PROJECT NAME: New Urban High Ridge PUD
APPLICANT: Mr. Tim Hernandez with New Urban Communities
APPLICANT'S ADDRESS: 398 Northeast 6th Avenue Delray Beach, FL 33483
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION:
September 20, 2005
TYPE OF RELIEF SOUGHT: New site plan approval to construct 48 single-family detached homes
and 126 fee-simple townhomes on an 18.44-acre parcel in the PUD
Planned Unit Development zoning district.
LOCATION OF PROPERTY: Northwest corner of High Ridge Road and Miner Road (Exhibit "A")
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
1. Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
2, The Applicant
/HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3,
The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included",
4.
. The Applic'!f1t's application for relief is hereby
.L GRANTED subject to the conditions referenced in paragraph 3 hereof,
DENIED
5.
This Order shall take effect immediately upon issuance by the City Clerk.
6.
All further development on the property shall be made in accordance with the terms
and conditions of this order.
7.
Other
DATED:
S:\PJanning\SHARED\WP\PROJECTS\High Ridge- New Urban Conununities\NWSP 0:5-0]
City Clerk
EXHIBIT "c"
Conditions of Approval
Project name: High Ridge New Urban Communities
File number: NWSP 05-016
Reference; 3" review plans identified as a New Site Plan with an August 9, 2005 Planning and Zoninl;!
Department date stamp marking.
I
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments: None X
PUBLIC WORKS - Traffic
. ----
Comments;
1. Staff strongly discourages on-street parking along High Ridge Road and X
Miner Rd, due to their functional classification (Urban Collector) and the
volumes and types of traffic they carry. The applicant may petition the
County for permission to utilize on-street parking. If allowed by the County,
provide written concurrence of this decision. . ,- ---.-
2. At the time of permitting, improve High Ridge Road to a minimum of three X
12-foot lanes from Miner Road to the northern boundary of the proposed
development. Provide plans, including typical sections) for off-site
improvements, including curb and gutter along High Ridge Road, Palm
Beach County permi1s will be required for work within the Palm Beach
County right-of.way. Staff recognizes that improvements required by the city
may not be required and I or supported by the County. The developer shall
provide a letter of credit in the amount of 110% of the engineer's estimate for
public roadway improvements prior to issuance of any building permits for
this project. The letter of credit shall be held until such time as the
improvements are complete.
ENGINEERING DIVISION --
,--.-~-
Comments:
-.-
3. The minimum right-of-way width for a PUD is 40-feet. (LDR, Chapter 2,5, X
Section 9.F,) The applicant is proposing a traditional neighborhood design
and is desirous of utilizing a proposed Code Change, currently in process, to
allow for lesser right-of-way widths for portions of the project. Internal
roadways will be categorized as "Primary" and "Secondary" based on their
functions. Primary roadways will handle internal flow, guests, deliveries and
FirelRescue access. Secondary roadways will be utilized for homeowner
access to the rear loaded parking and will additionally be used for Solid
Waste Access.
Primary internal roadways shall have no less than 40-ft. right-of.way widths,
but may use II-ft. lanes widths, Secondary internal roadways shall have no
less than 20-ft, right-of-way widths and may use lO-ft. lane widths, The
m
COA
08/23/05
2
DEPARTMENTS INCLUDE REJECT
applicant shall provide, through homeowners documents, an additional buffer
area of no less than 5-ft., adjacent to both sides of the proposed right-of-way
to allow for Solid Waste storage and pickup. The buffer area shall be kept
free of all obstructions, including fencing and landscaping, for this purpose.
Primary access roadways connecting to High Ridge Road will conform with
all Land Deve]opment Regulations and City Standards,
The above Condition of Approval is contingent upon Commission approval
of the proposed changes to Chapter 2,5 ofthe LDR. In the event Commission
does not approve the Developer shall be required to provide roadways and
rights-of-way in accordance with the LDR and City Standards or may seek a
variance, in accordance with the procedure established in the LDR.
4. ]n order to accommodate a roadway typical section within the proposed 20-ft, X
secondary roadway (if approved) the engineer shall construct two. 9 I12.ft.
lanes with 6-in. concrete header curb on each side of the roadway. Asphalt
paving, lime/shellrock and stabilized subgrade in accordance with City
Standards shall be comp]etelv contained within the header curb.
5. Upon Commission approval of the site plan schedule a pre-application X
meeting with the Engineering Division to begin the p]a1 process.
d
6, Show proposed site lighting on the landscape plans (Chapter 4, Section X
7.BA.) The lighting design shall provide a minimum average light level of
one foot-candle. On the Lighting Plan, specifY that the light poles shall
withstand a ]40 MPH wind load (Chapter 23, Article II, Section A.1.a and
Florida Bui]ding Code). Provide a note tha1 the fixtures shall be operated by
photo-e]ectrical control and are to remain on until 2:00 a.m. (LDR, Chapter
23, Article II, Section A.1.a.) Include pole wind loading, and pole details in
conformance with Chapter 6, Article IV, Section] I, Chapter 23, Article ],
Section 5.B.7 and Chapter 23, Article II, Section A on the Lighting Plan,
7, 11 will be necessary to replace or relocate large canopy trees adjacent to light X
fixtures to eliminate future shadowing on the parking surface (LDR, Chapter
23, Article II, Section A.I.b).
8, At the time of permitting, show sight triangles on the Landscape plans (LDR, X
Chapter 7,5, Artic]e II, Section 5.H.),
9, Per the LDR, Chapter 7,5, Article II, Section 5,C,2. Ficus species are not X
permitted. See Sheet 13 of] 7.
10. Full drainage plans, including drainage calculations, in accordance with the X
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
] ]. Paving, Drainage and Site details will not be reviewed for construction X
COA
08/23/05
3
DEPARTMENTS INCLUDE REJECT
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards" and
will be reviewed at the time of construction permit application.
UTILITIES
Comments:
12. Palm Beach County Health Department permits will be required for the water X
and sewer svstems serving this proiect (CODE, Section 26-12).
13. Fire flow calculations will be required demonstrating the City Code X
requirement of 1,500 g.p.m. (500 g.p.m. some residential developments) with
20 p.s.i. residual pressure as stated in the LOR, Chapter 6, Article IV, Section
16, or the requirement imposed by insurance underwriters, whichever is
greater (CODE, Section 26-16(b)).
14. The CODE, Section 26.34(E) requires that a capacity reservation fee be paid X
for this project either upon the request for the Department's signature on the
Health Department application fonns or within seven (7) days of site plan
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand,
IS. This office will not require surety for installation of the water and sewer X
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter IS a prerequisite to obtaining the
Certificate of Occunancv.
16, A building permit for this project shall not be issued until this Department has X
approved the plans for the water and/or sewer improvements required to
service this proiect, in accordance wi1h the CODE, Section 26-15.
17, The city of Boynton Beach does not wish to have another lift station X
constrUcted for this project. If the applicant desires, there is a lift station
approximately y, mile north of this project (south terminus of NW 7th Ct. -
Lift Sta1ion 717) or another approximately'/., mile east of the intersection of
High Ridge Rd, and Miner Rd. (Lift Station 718.) Also available are gravity
systems in the Commerce Rd, right-of-way and within the Cedar Ridge
subdivision. The invert elevation at Lift Sta, 717 is 1.19, By upsizing to a
lO-in. main and using a 0.3% slope it is possible to tie into Lift Sta. 717.
Credit for oversizing the main may be available, A copy of the as-builts for
Lift Sta. 717 has been given to the applicant. Should the developer propose
to build their own lift station for this project, they would have to submit an
analysis indicating that the life cycle cost (capital and O&M) would be
cheaper for the system with a new lift station than it would be for connecting
to the existing stations, This analysis can be conducted based upon "present- ~..
COA
08/23/05
4
DEPARTMENTS INCLUDE REJECT
worth" of the two alternatives, with an expected 40-year life on the stations.
18. Utility construction details will not be reviewed for construction acceptability X
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates); they will be
reviewed at the time of construction permit application.
FIRE
Comments:
19. Appropriate fire department access will be required at the pool 1 recreation X
area. At the time of permitting, an access road (14 feet in wid1h) will be
required to the pool area so that medical 1 emergency victims can be quickly
and safely loaded, Revise the plans 10 show compliance with this
requirement.
POLICE
Comments: None X
BUILDING DIVISION
Comments:
20. At time of permit review, submit signed and sealed working drawings of the X
proposed construction,
21. Add a labeled symbol to the site plan drawing that represents and delineates X
the path of travel for the accessible route that is required between the
accessible units and the recreational amenities that are provided for the
project and other common area elements located at the site. The symbol shall
represent the location of the path of travel, not the location of the detectable
warning or other pavement markings required to be installed along the path.
The location of the accessible path shall not compel the user to travel in a
drive/lane area that is located behind parking vehicles. IdentifY on the plan
the width of the accessible route, (Note: The minimum width required by the
Code is 36 inches). Please note that at time of permit review, the applicant
shall provide detailed documentation on the plans that will verifY that the
accessible route is in compliance with the regulations specified in the 200 I
FBe. This documentation shall include, but not be limited to, providing finish
grade elevations along the path of travel.
22. As required by the CBBCO, Part III titled "Land Development Regulations", X
submit a site plan that clearly depicts the setback dimensions from each
property line to the leading edge of the building/so The leading edge of the
building/s begins at the closest point of the overhang or canopv to the
COA
08/23/05
5
DEPARTMENTS INCLUDE REJECT
property line. In addition, show the distance between all the buildings on all
Xsides,
. .
23. A water-use permit from SFWMD is required for an irrigation system that X
utilizes water from a well or body of water as its source. A copy of the permit
shall be submitted at the time of permit application, F.S. 373,216. ,,-
24. If capital facility fees (water and sewer) are paid in advance to the City of X
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
a, The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
b. If the project is a multi-family project, the building numberls must be
provided. The building numbers must be the same as noted on the
Commission.approved site plans.
c, The number of dwelling units in each building.
d, The number of bedrooms in each dwelling unit.
e. The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26.34)
25. At time of permit review, submit separate surveys of each lot, parcel or tract. X
For purposes of setting up property and ownership in the City computer,
provide a copy ofthe recorded deed for each lot, parcel or tract. The recorded
deed shall be submitted at time of permit review. ..-
26, At time of building permit application, submit verification tha1 the City of X
Boynton Beach Parks and Recreation Impact Fee requirements have been
satisfied by a paid fee or conveyance of property. The following information
shall be provided:
f. A lellal description of the land.
g. The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
h, If the project is a multi-family project, the building numberls must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
I. The number of dwelling units in each building,
J. The total amount being paid.
(CBBCO, Chapter I, Article V, Section 3(1))
27. Pursuant to approval by the City Commission and all other outside agencies, X
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must incorporate
all the conditions of approval as listed in the development order and approved
by the City Commission.
.
COA
08/23/05
6
I
DEPARTMENTS INCLUDE REJECT
28. The full address of the project shall be submitted with the construction X
documents at the time of permit application submittal. If the project is multi.
family, then all addresses for the particular building type shall be submitted.
The name of the project as it appears on the Development Order must be
noted on the building permit application at the time of application submittal.
PARKS AND RECREATION
Comments:
29. The impact fee will be: X
Single family, detached 48 units @ $940,00 each = $45,120.00
Single family, detached 126 units @ $771.00 each = $97,146.00
TOTAL $142,266,00
FORESTERlENVIRONMENT ALlST
Comments: '"
30, All ornamental trees on the Plant list must be listed in the specifications as a X
minimum of 3" diameter (not Cal) at DBH (4.5' off the ground), 12'-14'
height, and Florida #1. The height of the trees will be larger than 12'-14'
to meet the 3" diameter requirement (Chapter 7.5, Article II See, 5.C, 2,).
31. The irrigation system design (not included in the plans) should be low volume X
water conservation using non-portable water.
32. Turf and. landscape (bedding plants) areas should be designed on separate X
zones and time duration for water conservation,
33. Trees should have separate irrigation bubblers to provide water directly to the X
root ball (Chapter 7,5, Article II See, 5. C.2.).
PLANNING AND ZONING
Comments:
34. According to the Land Development Regulations, alleys and other secondary X
roadways are considered to be rights-of-way. In a Planned Unit
Development, the minimum width of a right-of-way is 40 feet. Approval of a
variance or an amendment to the Land Development Regulations would be
required in order to allow the alleys to be less than 40 feet in width.
35. A unity of title may be required. The Building Division of the Department of X
COA
08/23/05
7
DEPARTMENTS INCLUDE REJECT
Development will detennine its applicability,
36. On the master plan (sheet I of 6), with a dashed line, show the limits of the X
2'd story porches proposed on the sides of the townhouse buildings; or is this
alreadv shown in the typical Multi.familv Setback matrix?
37. At the time of permitting, the elevation pages ofthe clubhouse should include X
the exterior finish, paint manufacturer's name, and color codes. (Chapter 4,
Section 7.D.), --
38, On the landscape plan, ensure that the plant quantities must match between X
the tabular data and the graphic illustration,
39. All trees, if proposed as trees, must be at least 12 feet in height and three (3) X
caliper inches at the time of their installation (Chapter 7,5, Article Il, Section
5.C.2.), This applies to the Ligustrum, Bald Cypress and Live Oak trees. -.~- ---
40. The trees proposed around the townhouse and single.family detached X
buildings must be installed at 1, the building height of the building (Chapter
7.5, Article II, Section 5.M,).
4J. The landscape plan shows that there are trees proposed outside the property X
line, along High Ridge Road and Miner Road, The trees would require the
Engineering Division review and approval. Regardless, they cannot be used
within the landscape plan as counting towards meeting the minimum required
number of trees. ---
42. Staff recommends that where possible, the trees proposed within the east and X
south landscaped "common" areas be spaced no further than one (I) tree per
20 linear feet. --
43, Regarding the subdivision wall sign, place a note on the site plan indicating X
that the sign will be located 10 feet from the property line (Chapter 21,
Article IV, Section J.D.).
-
44. The ends of those townhouse buildings directly visible from High Ridge Road X
and Miner Road should be enhanced with features similar to the front facades
using elements such as balconies, individual roof features, porches, varying
surface materials and colors, etc.), Those units would include #1, #17, #40,
#84, #96, #139, #147, #169, and #174.
45. Indicate on the plans the proposed locations of the townhouse buildings by X
type (not unit type). Two building designs are proposed but not located on the
site. Placement of the two building design types should maintain
compatibility in the proiect.
COA.doc
08/24/05
8
DEPARTMENTS INCLUDE REJECT
46, Color swatches are to be provided for all proposed colors, Those unmuted X
colors proposed, typical of the Caribbean or other islands, or waterfront
environmen1s, are inconsistent with established colors throughout the High
Ridge Road corridor, and should be replaced with muted earth tones to
increase compatibility with existing buildings and the natural characteristics
of the area (i,e. existence of scrub and other preserve areas, and mature trees
and other existing vegetation). Modify the proposed colors as follows and
provide color renderings to match.
ADDITIONAL PLANNING & DEVELOPMENT BOARD COMMENTS:
Comments:
47, None X
ADDITIONAL CITY COMMISSION COMMENTS:
Comments:
48. To be determined, LfI......" ~
MWR/elj