Quantum Park Lots 15 & 16
DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORIDA
,
Development t
P&Z
Building
Engineering
Oce. LIcense
Deputy City Clerk ,
PROJECT NAME:
Quantum Corporate Center (Quantum Park lots 15 & 16)
APPLICANT'S AGENT: Eric Anderson, Anderson Architecture, Inc.
APPLICANT'S ADDRESS: 399 W. Camino Gardens Boulevard # 202, Boca Raton, FL 33432
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: October 18, 2005
TYPE OF RELIEF SOUGHT: Request Major Site Plan Modification approval for the addition of
approximately 9,000 square feet to the second floor internal to the
existing building and conversion from office/industrial to strictly
office building on a 5.25 acre parcel in the Quantum Park Planned
Industrial District.
LOCATION OF PROPERTY: Lots 15 & 16 Quantum Park PID
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
1. Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
2. The Applicant
/HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3.
The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
4.
The Applicgnt's application for relief is hereby
~ GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5.
This Order shall take effect immediately upon issuance by the City Clerk.
6.
All further development on the property shall be made in accordance with the t
and conditions of this order.
7.
Other
City Clerk
m Corporate Center\DO.doc
DATED:
ID-tl/-05
S:\Planning\SHARED\WP\PROJECTS\Quantum Lots 15 &16'\
EXHIBIT "lit"
.
.-l "J=ln1[IIII'"1 ~III 111111111111 7/1: ,
= I~) iU.;~.u I~f ~ }7 _ > NOT
- @~~~~ '<1ttJ.~J' V 'I IN _!, IV. 1
... 'IC!J.. 1. t= ~ ~ : C I T V __ '--
~ Ie ~ U-p:~,; J "'~ .. ~f"^.tCI)~
L ~ ~r" ~ f!WI: ~ ~1 '=,,,u!fJJ-
"'-- ~ f.....i' r.HI " ~~:;; ,," . ~(~ r ____ '/ J'
Y ~ i\.....JI(/ ~ ,\ ~
~ . ~ 'ThJ /2''1 ~'/ t': ' .----.' R'L^-^~ "-~, r
~ ~~~~, 'j:)j~ r-~ ._}b:J1
~ ~3:\ ~;J,~::~\ , ~~" J 'f '-
:.:J :: \.~1 \ "'i,\ / .... -.....'/; ,~
- ': 'l.. ;:" .-- '~ .--., - IV
-
~ / /' i ",- 'I ~ ~ ~':I IA'Iz. t' -- ~~
" I 11f' - , '.
~ (~ :'" - I I ,_ -: OVN~ ;'::--'-'4 H 1. --. ,L-
::[. ,- ~,~;: K OF COMMEROi~~ /; ~ J ~
=: '~ _"rIUANTUM PARK) ~
~ PIt] ~ - ~ J
~, "MOTOROLA,i '~~ j' r~71 "
'"" /~c;J ,>.'t~,.., 'IT --,~,. ItIOtdllLv" \ 0 I I ~'
~ f~,. ~ \;. PU
.~ .' ,
, " ....... i' ' ,,' . .
:: -.."".. .,...:,.' i'~-i::: :::ili'i~Q . iitIIll'l- Ie: .... _r-l'Z: _ill
n. \ '~~ i[~r . = ~:' =Ej::., _' JYNJ I \111''1,
L \j . . '1(;-\-v\C.' ~~ =~ '0 1/8 MILE'S J
~ ~ . ~~< ~-,~~]~~ nil/III 'I _' 00
R A A ,I." '0 400. '800 FEET lIT;
nil
, - I I I
EXHIBIT B
~l: : I
: ,~~
~ ,
./
./\
./
./ \
./
./
./
H~ u ~~ I~ ~~
~I Jllll~ ~I
1!~III!'
~ ij ~ Ii !!
:111-11"11 II
i ~iP ·
If I ! · I
P~~~"'~
I
",\,
\ " "
\ \"
\ \ \\,\, \
\~ \, \ \ ,
~,\\ \\\
\~ \\ \\\
\ \\ \ \,\, \
\~ \\ \\\
\ \\ \\\\
\ \\ \\,\
I~\ ,\ \ \\\
\\ ' I \":
\\ \\ \\\~
1\ 'J ~ ill
\\ ii !i
,\ ...
~ (~
il "- II (f i
II ! I ~ 1 i
Ii:: I I I: I
,'II I I Ii I 1
,t Ii I,' h:: '"
~I !! @! I !i: I I
11 It I ~ I II: 1 -~. .
: I n t r-' II t I I .,
! ! If . I II ~ t I - J~ / .
i' I, I I It: 1 I ~I / II
.' I I I II I I I ( /
iI Ii I' I if: 1 I 1 II 'I
'iII' II 1t:11 1'----'
!I, I' r1! I I I -3
jl h I I ~ i': I I 'I II i
!IIi Iqili:'.: II
i! l~ \ I. II': : 1
i! It , I I II! I )
.,,' I I ", 1 I
'I I!~ I I !Lj 1 I 1
i! ill~ \ i !,ri: :
II I' I' " I
., I I II: I 1
'hi! ,I It: I I
. II " !" I I
~! ,i I II . I :
!, I' I! I ~ I 1
!i:' U :: ~ ~I
!!I i i :
II I I I
i! I !I 5. / -' LjW III--nn-----
!I 1 A~ // -- "I m;n---,----
'tn' -_,.___L__.rt~ I
II Ipn I } : r --- - 1 ! ----- --
:, ~ lit, -t- ---__-1 U
;i ill,Uii ,
I~H!I;lUI ~
~ I~J~;~~ ,
I 'illl~
i i:iiijl
j !IHIJi
to'
a;n
!~.,
iI
>
o
....
:I:
i
11 ill l~ ~ [D
;~ j '. ~ C
~ fa .~ ~ r=
~ " ~ 0
. ;! i z
~ ~ Gl
2 I "
0
i'~ Ii HI F 0
.~~ :! ~ rn
'. ~
Ii !P~ ,. ~
! i~
ii i ~ ~ i . !! ~
!' . I', ~ ~
~L . I .
-;- Ii
. . ~ g
. ~ ~ .
I i d~ z ~ ~
~~ 0 ~ l>
~ r.a g ::u
> ~
(')
~ ;;~ ~ '3~ fM l>
H n~ ;; -I r
:: (')
~ -~ h c
~ ~ ~
-
<>1 0
~~ ~I z
~~ VJ
.::.... "3
~ ~
"l!
.h
~:rrrnill
=-];:~c.w
3lSOf o.anun &ou.\wd
--"-
r
I ;; a ~ I
f ii !'i
f I!
I ! i
'I . :II
if I Iii
I E Jl
'~~ il
I r; ~III.I ~
.111 Iii hi
· ;11'11 it . ~
H1
~J!~I i Illr;
I,ll II I!
IIII I Ii
Ptt
~
~
i"'lt;WI' ~
l'tIfIlU;
I IfIll ~
IflliJJI ~
fllf1II
I I
EXHIBIT B
~
/'
/'
\
/'
/'
\
/'
/'
\
, ,,\
, ., \
\ \ \, \
\ \ \ \ \
\ \ \ \ \\
\, \ \ \
\ \ \(~\
,,\ \!.Y. \
\, \ \ , \
\' \' \
\ \ '0\
\ \\~ ~\\\
'\ .... P"\, \
" \ ~'
\' I' \ -.
'~\ I '\ \
\\ '. ~ \
\\ ' ,,-
\\ ;s
\\ msa'
II r I
" ,
\\ 1 i.
\\ I : :.
Ii I
rr If ~ i,
:: U II
!. II u
i! ,: n
:: H l!
!: II II
!!" :.;
i!!i I I
Ii Ii II o.@1
II II
:. II
II II
., I' ,.. I
H Ii
!i Ii
i I I, I:
.r III . 8
il i,
I! !I
:1 ,I I
!: iI "::.
!~ II
If I!
i: !,
., ,I
!l jl
jl ':
:1 II
~ I "
!i Ii I a
!i Ii .11 ~I
it Jil: Ii SO'
i r II-------jl
il II I t-
:1 II Ii i I
" II II: I i
I! II II i, I
Ifl:!JlInliiinllf!ri~":II!ri.flllllaru:n In,JtHi ~
:. H"r!l"t_al~.fnl :1-" ill .. litO'" 1 II~I
l!ilif!~~:!t~UinJ.JU:iUI.' ',. IJ:,-; ~ ~llifl:
illl"Smr"IDune H~{~" I m II.. 'I. I. I
~!i!ilil!!im!"l!!li!J!ibb'!:j!!1 i p,! Iii
n in1;ili p.li~~P L~ilt!ftitfi tul Ii'
n iH vg Ri~JI5~ ig 1m 5i"~j i! I~ II
!f ID :t:1 0"}U1.I- I "d f J II .. I
I.." III · :11'11 s II 1 '3 r
f~llp" 1 ~I i ILJ: 1ft ti. "al I
11 n '. 1:.. f~ J! J "1'
I Ii- I":J '"
~ I
\
\
HI' .... .. .......
U 111~'il'llIIIJ ~ "'ft'... ~
II "" I . g 1 0 ; . l' ~ ." 0 . . . . 0 .~
~
~ ~ I ;r~m~'~~i?r'mfag : 9jJ~jf~~~~ij :
II ~tij;ltit[~~:I~I~!lg I !Ia~g~~~tl:l I
&I ~J~f;r~i~;mI~J~JfJ-I'P!l I '~JH~1iJ;t~~ I
U r r ~i Je rUl, i r ~ J!iJP'r,FCI!lJ~1c
II r I~ i.. . i: lJ t'l :l~ III I
.. ~ f !j
t1ITfiE=-
j~~~
_.......R.
j ill ili.' Iii n
~f ~ II. III
~"I ~ ~
)! III] B.I
i III III
II lID
II
III
11I---' 'co<
\:.~,~.."!' '.~':...,
t~I' ~.
III,"'" 11- '"""
.'........- .' '-',..
S;-"i;!", ';, ill!
~.~~:!;. . !- .~.",-;.
~;;;;~"" r " "J"",'"
I Ell Ell
Bl Bl
Bl Bl
Bl
I - '
I II III
II III
I II III
II Ii
~r . . I
~<.n I I
p- ~ i!
~> ..i
m-
I D D
[J 11-:''''''''',
:':~
,: :~~
1iiI,,.,,,,'..,,,,, '".'. E
au ail
III 111
~ "
IIIJ EJ
. ~,,:.,.'~,;.~.;,
mil ~
III' II'
IIW IBW
III III
111 II)
Ii I
Ii I
I;:'::::~;,., :1,...<.:Ii
:~,.::; i [~i
_ if. i _____j h~~:
t
I
I
I
I::-c;c.oor
I
i
~
,
I
,
I
~
,II
J
~
1
I
EXHIBIT B
I ~ ~[jo,
ElI] ~ 00
~ r~]oo
~ [~oo
~ ~oo
~ ~oo
~ ~oo
~ ~oo
~~
~ ~oo I
~ ~oo I
~ ~oo
~ ~oo
~ ~oo
~ ~oo
~ ~oo
~oo
~oo
~ ~oo
~ ~oo
00
is
~~
g
Ii
I 1-. ,
.. .
f" ii ~ !if
II
.
J
I
EXHIBIT "C"
Conditions of Approval
Project name: Quantum Park Lots 15 + 16
File number: MSPM 05-009
R ~ 2nd l'd'fi d . h A
16 2005 PI
&Z
d
k
e erence: reVIew pans 1 entl Ie WIt an ugust , anmng onmg ate stamp mar mg.
DEP ARTMENTS INCLUDE REJECT
PUBLIC WORKS- General
Comments: None X
PUBLIC WORKS- Traffic
Comments: None X
UTILITIES
Comments:
1. Fire flow calculations will be required demonstrating the City Code X
requirement of 1,500 g.p.m. (500 g.p.m. some residential developments)
with 20 p.s.i. residual pressure as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by msurance underwriters,
whichever is greater (CODE, Section 26-16(b)).
2. A building permit for this project shall not be issued until this Department X
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15.
3. Utility construction details will not be reviewed for construction X
acceptability at this time. All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construction Standards" manual (including any updates);
they will be reviewed at the time of construction permit application.
FIRE
Comments: None X
POLICE
Comments: None X
ENGINEERING DIVISION
Comments:
Conditions of Approval
2
DEPARTMENTS INCLUDE REJECT
4. Please note that changes or revisions to these plans may generate additional X
comments. Acceptance of these plans during the Technical Advisory
Review Team (TART) process does not ensure that additional comments
may not be generated by the Commission and at permit review.
5. Full drainage plans, including drainage calculations, in accordance with the X
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
6. Paving, Drainage and Site details will not be reviewed for construction X
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
BUILDING DIVISION
Comments:
7. Please note that changes or revisions to these plans may generate additional X
comments. Acceptance of these plans during the TART (Technical
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review.
8. The height and area for buildings or structures of the different types of X
construction shall be governed by the intended use or occupancy of the
building, and shall not exceed the limits set forth in Table 500 of the 2001
FBC.
9. General area modifications to buildings shall be in accordance with 2001 X
FBC, Sections 503.3, 503.3.2, and 503.3.3. Provide calculations verifying
compliance with the above code sections and the 2001 FBC, Table 500.
10. Buildings, structures and parts thereof shall be designed to withstand the X
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application.
11. Every building and structure shall be of sufficient strength to support the X
loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table
DEPARTMENTS INCLUDE REJECT
1604.1. Indicate the live load (pst) on the plans for the building design.
12. At time of permit review, submit signed and sealed working drawings of the X
proposed construction.
13. If an accessible route has less than 60 inches clear width, then passing X
spaces at least 60 inches by 60 inches shall be located at reasonable
intervals not to exceed 200 feet. A "T"-intersection of two corridors or
walks is an acceptable passing place. 2001 FBC, Section 11-4.3.4.
14. If capital facility fees (water and sewer) are paid in advance to the City of X
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
A The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
B If the project is a multi-family project, the building numberls must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
C The number of dwelling units in each building.
D The number of bedrooms in each dwelling unit.
E The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
15. At time of permit review, submit separate surveys of each lot, parcel, or X
tract. For purposes of setting up property and ownership in the City
computer, provide a copy of the recorded deed for each lot, parcel, or tract.
The recorded deed shall be submitted at time of permit review.
16. Pursuant to approval by the City Commission and all other outside agencies, X
the plans for this project must be submitted to the Building Division for
reVIew at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
17. Sheet 1.2 - The direct burial light poles shall comply with 1002 FBC, X
Section 1606.1.
PARKS AND RECREATION
Comments: None X
FORESTER/ENVIRONMENTALIST
Comments:
18. The applicant must indicate on the landscape plan that any existing trees I X
Conditions of Approval
4
I DEPARTMENTS I INCLUDE I REJECT I
vegetation in accordance with the original approved landscape plan for lot
# 15 and # 16 that are dead, missing or in poor health after site construction
must be replaced with the same size materials throughout the lots. The
existing landscaping should be identified on the plan as to species, size,
diameter, and health.
19. The Quantum Boulevard right-of-way must receive Floratam sod and X
irrigation coverage for both lots #15 and #16. [Environmental Regulations,
Chapter 7.5, Article II Sec. S.C. 2.]
20. The applicant should add a note that all utility boxes or structures (not X
currently known or shown on the plan) should be screened with Cocoplum
hedge plants on three sides.
21. Trees should have separate irrigation bubblers to provide water directly to X
the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.
C.2.]
PLANNING AND ZONING
Comments:
22. Landscaping along the east side of the project abutting Quantum Boulevard X
shall be upgraded to meet current landscape regulations.
23. Provide an executed unity of title, satisfactory to the City Attorney, for the X
two (2) parcels, prior to the issuance of the first permit.
ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS
Comments:
1. None X
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
1. To be determined.
S:\PlanningISHARED\ WPIPROJECTSIQuantum Park Lots 15 + 16 Coiltronics\Coiltronics\MSPM 05-0091COA.doc