New Haitian Alliance Church o.o . co ,ss,o.
PROJECT NAME: New Haitian Alliance Church
APPLICANT: Alfred Daise with Daise Management Corporation
APPLICANT'S ADDRESS: P.O. Box 1185, Loxahatchee, FL 33470
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: June 3, 2003
TYPE OF RELIEF SOUGHT: Request new site plan for a church
LOCATION OF PROPERTY: East side of Hoadley Road, approximately 850 feet south of Old
Boynton Road
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
X THIS MATTER came before the City Commission of the City of Boynton Beach, Flodda
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings
and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the relief
sought bythe applicant and heard testimony from the applicant, members of city administrative staff and
the public finds as follows:
1. Application for the relief sought was made by the Applicant in a manner consistent with the
requirements of the City's Land Development Regulations.
2. The AppOint
.Z~_ HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3. The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set forth
on Exhibit "C" with notation "Included".
4. The Appl, iczant's application for relief is hereby
.,Z~_ GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
6. All further development on the property shall be made in accordance with the terms and
conditions of this order.
7. Other
DATED: _('~.~ ~- ~).,~
S:\Planning\Shared\Wp\Projects\New Alliance Haitian Church\DO.doc
Location Map
..~
EXHIBIT "A"
., R1AA iii
~CD C3
;~.
~ ~c~
;,:;
SITE PHTOMETRIC PLAN
SCALE: 1' - 20'-0'
~ HOADLY ROAD CHURClt DON SENATORE
| FOR
/ ~A,S[ MANAGEMENT ~CHITECT
3160 N.[
/ BOYNTON BEACH, FLORIDA
N ~ 0~ P~, (9~) ~76-~
Globe Engineering,, Inc.
DON SENATORE
.--$'~j~ .. EXHIBIT B"
~ *, > * c ........................ i! DON SENATORE
-;
't ,r,,~l i ~ ARCHITECT
~ i, 3160 NE 3rdAVE.
1 I ill
.8./IBIHX3
'~I J.O:~J. IHOUV i ~ ~ :~
]UOJ.~/'N]S NOQ ; ................
ARCHITECT
316o N E. 3rd AVE
OAKLAND PARK, (954) 567,0644 FLORIDA
[ EXHfl31T "B"
.[ . z O0 + 0 'V,LS
EXHIBIT "B"
...... '~-!% ¢ ~: .......... oo + ~ 'v~s
................. 4 .................... L l/! ~1 ~
' ~ ii ,). % Glo~ Engineenng, bc. HOADLEY ROAD WIDENING, --i ...............
:~ ~[~ :~: ~: : FROM VENIRE DRIVE SOUTH ..................
EXHIBIT "C"
Conditions of Approval
Project name: New Alliance Haitian Church (a.k.a. Hoadley Road Church)
File number: NWSP 01-008
Reference: 4th review plans identified as NWSP 01-008 with an April 29, 2003 Planning and Zoning Department
date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments: None
PUBLIC WORKS - Traffic
Comments:
1. Place standard end of roadway markers at the southerly end (terminus) of X
Hoadley Road. These markers must be in compliance with the Manual on
Uniform Traffic Control Devices.
2. Staff recommends rejecting the Planning & Development Board condition X
that states the following:
"The City shall upgrade the southern portion of Hoadley Road, which
appears to be substandard relative to the northern portion of the road,
and provide turn-a-round and other deficient infrastructure".
Staff requires that all developers fund off-site improvements that are
necessary to accommodate the private improvements. Such off-site
improvements can include water mains, storm sewers, sanitary sewers,
streets, and traffic signals. The developer should bear the cost of upgrading
the street.
UTILITIES
Comments: None X
FIRE
Comments: None X
POLICE
Comments: None X
ENGINEERING DIVISION
Comments:
3. At the time of permitting, revise the plans to indicate that the color of the stop X
bar (proposed at the north driveway) will be white.
COA2
06/04/03
2
DEPARTMENTS INCLUDE REJECT
4. At the time of permitting, show all existing utilities and connections on Site X
Characteristics Map (survey) and site plan (LDR, Chapter 4, Section A.3).
5. Full drainage plans in accordance with the Chapter 6, Article IV, Section 5 X
will be required at the time of permitting.
6. At the time of permitting, provide a signed and sealed survey, not older than X
six (6) months in conformance with the Chapter 23, Article I, Section 5.B.2.
The surveyor shall dimension the remaining portion of a lot(s) when part of a
tot is not included within the description. The adjoining property to the north
shall read "West 250 feet of Tract 59", not the "East 250 feet as shown" (for
consistency with Legal Description.) Show the north right-of-way of Canal L-
24 in relation to the south property line.
7. The import of any fill will require both a tree survey and an excavation/fill X
permit.
BUILDING DIVISION
Comments:
8. Identify within the site data the finish floor elevation (lowest floor elevation) X
that is proposed for the building. Verify that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues [Section 3107.1.2, Chapter 31 of the
Boynton Beach amendments to the 1997 edition of the Standard Building
Code]:The design professional-of-record for the project shall add the
following text to the site data. "The proposed finish floor elevation __
NGVD is above the highest 100-year base flood elevation applicable to the
building site, as determined by the South Florida Water Management
District' s surface water management construction development
regulations. "From the FIRM map, identify in the site data the title of the flood
zone that the building is located within. Where applicable, specify the base
flood elevation. If there is no base flood elevation, indicate that on the
plans. Identify the floor elevation that the design professional has established
for the building within the footprint of the building that is shown on the
drawings titled site plan, floor plan and paving/drainage (civil plans).
9. At time of permit review, provide a completed and executed City unity of title X
form. The form shall describe all lots, parcels or tracts combined as one lot.
A copy of the recorded deed with legal descriptions of each property that is
being unified is required to be submitted to process the form. The property
owner that is identified on each deed shall match.
10. At time of permit review, submit signed and sealed working drawings of the X
proposed construction.
11. At time of permit review, submit for review an addressing plan for the X
project.
COA2
06/04/03
3
DEPARTMENTS INCLUDE REJECT
PARKS AND RECREATION
Comments: None X
FORESTER/ENVIRONMENTALIST
Comments:
12. The applicant should indicate on the landscape plans the specific, existing X
desirable trees that will be preserved, relocated on site, or removed and
replaced on the site.
PLANNING AND ZONING
Comments:
13. All hedge material (Scheffiera arbicola "Trinette") shall be installed at least X
24 inches in height, 24 inches in spread, with tip-to-tip spacing.
14. Staff recommends that all windows be made of dark glass since the building X
will be light in color. Staff also recommends including two (2) long and
narrow windows into the design of the east elevation and incorporating
architectural accents (such as score lines) into the overall design as well.
PREVIOUS PLANNING & DEVELOPMENT BOARD COMMENTS:
Comments:
15. The City shall upgrade the southern portion of Hoadley Road, which appears X
to be substandard relative to the northern portion of the road, and provide
turn-a-round and other deficient infrastructure.
PLANNING & DEVELOPMENT BOARD COMMENTS FOR 5-27-03
X
16. The City shall upgrade the southern portion of Hoadley Road ending at the
subject property leaving the developer responsible for the reminder of the
road, the turnaround, and other deficient infrastructure. Road shall be
improved in accordance with plans submitted to staff and provided in
back-up.
COA2
06/04/03
4
DEPARTMENTS INCLUDE REJECT
ADDITIONAL CITY COMMISSION COMMENTS:
Comments:
16. The applicant shall at its expense construct or reconstruct Hoadley Road from X
Velaire Drive south, to meet safe and efficient standards established by the
City Engineer.
MWR/elj
S:kPlanning\Share&Wp\Projects\New Alliance Haitian Church\COA2.doc