Grove Plaza Parcel C DEVELOPMEr ORDER OF THE CITY COMMISS '~1 OF THE
CITY OF BOYNTON BEACH, FLORIDA
PROJECT NAME: Grove Plaza Parcel "C"
APPLICANT'S AGENT: Jason Mankoff, Weiner & Aronson, P.A.
APPLICANT'S ADDRESS: 102 North Swinton Avenue Delray Beach, FL 33444
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: February 1, 2005
TYPE OF RELIEF SOUGHT: Request for Conditional Use/New Site Plan approval for a 6,832 square
foot minor automotive repair facility on a 0.823-acre parcel in a C-3
zoning district
LOCATION OF PROPERTY: South side of Hypoluxo Road, East of Lawrence Road
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
X THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
The Applica~nt
,,," HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
The Applicant's application for relief is hereby
~'/GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
All further development on the property shall be made in accordance with the terms
and conditions of this order.
7. Other
DATED:
forP&D.doc
City Clerk
rove Plaza Parcel C\COUS
C
LAWRENCE. RD
LOCATION MAP
EXHIBIT B
II
GROVE PLAZA
PARCEL
E!)q'il BI'T ~
GROVE PLAZA
PARCEL 'C'
EXHIBIT B
:"Jr
: :it : GROVE PLAZA
PARCEL 'C'
EXHIBIT B
iii ;il l'[llil]lJJtl
:, ,ii,, I,., ,.
:l::l! I:i .'l:,I,.II-'. Jl
':' "" :':J [':'~" Ill:I..: .,1 .I.I I I t
i J:: "" ' ","
t,,' ,1[,,
ii,' Jll!J Ii,'lJ
~ l!l
:! lil[:[l:l:.ljll!I J ,il i
[l!, ,,, J,J 'Iii
', 1.1.1ii -,, :ll, i !1 [Jlj'JliJ[,]:ll
,~,,,,.!,t:I,l,l:! i:[/ !i' '"' jj~llrJl,
I IJllilll':jtli: ,'ii !Ill !ii ii[
Il,:'''''~'::''"' li!/ ~I,'~
I BOYNTON BEACH, FL. PARCEL "C' ~
EXHi-B T B
EXHIBIT "C"
Conditions of Approval
Project name: Grove Plaza Parcel C
File number: COUS 05-002
Reference: 2nd review plans identified as a Conditional Use with a December 14, 2004 Planning & Zoning date
stamp marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS- General
Comments: None X
PUBLIC WORKS- Traffic
Comments: None
UTILITIES
Comments:
1. Please provide a timeline that clearly illustrates when water and sewer X
services will be required to serve the proposed project. Your starting date
for the timeline should be the date of City Commission approval. Also
provide milestone dates for permit application, the start of construction, and
the setting of the first water meter. This timeline will be used to determine
the adequacy of water and wastewater treatment capacity for your project
upon the project's completion, so please be as accurate as possible.
2. Palm Beach County Health Department permits may be required for the X
water and sewer systems serving this project (CODE, Section 26-12).
3. Fire flow calculations will be required demonstrating the City Code X
requirement of 1,500 g.p.m. (500 g.p.m, some residential developments)
with 20 p.s.i, residual pressure as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (CODE, Section 26-16(b)).
4. The CODE, Section 26-34(E) requires that a capacity reservation fee be X
paid for this project either upon the request for the Department's signature
on the Health Department application forms or within seven (7) days of site
plan approval, whichever occurs first. This fee will be determined based
upon final meter size, or expected demand.
5. A building permit for this project shall not be issued until this Department X
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15.
6. A building permit for this project shall not be issued until this Department X
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15.
Conditions of Approval
DEPARTMENTS iNCLUDE REJECT
7. The Utility plan depicts a sewer lateral being placed beneath a tire storage X
area. This configuration is not recommended.
8. Utility construction details will not be reviewed for construction X
acceptability at this time. All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construction Standards" manual (including any updates);
they will be reviewed at the time of construction permit application.
FlRE
Comments: None X
POLICE
Comments: None X
ENGINEERING DIVISION
Comments:
9. All comments requiring changes and/or corrections to the plans shall be X
reflected on all appropriate sheets.
10. Please note that changes or revisions to these plans may generate additional X
comments. Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the Commission
and at permit review.
11. Full drainage plans, including drainage calculations, in accordance with the X
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
12. Maximum runoff distance over impervious surfaces before diversion to X
percolation areas is fifty (50) feet (LDR, Chapter 6, Article IV, Section
5.B.2.a.)
13. Paving, Drainage and Site details will not be reviewed for construction X
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
BUILDING DIVISION
Comments:
14. Please note that changes or revisions to these plans may generate additional X
comments. Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the commission
and at permit review.
DEPARTMENTS INCLUDE REJECT
15. Buildings, structures and parts thereof shall be designed to withstand the X
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application.
16. At time of permit review, submit signed and sealed working drawings of the X
proposed construction.
17. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may X
not, therefore, be used for landscape irrigation where other sources are
readily available.
18. A water-use permit from SFWMD is required for an irrigation system that X
utilizes water from a well or body of water as its source. A copy of the
permit shall be submitted at the time of permit application, F.S. 373.216.
19. If capital facility fees (water and sewer) are paid in advance to the City of X
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
a. The full name of the project as it appears on the Development
Order and the Comtmssion-approved site plan.
b. The total amount paid and itemized into how much is for water
and how much is for sewer.
CBBCO, Chapter 26, Article II, Sections 26-34)
20. Pursuant to approval by the City Commission and all other outside agencies, X
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
PARKS AND RECREATION
Comments: None X
FORESTER/ENVIRONMENTALIST
Comments:
21. All shade trees on the Plant List must be listed in the specifications as a X
minimum of 12'-14' height, 3" caliper at DBH (4.5' offthe ground), and
Florida #1 (Florida Grades and Standards manual) The height of the trees
may be larger than 12'-14' to meet the 3" caliper requirement.
[Environmental Regulations, Chapter 7.5, Article II Sec. 5.C. 2.]
22. The landscape design should include 2 City signature trees (Tibochina X
granulosa) at each of the projeet ingress/egress location. These trees must
meet the minimum tree specifications. [Environnemental. Regulations,
Chapter. 7.5, Article II Sec. 5.C.3, N.]
Conditions of Approval
4
DEPARTMENTS INCLUDE REJECT
23. The elevation (height) of the vehicles and the raised berm area in X
relationship to each other should be shown on the detail plan.
Irrigation Plan
24. There is no irrigation system design included with the site plans. The X
irrigation design should be micro-irrigation for water conservation.
[Environmental Regulations, Chapter 7.5, Article II Sec. 5A.]
25. Turf areas should be limited in size. Landscape (bedding plants) areas X
should be designed on separate zones with proper time duration for water
conservation. Environmental Regulations, Chapter 7.5, Article II Sec. 5.
C.2.]
26. All trees on the site should receive irrigation from a separate bubbler. X
[Environmental Regulations, Chapter 7.5, Article II Sec. 5. C.2.]
PLANNING AND ZONING
Comments:
27. The landscape buffer along Hypoluxo Road shall contain a combination of X
colorful groundcover plants and a minimum of two (2) colorful shrub
species planted in a continuous row or in clusters spaced no greater than
twenty (20) feet apart, beginning at the project entrance. The focus of this
landscape material will be to create an aesthetically pleasing buffer from
Hypoluxo Road.
28. Repeat the planting of the variegated arbricola depicted in front of the X
storefront windows at the base of the large columns of the arches.
Additionally, the planting scheme currently depicted around the western
column should be mirrored at the eastern column.
29. Owner to arrange for timely pick-up of used tires to ensure tires are not seen X
above the masonw enclosure or that they are not stacked outside said
enclosure. Additionally, outdoor storage or accumulation of auto parts
and/or inoperable vehicles will be prohibited.
30. The proposed bollards shall be decorative in nature, as the B-3 model X
submitted for review.
31. Staff recommends the applicant consider elimination of the Montgomery X
palms and replace them with groupings of green and silver buttonwoods at
varying heights (7-12 feet) along the east and west landscape buffers, to
provide greater screening of the activity within the garage bays.
32. The billboard (or remains thereof) must be removed prior to the issuance of X
the first permit for the project.
DEPARTMENTS INCLUDE REJECT
ADDITIONAL PLANNING & DEVELOPMENT CONDITIONS
1. None X
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
1. To be determined.
S:LPlanning\SHARED\WP~PROJECTS\grove plaza\Grove Plaza Parcel C\COUS 05-002\COA doc