Loading...
Boynton Village Condo Parcels 4 &5 DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA D,"~" P~? SU,!;",', r; .' '" ( G~~. , -i , Clerk PROJECT NAME: Boynton Village Condominiums Parcels 4 + 5 (WR1) APPLICANT'S AGENT: Anthony Comparato, Compson & Associates and Kim Glas-Castro, Ruden McClosky AGENT'S ADDRESS: 980 North Federal Highway #200 Boca Raton, FL 33432 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: September 20,2005 TYPE OF RELIEF SOUGHT: Request conditional use / new site plan approval for the construction of four (4) five (5) story buildings at a height of 65 feet - 1 inch, to house 376 condominium units on an 8.815 acre portion of the 106.5 acre site known as Boynton Village and Town Center. LOCATION OF PROPERTY: Northeast corner of Old Boynton Road and Congress Avenue, just south of the SFWMD C-16 canal. DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. __ THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR X THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above, The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant ~HAS HAS NOT established by substantial competent evidence a basis for the relief requested. 3, The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". 4, The Applic'!Pt's application for relief is hereby ~ GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5, This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the t and conditions of this order. City Clerk own Center 1\Boynton Village Parcel 4 & 5 Condos NWS 7, Other DATED: q-~j-05 S:IPlanningISHAREDlWPIPROJECTSIBoynton Village- 0191DO.doc EXHIBIT "e" Conditions of Approval Project name: Boynton Village Parcels 4 + 5 Condos File number: COUS 05-007 Reference: 2"d review plans identified as a New Site Plan with a June 21, 2005 Planning and Zoning date stamp k mar mg, I DEPARTMENTS I INCLUDE I REJECT I PUBLIC WORKS- General Comments: 1. The trash holding area for this development will require Solid Waste trucks to X back across multiple lanes of traffic (entry to parking garage and roadway along the north and south side of the development.) Additionally the depicted orientation will take the trash close to parked cars. This is an unsafe situation. Please relocate trash holding area to address this concern. 2, A total of six trash rooms are shown on this plan. The depicted trash holding X areas do not appear to be large enough to accommodate multiple containers and still provide reasonable access by Solid Waste. Please indicate the number and size of the containers so we can evaluate the required pad sizes and our ability to perform the pickup operation, PUBLIC WORKS- Traffic Comments: 3. On the Site plans, show and identifY all necessary traffic control devices such X as stop bars, stop signs, double yellow lane separators striping, directional arrows and "Do Not Enter" signage, etc. See City Standard Drawings "K" Series for striping details, '-.0 UTILITIES Comments: - 4. Palm Beach County Health Department permits will be required for the water X and sewer systems serving this project (CODE, Section 26-12). 5. Fire flow calculations will be required demonstrating the City Code X requirement of 1,500 g.p.m. (500 g.p.m, some residential developments) with 20 p.s.i. residual pressure as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (CODE, Section 26-16(b)), 6. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid X for this project either upon the request for the Department's signature on the Health Department application forms or within seven (7) days of Site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand, Conditions of Approval 2 I DEPARTMENTS I INCLUDE I REJECT I 7. A building permit for this project shall not be issued until this Department X has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 8, Utility construction details will not be reviewed for construction acceptability X at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates); they will be reviewed at the time of construction permit application, FIRE Comments: 9, Provide the fire hydrant layout for this project with the hydrants clearly X shown, Show all water supply lines for fire protection and hydraulic calculations. Hydrant required every 500 feet of road travel and no more than 200 feet off the corner of any building. 10. Provide water supply information for this parcel. This shall include water X supply lines for hydrant and sprinkler systems and the capacity of those lines. A new flow test is required when water feeder lines connected. POLICE Comments: None X ENGINEERING DIVISION Comments: 11. All comments requiring changes and/or corrections to the plans shall be X reflected on all appropriate sheets, 12. Please note that changes or revisions to these plans may generate additional X comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the Commission and at permit review, 13. Provided photometries do not meet minimum standards. X 14, Delete the tenth note on sheet L8 regarding maintaining 5 foot clear vision X in parking areas. 15. Full Drainage plans, including drainage calculations, in accordance with the X LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting, 16. Paving, Drainage and Site details will not be reviewed for construction X acceptability at this time. All engineerinl> construction details shall be in I DEPARTMENTS I INCLUDE I REJECT , accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. BUILDING DIVISION Comments: 17. Please note that changes or revisions to these plans may generate additional X --- comments, Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the City Commission and at permit review. 18. The height and area for buildings or structures of the different types of X construction shall be governed by the intended use or occupancy of the building, and shall not exceed the limits set forth in Table 500 of the 200 I FBC, 19. Every exterior wall within 15 feet of a property line shall be equipped with X -- approved opening protectives per 2001 FBC, Section 705,1.1.2, 20. Buildings, structures and parts thereof shall be designed to withstand the X minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application, .. 21. Every building and structure shall be of sufficient strength to support the X loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table 1604.1, Indicate the live load (pst) on the plans for the building design, 22, Buildings three-stories or higher shall be equipped with an automatic X sprinkler system per F.S, 553.895, Fire protection plans and hydraulic calculations shall be included with the building plans at the time of permit application. 23. The building plans are not being reviewed for compliance with the X applicable building codes. Therefore, add the words "Floor plan layout is conceptual" below the drawing titled Floor Plan found on sheet/s A-I through A-26, A-31, A-32, and CH-l.. However, add to the floor space drawing a labeled symbol that identifies the location of the handicap accessible entrance doors to each building/tenant space. The location of the door/s shall match the location of the accessible entrance doors that are depicted on the site plan drawing, 24. At the time of permit review, submit details of reinforcement of walls for X the future installation of grab bars as required by the Federal Fair Housing Act Title 24 CFR, Part 100.205, Section 3, Requirement #6. All bathrooms within the covered dwelling unit shall comply. 25. To properly determine the impact fees that will be assessed for the one-story X clubhouse, provide the following: Conditions of Approval 4 I DEPARTMENTS I INCLUDE I REJECT I a, Will the clubhouse be restricted to the residents of the entire project only? b, Will the residents have to cross any major roads or thoroughfares to get to the pool/clubhouse/recreation building? c. Will there be any additional deliveries to the site? d. Will there be any additional employees to maintain and provide service to the site? . Please have the applicant provide the City with a copy of the letter that will be sent to the impact fee coordinator. To allow for an efficient permit review, the applicant should request that the County send the City a copy of their determination of what impact fees are required for the pool/clubhouse/recreation building/lease office, 26. CBBCPP 3.C,3.4 requires the conservation of potable water. City water may X not, therefore, be used for landscape irrigation where other sources are readily available. 27, A water-use permit from SFWMD is required for an irrigation system that X utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. 28. If capital facility fees (water and sewer) are paid in advance to the City of X Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: a, The full name of the project as it appears on the Development Order and the Commission-approved site plan, b. If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. c. The number of dwelling units in each building, d, The number of bedrooms in each dwelling unit. e. The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) 29. At time of building permit application, submit verification that the City of X Boynton Beach Parks and Recreation Impact Fee requirements have been satisfied by a paid fee or conveyance of property, The following information shall be provided: a. A legal description of the land. b, The full name of the project as it appears on the Development Order and the Commission-approved site plan. c. If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. d, The number of dwelling units in each building. e. The total amount being paid, (CBBCO, Chapter I, Article V, Section 3(f)) 30, Pursuant to approval by the City Commission and all other outside agencies, X I DEPARTMENTS I INCLUDE I REJECT I the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. 31. The full address of the project shall be submitted with the construction X documents at the time of permit application submittal. If the project is multi- family, then all addresses for the particular building type shall be submitted, The name of the project as it appears on the Development Order must be noted on the building permit application at the time of application submittal. - 32, Add to the site data the total area under roof of each residential building, X Provide tabular area data for each floor of each building. The breakdown shall include the following areas and each area shall be labeled on the applicable floor plan drawing: a. Common area covered walkways; b. Covered stairways; c. Common area balconies; d, Entrance area outside of a unit; e. Storage areas (not part of a unit); f. Garages (not part of a unit); g. Elevator room; h. Electrical room; 1. Mechanical room; j, Trash room; k. Mailbox pickup and delivery area; and 1. Any other area under roof. (Chapter 4 - Site Plan Review, Section 7,E.2 and 3) 33, This structure meets the definition of a threshold building per F.S. 553.71(7) X and shall comply with the requirements ofF.S, 553.79 and the CBBA to the 2001 FBC, Sections 105.3.1 through 105.3.6, The following information must be submitted at the time of permit application: m. The structural inspection plan must be submitted to the enforcing agency prior to the issuance of a building permit for the construction of a threshold building, n. All shoring and re-shoring procedures, plans and details shall be submitted. o. All plans for the building that are required to be signed and sealed by the architect or engineers of record shall contain a statement that, to the best of the architect's or engineer's knowledge, the plans and specifications comply with the applicable fire safety standards as determined by the local authority in accordance with this section and F.S. Section 633, 34. A two-hour fire-rated wall will be required between the parking garage and X the condominium per NFP A 88A, Section 4.1.2, 35, The vestibule to the trash room chute shall comply with the Federal Fair X Housing Act. PARKS AND RECREATION Conditions of Approval 6 DEPARTMENTS INCLUDE REJECT Comments: 36. Irrigation must be 110% coverage, X 37. Impact Fee: 376 multifamily units (@. $656 per unit = $246,656.00 X FORESTER/ENVIRONMENTALIST Comments: 38. Map of Boundarv and Topoeraphic Survey-Sheet 1 of I X Existinl! Trees Manal!ement Plan The Landscape Architect should tabulate the total existing trees on the site, The tabular data should show the individual species of trees proposed to remain in place, be relocated throughout the site, or removed / replaced on site. All desirable species of existing trees must be relocated rather than removed if the trees are in good health. These trees should be shown by a separate symbol on the landscape plan. [Environmental Regulations, Chapter 7,5, Article I Sec. 7,D.p, 2.] 39, I recommend that the applicant preserve, where possible, all existing X desirable trees that are located within the proposed landscape buffers. [Environmental Regulations, Chapter 7.5, Article I Sec. 7.D,p, 2,] 40. Irril!ation Plan-No Irrieation plan included in the submittal X The irrigation system design (not included in the plans) should be low volume water conservation using non-portable water. 41. Turf and landscape (bedding plants) areas should be designed on separate X zones and time duration for water conservation. X 42, Trees should have separate irrigation bubblers to provide water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article 11 See,S. C.2.1 PLANNING AND ZONING Comments: X 43, The signature trees must have eight (8) feet of clear trunk if placed within the safe-sight triangle (Chapter 7.5, Article 2, Section 5,N.). Alternative plant material may be substituted if the above referenced plant material is not available or undesired. Any substitution of plant material (for the signature tree requirement) will be subject to the City Forester / Environmentalist review and approval. 44. Staff recommends that you submit a master sign program that shows the X number, location, dimensions, exterior finish, and color(s) of all freestanding monument signs (Chapter 2. Section 5.H.9.). The sign program would I DEPARTMENTS I INCLUDE I REJECT I address all types of signs, which would include commercial wall signs, identification signs, residential subdivision signs, freestanding monument signs, canopy signs, way-finding signs, directional signs, and all other signs as regulated by Chapter 21 of the Land Development Regulations. 45. Provide a detail of a typical outdoor freestanding lighting fixture. The detail X of the typical freestanding outdoor lighting fixture should include the overall height, exterior finish, materials used (i,e, concrete or aluminum) and color(s). The lighting fixture height, style, design, and illumination level shall be compatible with the building design and height and shall consider safety, function, and aesthetic value (Chapter 9, Section IO,F.I.). 46. Provide a detail of the parking structure gates indicating its dimensions, X materials used, exterior finish, and colors (Chapter 4, Section 7.D.). 47. The project is subject to the limitations and timing at which development may X proceed as outlined in the Palm Beach County Traffic approval letter or the conditions contained within the CRALLS amendment upon its adoption, ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 1. None X ADDITIONAL CITY COMMISSION CONDITIONS Comments: I 1. To be determined, ~ I I I S:lJ>lanning\SHARED\WP\PROJECTS\Boynton Village~Boynton Town Center l\Boynton Village Parcel 4 & 5 Condos COllS 05-007\COAdoc