Loading...
R04-1311 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. R04- I ~1 A RESOLUTION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING EXECUTION OF TASK ORDER NO. U04-5-11B, FOR THE TESTING AND REPORTING SERVICES OF INTERIM MECHANICAL INTEGRITY TESTING OF THE CITY'S DEEP INJECTION WELL, IN THE AMOUNT OF $73,870.00, TO CH2M HILL; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, Task Order No. U04-5-1 lA (Part 1) was executed on July 23, 2004 for ;5,130.00; and WHEREAS, This Task Order is to obtain FDEP's approval of the proposed nechanical integrity test (MIT) methodologies; and WHEREAS, Task Order No. U04-5-1 lB (Part 2) consists of four sub-tasks; Task 1, ~ermitting and FDEP Coordination (authorized through Task Order U04-5-11A); Task 2, ~'ontracting - Preparation of specifications and contract documents; Task 3, Services During ;'onstruction, Residential observation for testing activities; Task 4, Preparation of Summary report, report documenting MIT activities. WHEREAS, The cost for Task 1 is not included in Task Order No. U-04-5-1 lB for ;73,870.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF ['HE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as ~eing true and correct and are hereby made a specific part of this Resolution upon adoption tereof. :\CA\RESO~Agreements\Task ~ Change Orders\CH2M Hill U040511B.doc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3O Section 2. The City Commission of the City of Boynton Beach, Florida does tereby authorize and direct the approval and execution of Task Order No. U04-5-1 lB with '.H2MHILL for the testing and reporting services for Interim Mechanical Integrity Testing of W-l, the City's Deep Injection Well, in the amount of $73,870.00. Section 3. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this ..~ day of August, 2004. ~,TTEST: CITY OF BOYNTON BEACH, FLORIDA ..~a~or '1 ~'~ ;:\CA\RESOV',greements\Task - Change Orders\CH2M Hill U040511 B.doc ~oq-t3L Task Order No. UO4-5-11B Testing and Reporting Services for Interim Mechanical Integrity Testing of IW-1 at the West Water Treatment Plant for the City of Boynton Beach A. Background In 2002, the City of Boynton Beach (City) discovered that the steel liner in injection well 1W-1 was severely corroded and would need to be rehabilitated. To rehabilitate the well, a fiberglass reinforced plastic (FRP) liner was proposed and ultimately installed inside the 16- inch diameter final casing. It was determined that the liner would be cemented from the base of the liner to land surface in lieu of using a tubing and packer assembly. The Florida Department of Environmental Protection (FDEP) considered this to be an alternative design and as a result, required an interim mechanical integrity test (MIT) be conducted at the midpoint of the 5 year operating permit. With the last MIT completed on March 15, 2002, the interim MIT is to be completed by September 15, 2004. The City has requested that CH2M HILL conduct the interim MIT in a "turn-key" manner, inclusive of contractor testing services. CH2M HILL will provide engineering services that include: preparation of a testing plan and specifications, conducting bid phase services, subcontracting testing services, providing onsite resident observation during testing and preparation of an engineering report. Task Order U04-5-11B will consist of four tasks that are defined in Section B. B. Scope of Services Task 1 - Permitting and FDEP Coordination The purpose of this task is to obtain FDEP's approval of the proposed Mechanical Integrity (MI) test methodologies. CH2M HILL shall coordinate, attend, and provide documentation of an FDEP meeting or other communication, if required, to finalize and approve the testing plan. Based on CH2M HILL's experience on similar projects for other clients, it is assumed that no permits or permit modifications will be required to complete this work. CH2M Hill shall provide services to prepare a testing plan for MI demonstration of IW-1 at the West WTP. The draft testing plan shall be submitted to the CITY for review prior to submittal to the FDEP. Preparation and submission of a MI Test plan was prepared and submitted to the City on July 6, 2004. Authorization for a portion of this element was made under the General Engineering Task Order and was provided by the City on July 2, 2004. Fees for the preparation of the MIT Plan are not included as part of this task order. DFB\TSK 0RD_04-05-11_072104.DOC 1 The CITY shall be provided with two (2) draft and three (3) final copies of the MI testing and all other correspondence with FDEP. CH2M HILL shah submit the testing plan to FDEP and other regulatory agencies as appropriate upon receipt of the CITY's comments on the draft testing plan. The balance of Task 1 activities were authorized by the Utilities Department through Consultant Authorization U04-5-11A on July 21, 2004. Task 2 - Contracting CH2M HILL will prepare specifications and contract documents for the mechanical packer pressure test and internal radioactive tracer survey (RTS) testing procedures to demonstrate MI for the injection well. The CITY shall be provided with two (2) draft copies for review, and three (3) final copies of the bid package for distribution to CITY staff. CH2M HILL shall provide any copies of the contract documents required for submittal to the FDEP. CH2M Hill shall submit the final bid package to up to three (3) qualified bidders and evaluate the proposals of the respondents. Upon evaluation, CH2M HILL will award the contract to most qualified bidder. The award will also consider price and the Contractor's ability to meet the project schedule. The selected Contractor shall contract directly with CH2M HILL to conduct both the mechanical packer pressure test and the internal RTS survey and any other related services deemed necessary to complete the MI demonstration. It is assumed that these services will be let under one contract. Task 3 - Services During Construction Dtrring field activities, CH2M HILL will provide resident observation on a full-time basis to observe all testing activities. The resident observer will be supported by a senior engineer for the duration of field activities. The resident observer shall prepare daily reports for each day of resident observation provided. The CITY shall receive copies of the daily reports documenting the testing activities in the final report for the MIT activities. For the purpose of this proposal it is assumed that the field engineer will be dedicated to this project and will be working on a full time basis during the entire task for up to 5 days. Task 4 - Preparation of Summary Report Upon completion of the testing activities, CH2M HILL will prepare an engineering report documenting the MI testing activities. The report shall include an analysis of the data and results, and will provide applicable recommendations for follow-up work (if necessary). The CITY shall receive one (1) draft report and three (3) final signed and sealed copies of the engineering report and associated geophysical logs. CH2M HILL will also submit the engineering report and associated geophysical logs to the FDEP Technical Advisory Committee (TAC). DFB\TSK 0RD_04-05-11_072104. DOC 2 C. Assumptions · CITY representatives will attend the pre-construction conference. · CH2M HILL will coordinate with the CITY and the testing subcontractor to allow access to the injection well (IW-1). · The basis of testing for this task order is the MIT plan submitted to FDEP, additional testing or field evaluations are not included as part of this task order. · No permits are anticipated - permitting services are not included in this task order. · The City will complete their review of the draft final report within one week of submittal. · The fee associated with the testing Contractor has been estimated by CH2M HILL using informal methods. Should the fee exceed the estimate, additional funding will be required. Contrarily, if the fee for the testing is below the estimate, the balance of the estimate will be unused and returned to the City. The fee estimate for testing services includes a 10% mark-up to cover administrative costs, risk, and the time-value of money. O. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement for General Engineering Consulting Services dated November 2003, between the City of Boynton Beach and CH2M HILL, Inc. E. Compensation Compensation by the CITY to the CONSULTANT for Phase I will be on a time and materials basis in accordance with the above mentioned Agreement. The estimated compensation for the services described in this Task Order is $73,870 as shown in Table 1 while a break-down of labor classifications are provided in Attachment A. DFB\TSK ORD_04-05-11_072104. DOC 3 TABLE 1 West VVTP IW-1 Interim MIT Labor Labor Cost Expense Subcontractor Total Hours Cost Cost Task 1 - Permitting & FDEP Coordination (a) Task 2 - Contracting 44 $5,150 $ 250 $0 $5,400 Task 3 - Services during 82 $8,400 $ 550 $54,450 $63,400 Construction Task 4 - Preparation of 46 $4,670 $400 $0 $5,070 Summary Report TOTAL 172 $18,220 $1,200 $54,450 $73,870 Note: (a) - Partial funding of $3,500 for this task was approved under the General Services Task on July 2, 2004 to meet the time demands for this project. The balance of Task 1 was funded through Consultant Authorization U04-5-11A, approved on July 21, 2004. Fees associated with these services are not repeated in this task order. F. Schedule The CONSULTANT will commence the services described above upon receipt of written authorization and will complete the work according to the table below. Permitting, Project Design, and Bidding and Subcontracting of Testing Services Services During Construction / Resident Observation / Engineering Support Notice to Proceed - August 3, 2004 Complete Task 1 - August 1, 2004 Complete Task 2 - August 20, 2004 Begin Testing Activities/Task 3- September 1, 2004 Compete Testing/Task 3 - September 8, 2004 Submit Summary Report/Task 4 - October 29, 2004 DFB\TSK 0RD_04-05-11_072104. DOC 4 G. Authorization DATED this ~ / CITY OF BOYNTON BEACH Kurt Bressner City Manager day of CH2M HILL, INC. · 2004 Office Manager Attest / Authenticated: · DFBWSK ORD_O4-O5-11_O72104.DOC 5 ATTACHMENT A Boynton Beach MIT Level of Effort Chargeable Tasks without Period Subtotals CH2MHILL Functional Name Category Hours Rate Amount Notes Task MI,02 - Contracting SCHILLING, MARK A Engineer / 16.0 $8500 $1,360.00 Hydrologist FRITCH, MOLLY E Senior Admin 8.0 $75.00 $600.00 Support SKEHAN, SEAN T Senior Project 4.0 $160.00 $640.00 Manager SMITH, DAVID K Senior Project 16.0 $160.00 $2,560.00 Manager Subtotal for Task MI.02 - Contracting 44.0 $5,160.00 Task MI.03 - Testing OLIVER, WILLIAM SCHILLING, MARK A SKEHAN, SEAN T SMITH, DAVID K Admin Support 2.0 $54.00 $108.00 Engineer / 60.0 $85.00 $5,100.00 Hydrologist Senior Project 4.0 $160.00 $640.00 Manager Senior Project 16.0 $160.00 $2,560.00 Manager Subtotal for Task MI.03 - Testing 82.0 $8,408.00 Task MI.04 - Reporting OLIVER, WILLIAM SCHILLING, MARK A WILLOUGHBY, YVONNE A SKEHAN, SEAN T SMITH, DAVID K Admin Support 2.0 $54.00 $108.00 Engineer / 24.0 $85.00 $2,040.00 Hydrologist Senior Admin 8.0 $75.00 $600.00 Support Senior Project 4.0 $160.00 $640.00 Manager Senior Project 8.0 $160.00 $1,280.00 Manager 46.0 $4,668.00