Loading...
O89-53ORDINANCE NO. AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AMENDING CHAPTER 5, BUILDING CODE, SECTION 5-7 STANDARD FOR THE INSTALLATION OF ROOF COVERINGS CODE BY ADOPTING THE PALM BEACH COUNT'fWIDE STANDARD FOR THE INSTALLATION OF ROOF COVERINGS, 1989 EDITION, REVIEWED AND RECOMMENDED BY THE BUILDING CODE ADVISORY BOARD OF PALM BEACH COUNTY AND BUILDING OFFICIALS ASSOCIATION OF PALM BEACH COUNTY; PROVIDING A CONFLICTS CLAUSE; A SEVERABILITY CLAUSE; AUTHORITY TO CODIFY; AN EFFECTIVE DATE AND FOR OTHER PURPOSES. WHEREAS, the City of Boynton Beach is mandated by Palm Beach County to adopt the same basic construction codes as all municipalities in Palm Beach County; and WHEREAS, the Building Code Advisory Board of Palm Beach County has recommended the adoption of the Palm Beach Countywide Standard for the Installation of Roof Coverings reviewed and recommended by the Building Code Advisory Board of Palm Beach County. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA: Section 1. That Chapter 5 of the Codified Ordinances of the City of Boynton Beach, Florida, Section 5-7, "Standard for the Installation of Roof Coverings, Adopted" is hereby amended to read as follows: Sec. 5-7 Standard for the Installation of Roof Coverings, Adopted The model Palm Beach Countywide Standard for the Installation of Roof Coverings, 1989 Edition, is hereby adopted and made a part hereof by reference. Section 2. That the addendum listed in Section 1. is attached hereto and made a part hereof by reference. Section 3. All ordinances or parts of ordinances in conflict herewith are hereby repealed. Section 4. Should any section or provision of this ordinance or any portion hereof be declared by a Court of competent jurisdiction to be invalid, such decision not affect the remainder of this ordinance. Section 5. ordinance. Section 6. This immediately upon passage. 1989. shall Authority is hereby granted to codify said ordinance shall become effective FIRST READING this /~ day of %~~~ SECOND, FINAL READING and PASSAGE this ~ day of 1990. CITY 0 NTON BEACH, FLORIDA Vice Mayor ' - ~ commissioner ~6mm 't s s ione r ~ - ATTEST: City ~r-k (Corporate Seal) Commissioner BUILDING CODE ADVISORY BOARD OF PALM BEACH COUNTY MODEL COUNTYWIDE STANDARD FOR THE INSTALLATION ROOF COVERINGS cabrc.881 REV. 7/12/89 TABLE OF CONTENTS SECTION 101 SECTION 102 SECTION 103 SECTION 104 SECTION 105 SECTION 106 SECTION 107 '~ECTION 108 SECTION 109 SECTION 110 SECTION 111 SECTION 112 SECTION 113 SECTION 114 SECTION 115 SECTION 116 SCOPE GENERAL ALTERNATE MATERIALS AND CONSTRUCTION ASPHALT/FIBERGLASS SHINGLES MINERAL FIBER SHINGLES SLATE SHINGLES CONCRETE AND CLAY TILES WOOD SHINGLES AND SHAKES BUILT UP ROOFS ALTERNATE METHODS OF SLATE OR MINERAL SURFACED ROLE ROOFING METAL ROOFS SYNTHETIC SHEET MEMBRANE ROOFS REROOFING/RECOVERING FLASHINGS APPROVED LIQUID APPLIED ROOFING MATERIALS SYSTEMS FOAMED IN PLACE ROOF INSULATION CODING: Words ~%~e~en are deletions; words underlined are additions to the 1985 Model Countywide Standard for the Installation of Roof Coverings. cabrc.881 1 REV. 7/12/89 STANDARD FOR THE INSTALLATION OF ROOF COVERINGS 101 - SCOPE The requirements set forth in this Standard shall be construed as minimum requirements and shall apply to the application and installation of roof covering materials specified herein, excluding pre-engineered steel buildings. Roof coverings shall be applied in accordance with this Standard and meet manufacturers published ~ee~e~s instructions. 102 - GENERAL 102.1 - COVERING 102.1.1 - Roof coverings shall provide weather protection for the building at the roof. ~O2.1.2 - Ail roof coverings shall be applied to a solid or closely fitted deck, except where the roof covering is specifically designed to be applied to spaced supports. 102.1.3 - Roofinq systems shall be tested for wind uplift resistance in accordance with FM 4470, UL 580, or other uplift pressure criteria acceptable to the BUildinq Official. DeDendinq upon elevation of installation, the roof system shall have achieved a minimum 1-60 or 1- 90 wind resistance classification. 102.2 - INSULATION 102.2.1 - The use of above deck thermal insulation is permitted on top of both the roof deck and the roof membrane provided such insulation is covered with an approved covering applied directly thereto in accordance with manufacturer's mee~mme~i~s published instructions. 102.2.2 - The base layer shall be a minimum of ~ 3/4-in Class A insulation shall be installed over metal decking when a roof covering is installed subject to the insulation manufacturer's flute span table. The bottom layer of insulation shall be mechanically fastened. 102.3 - FASTENERS 102.3.1 - Nails, clips or similar attaching devices shall be hot dipped galvanized or equivalent, copper or aluminum, except on built up roofs where suitable corrosion resistant fasteners may be used. 102.3.2 - Fasteners for wood shingles shall be rust resissant and of hot dipped zinc coated steel, aluminum or stainless steel and shall be long enough to penetrate into the sheathing at least 1/2 in. cabrc.881 2 REV. 7/12/89 102.3.3 - The composition flashing (base flashing) shall be fastened either with 1 in solid cap-head nails or with nails driven through tin tags. The nails shall be spaced approximately 8 in on center. 102.3.4 - The' underlayment shall be fastened to the roof sheathing either with 1 in solid cap-head nails or nails driven through tin tags~ Fasteners shall be installed 12 in on center throughout ~-~-~-~n ee~e~-~-~e the field and perimeter~ 102.4 - REPLACEMENT - Not more than 25% of the roof covering of a building shall be replaced in any period of 12 months unless the entire roof covering is made to conform with the requirements of this Standard, as well as Chapters 7 and 12 of the Standard Building Code, as amended. -102.5 - FLASHING, CANTS, NAILERS - Composition base flashing sha]~ extend a minimum of 8 in nominal vertically above the. roof line. Cant must be provided at any 90 degree angle created by rectangular curbs projections. Wood nailers shall be provided at the top of all prefabricated curbs. 102.6 - MECHANICAL UNITS - Mechanical units for new construction shall be mounted on pipe standards or. curbs beneath which roofing materials will extend must be mounted to a height sufficiently above the roof to allow room to install the roof system and to make repairs beneath the unit (minimum 18 in). Heavy loads, such as large mechanical units, ~e~t~ shall not be rolled over the completed membrane as they may cause damage to the roof. A failure in horizontal shear between the membrane, insulation or deck from these loads may result in future splitting of the roof. EXCEPTION: 1 & 2 Family Dwellinqs 102.6.1 - Condensation from all coolinq coils or evaporators shall b~ carried full size from drip pan outlet and piped to a s~orm sewer drain or an approved French drain on units larqer than 3 tons nominal capacity Drains from units 3 tons and smaller capacity may terminat~ in a qutter or roof drain, or on a concrete pad at ground level or other location subject to the approval of the Mechanical Official. 103 - ALTERNATE MATERIALS AND ALTERNATE METHODS OF CONSTRUCTION The provisions of this Standard are not intended to prevent the use of any material or method of construction not specifically prescribed by this Standard, provided any such alternate has been approved and its use authorized by the Building Official. The Building Official shall approve any such alternate, provided he finds that the proposed deskgn cabrc.881 3 REV. 7/12/89 is satisfactory and complies with the provisions of Chapter 12 of the Standard Building Code, and that the material, method of application of work offered is for the purpose intended and at least the equivalent of that prescribed in this Standard in quality, strength, effectiveness, durability and safety. The Building Official shall require sufficient evidence or proof be submitted to substantiate all claims that may be made regarding its use. If in the opinion of the Building Official, the evidence and proof are not sufficient to justify approval, the applicant may refer the entire matter to the Board of Adjustments and Appeals. 104 - ASPHALT/FIBERGLASS SHINGLES 104.1 - GENERAL 104.1.1 - Asphalt/fiberglass shingles used as a roof covering shall comply with the requirements of this section. ~O4.1.2 - Shingle exposure shall be as specified in the manufacturer's published &pp~e~ instructions. 104.1.3 - Head lap shall be a minimum of 2 in. 104.2 - APPLICATION 104.2.1.1 - 3:12 pitch up to 20:12 pitch: Underlayment shall be one layer of Type 30 asphalt saturated non-perforated orqanic felt. 104.2.1.2 - Asphalt/fiberglass shingles may be installed on roof projection of 2:12 pitch to 3:12 pitch providing th-e projection does not exceed 6 feet and an additional underlay of 1 layer of Type 15 asphalt saturated non-perforated orqanic felt shall be hot mopped over the Type 30 felt base sheet. 104.2.1.3 - RE-ROOF ONLY - Asphalt/fiberglass shingles may be installed on roof slopes of 2:12 pitch to 3:12 pitch providing an additional underlayment of one layer of Type 15 asphalt saturated non-perforated orqanic felt be hot mopped in asphalt over the Type 30 base sheet or an additional Type 30 base sheet installed in shinqle fashion. 104.2.2 - Shingles shall be fastened and cemented in valleys, wall and roof intersections and gable ends. Eaves must be cemented and the metal eave drip shall be installed over the felt. 104.2.3 - Fasteners shall penetrate through the roofing material and at least 3/4-in into or throuqh the roof sheathing ~-~h~h-~4~e~-~ 104.2.4 - Where steep slopes are involved, special methods of fastening may be required. Follow manufacturer's ~b~e~ published instructions. cabrc.881 4 REV. 7/12/89 105 - MINERAL FIBER SHINGLES 105.1 - For a minimum slope of 3:12 up to 4 1/2:12, underlay shall be a minimum of one layer Type 30 asphalt saturated non-perforated orqanic felt nailed and one layer of Type 15 asphalt saturaSed non-perforated organic felt laid with hot asphalt or cold process cement solid mopped. 105.2 - For slopes of 4 1/2:12 and greater, underlay shall be one layer of Type 30 asphalt saturated non-perforated orqanic felt. 105.3 - Application shall be in accordance with the ~e manufacturer's published instructions. 106 - SLATE SHINGLES 106.1 - FOr a slope of 3:12, up to 4:12, underlay shall be a minimum of one layer of Type 30 asphalt saturated non-perforated orqanic felt fastened and one layer of Type 15 asphalt saturated non-perforated~ orqanic felt laid with hot asphalt or cold process cement solid mopped in accordance with ~h~-~nm~a~-~f the manufacturer' published instructions ..... 106.2 - For slopes of 4:12 and greater, underlay shall be one layer of Type 30 asphalt satl]r~tad non-perforated orqanic felt. 106.3 - Maximum exposure shall be as listed in TABLE 106.3 MAXIMUM EXPOSURE. TABLE - 106.3 MAXIMUM EXPOSURE Length of Shingle Maximum Exposure 24-in 22-in 20-~n 18-~n 16-in 14 -~n 12 -in 10-1n 10 1/2-in 9 1/2-in 8 1/2-in 7 1/2-in 6 1/2-in 5 i/2-in 4 1/2-in 3 1/2-~n 107 - CONCRETE AND CLAY TILE 107.1 - TILES USING CEMENTED APPLICATION (ALL AREAS) 107.1.1 -- Underlay for roof slope of 3'12 and greater shall be a minimum of one layer of Type 30 asphalt saturated non-perforated orqanic felt applied with 2 in head lap and 6 in side lap. Then apply cabrc.881 5 REV. 7/12/89 one layer of mineral surface or slate surface roll roofing, having a minimum weight of 74 lb/100 sq ft with 4 in head lap and 6 in side lap to the Type 30 asphalt saturated base felt by mopping hot minimum Type III asphalt and adhering a mineral surface or slate surface sheet, backnailing 12 in on center under the 4 in head lap using roofing nails driven through tin tags or with capped nails. Plastic cement or other cold applied roof cements may be substituted for asphalt, on roof slopes greater than 6:12. 107.1.2 - Ail tile applied to roofs having a slope up to and including 6:12 shall be set on an island of mortar. Mortar shall be sandwiched along sides of all barrel tile. The head lap.off.both shingles and barrel tile shall not be less than 2 in and- 1 1/2 in on side for barrel tile. All starter tile shall be nailed. Clay tile set in mortar shall be sufficiently wetted prior to setting in mortar bed. 107.1.3 - On slopes greater than 6:12 tile shall be spot nailed every third tile in every fifth row or in other approved manner with not less hthan 1 1/2 in hot dipped galvanized or equivalent nails. On pitches qreater than 7:12 all tile shall be mechanically attached. 107.1.4 - Mortar shall be in accordance with ASTM C270-~ 87a, Type M or Type S. 107.1.5 - e~e%e Roof tile shall comply with physical test requirements as follows~ 1. Portland cement concrete used for roof tile shall be no less strength than 2,000 psi in 28 days. ~e-~h~-haYe-~-m~m~m-~h~ke~es~-~f-~t-~~n~_~_~_~_~e~ 2. Barrel tile shall be test loaded by being supported on sand 2 in deep in a sand box 4 in wider than the width of the tile. Shingle tile shall have test~ cloth tubes parallel to the edge of the tile. Sand tubes shall be 2 in diameter loOsely filled with dry 40/60 silicon and shall be placed under the edge of tile with a center-to-center distance equal to the width of the tile. A test load shall be applied on a 3-in square steel plate bearing on a sand bag set at the center of the tile. The breaking load of any individual shingle tile shall not be less than 200 lb and the average breaking load of five shingle tiles shall be no~ less than 250 lb and the average breaking load of five barrels shall be not less than 300 lbs. 4. Absorption: Roof tiles absorb not more than ~8 12% of the dry weight on the tile during a 24 hour immersion test. 5. Tile shall be subjected to a permeability test where a 2-in head of water is placed on the top side for 24 hours. Acceptable tiles will allow no water passage. 107.1.6 - FASTENERS Roof tiles shall be fastened in accordance with the manufacturer's published instructions and 102.3. Instruc~ion~ shall be available and shall contain but not be limited to: flashings, cabrc.881 6 REV. 7/12/89 underla~ment_ sl~.e re uirements ~nd fasteners and their i lacDment necessa_~_~y_ to co__the requirements of Cha- ter 12 of the Standard Build~ 107.2 - APPROVED ~NeR~E TILES USING MECHANICAL FASTENERS 107.2.1 - F~e~E~yme~_f~_~oeE_~t~pe~_~E_+~)_~_~e~e~_~E&~_~e_o~e ~e-~--~&~l~-~l--~e~lgi~-_~~_~9~__~pe_~__~e,~~__~ m~p~-~a-as~a%~= A mlnzmum sloe of 4:12 ma be used when underla ~lies~ith the followin re- uirement~: a m~n~mum of one la'er of T--. e 43 coat~ fel~ .or e, uivalent naile~ to the roof d , ' accordance with manufacturer,s ublished in~tructlo~.~'~i~e r~r deck. in ' ' ' ' -~-~-m-~-~ Tile shal , with the h--si, cai test re uirements liLle~ '~k'~" ~'~'~- ~-~. ~. ~xce- m~ ror~°mP]~ ~overla ~ in- li ~ tile shall h~ve a m~n~mum thickness of no~ less th~ 1.2.in for barrel tile and 3 8 in for shin le tile. ~ Tiles shall Pa~ m~n~mum stren th re uirements of 4 000 si in 28 da s. 107.3 - FASTENER~ - Roof tile~ shall be fastened in accord ' ~- ~ . . -_ ~anufacturer,s ubllshed ~ns ' ~~~r~nce with th~ truc~ons and 102.3. Instructions shall be availa_~le and shall contain but not be limited to: ~ underla ment sloe re uirements and fasteners_ and_~their~lacement necessar to com 1 with the re uirements of Cha ter 12 o~ the Standard Buildin Code. 108- WOOD SHINGLES AND SHAKES 108.1 - SHEATHING - Wood shingles and shakes may be applied to roofs with solid sheathing~ Spaced sheathing boards shall be not less than 1 x 4, spaced no~ more than 4 in clear between boards for shingles and for 18 in shakes. Sheathing boards for 24 in shakes shall not be less than 1 x 6, spaced not more than 4 1/2 in clear between boards. 108.2 - SHINGLES 108.2.1 - Shingles shall be laid with a side lap of not less than 1 1./2 in between joints in courses and joints in alternate courses shall not be direct alignment. Spacing between shingles shall be approximately 1/4 in. Each wood shingle shall be fastened to the sheathing, with two~ rust resistant nails (~-dRppe~ zinc coa~ed steel in accordance with ~STM 641 class II, aluminum, copper or stainless steel). -- 108.2.2 - Weather exposure for wood shingles shall not exceed those set forth in TABLE-108.1 WEATHER EXPOSURE AND ROOF PITCH. Minimum roof slope shall be 3:12. Hip and ridge weather exposure shall not exceed those permitted for the field of the roof. cabrc.881 REV. 7/12/89 110.1.2 - Mineral surface roll roofing (organic) having a minimum weight of 74 lbs per 100 sq ft or mineral surfaced roll roofing (inorganic) having a minimum weight of 63 lbs per 100 sq ft or slate surfaced roofing shall have a minimum 6 in end lap and 2 in side lap mopped or cemented. Minimum slope 2:12. 110.1.3~ - The edges of sheathing at eaves and gable ends in all cases shall be covered and protected with a noncorrosive metal. 110.1.4 - Mineral surfaced roof may be two layers of 46 double coverage rolled roofing, each layer lapped 19 in and fastened to wood deck with two rows of fasteners through tin caps spaced not more than 18 in on center through unsurfaced portion of sheet and 6 in on center at back of each sheet. Mop or cement unsurfaced portion of sheet. Minimum slope 1:12. 111 - METAL ROOFS 111.1 - MATERIALS 111.1.1 - Copper shall weigh not less than 16 oz per sq ft. 111.1.2 - Galvanized sheet metal shall be 0.0179-in (26 ga) thick or heavier, .90 oz, q 90 (total weight both sides) zinc coating per sq ft. 111.1.3 - Lead: ~-~ea~r-~-~-~e~-~_~~ soft lead, ft. · 2 % lb per sq 111.1.4 - Terne (tin) and TCS (terne coated stainless); terne coating - 40# per double base box, field painted when applicable in accordance with manufacturer,s published.instructions 111.1.5 - Aluminum, 0.024-in thick. 111.1.6 - Stainless steel minimum 26 qa. 111.2 - FASTENERS - Metal roofs shall be fastened with the fasteners specified in TABL~ 111.2 FASTENERS FOR METAL ROOFS. of cabrc.881 12 REV. 7/12/89 (Underlining deleted for clarity) TABLE 111.2 FASTENERS FOR METAL ROOFS TYPE OF ROOF METAL FASTENER Copper Hard Copper Copper Alloy Galvanized Galvanized, (hot dipped) Aluminum Aluminum 1. Stainless steel fasteners may be used with all s of roof metal. 111.3 - METAL SHINGLES 111.3.1 - Galvanized shingles, 8 in x i2 in maximum size, minimum uncoated thickness of 0.0149 in (28 ga). 111.3.2 - Aluminum shingles, minimum thickness 0.019 in, 12 in x 48 in maximum size. Rosin paper shall be used under metal in addition to underlay. 111.4 - FLAT SHEET ROOFING - Seams and joints on flat sheet roofing shall be locked and soldered and made watertight. 111.5 - CORRUGATED SHEETING - Corrugated, Five-V crimp, or other of industrial roofing, to be securely nailed with lead head or washered-neoprene nails. 111.6 - SHEETING TO STEEL FRAMING - Metal roofing fastened directly to steel framing shall be attached by manufacturer's approved fastenings and shall shed water away from structural members. 111.7 - MINIMUM SLOPE NONSOLDERED SEAMS - Minimum slope for all lapped, nonsoldered seam metal roofs shall be 3:12. cabrc.881 13 REV. 7/12./89 deck. Roofing plies shall than be solidly mopped in accordance with the manufacturer's published instructions ~ee~e~~ for the installation of roofing over insulation. 109.%~ - ADDITIONAL PLIES - Additional felts, ply sheets or cap sheets shall be adhered to the base ply or directly to roof insulation with solid mopping of a bituminous ~mpo~ material applied in accordance with manufacturer's published instructions ~ee~mme~~. Each additional ply sheet shall be solidly mopped to preceding ply sheet. 109.5~ - FASTENERS - Nails in nominal 1 in lumber shall not be smaller than 12 gauge wire nails with heads not less than 3/8 in diameter driven through tin caps, and not less than 3/4 in long. Roof decks of cement fiber, poured gypsum, light weight insulating concrete or similar nailable surfaces require fasteners specifically designed for use on the Type of deck involved. 109.6~ - SURFACE TREATMENT - Flood coatings, protective/reflective coatings, aggregates and other surface treatments shall be installed in accordance with manufacturer's published instructions Aggregate materials shall be embedded in a ~ flood coat of hot bitumen (not mopped) and shall not be ussd on roof slopes greater than 3:12. Aggregate shall comply with ASTM D 1863 or locally obtainable gravel sized according to manufactures specifications. A handful of aqqre~ate shall no~ drip water. The aqqreqate shall be dry and clean enouqh to adhere to the hot bitumen flood coat when installed. 109.~ - SLOPES AND MATERIALS cabrc.881 10 REV. 7/12,/89 109.6.1 - Roof materials shall conform to those materials specified in TABLE 109.6.1 BUILT UP ROOFS, SCOPES AND MATERIALS. TABLE 109.6.1 - BUILT UP ROOFS, SCOPES AND MATERIALS ROOF PITCH in pr ft BASE PLIES COATINGS 0-1/4:12 1/8-1/2:12 1/2:12-1 1/2:12 1:12-3:12 2:12-6:12 15 coal tar saturated felt or 15 asphalt/coal tar saturated fei t 15 asphalt saturated fe[t or 15 asphalt impregnated glass fiber mat 15 asphalt saturated felt or 15 ashpalt inpregnated glass fiber mat 15 asphalt saturated felt or 15 ashpaLt inpregnated glass fiber mat 15 asphalt saturated felt or 15 ashpalt inpregnated glass fiber mat coal tar pitch, ASTM D450 coal tar bi tuman, ASTM D450 III dead Level ashpalt, ASTM D312 ! f !at asphalt ASTM D132 II! flat asphalt ASTM D132 flat asphalt ASTM D132 Iii 110 - SLATE OR MINERAL SURFACED ROLL ROOFING 110.1 - MATERIAL AND INSULATION 110.1.1 - Underlayment shall be one having a minimum diameter of 1 5/8 in. 30 felt fastened by tin caps cabrc.881 11 REV. 7/12/89 TABLE 108.1 WEATHER EXPOSURE AND ROOF PITCH ROOFING LENGTH GRADE MATERIAL (IN) EXPOSURE (IN) 3:12 PITCH (MINIMUM) TO < 4:12 4:12 PITCH (MINIMUM) & STEEPER 16 SHINGLES 18 24 SHAKES 18 NO. 1 3 3/4 5 NO. 2 3 1/2 4 NO. 3 3 3 1/2 NO. 1 4 1/4 5 1/2 NO. 2 4 4 1/2 NO. 3 3 1/2 4 NO. 1 5 3/4 7 1/2 NO. 2 5 1,/2 6 1/2 NO. 3 5 5 1/2 NOT 8 24 PERMITTED 10 108 - SHAKES 108.3.1 - Shakes shall be laid with a side lap of not less than 1 1/2 in between joints in adjacent courses. Spacing between shakes shall be approximately 1/2 in. Each wood shake shall be fastened to the sheathing with two rust resistann nails (hot dipped zinc coated steel, aluminum, copper or stainless steel). The starter course at the eaves shall be doubled and the bottom or first layer may be either 15 in or 18 in wood shakes or wood shingles. 15 in or 18 in shakes may be used for the final course at the ridge. 108.3.2 - Shakes shall be laid with 18-in wide strips of minimum Type ~$ .30 asphalt saturated non-perforated orqanic felt shingled between each course in such manner that no felt is exposed to the weather. 108.3.3 - Weather exposure shall not exceed those set forth in TABLE-108.1 MAXIMUM EXPOSURE. Hip and ridge weather exposure shall not exceed those permitted for the field of the roof. 108.4 - FIRE RETARDANT SHINGLES AND SHAKES 108 4.1 ' -- - - - ~re ~~-~-re~t~ec~_~_~ii~3~_~_~s__~__~f e~e~~--~im~e~-~--1-5/-~-if~-m~m~-~ywo~d_~e~k~_~n~n~l__~_~ 1. Class B fire retardant treated wood shakes with an asphal~ fel[ interlayment consistinq of 18-inch wide strips of Type 30 satur,~ted cabrc. 881 8 REV. 7/12/89 non-perforated orqanic felt over particleboard or 15/32-inch plywood. 7/16-inch minimum Type 2 -M-W 108.4.5 ~ - Fire retardant treated wood shingles and shakes as Class C prepared roof coverings. Shakes are to be provided with an interlayment of one layer of 18-in wide by minimum Type ~ 30 asphalt saturated non-perforated organic felt between shake courses. 109 - BUILT UP' ROOFS -t09.1 - SPECIFICATIONS - Specifications of any manufacturer who systems are bondable or guaranteed, whether or not such bond guarantee is to be issued, shall be deemed to meet the requirements .... ~ this Standard, provided they do not conflict with the requirements of the fire district limits. 109.~1 - SURFACE PREPARATION 109.Z~.1 - Before starting the application of any roofing membrane, all roof decks shall be uniform and broom cleaned~ &~ Parapet walls, vertical walls, penthouses and similar structures above the roof level shall have been completed, and all flat roof decks shall have been provided with a cant strip where the roof deck joins a vertical surface. Cant strips shall extend at least 3 1/2 in up all the vertical surfaces. Wood roof decks shall be solidly sheathed. Structural concrete decks shall be smooth, dry and free from laitance. Lightweight insulating concrete~ cellular foam roof decks shall be ~r~ cured and at least 72 hours of precipitation-free weather is required prior to roof application. Subsequent to that time, if precipitation occurs, an additional 24 hours drying time is required. 109.Z~.2 - Gypsum roof decks shall be surface dry before starting application of roofing. In no case should the application be started less than 24 hours after the gypsum pouring. 109.Z!.3 - Ail eave fascia shall be completed by completion of fin~ roofing. 109.~ - BASE PLY - Unless otherwise specified herein, a base ply shall be secured by mechanical fastening to any nailable deckJ Where one or more layers of material are installed as the base ply, they. shall be laid dry, not cemented and attached to the nailable deck with fasteners. On pre-cast, non-nailable decks a minimum of 1/2 in fiberboard insulation shall be solidly mopped to a primed concrete roof cabrc. 881 9 REV. 7/12/89 112 - SYNTHETIC SHEET MEMBRANE ROOFS 112.1 - GENERAL 112.1.1 - For the purpose of this Standard, synthetic sheet membrane roofs (hereafter referred to as "membrane") include elastomeric and plasteromeric preformed sheet materials and modified bituminous sheet materials, both reinforced and non-reinforced, which are typically, but not necessarily, installed in single layers. 112.1.2 - The structural roof system to which the membrane is to be applied may be required to be certified by a registered engineer as being capable of sustaining the construction, membrane, ballast and ancillary material loads that will be encountered during'and subsequent t · o membrane application,. Preservative treated wood nailers shall be installed at ~he perimeter of ~he roof, around all roof vents, skylights and similar penetrations, and all membrane terminations unless , 1. the roof membrane is to be attached directly to the structural deck, 2. the roof membrane is to be attached through the substrate and into the structural deck, 3. the substrate at these locations is capable of accepting mechanical fasteners and is fas~ned to the structural deck in a manner to obtain sufficient strength to resist the forces of wind uplift. The thickness of the nailer shall be such that the top of the nailer is flush with the surface to which the membrane is to be installed. 112.2 - MATERIALS 112.2.1 - There shall be no co-mingling of different s of materials except through proper adapters. In all cases, approved methods and sealers designed for the particular elasto/plastic materials shall be used. ~ 112.2.2 - An elastomer, as defined by the Roofing Industry Educational Institute glossary, is a substance that can be stretched at room temperature to at least twice its original length, and after having been stretched and the stress removed, will re approximately its original length in a short time~urn without force to 112.2.3 - A plastic, as defined by ASTM D 883, is a material that contains as an essential ingredient one or more organic polymeric substance of large molecular weight, is solid in its finished state and at ~ome stage in its manufacture or processing into finished articles can be shaped by flow. , 112 2.4 - Membrane, material shall be a minimum 0.040-in thick. cabrc.881 14 REV. 7/12/89 112.2.5 - Flashing, Elasto/Plastic material, cured or uncured, shall be minimum 0.040-in thick. Composite flashings shall be minimum 0.030-in thick. 112.3 - APPLICATION - The membrane shall be applied by one or a ~ combination of the following methods: 112 . 3 . 1 - ADHERED METHOD 112.3.1.1 - SUBSTRATE - The substrate to which the membrane is to be applied shall be clean, dry and free from debris or contaminants that will interfere with the adhesion or attachment of the membrane or that will puncture the membrane. Joints or gaps in the substrate greater than 1/4 in shall be filled. Substrate materials shall be compatible with or shall be isolated from cleaning agents, solvents, adhesive or heat used to adhere the membrane or fabricate lap joints. 112.3.1.2 - MEMBRANE - The membrane shall be free from defects. LaD_~ -~oints shall be fabricated in accordance with manufacturer's publish~ instructions 112.3.1.3 - ADHESIVES - Adhesives shall be applied in accordance with manufacturer's published instructions weather limitations prescribed by the manufacturer. 112.3.1.4 - MECHANICAL FASTENING - The membrane and the perimeter flashinq system shall be mechanical]~ fastened at the perimeter of the roof, around all roof vent, skyliqht and similar penetrations, at all membrane terminations, and as required within the field of the roof by the manufacturer. 112.3.1.5 - FLASHING - Flashing materials shall be compatible with the base membrane materials and substrates to which they are applied. 112.3.6 - PROTECTIVE COATINGS- Protective coatings shall be applied in accordance with manufacturer's published instructions 112.3.2 PARTIALLY ADHERED & MECHANICALLY FASTENED METHODS 112.3.2.1 - SUBSTRATE - The substrate to which the membrane is ~o be~ applied shall be clean, dry and free from debris or contaminants that will interfere with the adhesion or attachment of the membrane or tha~ will puncture the membrane. If insulation is to be used as the substrate, the insulation shall be adhered or mechanically attached to the structural deck. Substrate materials shall be compatible with or shall be isolated from cleaning agents, solvents, adhesives or heat used to adhere the membrane or fabricate lap joints. cabrc.881 15 REV. 7/12/89 112.3.2.2 -- MEMBRANE - The membrane shall be free from defects. Lap joints shall be fabricated in accordance with manufacturer,s published instructions 112.3.2.3 - ADHESIVES - Adhesives shall be applied in accordance with manufacturer's, published instructions Pe~eme~Hs, and within the weather limitations prescribed by the manufacturer. 112.3.2.4 - MECHANICAL FASTENING - The membrane and the perimeter flashing system shall be mechanically fastened at the perimeter of the roof, around all roof vent, skylight and similar penetrations, at all membrane terminations, and as required within the field of the roof by the manufacturer. 112.3.2.5 - FLASHING - Flashing materials shall be compatible with the base membrane materials and substrate to which they are applied. 112.3.2.6 - PROTECTIVE COATINGS - Protective coatings shall be applied in accordance with manufacturer,s published instructions 112.3.2.7 - BALLAST - Ballast shall conform to and be applied in accordance with manufacturer,s published instructions Systems requiring ballast shall not be used on roof slopes greater than 1:12. 112.3.3 - LOOSE LAID/BALLASTED METHOD 112.3.3.1 - SUBSTRATE - The substrate to which the membrane is to applied shall be clean, dry and free form debris or contaminants that will puncture the membrane. Substrate materials shall be compatible with or shall be isolated from cleaning agents, solvents, adhesives or heat used to adhere the membrane or fabricate lap joints. 112.3.3.2 - MEMBRANE - The membrane shall be free from defects. Lap joints shall be fabricated in accordance with manufacturer,s published instructions 112.3.3.3 - ADHESIVES - Adhesives shall be applied in accordance with manufacturer,'s published instructions ~e~eme~%s and within the weather limitations prescribed by the manufacturer. .... ~ ~ ~7~a~a-~-- ~L~t~ --~ The membrane and the perimeter flashinq system shall be mec]~ fastened at the perimeter of the roof~ around all roof vents~ ~ts and similar enetrations, at all membrane terminations an~ as re,red within the field o~ the roof ~the manufacturer. cabrc.881 16 REV. 7/12/89 112.3.3.5 - FLASHING - Flashing materials shall be compatible with the base membrane materials and substrates to which they are applied. 112.3.3.6 - PROTECTIVE COATINGS - ~rotective coatings shall be applied in accordance with manufacturer's published instructions 112.3.3.7 - BALLAST - Ballast shall conform to and be applied in accordance with manufacturer's published instructions Systems requiring ballast shall not be used on roof slopes greater than 1:12. 112.3.3.8 - INVERTED SYSTEMS - Refer to Section 102.2.1 for insulation requirements. 112.4 - PRECAUTIONS - The manufacturer's published instructions ~%~&~ and details shall be strictly adhered to and a copy of the instructions shall be available at all times on the job site during installation. 113 - REROOFING/RECOVERING The requirements of this section shall govern reroofing/recovering. 113.1 - DEFINITIONS: 113.1.1 - For the purposes of this section, the following definitions shall apply: 1. REROOFING: The practice of removing the existing roofing membrane, repairing any damaged substrate, and installing a new roofing system. 2. RECOVERING: The practice of preparing the old roof surface (as opposed to the removal of the existing roof) and installing a new roof system. 113.1.2 - The structural roof components to which the roofing system is to be applied shall be capable of supporting the roof system, ancillary material, and equipment loads that will be encountered in any reroofing/recovering operation. Any structurally damaqed roof components, e.q., roof deck, sheathinq, rafters, joists shall be repaired in such a manner which maintains the structural inteqrity of the component and roofinq system. 113.2 - INSTALLATION - Reroofing rather than recovering shall be utilized in the following cases: t. When ~1~ existing roofing or insulation is water soaked or deteriorated to the point that it is not suitable as a roof base?-- for additional roofing. 2. When blisters exist in any roofing, unless blisters are cut or~ ~ scraped open and nailed down before applying additional roofing. 3. When the existing roof surface is gravel or the like, unless gravel shall be thoroughly removed or all loose gravel removed and an approved base material installed before applying additional roofing. 4. When existing roof is rigid tile or rigid shingle. cabrc.881 17 REV. 7/12/89 5. When sheathing or supports are deteriorated to the point that the roof structural system is not sUbstantial enough to support recovering. 6. When existing roof has two or more applications of any roofing material. 7. Wood shingles shall not be placed over more than one application of asphalt shingles. Wood shingles or shakes shall not be applied over existing wood shakes or shingles. 8. All reroofing is to be applied in accordance with new roofing specifications. EXCEPTIONS: 1. When the structural deck is concrete and the existing roof is firmly attached to the deck, than the roof shall be removed down to a minimum of three plies of moisture free felts. 2. When otherwise approved by the Building Official. 114 - FLASHINGS 114.1 - GENERAL 114.1.1 - Flashings shall meet the requirements of this section, except as otherwise specified in this standard. 114.1.2 - Ail metal flashing installed east of Federal Highway U.S. shall be a minimum of 16 ounce copper or 26 gauge stainless steel. 114.1.3 - Intersection of Flat, Low slope and Pitched Roof. Whenever flat and pitched roofs meet or intersect, a flashing not less than 12 in wide is required. See TABLE-ii3.3.2 VALLEY AND FLASHING MATERIALS. 114.1.4 - Wall to roof intersection flashing shall extend 5 in up tho wall and a minimum 4 in onto the roof. 114.2 - RIGID SHINGLE ROOF COVERINGS 114.2.1 - Flash with metal and coun~erflash with metal or non-me~allie material. 114~2.2 - Ail flashingr-exee~k_~_e~geT_sha~_~e_~_~ri~u~r~z~_l~r_~' wi~e-a~ shall be a minimum of 16 ounce copper or 26 gauge stainless steel. EXCEPTION: Drip edge or break metal (where change in slop~ occurs) may be any metal permitted in TABLE 114.3 2 VALLEY AND FLASHING MATERIALS. ' 114.2.3 - Chimneys, stucco, brick or walls tha~ would be damaged by cutting to install metal counter e~p flashing may have flashing installed as approved by the Building Official. cabrc.881 18 REV. 7/12/89 114.3 - ASPHALT/FIBERGLASS SHINGLE ROOF COVERING 114.3.1 - FLASHINGS - base and cap flashings shall be installed in accordance with manufacturer's published instructions. Base cap .~ flashings shall be corrosion resistant metal of minimum thickness in accordance with TABLE-ii4.3.2 VALLEY AND FLASHING MATERIALS. 114.3.2 - Ail valley flashing shall be at least 16 in. wide and of any of the corrosion resistant material listed in TABLE-ii4.3.2 VALLEY AND FLASHING MATERIALS. TABLE - 114.3.2 VALLEY AND FLASHING MATERIAL MINIMUM MATERIAL THICKNESS GAGE WEIGHT COPPER - - 16 OZ. ALUMINUM 0.025 IN - - STAINLESS STEEL - 26 - GALVANIZED STEEL (G90) - 26 - ZINC ALLOY 0.027 IN - - LEAD - - 3 POUNDS PAINTED TERNE - - 20 POUNDS NOTE: Ail metal flashing installed east of Federal Highway U.S. #1 shall be a minimum of 16 ounce copper or 26 gauge stainless steel. 114.4 - WOOD SHINGLES AND SHAKES 114.4.1 - Roof valley flashing shall be provided of not less than 16 ounce copper or 26 gauge stainless steel and shall extend at least ~ in from the centerline each way. Flashing shall be "W" shape with a 3/4 in high center crimp and shall have an end lap of not less than in. The metal shall be fastened with clips spaced at 24 in on center. 114.4.2 - Wall to roof intersection flashing shall ~-R6-~e-~t~i~~-~ee~-a~-~°nz~t~ extend a minimum + ~ in up the wall and a minimum 5 4 in onto the roof. 114.5 - BUILT UP ROOFS 114.5.1 - Base flash with a bituminous built-up flashing material o] cant strips and cap flash with metal or other approved methods. 114.5.2 - Corrosion-resistant metal shall be used for cap or counterflashing. See TABLE-iI4.3.2. VALLEY AND FLASHING MATERIAL. 114.5.3 - When a bituminous base flashing is used, a minimum of two plies of 15 asphalt saturated non-perforated orqanic felt or glass fiber ply sheets ~m-~be~ felts shall be installed with steep cabrc.881 19 REV. 7/12/89 asphalt or plastic cement for a Class C roof, top nailed and top coated with steep asphalt or plastic cement. 114.5.4 - A bituminous base flashing for Class A or B roof shall be a minimum of three plies of 15 asphalt saturated non-perforated orqanic felt or glass fiber ply sheets or asbestos felt. Each ply shall be set in a solid mopping of steep asphalt or in a continuous bed of plastic cement. The flashing assembly shall be coated with steep asphalt, plastic cement, or emulsified asphalt or the flashing shall comply with the recommendations of the roofing manufacturer for a base flashing. 114.6 - GRAVEL STOP 114.6.1 - Gravel stop shall have a minimum 3,/4 in rise above the roof flange, out onto roof a minimum of 3 in, fastened a minimum of 6 in on center. 114.6.2 - Overlap shall be a minimum of 4 in. Another method of joint construction as approved by the Building Official may be used. 114.6.3 - Ail joints shall be sealed with plastic cement. 114.6.4 - Gravel stop shall be installed on top of all mopped felts in a layer of plastic cemenn and then stripped w~th two layers of felt, each embedded in a mopping of hot asphalt with the first strip of a minimum of + ~ in wide and the top strip a minimum of ~ 9 in wide or in accordance with manufacturer's published instructions. - 114.6.6 ~ - An approved nailer is required for gravel stop and metal flashing flanges. 114.6.~ ~ - Gravel stop shall comply with the minimum values listed in TABLE-114.6.~ ~ GRAVEL STOPS-DIMENSIONS AND MATERIAL. TABLE - 114.6.~ 6 GRAVEL STOPS-DIMENSIONS AN~MATERIAL HEIGHT OF GALVANIZED GRAVEL STOP STEEL(GAGE) (G90) COPPER ALUMINUM (OZ) (INCHES) ZINC STAINLESS ALLOY STEEL(GAGE) (IN) 4 26 5 24 6 22 7 22 8 2O 16 0.025 16 0.032 20 0.040 20 0.040 20 0.050 0.020 26 0.027 26 0.027 24 22 20 cabrc.881 20 REV. 7/12/89 114.7 - DRIP EDGE FOR EAVES AND GABLES 114.7.1 - Provide a drip edge at eaves and gables of all roofs applied over the underlayment. Overlap to be a minimum of 2 in. 114.7.2 - Eave drip shall extend 1/4 in below sheathing and extend back on the roof a minimum of 1 1/2 in. This applies to both new and old roofs. 114.7.3 - EXCEPTION: This section does not apply to wood shingles or shakes. 114.7.4 - See TABLE-ii4.3.2. VALLEY AND FLASHING MATERIALS. 114.8 - CHIMNEYS - Cricket or saddle coverings shall be metal and structurally supported. See TABLE-Ii4.3.2. VALLEY AND FLASHING MATERIALS. 114.9 - PARAPET WATJ~ - On parapet walls that require waterproofing within the fire district limits, if a bituminous flashing is used, the top layer shall be one layer of 15 ~e~%~ fiberqlass felt in soli~ layer of plastic cement. ll4.10-OPENINGS IN ROOF 114.10.1 - Ail plumbing~ ~ electrical and ventilation penetrations ~e~ shall be flashed with ~~ee%--~t--me~a~--~a~i~g~. the same material as used in the roofinq application. 114.10.2 - In any reroofing application, all base flashings on protrusions extending through the plane of the roof shall be removed and replaced with corrosion resistant metal flashings. See TABLE-ii4.3.2 VALLEY AND FLASHING MATERIAL. 114.10.3 - Metal flashing flanges to be set, nailed and stripped in accordance with gravel stop applications specifications and manufacturer's published instructions. 114.11 - METAL PANS 114.11.1 - Fabricated metal pans for sealinq roof penetrations shall b~ minimum 2 1/2 in deep and constructed of a minimum 26 qa stainless steel, 0.040 in aluminum, 0.027 zinc alloy or 16 ounce copper, 26 qa galvanized G90 or the manufacturer's recommended product. 114.11.2 - Provide a minimum 2 in clearance between the edqes of th~ metal pan and penetratinq components. 114.11.3 - Securely fasten metal pans to substrates usinq suitabl~ compatible non-corrosive fastener or manufacturer's published instructions. cabrc. 881 21 REV. 7/12/89 114.11.4 - The' deck flanqe shall be stripped in with one stripDinq ply in hot or mastic and one or more additional plies in hot or mastic or flashinq ply in hot or mastic. The strippinq ply and successiw~ ply(ies) or flashinq shall cover the flanqe and extend on the roof minimum of 6 in in accordance with manufacturer,s published instructions. 114.11.5 - The pan shall be filled with hot III or other material (e.q. dead level, Type II asphalt, self levelinq elastomeric sealer) as recommended by the roofinq manufacturer. If hot asphaltic material used to fill the pan, the fillinq shall be accomplished in two lifts_L the $irst lift fillin a roximatel to mid oint the second and f_inal lift will be_acc~lished after the first lift has chille~ and will fill the -.an~ A final to in- of roofers m~stic or e]astomeric sealer may be applied to assure drainaqe of the pan. 115 - APPROVED LIQUID APPLIED ROOFING MA~BR}A~S SYSTEMS ~115.1 - GENERAL - The use of liquid applied roofing m~e~s systems shall be in accordance with the manufacturer,s published instructions ~ee~m~e~e%~~. The moisture barrier shall be a single or multiple component system consisting of the number of applications as recommended by the manufacturer. The dry mil thickness of the systems shall be in compliance with the manufacturer,s published instructions ~ee~e~. In any event the minimum dry thickness shall be 15 mils. ' 115.2 - PREPARATION OF SURFACE - Before starting the application, to assure adherence, the substrate must be clean, dry and free from dust, dirt, incompatible chemicals, grease, oil, wax and laitance. A primer may be recommended by the manufacturer. 115.3 - APPLICATION - The applicator shall be familiar with the system and application equipment either through previous experience, training or assistance provided by the manufacturer,s representative during application. The system should be applied uniformly at recommended thickness by the manufacturer. Weather conditions should be favorable and both the air and substrate as recommended by the manufacturer. All roofing substrate m~e~s systems shall be solidly attached. All surface openings and flashing details are to be corrected prior to application of the liquid coating. If movement is anticipated in the deck, bond breakers or reinforcing embedded fabric should be considered at the roof joints according to manufacturer,s published inStructions. 115.4 - ROOF SLOPE - The minimum recommended roof slope is 1/4:12 (2%). Roofs which pond water are not acceptable. ' 115.5 - PRECAUTIONS - The manufacturer,s published instructions ~bb~%b~s and details shall be strictly adhered to and a copy of the instructions shall be available at all times on the job site during installation. cabrc. 881 22 REV. 7/12/89 116 - FOAMED IN PLACE ROOF INSULATION 116.1 - GENERAL 116.1.1 -- Foamed in place roof insulation, when used in conjunction with a waterproof and protective surface coating shall be applied full thickness in one layer in accordance with the manufacturer's published instructions ~e¢~mme~a~ . Quality of the foam surface shall be esSentially Uniformily smooth, free of voids, crevices and pinholes, Protective surf:acing m~eP~m systems shall be applie.d no less than 2 hours nor more than 72 hours following the application of the foam. 116.1.2 - When liquid applied surfacing is used, requirements of Section 115 apply. When elastomeric or plastomeric protection is used, requirements of Section 112 apply. cabrc.881 23 REV. 7,/12/89