Loading...
Serrano Beach PUD DEVELOPMEP ~ ORDER OF THE CITY COMMISf iN OF THE CII ., OF BOYNTON BEACH, FLORIDA PROJECT NAME: Serrano Beach PUD APPLICANT'S AGENT: Julian Bryan / Julian Bryan & Associates, Inc. APPLICANT'S ADDRESS: 1700 Northwest Arcadia Way, Boca Raton, FL 33432 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: January 18, 2005 TYPE OF RELIEF SOUGHT: Request for Master Plan modification approval to reduce the front yard setbacks from 25 feet to 22.5 feet. LOCATION OF PROPERTY: South of Golf Road, approximately ~ mile west of Congress Avenue. DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 6. 7. DATED: 1. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant ~AS HAS NOT established by substantial competent evidence a basis for the relief requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". 4. The Applicants application for relief is hereby ~RANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. All further development on the property shall be made in accordance with the terms and conditions of this order. Other 1-~11-0 S:IPlanningISHAREDIWPIPROJECI'SlSerrano PUDIMPMD OS-0021DO.doc DEVELOPMEf ORDER OF THE CITY COMMISS CITY OF BOYNTON BEACH, FLORIDA \j OF THE PROJECT NAME: Serrano Beach PUD Development paz Building EngIneering Occ. Llcen.e D!p.uty City Clerk APPLICANT'S AGENT: Julian Bryan / Julian Bryan & Associates, Inc. APPLICANT'S ADDRESS: 1700 Northwest Arcadia Way, Boca Raton, FL 33432 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: January 18, 2004 TYPE OF RELIEF SOUGHT: Request for Master Plan modification approval to reduce the front yard setbacks from 25 feet to 22.5 feet. LOCATION OF PROPERTY: South of Golf Road, approximately ~ mile west of Congress Avenue. DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applica~t ~HAS HAS NOT established by substantial competent evidence a basis for the relief requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". 4. The Applicant's application for relief is hereby /' GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other DATED: J -c!J 1- 0 S:lPlanninglSHAREDlWPlPROJECI'SlSerrano PUDIMPMD OS-0021DO.doc Location Ma Serrano at Boy t P n on Beach ~_...-----.:..-~ ---c ! /--- ~/' --------j. / ) --------------..../ PU ~ 800 , 0 800 Feet , N .-<r' s EXH-IBIT A ~ ; I .: i t ~ , , . I , . ~! ., ] ll' " :j" '!! ~3 ~g I~ g~ fI :;' I UN-SUBDMDED VILlAGE OF GOLF VILLAGE OF GOLF ZonIng: R Zoning: R. R""IdenUeI Slng'&-FIII11IIy .no Jou.... _ _ .~!'JI~ BI/lllle,f...,IJy... funT. CMAIM ~'Ml FENCE r-UI$T. 10' IJoGRUJ "(GIlts! ESOl.T. -.na-GOWCOursa 1,. .. .. ,."'.'-"""'.N'CtJUFFE1tCSlrt.ITY"J I:t ,rCl/fEMNII} I /tOM~OJ _.I.. -.. "'M'~.~. ".::'. I-- =--::r.' _' .: ~l"--;r. -- _ ., 'lel'" -"- ~ii>fl:m~='._, '_'--I' _, '11 ,,-- ,f , 'I", - ,'-,-,.---,-, "i' , '["3i'} 1', -,'--, , , , loll I 1 I I I I 11 1 I I "I 1; \ I I.. 1 01 I Of I ..., I ~ I, Ct : Ig I::: ~ I i:f II ! 1!1~ ... I N :a tit I I I I '" :.; ','S. : r , 1 I I I I I~:i I I : :~ 10 !!i I I I I I I 1 I I ~ :: J.~ I.. .. J~~ ~ :~.~: ...._ ~ ~.Y-:~f-~~~:~= L~ ~. .:~. ~~ ' =.~ .~_~ ::~L t d ~:fi;:l~l')s ~(~~~I,~":~..:'~:~ F &1~i1r:\'c hh~ Ii . IT, - '! i ~ I" / / : II ~ ,~ . i ., !.. ,: a ~. ~ '" r ~ " i~' ,':-- , i . .', L ~. . ii . i ' , " , , ; !i~ i M;' , - - - 'I , . r- - .- if ~? - Ii: . I 1_ - ~,;.. l. i, I ~ : t; .1.: i~: !: .. "C;~ 1.,1 r ~~ , I .I,!:I ~ " , ~ll. I : : ~ , , tV ~, ~ ' ~ 1 ~~'r, - - - - " ~-~ "I ,i I'!.: .I: : ,_ -T!'L _ ~ _ :: L' ..~ ~~ -J==:"--iJ t ~R:-: 8~ :l Ide ~ t:j !,i j:: _:::_ ..._: ~~ 1..' " -"1 . ~ ~~.; '"' - 'h l!o' ~ ~ ,I I I I -"rUJ - - I 'l. "; I I :.! :'.~ ~- ",,: i:;: ~ ) -. I:: J:. '.) li . ~ i :: <&- - ~r:~' i! i'~~: / - -, - f 11 li!iJi ~~ I' .," - - - - ,: i!!~, " ,_: l- : ' ' ; :; il ~~!! ~ ~111 " :! i~ ~:~: '", ':~!.. II ---d~-Inii!,m ef~ ' , , ~ ': ,~:' \' '"" I" 8' :!\ g!~ ~ i " - - - - - ii!" , : ;:,!l : - & : ~ &i~ : ~ ~!: ~ l!,; " ~f~ I " l' 'i i' Ii \" I'" I"! j@" _ . " .~ ~ ': .:, , . ..u .. ~ ' , '~, "] ,~ ' , , :: I \ \ '- - -- - - T"" : t- 'IT ' ~ ~\:1',':' m~ : ~~ '~:- - I .,~,~~, ;:"lN~ I __ t_~j~~ I -_/~ I ~ . ~ ;-<% -: h ~ / :,,~~:_._~--. --:-~~ ~~-~ ,<<<:~~;.,.."':..~ :~_~1'__~-___~-_ ~ : f ~ ! UI ///////~ /~~~:~:'=I:jE[f~~~~~=;~: .., If" / ',~"""" "'~. Ii :;j ~ 'I I I I I I I I It.., I _ I ~ I,', 9 'I ~ I {fg ~ ~ I ~ I ~ I !t 1 l ~ ~ I !i . It I iP~ .... ~ ,,'I : 3 I I . 1 \ I l~ I I I ~ I ~t ! I I I ~ 'I I ~ I I I I I I I" 1 1 I \ ;~ \ ' ::: t ,~_ L-:..---~I!-~_:~~~'~:-7~~'.~:-~.:.;:J ~ 1--1 ~'~~~'T,;~~~;';,';~;,'\.'_'~U_~ - ;';";;ft~~.,.:~;-:- . ,:""~n. u_u,\u u_ U__: I ~ '1 ""~ \: ~ I . UN-SUBDMDEO ) , . 'r: . I ~~ -. ,BOYNTON BEACH , Zoning: AR . (E""""ntary SchooQ I . } : \ ", ", J", IIIIJ" IIi III flU 111111'.. HI HI Uti plilm~ .., ,.. "" B,' ~ 'H u; BB i' '" ~~~ ~u HH r~ E II I , , I ii i --, .1 . :p:::::_ . I;! ~~;;_. m,:::: "c. 1+;:: , !~ If i~ i I n ~,\ i II .'-i' ~n ~.~ :~ \&I --...:. ":-e.~ K /(~, , 'I : SM ' j~ : " . . . . . . , . . ' . ' , ' g: , : .. i \ :: I: i: : .. .' i: : \ I, " I' i: ! : , . i: i: ~ I: : ~ i : :\0 j\: : }J' : " I' W : ~ : , . , , "jM , UN-SUBOr VILLAGE 0 Zoning: P . PL .. i I , I , I , I , I , I , I , I , i , I i I , I I I(i 111'ii : I ~ ! I, JIll!; ! ! ~ ~ ~ II lIii' .. Z I" I, Iii IJil(,ii pm ,I~ ,.. ! Sf I · ~ , i~ hlil, . f:~ I ~~u I " 111,11 Sill' l ~ II! 11',11 :~ > I ~- ; Ii !1'lh ;~ 1.( '~I!i . Ii I ~ i! ~~!~ ~~ ' i ., dlJh li~! ~ ~ I ~ liill; 'f r= ! 11)1., · Ii i 11111 -- 5 j ~~& ~ ij :! 8 l!: ... ~~ij . ~j ~n I _~ = f Y ~~~ 2~-;": ~ ~ r----..... r~ ~ \!~~I! -"""""'-"U' . ~ Sl~~i ~~:~ C I-- I ---"'~--..J "'''' " ~" i~ I~: ~ u~ ih Ih! ~ lrjllii ~ JU s LI.. -1= ,., fl m .. . J;tl~ I ~ COUNTJl.Y LAKl Tko ~ I~il~ = 0 5 z ,..~~o ~ 0 I i !V~~ .)> ~ iifi i:j _ ~ f,r ! ~ ~ hlt!~ ~ I r4 "U . lh .., J fj Y/ c- .if J B A Julian Bryan & Associates u",",n _....n ._ p..nnl.... ~on'"" p...."..... .n._I. ~..-. _.,,,"..... .......~~.n.., P~_ln.. _ o .." ...... 11f!:I~ I 'il~11 ~ ~ , ~ fllf.. ~~'l I ~i 5~ @ . ~liI' , I ~... ~ , j ~ . ~~ ~~7, . 1"',1 ~l '!II I ~I - SI~ ...~Fcl= -=-F=-=t=-~Il _c~_ ~r~ j 51~~ ~~!;u ~ ~ . .il ~~:: ~ s 1~~ ~ J ~~ x~ ~.'iii ~ ~~~il! U' s: I I: t',.. ...~ ~ " 'I i .. I: ~ :: 1---.1-- ~"" ~ ~ ' " I ... ::; -- ..- I --- fii---.J "';ti t M ~ ~. .. '" ~ ~~ /KY.'>>"', .1 -1fP. /05'TrP. . o ~ i COWIlIU!""YI!. !--~ MASTER SITE PLAN SERRANO -~-l rrrrrrl I I I I I I ~ EXHIBIT B EXHIBIT "e" Conditions of Approval Project name: Serrano Beach PUD File number: MPMD 05-002 Reference: 2nd review plans identified as a Master Plan Modification with a November 23,2004 Planning & Z d ki omng ate stamp mar ng. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS- General Conunents: None X PUBLIC WORKS- Traffic Conunents: None X UTILITIES Conunents: None X FIRE Conunents: 1. The site plan and / or master plan design documents shall adhere to Chapter X 9 of the Code of Ordinances ofthe City of Boynton Beach entitled "Fire Protection and Prevention". This ordinance adopts NFP AI, Fire Prevention Code, 1997 edition, and NFP A 101, Life Safety Code, 1997 edition. 2. Design documents shall demonstrate compliance with Land Development X Regulations Chapter 6, Section 16, which provides requirements for hydrants. Connections shall be to water mains that are not less than 6 inches in diameter. Domestic residential pressure shall not be less than 20 psi and must maintain a fire flow of at least 1500\ gallons per minute. 3. Where underground water mains and hydrants are to be provided, design X documents, must demonstrate that they will be installed, completed, and in service prior to construction work per NFP A, (1997) Section 41-2.3.2. 4. Pursuant to City Ordinance 9-3F, the Fire Marshal has developed an X Administrative Order dated May 9,2001 that provides the minimum performance for all security gates and emergency access. Another Administrative Order dated May 15,2001 addresses Knox Box storage of information for responding emergency personnel. 5. Design documents must demonstrate compliance with the requirement for X fire lanes that are provided in Section 9-12 of the City Ordinances. Signing and marking are described in Land Development Regulations Chapter 23, Section B.2. 6. Fire lanes shall be provided at the start of a project and be maintained X throughout construction for access per NFP AI, Section 41-2.1. 7. Fire-rescue access roadways per NFP A 241, Chapter 5, shall be provided at X Conditions of Approval 2 I DEPARTMENTS I INCLUDE I REJECT I the start of the project and maintained until completion. POLICE Comments: None X ENGINEERING DIVISION Comments: None X BUILDING DIVISION Comments: 8. Please note that changes or revisions to these plans may generate additional X comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the commission and at permit review. 9. Indicate within the site data the type of construction of each building as X defined in 2001 FBC, Chapter 6. 10. Indicate within the site data the occupancy type of each building as defined X in 2001 FBC, Chapter 3. 11. Place a note on the elevation view drawings indicating that the exterior wall X openings and exterior wall construction comply with 2001 FBC, Table 600. Submit calculations that clearly reflect the percentage of protected and unprotected wall openings permitted per 2001 FBC, Table 600. 12. At time of permit review, submit signed and sealed working drawings of the X proposed construction. 13. IdentifY within the site data the finish floor elevation (lowest floor elevation) X that is proposed for the building. Verify that the proposed elevation is in compliance with regulations of the code by adding specifications to the site data that address the following issues: The design professional-of-record for the project shall add the following text to the site data. "The proposed finish floor elevation _' _ NGVD is above the highest 1 OO-year base flood elevation applicable to the building site, as determined by the SFWMD' s surface water management construction development regulations." a. From the FIRM map, identifY in the site data the title of the flood zone that the building is located within. Where applicable, specifY the base flood elevation. If there is no base flood elevation, indicate that on the plans. b. IdentifY the floor elevation that the design professional has established for the building within the footprint of the building that is shown on the drawings titled site plan, floor plan and paving/drainage (civil plans). I DEPARTMENTS I INCLUDE I REJECT I 14. Add to the submittal a partial elevation view drawing of the proposed X perimeter wall/fence. Identify the type of wall/fence material and the type of material that supports the wall/fence, including the typical distance between supports. Also, provide a typical section view drawing of the wall/fence that includes the depth that the wall/fence supports are below finish grade and the height that the wall/fence is above finish grade. The location and height of the wall/fence shall comply with the wall/fence regulations specified in the Zoning Code. 16. A water-use permit from SFWMD is required for an irrigation system that X utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. 17. If capital facility fees (water and sewer) are paid in advance to the City of X Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: a. The full name of the project as it appears on the Development Order and the Commission-approved site plan. b. If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. c. The number of dwelling units in each building. d. The number of bedrooms in each dwelling unit. e. The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) 18. At time of permit review, submit separate surveys of each lot, parcel or tract. X For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel or tract. The recorded deed shall be submitted at time of permit review. 19. At time of building permit application, submit verification that the City of X Boynton Beach Parks and Recreation Impact Fee requirements have been satisfied by a paid fee or conveyance of property. The following information shall be provided: a. A legal description of the land. b. The full name of the project as it appears on the Development Order and the Commission-approved site plan. c. If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. d. The number of dwelling units in each building. e. The total amount being paid. (CBBCO, Chapter 1, Article V, Section 3(f)) 20. Pursuant to approval by the City Commission and all other outside agencies, X the plans for this project must be submitted to the Building Division for reVIew at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. Conditions of Approval 4 I DEPARTMENTS I INCLUDE I REJECT I PARKS AND RECREATION Comments: 2l. 47 single-family units @ 940ea = $44,180 X The fee is due at the time of the first building permit for this phase. 22. Recommendation that the developer include bike lanes for residents X considering the proximity to an elementary school. FORESTER/ENVIRONMENT ALIST Comments: 23. Existin2 Trees removal and Landscape Plan X The applicant must submit a tree replacement (mitigation) plan for the 498 diameter inches of trees removed from the site: Tree Species OuantitvDiameter inches (each) Total Diameter Slash Pine 36 trees 10" each 360" total Live Oak 1 double 12" each 24" total Live Oak 1 single 30" each 30" total Live Oak 1 single 12" each 12" total Live Oak 1 double 6" each 12" total Live Oak 1 single 1 0" each I 0" total Acacia 5 trees 8" each 40" total 46 trees total 498" total Total diameter of trees removed from the site is 498 diameter inches. Irrigation System 24. There is no irrigation system design included with the site plans. All shade X trees should receive water from an irrigation bubbler. [Environnemental. Regulations, Chapter. 7.5, Article II Sec. 5,A.] PLANNING AND ZONING Comments: 25. All 48 Conditions of Approval from the original Development Order are X still in force. 26. Applicant shall agree to, and place within the Homeowner Documents, that X the perimeter buffer landscape shall be maintained as approved, and that individual homeowner may not remove it for improvements on their property. 27. There does not appear to be a fence proposed along the south perimeter of X . ". - - " . .. DEP ARTMENTS INCLUDE REJECT the subdivision. If one is currently contemplated, it should be indicated on this plan. If one should be considered in the future, it shall be placed on the north side of the 10 foot landscape buffer. This would place the landscape material on the outside of the fence, screening the fence from Palmland Drive. A note to this effect shall be placed on the Master Plan. I I ! ! ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 1. None X ADDITIONAL CITY COMMISSION CONDITIONS Comments: 1. To be determined. .~ ~A(,) '...._" V I S :\Planning\SHARED\ WP\PROJECTS\Serrano Beach\MPMD 05-002\COA ,doc