Loading...
Rapido Rabbit DEVELOPMENT <DER OF THE CITY COMMISSIO' CIlY uF BOYNTON BEACH, FLORIDA FTHE PROJECT NAME: Rapido Rabbit Development P&Z Building Engineering Occ. License Deputy City Clerk APPLICANT'S AGENT: Bradley Miller Miller Land Planning Consultants APPLICANT'S ADDRESS: 282 Pineapple Grove Way Delray Beach, FL 33444 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: February 21,2006 TYPE OF RELIEF SOUGHT: Request for Conditional use approval for a 4,595 square foot carwash on a 3.39 acre parcel in an M-1 zoning district. LOCATION OF PROPERTY: East of Congress Avenue, North of SW 30th Avenue DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR X THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant ~AS HAS NOT established by substantial competent evidence a basis for the relief requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". 4. The Applicajlt's application for relief is hereby ~ GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other ~ m. DATED: O~-c514 -Db S :\Planning\SHARED\WP\PROJECTS\RaJXcjo )nditions of Approval Project name: Rapido Rabbit File number: COUS 05-004 Reference: 3rd review plans identified as a Conditional Use/New Site Plan with an October 11, 2005 Planning & Z d t tam k' onmg a e s pmar mg. I DEPARTMENTS !lNCLUDE I REJECT I PUBLIC WORKS- General Comments: None X . PUBLIC WORKS- Traffic Comments: 1. The plans depict a roadway to be constructed on the adjacent Parcel B, X which is clearly indicated as "Not Included" in this submittal. An irrevocable cross-access agreement between Parcels A, Band C for ingress- egress purposes will be required. 2. Show all off-site improvements required for this project. The proposed X roadway on the north is symmetrical around that property line. Show that the adjacent property owner is in agreement with this proposal. 3. Separate permits will be required from Palm Beach County for the proposed X Congress Ave. curb cut. UTILITIES Comments: 4. Palm Beach County Health Department permits will be required for the X water and sewer systems serving this project (CODE, Section 26-12). 5. Fire flow calculations will be required demonstrating the City Code X requirement of 1,500 g.p.m. (500 g.p.m. some residential developments) with 20 p.s.i. residual pressure as stated in the LOR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater. (CODE, Section 26-16(b)) . 6. The CODE, Section 26-34(E) requires that a capacity reservation fee be X paid for this project either upon the request for the Department's signature on the Health Department application forms or within seven (7) days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 7. Water meter size shall be based on the demand for the volume anticipated X for the car wash. Please provide engineering calculations, or any explanation of the demand. Conditions of Approval 2 I DEPARTMENTS I INCLUDE I REJECT I 8. A building permit for this project shall not be issued until this Department X has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 9. Utility construction details will not be reviewed for construction X acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates); they will be reviewed at the time of construction permit application. FIRE Comments: None X POLICE Comments: None X ENGINEERING DIVISION Comments: 10. Please note that changes or revisions to these plans may generate additional X comments. Acceptance of these plans during the TART process does not ensure that additional comments may not be generated by the Commission and at permit review. 11. Full drainage plans, including drainage calculations, in accordance with the X LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. 12. Paving, Drainage and Site details will not be reviewed for construction X acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. BUILDING DIVISION Comments: 13. Please note that changes or revisions to these plans may generate additional X comments. Acceptance of these plans during the TART process does not I DEPARTMENTS INCLUDE REJECT ensure that additional comments may not be generated by the commission and at permit review. 14. Buildings, structures and parts thereof shall be designed to withstand the X minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. 15. At time of permit review, submit signed and sealed working drawings of the X proposed construction. 16. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may X not, therefore, be used for landscape irrigation where other sources are readily available. 17. A water-use permit from SFWMD is required for an irrigation system that X utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. 18. If capital facility fees (water and sewer) are paid in advance to the City of X Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: a. The full name of the project as it appears on the Development Order and the Commission-approved site plan. b. The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) 19. At time of permit review, submit separate surveys of each lot, parcel or X tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel or tract. The recorded deed shall be submitted at time of permit review. 20. A permit from the EP A shall be required prior to the submittal of plans for a X building permit. The car wash shall comply with F.A.C. Rule 62-660.803. The local EPA office can be contacted at 561-681-6600. 21. Pursuant to approval by the City Commission and all other outside agencies, X the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. 22. The full address of the project shall be submitted with the construction X documents at the time of permit application submittal. If the project is multi- Conditions of Approval 4 I DEPARTMENTS !lNCLUDE I REJECT I family, then all addresses for the particular building type shall be submitted. The name of the project as it appears on the Development Order must be noted on the building permit application at the time of application submittal. 23. Building shall be designed utilizing the 2004 Florida Building Code. X PARKS AND RECREATION Comments: None X FORESTER/ENVIRONMENT ALIST Comments: 24. Applicant must grade the property to the north canal to Lake Worth X Drainage District specifications. PLANNING AND ZONING Comments: 25. A single sign style (such as cabinet, channel, reverse channel) shall be used X for wall signage. Note code limitation on non-word depictions. Provide calculations of areas for determining compliance with the Land Development Regulations. 26. The monument sign as proposed is plain and unadorned and should be X reduced in size to be more in scale with the building. Additionally, the sign should be made more compatible with the building style to transform its boxy appearance. 27. Provide a landscape cross-section C Detail of a 450 angle at the southwest X comer and northwest comer of the site. Additionally, remove the N.T.S. (not to scale) label on the cross-sections and depict landscape to scale, adjusting the size of the plant material on the plant list if necessary, to provide an instant landscape barrier at time of planting. Cross-sections A, B, & C should be comparable for these planting areas on the exit end of the tunnel as well. 28. The applicant has agreed there will be nothing other than automated or self- X service features as part of this Conditional Use application. Any future requests for other services (wax, upholstery cleaning, etc.) would require a new Conditional Use review/approval. 29. Provide executed and recorded copy of the cross-access easement with X I DEPAKTMENTS I INCLUDE I REJECT I Parcel A, prior to issuance of first building permit. 30. Access off of Congress A venue is only partially on your parcel. Provide X executed and recorded copy of the cross-access easement with the parcel to the north, prior to the issuance of first building permit. 31. The drainage depicted on sheet C-l depicts drainage improvements crossing X onto Parcel A. Provide executed and recorded copy of this easement with Parcel A, prior to the issuance of first building permit. 32. Include baffling of light fixtures in order to prevent glare and light spillage X onto adjacent properties. Additionally, consider reducing the lighting to security lighting only within one (1) hour of closing. 33. Provide noise level data for blowdryer equipment for a distance equal to the X rear of the residential properties to the north. All mechanical equipment, including the vacuums, should be turned off at closing time each day. 34. Staff recommends the installation of some variety of wall along the north X and east sides of the tunnel exit / parking lot to reduce the potential of noise escaping the site, should the professional sound study being prepared by the applicants warrant more than the landscaping being proposed. 35. Applicant states the hours of operation will be from dawn to dusk. Any X proposal to extend these hours will require commission approval. Staff recommends however, the carwash be open no later than 7 P.M. 36. Applicant shall provide a unity of title for all of Parcel "A", prior to X issuance of first building permit. ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 37. None X ADDITIONAL CITY COMMISSION CONDITIONS Comments: 38. Comment #33 was rejected by the City Commission to replace it with only X the second portion of comment that reads as follows: All mechanical equipment, including the vacuums, should be turned off at closing time each day. 39. Omit comment #34 as the sound standards are to be met without use of a X buffer wall along south side of project. Conditions of Approval 6 DEPARTMENTS INCLUDE REJECT 40. If sound levels of the project are ultimately measured to exceed sound X limitations of the code, the owner or operator will either remove the number of blowers necessary to comply with city sound limits, or apply additional sound mitigation measures within the tunnel to accomplish same. Sound readings would be taken by city personnel certified in using a sound level meter. 41. There shall be no certificate of occupancy granted until the City of Boynton X Beach has tested the operations of the carwash and has found it to be in the limits described by the sound ordinances of the City. 42. The project shall include gates at project driveways that will be locked to X prevent access when business is closed. 43. Power to the vacuum units shall be turned-off to prevent use when business X is closed. 44. A minimum of two employees shall be on site during house of operation. X 45. Signage shall be posted that prohibits playing of radios while on premises. X S:IPlanningISHAREDlWPIPROJECTS\Rapido Rabbit\2nd Review Comments. doc