R04-035 RESOLUTION NO. R04- /)/_~5 A RESOLUTION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING EXECUTION OF AMENDMENT NO. 1 TO TASK ORDER NO. 01-17 TO CAMP, DRESSER & MC KEE, INC., IN THE AMOUNT OF $48,700.00, PROVIDING FOR ADDITIONAL ENGINEERING SERVICES FOR THE INCA STORMWATER IMPROVEMENTS AND WATER MAIN REPLACEMENT PROJECT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, task Order 01-07, approved by the City Commission on June 17, 2003, included services for minor design modifications//additions for the preparation of area street lighting and aeration fountain specifications in addition to construction phase services regarding the INCA Project, however, neither this Task Order, nor the original Task Order (01-05), included permitting for conditions related to the mangrove and wetland areas existing within the project area; and WHEREAS, three extensive requests have been received from the permitting agencies, South Florida Water Management District and the U.S. Army Corps of Engineers, ifor additional information regarding environmental issues, which are outside the scope of services described under Task Orders previously adopted. WHEREAS, the City Commission, upon staff's recommendation, has deemed it appropriate, and in the best interests of the public, to approve Amendment No. 1 to Task Order No. 01-17 for Camp, Dresser & McKee, in the amount of $48,700, for the additional engineering services for the INCA Stormwater Management Improvements and Water Main Replacement Project (formerly referred to as the NE 7th Street and NE l0th Avenue area and North and South Roads). NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: S:\CA\RESO\Agreements\Task - Change Orders\Task Order - Amendment 1 to CDM 01-17.doc Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. Section 2. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct execution Amendment No. 1 to Task Order No. 01-17 for Camp, Dresser & McKee, in the amount of $48,700, for the additional engineering services for the INCA Stormwater Management Improvements and Water Main Replacement Project (formerly referred to as the NE 7th Street and NE l0th Avenue area and North and South Roads). Section 3. PASSED AND ADOPTED this 2ity Clerk ~-w2) ~t'~ q...~,j This Resolution shall become effective immediately upon passage. / ~'~ day of March, 2004. CITy OF B ~_.~OYN~~CH, FLORIDA Q Commi~ Comrhissio S:\CA\RESO~Agreements\Task - Change Orders\Task Order - Amendment 1 to CDM 01-17.doc ENGINEERING SERVICES TASK ORDER CITY OF BOYNTON BEACH TASK ORDER NO. 01-17, Amendment No. 1 CDM PROJECT NO. 6276-39603 DATE: I. PRO}ECT TITLE Additional Services for N.E. 7m Street Area and North & South Roads II. BACKGROUND III. IV. CDM was retained by the City of Boynton Beach (City) to design, permit and provide bidding services for stormwater improvements to N.E. 7~h Street Area and North & South Roads. During the permitting process, the South Florida Water Management District (SFWMD) and the U.S. Army Corps of Engineers (USACOE) requested additional information regarding environmental issues related to wetlands within the project area. The additional issues were defined on two (2) response letters by SFWMD as Request for Additional Information (RAI). The RAI letters requested additional design and wetland mitigation work that was outside the scope of services described under Task Order 01-05 approved by the City of Boynton Beach. This Task Order Amendment consists of professional services to respond to the RAI's from SFWMD, revision of the construction drawings and specifications incorporating the changes required by the RAI's. The City also requests a street lighting plan for the North & South Roads project. CONTRACT REFERENCE This Task Order shall be performed under the terms and conditions described within the Agreement for General Engineering Consulting Services dated the 4m day of October 2000 between the City of Boynton Beach (City) and Camp Dresser & McKee Inc. (CDM). SCOPE OF SERVICES The Scope of Services shall include the following tasks: · Wetland mitigation design and related work as requested by SFWMD; · Preparation of RAI response documents to SFWMD RAI #2 dated March 21, 2003, and RAI #3 dated October 3, 2003; · Revision of drawings and specifications after the issuance of the ERP to incorporate changes resulting from SFWMD requests; and · Preparation of construction plans for street lighting North & South Roads project. N:\0000\bs7771 TO.doc 1 02/11/04 Mo VI. VII. The detailed Scope of Services is outlined in Exhibit A. PROJECT STATUS REVIEW CDM shall provide the City with written monthly status reports with monthly invoices for the duration of the project. PROJECT SCHEDULE CDM will commence services upon receipt of written authorization and will complete the professional engineering services within four weeks in order to fulfill SFWMD requests. In the event the SFWMD requests additional information beyond what was established in their two (2) RAI letters, additional compensation would be required. COMPENSATION FOR SERVICES The total amount to be paid to CDM by the City under this Task Order shall be a lump sum amount of $48,700. A breakdown of the labor hours and other costs associated with this Task Order are provided in Exhibits B and C. IN WITNESS WHEREOF, the parties have hereunto set their hands the day and year first above written. CAMP DRESSER & McKee INC. CITY OF BOYNTON BEACH, FLORIDA David F. Holt' ,~P.E., D~ Associate Kurt Bressner, City Manager N:\ 0000\ bs7771 TO. doc 2 02/11/04 EXHIBIT A ADDITIONAL SERVICES FOR N.E. 7TM STREET AREA AND NORTH AND SOUTH ROADS SCOPE OF SERVICES TASK 1 - WETLAND MITIGATION DESIGN This task includes the wetland mitigation design for the project including: · Site visits with the South Florida Water Management District (SFWMD) and U.S. Army Corps of Engineers (USACOE) staff; · Preparing planting plans within the outfall area for temporary and permanent impacts; · Preparing planting and mitigation plans in consultation with the SFWMD/USACOE; and · Preparing pertinent documents to support the planting, mitigation plans and conservation areas. · Incorporate planting plans and details into the construction drawings. · Prepare technical specifications addressing planting and mitigation plans. · Provide cost estimate to furnish and install the wetland planting plan. TASK 2 - PREPARATION OF RAI RESPONSE DOCUMENTS This task will be undertaken to respond to SFWMD RAI. CDM responded to RAI #2 on September 2, 2003 which was not included in the original scope of services. Recently RAI #3 was issued by the SFWMD regarding wetland issues. CDM will prepare the responses to RAI #3, address all issues mentioned in the letter and provide supporting documentation. Costs for obtaining legal descriptions from surveyor are not included in this task. This task will be completed within two (2) weeks from the date of authorization by the city. TASK 3 - STREET LIGHTING FOR NORTH AND SOUTH ROADS AREA CDM will prepare construction drawings, details and specifications for the installation of street lighting along North and South Roads, including West, Northwest, Central, Northeast and East Drives. TASK 4 - REVISION OF BID FORM AND COST ESTIMATE CDM will modify the bid forms to include the items necessary for installation of sewer lines (2,700 ft) within the project area to include the necessary bid items for street lighting installation and to include an item for wetland mitigation and protection. N:\0000\bs7771 Exh A.doc A-1 2/11/2004 EXHIBIT B PROJECT BUDGET PROJECT: City of Boynt0n Beach Additional Services for NE 7a' Street Area and North and South Roads CONTRACT REFERENCE: Agreement for General Engineering Consulting Services between City of Boynton Beach, Florida and Camp Dresser & McKee Inc. dated October 4, 2000. Labor Category Hours Total Officer Technical Specialist Project Director Senior Engineer Professional II Professional I Senior Support Staff Support Clerical 2 78 15 106 6O 54 80 24 4O 459 TOTALLABORCOST $48,006.00 OTHER DIRECT COSTS $700.00 TOTAL ESTIMATED COST $48,706.00 LUMP SUM COST $48,700.00 N:\0000\bs7771 Exh B.doc\02/ll/04 B-1