Boynton Cancer CenterDEVELOPMENT ORDER OF THE CITY COMMISSION OF THE PROJECT NAME: APPLICANT'S AGENT: CITY OF BOYNTON BEACH, FLORIDA ~,.~. Boynton Beach Cancer Center (fka Woolbright Medical Building) Mr. George G. Gentile - Gentile, Holloway, O'Mahoney & Associates, Incorporated APPLICANT'S ADDRESS: 1907 Commerce Lane, Suite 101 Jupiter, FL 33458 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: March 16, 2004 TYPE OF RELIEF SOUGHT: Request new site plan approval for the construction of a 6,851 square foot building on a 0.39-acre parcel in the C-1 zoning district. LOCATION OF PROPERTY: Northwest corner of Woolbright Road and Southwest 22nd Street DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. The Applicant ~ HAS HAS NOT established by substantial competent evidence a basis for the relief requested. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". The Applicant's application for relief is hereby _~ GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. All further development on the property shall be made in accordance with and conditions of this order. 7. Other DATED: 3--f'~'~-'-~ $:'~P~nning'~.SHARJED~'P~PRO.rECTSX, Boynton Beach Cancer ~-ntc~-~rW~P 03-029'xDO.doc City Clerk I in. -=- 265.3 feet N CONGRESS AVl C1 R3 C3 PCD LOCATION MAP BOYNTON BEACH CANCER CENTER VQ~IO"I -~ 'H~ NO. LNA01] 0 EXHIBIT "B" mm, mm'mm EXHIBIT "B" t li EXHIBIT "B" t'! I[ EXHIBIT "B" ' i I , - ~ '!-~' ' ~'''' ~ "~ ~ , . '~ O~ ' ~ ,, .~ ~ I'11.~ i~ ~ ',',~ ', F~[ ) ,,i~i i~ ~i iii ~ , ~ /,: ~ ~ iii~ I I , i t,!~,~ ~~~ J~ ~ I !~ iii ~ I ~: ,~ I~'~~~~ x~,~' ~,,iii i / I :V / . ~//% - EXHIBIT "B" EXHIBIT "C" Conditions of Approval Project name: Boynton Beach Cancer Center File number: NWSP 03-029 Reference: 2~ review plans identified as a New Site Plan with a February 6, 2004 Planning and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: None X PUBLIC WORKS - Traffic Comments: 1. Revise the note on Sheet 4 of 8 to indicate compliance with City Standard X Drawing "K" series. ENGINEERING DIVISION Comments: 2. Please note that changes or revisions to these plans may generate additional X comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the Commission and at permit review. 3. Full drainage plans, including drainage calculations, in accordance with thc X LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. 4. Paving, Drainage and site details will not be reviewed for construction X acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. 5. On the site plan, staff recommends labeling the southernmost parking spaces X as designated for "employee parking" due to the lack of a "bump-out" in the desit~n of the parkinl~ lot. UTILITIES Comments: 6. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid X for this project either upon the request for the Department's signature on the Health Depathitent application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. COA 02/23/04 2 DEPARTMENTS INCLUDE REJECT 7. A building permit for this project shall not be issued until this Department has X approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 8. Utility construction details will not be reviewed for construction acceptability X at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates); they will be reviewed at the time of construction permit application FIRE Comments: 9. Prior to Fire Department approval of a building permit, new construction X projects must provide the results of a hydrant flow test indicating a fire flow not less than 1500 gpm ~ 20 psi above domestic use. This applies to new or existing hydrants within the required 200 feet of. the facility. 10. On Water & Sewer Plan (sheet 5 of 8) an existing ten (10) inch WM is shown X coming from the south with a ten (10) inch x six (6) inch tap for the hydrant supply. The existing WM coming from the north is shown as an eight (8) inch. Show the location of the reducer. POLICE Comments: None X BUILDING DIVISION Comments: 11. Place a note on the elevation view drawings indicating that the exterior wall X openings and exterior wall construction comply with 2001 FBC, Table 600. Submit calculations that clearly reflect the percentage of protected and unprotected wall openings permitted per 2001 FBC, Table 600. 12. Buildings, structures and parts thereof shall be designed to withstand the X minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that are signed and scaled by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. 13. Every building and structure shall be of sufficient strength to support the X loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table 1604.1. Indicate the live load (pst') on the plans for the building design. COA 02/23/04 3 DEPARTMENTS INCLUDE REJECT 14. At time of permit review, submit signed and sealed working drawings of the X proposed construction. 15. ^ water-use permit from SFWMD is required for an irrigation system that X utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. 16. If capital facility fees (water and sewer) are paid in advance to the City of X Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application (CBBCO, Chapter 26, Article II, Sections 26-34): · The full name of the project as it appears on the Development Order and the Commission-approved site plan. · The total amount paid and itemized into how much is for water and how much is for sewer. 17. Pursuant to approval by the City Commission and all other outside agencies, X the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. 18. The full address of the project shall be submitted with the construction X documents at the time of permit application submittal. If the project is multi- family, then all addresses for the particular building type shall be submitted. 19. Sheet A-1 - Light Pole Detail - The design of the light pole shall be designed X to withstand 140 mph wind load as mandated in 2001 FBC, Section 1606. Submit calculations to verify compliance. PARKS AND RECREATION Comments: None X FORESTER/ENVIRONMENTALIST Comments: 20. The Details sheet section on this page should include a line indicating where X the height, caliper ~ DBH, and clear trunk (cO area of the shade tree will be measured at time of planting and inspection. 21. The applicant should show on Sheet L-2 on the elevation cross-section detail X the actual heights of the proposed landscape trees and vegetation at the time of planting to (proper scale) visually buffer the proposed driveway / parking COA 02/23/04 4 DEPARTMENTS INCLUDE REJECT lot facility from the Woolbright Road and S. W. 22nd Street rights-of-ways. PLANNING & ZONING Comments: 22. A traffic impact statement for this project was submitted and sent to the Palm X Beach County Traffic Division for their review and approval. The Division sent the following statement: The Year 2002 build-out date on the previous approval has passed, and since the project is expected to generate more than 20 peak hour trips, it is required to submit a new traffic study (not just a trip generation statemenO and address all TPS requirements. The study must include a new build-out date, which will be used as the basis of the new traffic analysis. Be advised that the Palm Beach County TPS requirements was modified in April 2003, and all TPS related traffic analysis are now peak hour based. At this time, the project is still under review and staff has not received confirmation from the Traffic Division that it meets the Traffic Performance Standards of Palm Beach County. No building permits would be issued until staffreceives this confirmation from the County. 23. The configuration of the parking lot must be consistent on all plans. X 24. The detail of the outdoor freestanding lighting fixture (shown on sheet ES-l) X should indicate the material and dimensions of the structure. This should be shown on the plan at the time of permitting. 25. On the landscape plan, ensure that the plant quantifies match between the X tabular data and the graphic illustration. 26. The freestanding monument sign must be setback at least 10 feet from the X east and south property lines (Chapter 21, Article llI, Section 5.). ADDITIONAL PLANNING & DEVELOPMENT BOARD COMMENTS: Comments: 27. None X ADDITIONAL CITY COMMISSION COMMENTS: comments: 28. To be determined. S:\Planning~SHARED~WP~,PROJECTS\Boynton Beach Cancer CentertNWSP 03-O29\COA.doc