Loading...
R06-073 1 2 3 4 5 6 7 8 Ii 9 I 10 11 12 13 14 15 II RESOLUTION NO. R06- 073 A RESOLUTION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING AND DIRECTING THE CITY MANAGER TO EXECUTE TASK ORDER NO. 06-02-01 WITH CH2M HILL FOR THE PURPOSE OF PROVIDING ARCHITECTURAL AND ENGINEERING SERVICES FOR THE RECONSTRUCTION OF THE LIFEGUARD TOWERS AT OCEANFRONT PARK IN THE AMOUNT OF $14,477.00; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, two (2) lifeguard towers at Oceanfront Park were heavily damaged and one (1) tower was completely destroyed by Hurricane Wilma. The lifeguards have been using portable towers since that time however they are not adequate protection from the wind, rain 16 and sun; and 17 WHEREAS, CH2M Hill is on the recently approved engineering services list and is 18 interested in performing the work; and 19 WHEREAS, Staff is recommending that City Commission award Task Order 06-02-01 20 to CH2M Hill for architectural and engineering services for the reconstruction of the lifeguard 21 towers at Oceanfront Park that were destroyed by Hurricane Wilma in the amount of 22 $14,477.00. 23 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 24 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 25 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 26 being true and correct and are hereby made a specific part of this Resolution upon adoption 27 hereof. 28 Section 2. The City Commission of the City of Boynton Beach, Florida does hereby 29 authorize and direct the approval and execution by the City Manager of Task Order No. 06-02- S:\CAIRESOlAgreementsITask - Change OrderslCH2M Hill Task Order 060201 Lifeguard tower.doc 01 with CH2M HILL for the purpose of providing architectural and engineering services for the 2 reconstruction of the lifeguard towers at Oceanfront Park that were destroyed by Hurricane 3 Wilma in the amount of $14,477.00. 4 Section 3. This Resolution shall become effective immediately upon passage. 5 PASSED AND ADOPTED this -1!L day of March, 2006. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ATTEST: 24 25 26 27 28 29 CITY OF BOYNTON BEACH, FLORIDA ~-:J~/~ tfayor Vice MaY<?J;:. ,~." lSSlOner t!;. ,;ZL~Jl . ~/ ;;::::er 'C,~ Commissioner m.~ S:ICAIRESOlAgreementslTask - Change Orders\CH2M Hili Task Order 060201 Lifeguard tower.doc CH2M HILL One Harvard Circle . CH2MHILL ~ West Palm Beach, FL 33409-1923 Tel 561.515.6500 Fax 561.515.6502 ROb-073 PROPOSAL/SCOPE OF SERVICES FOR CITY OF BOYNTON BEACH LIFEGUARD STATIONS Task Order No. 06-02-01 Architectural and Engineering Services for Replacing Three (3) Life Guard Station Buildings at Boynton Beach Ocean Park. A. Project Description: The City of Boynton Beach has requested CH2M HILL to provide design through construction phase architectural and engineering services for the demolition and replacement of three (3) Life Guard station Buildings - all located at Boynton Beach Ocean Park. The three (3) Life Guard Station Buildings will each be rebuilt on their existing structural post support structure using an existing platform base dimension of 13'-4"x 10'-4". All Three (3) buildings are to be of wood frame construction with horizontal cement fiber board type exterior facades and will be of identical building footprint and design (one design for all three) except for locations of access stairs/ramps to each station. No new foundation or civil is work is included. Utilities tie-ins will be from existing locations. Mechanical work will include natural ventilation only and no fire protection is included. B. Scope of Services: At the request of the City, CH2M HILL is to provide Architectural and Engineering design phase services for the structures noted above at Boynton Beach Ocean Park. Services include providing construction documents (drawings and specifications) only. Providing permitting assistance, bidding assistance and construction phase services is an additional service if requested, and is not included in the basic services of this proposal. It is assumed that the work for all three (3) structures will be one project by one contractor / one construction contract. No construction cost estimate is included. ORLOWSKI PROPOSAL: BB LIFE GUARD BLDGS 1/20106 Page 2 February 22, 2006 Scope of Services listed below provides services for all three structures as listed above: Task A: Site Visits ( 1 architect and 1 engineer, 4 hours each) $ 1,032 Expenses: Local travel and miscellaneous expenses $ 40 Total Lump Sum Task A $ 1,072 Task A Deliverables: Assistance and support deliverable only Task B: Provide Drawings and Specifications for Bidding. 1 Life guard Buildings (3 identical buildings) (1: Architectural/Engineering 40 hours & tech 96 hours) $13,280 Note: We estimate 4 sheets are required to incorporate Architectural, structural, plumbing and electrical plans And details (see Attachment A). Expenses: Expenses for Deliverables: six (6) sets of drawings & specifications $ 125 Total Lump Sum Task B $13,405 Task B Deliverables: six (6) sets of drawings and specifications Task C: Permitting (by Owner) $ 0 Task D: Bidding (by Owner) $ 0 Task D Deliverables: Assistance and support deliverable only Task E: Construction Phase Services (By Owner) ~ TOTAL SERVICES (Task A & B) Lump Sum $ 14,477 Task F: Additional Services, not presently contemplated in this Work Authorization, may be subsequently established by agreement of the parties and amendment hereto. Such Additional Services may include, but are not limited to: a) Permitting Assistance b) Bidding Assistance c) Construction Phase Services d) Permit fees e) Environmental permitting f) Geotech report to support site improvements ORLOWSKI PROPOSAL: BB UFE GUARD BLDGS 1/30/06 Page 3 February 22, 2006 g) Structural Survey beyond initial site visit h) Extension of Tasks A - E beyond that described herein. i) Revisions to previously approved work j) Any additional work not listed above Schedule: CH2M HILL shall commence services immediately upon authorization and complete Tasks as indicated below from receipt of "Notice to Proceed," not inclusive of any review periods required by City Staff. Competitive Bidding anticipated to be four (4) week period and construction is estimated at 12 weeks (3 months). Task A & B: Site visits and construction documents 5 weeks Assumptions: · City to provide As-Built Drawings of Buildings and Utilities connections at existing slab locations · The City will provide Front End bid documents for Task D, including the identification of any applicable permit fees to be paid by the City or the Construction Contractor · The pricing and schedule is based upon the assumption that all work is completed concurrently and that work is not subdivided · This proposal assumes all 3 life guard stations are identical with the exception of minor adjustments of acess points. · No Construction Cost Estimate is included · Demolition services, hauling and removal of debris are to be handled by others (including any assessment as to hazardous or toxic materials) · No civil/site work included · The current condition of the existing structural post support structure is sufficient for construction. No design of existing post structure is required or included · It is understood that a geotechnical report is not included in this scope of work. · Any delays in schedule which are outside of CH2M HILL's control (including reviews and approvals) may constitute a change in schedule and require an amendment to the schedule herein, and may constitute additional services. · No requirement for environmental permitting. The presence or duties of CH2M HILL's personnel at a construction site, whether as onsite representatives or otherwise, do not make CH2M HILL or their personnel in any way responsible for those duties that belong to the Client or its Construction Contractor, or other entities and does not relieve the Construction Contractor or other entities from their obligations, duties and responsibilities, including but not limited to all construction methods, means, techniques, sequences, and procedure necessary for coordinating and completing all portions of the construction work or any health or safety precautions, and have no duty of inspecting, ORLOWSKI PROPOSAL: BB LIFE GUARD BLDGS 1/30106 Page 4 February 22, 2006 noting, observing, correcting or reporting on health or safety deficiencies at the site, except as related to CH2M HILL's own personneL Contract Reference: This Task Order shall be performed under the terms and conditions described within the Agreement for General Engineering Consulting Services (February 2006). Compensation: Compensation by the CITY to the CONSULTANT for this Task order will be on a Lump Sum basis in accordance with the above mentioned agreement. The lump sum compensation for the services described in this Task Order is Fourteen Thousand Four Hundred Seventy Seven Dollars ($14,477) as shown above. CH2M HILL will invoice the City on a monthly basis as required for payment. APPROVED BY: CITY OF YNTON BEACH, FLORIDA By: Dated this ~ day of Ynt1Jt.e..L . 2006. CH2M HILL, INC. By:- CcS,% Dated ~ day of 1'Ch~ .2006. ORLOWSKI PROPOSAL: BB LIFE GUARD BLOGS 1130106 Page 5 February 22, 2006 Sheet T-l Al-l Al-2 A2-1 4 Attachment A Life Guard Stations at Boynton Beach Ocean Park Scope of Services / Estimated Drawings Sheet Title Title, Index, Legend, Site Plan Demolition Plans & Typical Floor Plan and Platform Elevations and Sections (including structural, plumbing & electrical) Stair / Ramp Configurations & Details ORLOWSKI PROPOSAL: BB LIFE GUARD BLOGS 1/30106 The City of Boynton Beach City Clerk's Office 100 E BOYNTON BEACH BLVD BOYNTON BEACH FL 33435 (561) 742-6060 FAX: (561) 742-6090 e-mail: prainitoj@ci.boynton-beach.f1.us www.boynton-beach.org MEMORANDUM TO: Wally Majors Recreation & Parks Director FROM: Janet M. Prainito City Clerk DATE: March 23, 2006 SUBJECT: R06-073 - PROPOSAL/SCOPE OF SERVICES FOR CIlY OF BOYNTON BEACH LIFEGUARD STATIONS - TASK ORDER NO. 06-02-01 Attached for your handling are two fully executed original Task Orders mentioned above. I have retained one original in the City Clerk's Office for our Central Files. Thank you. ~ 7n. p~ Attachments (2) Copy to: Jody Rivers Central File s:\CC\WP\AFTER COMMIssION\Departmental Transmittals\2006\Wally Majors - R06-073 - CH2M Hill Task Order - Ufeguard stations.doc America's Gateway to the Gulfstream