Loading...
R06-101 II 1 RESOLUTION NO. R06- 101 2 3 A RESOLUTION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, AUTHORIZING EXECUTION OF 5 TASK ORDER NO. U04-08-08 IN THE APPROXIMATE 6 AMOUNT OF $31,630.00 TO GLOBAL TECH, INC., FOR 7 ENGINEERING SERVICES FOR PREPARATION OF A 8 SPILL RESPONSE PLAN FOR THE WASTEWATER 9 CONVEYANCE SYSTEM; AND PROVIDING AN 10 EFFECTIVE DATE. 11 12 13 WHEREAS, the Florida Department of Environmental Protection is preparing a 14 Consent Order to be issued tot he City of Boynton Beach in response to a sewer spill that 15 took place in 2004; and 16 WHEREAS, part of the Consent Order is the Emergency Response Plan; and 17 WHEREAS, the City Commission of the City of Boynton Beach upon 18 recommendation of staff, deems it to be in the best interest of the citizens of the City of 19 Boynton Beach to authorize execution of Task Order U04-08-08 in the approximate amount 20 of $31 ,630.00 to Globaltech, Inc. 21 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 22 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 23 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 24 being true and correct and are hereby made a specific part of this Resolution upon adoption 25 hereof. 26 Section 2. The City Commission of the City of Boynton Beach, Florida does 27 hereby authorize and direct the approval and execution of Task Order U04-08-08 in the 28 approximate amount of $31,630.00 to Globaltech, Inc., for engineering services to prepare 29 an Emergency Spill Response Plan for the wastewater conveyance system, a copy of which S:\CA\RESOlAgreements\Task - Change Orders\Globaltech - Task Order U04-0B-06.doc II is attached hereto as Exhibit "A", 2 Section 3. This Resolution shall become effective immediately upon passage. 3 PASSED AND ADOPTED this ~ day of June, 2006. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 ATTEST: Yn.~ CITY OF BOYNTON BEACH, FLORIDA /t? Commissioner - Robert Ensler S:\CA\RESOlAgreements\Task . Change Orders\Globaltech - Task Order U04-0B.06.doc ROfo-IOI Globaltech, Inc. Task Order No. U04-08-08 Engineering Services for Preparation of a Spill Response Plan for the Wastewater Conveyance System A. Background The Florida Department of Environmental Protection (FDEP) is currently preparing a Consent Order to be issued to the City of Boynton Beach (CITY). The Consent Order is being issued in response to a sewage spill the CITY experienced in 2004. The Consent Order will require the CITY to develop a standard protocol for responding to sewage discharge incidents. The protocol will have to be submitted to the FDEP within 90 days of the execution of the Consent Order. The Consent Order will also require development of a comprehensive Operation and Maintenance (O&M) Manual for the wastewater conveyance system. The submission date for the O&M Manual has yet to be decided. The FDEP has also stated that they would like the CITY to develop a Capacity, Management, Operations and Maintenance (CMOM) Program although FDEP is not currently requiring one. The CITY has requested that Globaltech, Inc (CONSULTANT) provide engineering services to prepare the spill response plan. Preparation of the O&M Manual or a CMOM Program is outside the scope of this Task Order, but can be added as Additional Services. The spill response plan will cover the following topics: · A written protocol for responding to wastewater spills from gravity lines, manholes, force mains, lift stations, and master lift stations. · The protocol will include an initial site assessment which will include an evaluation of the potential size of spill, who or what will be affected by the spill, and a listing of recommended actions based on the site assessment. · The plan will include recommended actions to minimize, contain and neutralize the spill and if the spill cannot be contained on site, methods to mitigate the damage to the surroundings. · Listing of CITY personnel who need to be notified and on site after a spill occurs. · Incorporation of gravity sewer maps and force main maps, with valve locations into the spill response plan. · Development of a public notification procedure. · Listing of specific supplies, tools and machinery that the CITY should keep on hand in order to respond to wastewater spills. · A compilation of paperwork that needs to be completed and submitted after a spill and a list of agencies to be notified after a spill. · Development of a training program, including a system for updating the response plan as new facilities are constructed or existing ones modified. TASK ORDER No. U04-08-08 B. Scope of Services The CONSULTANT shall provide the following services as described below: · Meet with the FDEP to coordinate the information requirements for the spill response plan. · Meet with the CITY to discuss FDEP requirements and review available information. · Meet with the CITY to collect necessary information. · Prepare a draft spill response plan. Provide 5 copies of the draft spill response plan. · Meet with the CITY to discuss CITY comments on the draft spill response plan. · Incorporate CITY comments and complete the fmal version of the spill response plan. Provide 10 copies of the fmal spill response plan to the CITY. Submit one copy of the final spill response plan to FDEP. C. Assumptions In addition to the work items discussed above, the following assumptions were made in establishing the scope of work and associated fee. Changes and/or modifications in the above work items or these assumptions are considered an Additional Service Item under the terms of the contract. · CITY will provide utility maps in CAD format or will provide hard copies for inclusion in the report. · The spill response plan will be generic in scope and will not reference particular lift stations. Gravity system and force main maps relating to each lift station will be collected from the CITY and pertinent maps will be stored at each lift station. · The plan will list actions to take after a spill has occurred. It will not cover spill prevention. Natural disasters, acts of terrorism, vandalism, or acts of God will not be evaluated. · The CITY will be responsible for conducting the training of CITY staff. D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement for General Consulting and Engineering Services dated February 21, 2006 between the City of Boynton Beach and Globaltech, Inc. " ~.r" TASK ORDER No. U04-08-08 E. Additional Services The following are examples of some specific Additional Service Items that may be required, but are not included within this Task Order. Generally, a condition contrary to the work described in Section B or assumptions of Section C (upon which the fee is based) is considered an Additional Service Item. Examples include: · Preparation of a conveyance system O&M Manual. · Development of a Capacity, Management, Operations and Maintenance (CMOM) Program. · Training CITY personnel. These and other services can be provided, if desired by the CITY, under separate Task Order or by an amendment to this Task Order. Services performed will be on an as- directed basis in accordance with a written Notice to Proceed from the CITY. F. Compensation Compensation by the CITY to Globaltech for all tasks will be on a lump sum basis in accordance with the above-mentioned Agreement and as shown in the Table below. Individual task limits will not be exceeded without prior written authorization from the CITY. Work completed by Globaltech will be invoiced monthly on a percent complete basis. T bl 1 C ti T bl ti TkO d N U04 08 08 a e . ompensa on a e or as r er o. - - . Task Labor Labor Labor Labor Expenses Total Classification Hours Costs/ Costs Costs Hour Preparation of a Senior Project 148 $110 $16,280 $300 $16,580 Spill Response Manager Plan Project 46 $105 $4,830 - $4,830 Engineer Designer 104 $70 $7,280 $500 $7,780 Administrative 32 $45 $1,440 $1,000 $2,440 Total N/A $29,830 $1,800 $31,630 '2 ~.r'2 TASK ORDER No. U04-08-08 G. Schedule The CONSULTANT will commence work upon receipt of written authorization. The Table below shows the proposed schedule: Table 2: Schedule Table for Task Order No. U04-08-08 Submit Draft Plan 10 Weeks from NTP and/or after collection of all necessary information Submit Final Plan 2 weeks from receipt of review comments DATED this I~ day of ~ ,2006. CI~~CH Kurt ressner City Manager ---- A ~.r A CITY CLERK'S OFFICE MEMORANDUM TO: Barb Conboy Utilities Manager FROM: Janet M. Prainito City Clerk DATE: June 14, 2006 RE: Task Order No. U04-08-08 Engineering Services for Preparation of a Spill Response Plan for the Wastewater Conveyance System and Resolution number R06-101 Attached for your information and files is one copy of the above mentioned Resolution No. R06-101 and two originals of the fully executed Task Order. Since this Task Order did not require any additional signatures, I have kept one original for our files. Please contact me if there are any questions. Thank you. c!t~ Yn. 1~~,0v Attachments S ICCIWPIAFTER COMMISSIONIDepartmenlal Transmiltalsl2006IBarb Conboy - Task Order #U04-5-06 - CH2M HILL Flondan AqUifer - 03-25-06 doc