435 RE: Fire Station No. 2 Dear Mr. Ness: Attached are two copies of Work Authorization No. 1, Scope of Services For City of Boynton Beach, Fire Station No. 2. Please obtain an authorized signature for the City of Boynton Beach for both copies and return one copy to me. If you have any questions, please do not hesitate to call. Sincerely, Michael Flattery Project Manager /dd Attachments