Bethesda Comprehensive Heart MS
DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORIDA I Development
p&Z
Building.
PROJECT NAME: Bethesda Memorial Hospital Comprehensive Heart Center Engineering
Occ. License
Deputy City Clerk
APPLICANT'S AGENT: Shayne Conover - Kilday and Associates ---
APPLICANT'S ADDRESS: 1551 Forum Place Suite 100A West Palm Beach, FL 33401
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: July 19, 2005
TYPE OF RELIEF SOUGHT: Request Major Site Plan Approval for a four-story 86,167 square foot
addition to the hospital to accommodate a Comprehensive Heart Center.
LOCATION OF PROPERTY: 2815 S. Seacrest Blvd. Boynton Beach, FL
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
1. Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
2. The APP~t
_HAS
- HAS NOT
established by substantial competent evidence a basis for the relief requested.
3. The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
4. The APP~t'S application for relief is hereby
_ GRANTED subject to the conditions referenced in paragraph 3 hereof.
- DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
6. All further development on the property shall be made in accordance with the terms
and conditions of this order.
7. Other
DATED: 7-~~-o5"
City Clerk
S:\Planning\SHARED\WP\PROJECTS\Be Bethesda Open Heart MSPM 05-005\D .,
~_ I II I
-~ )
cC ~ " '"'' """" '"'''' "'" " '----.-
~ .--- -
'"~~ ~ . ..
lJ\" '-- ~ -
¡:¡ i-----
</Îì ~v~~!J ~
~- lili -
~~ ~ ~ ã)
~ ~
§ Q. ~ ~ ~
"í '1)6' «. - 00
~ ! .(4'4>~ !! ~ ~ ~
~ v~e :z::;: - II
to) 4'~ ~ II) .5
~ ~ ~
m;: Q5;e ~
~~ ." ~
~\ : *' I' ~
i R ~ 1----- ..,...~ ~....
BJ ,2
~ ~ c
~ ~ <D
(~\ ~ Ü
. ~ ~ ~
~ ~ t
,~ ro
~ ~ ~ <D
. ~ ~
fu~ I ~ ¡
..c:
~ f(' ~ ~
~~ ü
~~ E
~ 0
~ Ü
a::
¡:¡ I
¡:
I- /I ro
~ ~
~ ü
~ ~
ลก 0
: I
ro
~ ~ ·0
@ ~ E
'" ~ II~ I ~
j ~
'SDÄI'ARK CIR 5W4TH.5T <D
..c:
~ ~ ~(I I I ,! Æ
It c 0
~ ¡¡¡ ~ \
i i t \ I
~ æSW5TH.ST æSW5THST r- SW 5TH. ST
~~ ~
~- .
~...~_..~. SW6TH.ST ~
- "\AI""" 5T
~,. ~i~~I.iÞ ._,. ill .... i
~I
. .
~....
I. ,
= a I
~ - - ~I II
...
~
fìI;1 Ii Ii ""
I ~ I ..
- II'" f.
. I
.
Ii
il
II
I-
II
. ,
, .
l~~m~1 =~~~~ [Ilal.ll \ Illill~l~ I ~
I I YanIO'1d 'Jt)Wtl NOJ.N.\OII ¡If ·1
I SNY1cI 8dY:)S(INY"1 I · I
.' ø
I!! !I! ø.
I q1t1lft Iii
Ell 11...1ih hll 'ill
III I I 11.1 I
d L I. ~
ill
ai
I!
eel ~
Ii' !
II.~L ~
a 'd ~
I. .1 !.I!
i! '11 ¡ -
..II I.!~
~. . .IU i
I 'I.. ;
I I . ,.1 I .
. . '.1
I" Ililll
. )
·t:. ~III .. ·"I'ill···· . . . ¡.rl. t ,. ~!~
I· .1, '.1. '. I. I J \ I ... . . 1 . .
¡ f
. ~ . I· p ..'
.
-
.
i
(i)-
(i)- !
-
t
.
.
I
.(i)
(j) . i
. ..
--
-..
;
. .
. . .
. '. , t , . , t ......,... I' . i .
. . -"0; 11.1····:··· ~ ... r . . .
P. '. . ..._____. _._~: .:... .._ -'~ .._., _.._.::. :;"{.~"':."¡:';'«:::.~:::<:::. . .;:.
..
~ ItdllT ····~;l·I!¡~llii . ... ,.-, ..,'. ·~'I itrJ~~
. .,.,' I 'Ii" I~: ,,"!'{ , .
. ,. .. ..,..:. '!. 1- -., .. .
. I j :g. '
~ 1 " " , ,'" I ' I ! . ,. j
I ! I ! f
æ . I. 'I T 1
~ I
~~ 'I
I, ¡
I ' , , .
·i;, ., .. . , , { :~l .(;]S
i. ~t r
e- ft
#l -- - -
-
, If.ll~ft~
- í
~ - - !
~
,
I ~t
,
w -- I- --
-<it I I
-
I I I
I ,Ii ¡Iii II
Illnn 1111 ,,' I
, !'''''!~m'n,b'
& ......!...,.:...:.
-- -- -~
,
I "
, ,
-
v . .. ---
.~ ~j: :~ .~-
.'{J ~
~ :~ '·i I
'. ,
:tíf- :~f. < <'
.. I- .J :~ ~; r
'I'~ :~ '1
'l¡ ,~ '.¿-
,~, J} i
~7; I ..~. '.j
:1i.- !1 ::~- :p:
.~{ p, !
. - - ·0 .. 0 ·0. '0 __0 ., 0·., _ 0 .. . I ~
- I, ~~
. I' '--- ~
I I
· ¡r--' .~. >-
_1& ¡I !/ m(jtj,I~1
~ .. , · ! III¡ I! ¡¡!
...... ...11 . ....'" . ...- ,,,.. .....
I "II, I -
i I
I I i I i I i I
.. ..,
. . J
._11 ill 1:1 1 .
. ~, !fu o'
i ~I
I ~ J
,.
r.1 ! I ! I ! I ! I !
~I
~ -~ì on J
-- .
. .
a
~
ø
;
~
~
!;!
¡:¡
IIIU3ßII1SMO:1 I11I1:!011lSMO:l
SIIUSIX3 .311
a ~
;: I""
~ !ii!:::
B ;1
~
z: I;
~ ..
: z
::!
i
.
!II!
I PJ
;!;
"1
~
;
¡¡
I
T ~ ~ . . .
EXHIBIT "C"
Conditions of Approval
Project name: Bethesda Comprehensive Heart Center
File number: MSPM 05-005
Reference: 2nd Review plans identified as a Major Site Plan Modification with a June 7, 2005 Planning &
Zomng date stamp marking.
I DEPARTMENTS I INCLUDE I REJECT I
PUBLIC WORKS- General
Comments: None X
PUBLIC WORKS- Traffic
Comments:
1. Provide a notice of concurrency (Traffic Performance Standards Review) X
from Palm Beach County Traffic Engineering.
UTILITIES
Comments:
2. All utility easements and utility lines shall be shown on the Site plan and X
Landscape plans (as well as the Water and Sewer Plans) so that we may
determine which appurtenances, trees or shrubbery may interfere with
utilities. In general, palm trees will be the only tree species allowed within
utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in
the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives
public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
3. Utility construction details will not be reviewed for construction X
acceptability at this time. All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construction Standards" manual (including any updates);
they will be reviewed at the time of construction permit application.
FIRE
Comments: None X
POLICE
Comments: None X
ENGINEERING DIVISION
Comments:
Conditions of Approval
2
I DEPARTMENTS I INCLUDE I REJECT I
4. All comments requiring changes and/or corrections to the plans shall be X
reflected on all appropriate sheets.
5. Please note that changes or revisions to these plans may generate additional X
comments. Acceptance of these plans during the TART process does not
ensure that additional comments may not be generated by the Commission
and at permit review.
6. Full drainage plans, including drainage calculations, in accordance with the X
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
7. Specify storm sewer diameters, inlets types, etc. on drainage plan. Indicate X
grate, rim and invert elevations for all structures. Indicate grade of storm
sewer segments. Indicate material specifications for storm sewer.
8. Paving, Drainage and Site details will not be reviewed for construction X
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
BUILDING DIVISION
Comments:
9. Please note that changes or revisions to these plans may generate additional X
comments. Acceptance of these plans during the TART process does not
ensure that additional comments may not be generated by the commission
and at permit review.
10. Buildings, structures and parts thereof shall be designed to withstand the X
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application.
11. Buildings three-stories or higher shall be equipped with an automatic X
sprinkler system per F.S. 553.895. Fire protection plans and hydraulic
calculations shall be included with the building plans at the time of permit
application.
12. Add to all plan view drawings of the site a labeled symbol that represents X
the location and perimeter of the limits of construction proposed with the
subject request.
13. At time of permit review, submit signed and sealed working drawings of the X
proposed construction.
I DEPARTMENTS I INCLUDE I REJECT I
14. A water-use permit from SFWMD is required for an irrigation system that X
utilizes water from a well or body of water as its source. A copy of the
permit shall be submitted at the time of permit application, F.S. 373.216.
15. If capital facility fees (water and sewer) are paid in advance to the City of X
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
a. The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
b. The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
16. Pursuant to approval by the City Commission and all other outside agencies, X
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
17. This structure meets the definition of a threshold building per F.S. 553.71(7) X
and shall comply with the requirements ofF.s. 553.79 and the CBBA to the
2001 FBC, Sections 105.3.1 through 105.3.6.
The following information must be submitted at the time of permit
application:
a. The structural inspection plan must be submitted to the enforcing agency
prior to the issuance of a building permit for the construction of a
threshold building.
b. All shoring and re-shoring procedures, plans and details shall be
submitted.
c. All plans for the building that are required to be signed and sealed by the
architect or engineers of record shall contain a statement that, to the best
of the architect's or engineer's knowledge, the plans and specifications
comply with the applicable fire safety standards as determined by the local
authority in accordance with this section and F.S. Section 633.
18. Sheet A-lOO and all floor plan sheets - Clearly delineate the areas to be X
constructed under this site plan modification.
PARKS AND RECREATION
Comments: None X
FORESTERJENVIRONMENT ALIST
Comments: None X
PLANNING AND ZONING
Comments:
19. Palm Beach County Traffic Division has requested a revised Traffic Study. X
No permit shall be issued prior to receipt of an approval letter.
Conditions of Approval
4
I DEPARTMENTS I INCLUDE I REJECT I
20. Major Site Plan Modification approval is contingent upon City Commission X
approval of the Code Review and proposed Height Exception.
ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS
Comments:
21. Applicant shall work with FP&L to attempt the relocation of power lines to X
underground locations..
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
I 1. To be determined. I I I
S:\Planning\SHARED\WP\PROJECTS\Bethesda\Bethesda Open Heart MSPM 05-005\COA.doc