R07-088
II
1 RESOLUTION NO. R07- 088
2
3 A RESOLUTION OF THE CITY OF BOYNTON
4 BEACH, FLORIDA, AUTHORIZING THE CITY
5 MANAGER TO EXECUTE TASK ORDER NO. U07-03
6 IN THE AMOUNT OF $1,394,247.90 WITH DCR
7 ENGINEERING SERVICES, INC., FOR
8 ENGINEERING, DESIGN, CONFIGURATION,
9 INSTALLATION, AND TRAINING SERVICE
10 REGARDING THE CITY'S LIFT STATIONS, WELLS,
11 WATER TREATMENT PLANTS AND PUMPING
12 FACILITIES; AND PROVIDING AN EFFECTIVE
13 DATE.
14
15
16 WHEREAS, at the Commission meeting of June 19, 2007, DcR Engineering, Inc.,
17 of Lakeland Florida was awarded a contract to provide Supervisory Control and Data
18 Acquisition (SCADA) system and Telemetry system services for the Utilities Department on
19 a task order basis; and
20 WHEREAS, the purpose of this Task Order is the first phase of a multi year project
21 and calls for the installation of the SCADA and Telemetry infrastructure and the replacement
22 of the existing remote control systems at our wellfields, remote storage facilities, stormwater
23 pumping stations and a number of wastewater lift stations; and
24 WHEREAS, the City Commission of the City of Boynton Beach upon
25 recommendation of staff, deems it to be in the best interest of the citizens of the City of
26 Boynton Beach to authorize execution of Task Order U-07-03 in the amount of
27 $1,394,247.90, with DcR Engineering Services, Inc., for engineering, design, configuration,
28 installation, and training service regarding the city's lift stations, wells, water treatment
29 plants, and water storage and pumping facilities.
30 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
31 THE CITY OF BOYNTON BEACH, FLORIDA, THAT:
S:ICAIRESOlAgreementslTask - Change OrderslDCR Task Order U-07-03.doc
II
Section 1.
The foregoing "Whereas" clauses are hereby ratified and confirmed as
2 being true and correct and are hereby made a specific part of this Resolution upon adoption
3 hereof.
4
Section 2.
The City Commission of the City of Boynton Beach, Florida does
5 hereby authorize and direct the approval and execution by the City Manager of Task Order
6 U-07-03 in the amount of $1,394,247.90, with DcR Engineering Services, Inc., for
7 engineering, design, configuration, installation, and training service regarding the city's lift
8 stations, wells, water treatment plants, and water storage and pumping facilities, a copy of
9 which is attached hereto as exhibit "A".
10
Section 3.
This Resolution shall become effective immediately upon passage.
11
PASSED AND ADOPTED this ~ day of August, 2007.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30 ATTEST:
31
32
33
34
35
36
----------
ROi-08B
TASK ORDER NO. U - 07- 03
CITY OF BOYNTON BEACH UTILITIES DEPARTMENT
124 East Woolbright Road
Boynton Beach} Florida 33435
Title of Project: RFP #037-2821-07/CJD SCADA and Telemetry Goods and Services:
Phase 1. System Infrastructure and Remote Telemetry Units
A. SCOPE OF SERVICES:
This project will provide engineering. design, configuration, installation and training services required to
provide the City with remote monitoring and control of the City's Lift Stations, Wells, Water Treatment
Plants and Water Storage and Pumping Facilities. Concurrently, 129 of the City's existing water and
wastewater pumping facilities will be upgraded and remotely monitored, controlled, alarmed and
historically logged. After completion, the new Telemetry system will provide more reliable and superior
service to the City of Boynton Beach Utility's customers. This task will include all hardware, software,
installation, startup and system testing for the deliverables itemized below.
DELlVERABLES AND SERVICES INQ.UDED:
Reference the attached spreadsheet (Exhibit 1) and RFP #037-2821-07/CJD for details of the project
deliverables and pricing.
1. Provide engineering, design, installation and configuration of two Central Servers/Field Interface
Units (FlUs). One FlU will be located at the East Water Treatment Plant with a second redundant
FlU located at the West Water Treatment Plant. Each of the FlU's will consist of 4 Front End
Processors (FEPs), Redundant VTScada Server computers, Ethernet switches, 4 CDM750 Radios,
antennas and rack mount enclosures. FlU redundancy will be configured via radio and the City's
control network. VTScada redundancy will be configured via the City's control network and will
auto-synchronize after a network failure. Provisions will be made for additional network
redundancy.
2. Furnish and install upgrades to the City's two existing VTS/VTScada software licenses to the
latest version with upgrades and support through June 5, 2008.
3. Furnish and install redundant VTS Browser Server License to the existing VTS Servers for remote
access via Microsoft Internet Explorer.
4. Furnish seven (7) additional concurrent VTS Browser Licenses for a total of eight (8).
5. Provide upgrades and support licenses for the VTS Browser Clients through June 5, 2008 to
coincide with the existing VTScada Server Licenses.
6. Engineer, design, furnish, install and configure four RF repeaters. Preliminary design divides the
City into 4 zones at Boynton Beach Blvd N&S and Congress Ave E&W. The repeaters will be
located at NW: LS918, NE: LS309, SW: LS814, SE: LS405. NoRemote Telemetry Unit (RTU) will be
Page 1 of4
required to communicate more than 1.9 miles and we expect no RTU antenna to be over 6 foot
elevation. To restore the ambiance of the City, the existing eyesore towers will be removed and
dome antennas will be utilized.
7. Furnish a spare repeater, setup and configured for replacement in case of a zone repeater
failure.
8. Provide engineering and professional services for combining the existing remote water and
wastewater HMI applications into a single redundant application. This will provide a combined
point of access for operational, reporting and alarming. Information Realms will be created for
personnel and access security.
9. Currently, the City's business and SCADA networks are shared creating a potential security risk to
the City water system. This item will, in conjunction with the planned plant SCADA upgrade,
provide the additional hardware required to isolate the two networks and provide a secure-point
of entry into the SCADA network from the business network.
10. Provide a customized and extensive training program for Maintenance, Operations, Engineering
and Administration. The City's Maintenance personnel will be trained in self-performing repairs,
upgrades and ongoing maintenance of the pumping station equipment. Operators will be
trained in control and first response procedures based on the CityJs Standard Operating
Procedures (SOPs). Engineering and Administration will be trained in system configuration, data
analysis, security administration, and specification and design procedures.
11. This item will provide materials combined with a standard duplex lift station RTU for "hands on"
training of Maintenance Personnel. A standard lift station Pump Control panel will be
manufactured per the City's specification during training utilizing a standard duplex RTU. After
completion of the training program, the Pump Control Panel may be installed at an existing lift
station budgeted for upgrade.
12. Upgrade 90 of the City's 154 Duplex Lift Stations itemized in Exhibit 2 with MOSCAD ACE RTUs.
This item will provide wireless monitoring, control, alarming and reporting of ninety existing
duplex lift station. The existing SCADA equipment and towers will be removed and the controls
upgraded to current National Electrical Codes (NEe) and Underwriter's Laboratory (UL)
Standards. Pump control redundancy, emergency alarm reporting, station history and operation
records, and pump control standardization will be provided with this item.
13. Upgrade the City's 5 Triplex Lift Stations itemized in Exhibit 2 with a Motorola MOSCAD ACE RTU.
This item will provide wireless monitoring, control, alarming and reporting offive existing triplex
lift stations. The existing SCADA equipment and towers will be removed and the controls
upgraded to current National Electrical Codes (NEe) and Underwriter's Laboratory (UL)
Standards. Pump control redundancy, emergency alarm reporting, station history and operation
records, and pump control standardization will be provided with this item.
14. Upgrade the City's single Quadruplex Lift Station itemized in Exhibit 2 with a Motorola MOSCAD
ACE RTU. This item will provide wireless monitoring, control, alarming and reporting ofthe
existing quadruplex lift station. The existing SCADA equipment and tower will be removed and
the controls upgraded to current National Electrical Codes (NEe) and Underwriter's Laboratory
(UL) Standards. Pump control redundancy, emergency alarm reporting, station history and
operation records, and pump control standardization will be provided with this item.
15. Upgrade the City's 19 Wells in the East Well Field with Motorola MOSCAD ACE RTUs. This item
will provide wireless monitoring, control, alarming and reporting of the existing twenty wells in
the east well field. The existing SCADA equipment and towers will be removed and the controls
upgraded to current National Electrical Codes (NEe) and Underwriter's Laboratory (UL)
Page 2 of 4
Standards. Pump control, emergency alarm reporting, station history and operation records,
and pump control standardization will be provided with this item.
16. Upgrade the City's 11 Wells in the West Well Field with Motorola MOSCAD ACE RTUs. This item
will provide wireless monitoring, control, alarming and reporting of the existing eleven wells in
the west well field. The existing SCADA equipment and towers will be removed and the controls
upgraded to current National Electrical Codes (NEe) and Underwriter's Laboratory (UL)
Standards. Pump control, emergency alarm reporting, station history and operation records,
and pump control standardization will be provided with this item.
17. Upgrade the City's 2 Water Storage and Pumping Facilities with Motorola MOSCAD ACE RTUs.
This item will provide wireless monitoring, control, alarming and reporting of the existing two
water storage and pumping system. The existing SCADA equipment and towers will be removed
and the controls upgraded to current National Electrical Codes (NEe) and Underwriter's
Laboratory (UL) Standards. Pump control redundancy, tank level monitoring, valve control,
emergency alarm reporting, station history and operation records, and pump control
standardization will be provided with this item.
B. SCHEDULE
The final schedule for DCR Engineering Services, Inc.'s services will extend from our authorization
date to 360 calendar days.
Page 3 of4
C. COMPENSATION TO THE ENGINEER
For conducting the base services delineated in Section A, Task Order 2007-01 is amended to the
Agreement dated June 19, 2007; DCR shall receive the lump sum fee of $1,394,247.90. This fee
includes all labor and other direct costs for the scope of work spedfied in Section A of this Task
Order and are represented in Exhibit 1 and RFP #037-2821-07/CJD. Additional work efforts
requested by the City, which are beyond the scope of work identified in Section A of this Task
Order, will be negotiated separately from this scope as compensation to DCR for this additional
work. Partial payments of the lump sum fees are to be paid to DCR on a monthly basis in
proportion to the percentage of work completed and materials received.
AMOUNT AUTHORIZED FOR
TASK~
L -t
Submitted By: . '
Todd B dbenner, P.E.
Presid nt, DCR Engineering Services, Inc.
$
1.394.247.90
Approved By:
Page 4 of 4
Quadraplex Liftstation
DESCRIPTION . TOTAL
NO ITEM/DESCKIPTION QTY COST
1 F7574, ACE3600 FOR CM200 UHF 1 1,279.00
2 V851, CM200 RADIO 1 535.00
3 V214, 38 X 38 CM METAL CHASSIS 1 196.00
4 V103. 31/0 SLOTS FRAME 1 205.50
5 V261 , AC PS 85-264 V WITH BATTERY CHARGER 1 364.00
6 V114. 6.5 AH BACKUP BATTERY 1 164.50
7 V245,16 DI4 DO EE 4 AI20MA 2 1,373.00
8 V20, ADD: BLANK MODULE 1 27.70
9 F7502. ACE CPU3640 .
10 \. --\". ," ..' . .,.
11 RTU/HMI Applications and Software Configuration 1 189.50
12 RTU Mount, Antenna and Cabling, Low Profile Antenna 1 510.62
13 AC Surge Suppression (Hesco) 1 64.15
14 Backup Pump Controller BR560 (2 pump control) 1 473.35
15 Analog Voltage Monitor BR549 (300V/600V) 1 407.90
16 3 Ph Fuse Block w/ CC fuses (for phase monitor) 1 113.49
17 Ammeters (each 1 required for each pump 5/8" Hole) 4 670.62
18 RTU Intrusion Switch and Bracket 1 71.91
19 PCP/Site Intrusion Switch and Bracket 1 112.96
20 Prepreparation and Installation 1 284.25
21 Controller CoversionlTurnaround 1 717.25
22 Mixed I/O Interface Block 2 1,109.50
23 Operator Panel custom sheet metal 1 43.98
24 Horn and Light 1 130.90
25 Sq. D 3 Position Selector Switch w/4 NO contacts 4 201.44
26 Sq. D Hand/Off/Auto Nameplate 4 13.80
27 Sq. D LED Run Light 4 181.74
28 Sq D Pump Run Nameplate 4 26.94
29 Custom Engraved Tags 1 9.52
30 Momentary Push Button 1 21.84
31 Hour Meter 4 185.64
32 Assembly and Prewire 1 47.38
33
34
35
36
37
38
39
40
41 Professional Enginneer 1 113.70
42 OEM Drawing 1 23.90
43 Administration 1 6.63
44 Acceptance Testing 1 69.50
45 Warranty 1 34.75
46 Truck Rental 1 80.00
47 Hotels (GSA Rates) 2 192.00
48 Meals (GSA Rates) 2
49 State Sales Tax 7.00% 431.12
50 Frelnht 2.50% 153.97
51 Bond
SHEET TOTALS i 10,838.95
I
1$ 10,838.95
Triplex Liftstation
DESCRIPTION TOTAL
NO ITEMIDESCRIPTION QTY COST
1 F7574. ACE3600 FOR CM200 UHF 1 1,279.00
2 V851, CM200 RADIO 1 535.00
3 V214, 38 X 38 CM METAL CHASSIS 1 196.00
4 V103, 3'1/0 SLOTS FRAME 1 205.50
5 V261 , AC PS 85-264 V WITH BATTERY CHARGER 1 364.00
6 V114,6.5 AH BACKUP BATTERY 1 164.50
7 V245,16 DI.4 DO EE 4 AI20MA 2 1,373.00
8 V20. ADD: BLANK MODULE 1 27.70
9 F7502, ACE CPU3640
10 1<">".' '.. .'
11 RTU/HMI Applications and Software Configuration 1 189.50
12 RTU Mount, Antenna and Cabling, Low Profile Antenna 1 510.62
13 AC Surge Suppression (Hesco) 1 64.15
14 Backup Pump Controller BR560 (2 pump control) 1 473.35
15 Analog Voltage Monitor BR549 (300V/600V) 1 407.90
16 3 Ph Fuse Block w/ CC fuses (for phase monitor) 1 113.49
17 Ammeters (each 1 required for each pump 5/8" Hole) 3 502.97
18 RTU Intrusion Switch and Bracket 1 71.91
19 PCP/Site Intrusion Switch and Bracket 1 112.96
20 Prepreparation and Installation 1 284.25
21 Controller CoversionlTurnaround 1 717.25
22 Mixed I/O Interface Block 2 1,109.50
23 Operator Panel custom sheet metal 1 43.98
24 Horn and Light 1 130.90
25 Sq. D 3 Position Selector Switch w/ 4 NO contacts 3 151.08
26 Sq. D Hand/Off/Auto Nameplate 3 10.35
27 Sq. D LED Run Light 3 136.30
28 Sq D Pump Run Nameplate 3 20.21
29 Custom Engraved Tags 1 9.52
30 Momentary Push Button 1 21.84
31 Hour Meter 3 139.23
32 Assembly and Prewire 1 47.38
33
34
35
36
37
38
39
40
41 Professional Enginneer 1 113.70
42 OEM Drawing 1 23.90
43 Administration 1 6.63
44 Acceptance Testing 1 69.50
45 Warranty 1 34.75
46 Truck Rental 1 80.00
47 Hotels (GSA Rates) 2 192.00
48 Meals (GSA Rates) 2
49 State Sales Tax 7.00% 413.96
50 Freight 2.50% 147.84
51 Bond
SHEET TOTALS 10,495.62
I $ 10,495.62
Duplex Liftstation
DESCRIPTION TOTAL
NO ITEM/DESCRIPTION QTY COST
1 F7574, ACE3600 FOR CM200 UHF 1 1,279.00
2 V851, CM200 RADIO 1 535.00
3 V214, 38 X 38 CM METAL CHASSIS 1 196.00
4 V103; 3 110 SLOTS FRAME 1 205.50
5 V261, ACPS 85-264 V WITH BATTERY CHARGER 1 364.00
6 V114,. 6.5 AH BACKUP BATTERY 1 164.50
7 V245, 16 DI4 DOEE 4 AI20MA 1 686.50
8 V20, ADD: BLANK MODULE 2 55.38
9 F7502,ACE CPU3640 .,
10 ><i,,<. \'>
11 RTU/HMI Applications and Software Configuration 1 189.50
12 RTU Mount, Antenna and Cabling, Low Profile Antenna 1 510.62
13 AC Surge Suppression (Hesco) 1 64.15
14 Backup Pump Controller BR560 (2 pump control) 1 473.35
15 Analog Voltage Monitor BR549 (300V/600V) 1 407.90
16 3 Ph Fuse Block w/ CC fuses (for phase monitor) 1 113.49
17 Ammeters (each 1 required for each pump 5/8" Hole) 2 335.31
18 RTU Intrusion Switch and Bracket 1 71.91
19 PCP/Site Intrusion Switch and Bracket 1 112.96
20 Prepreparation and Installation 1 284.25
21 Controller CoversionlTurnaround 1 603.55
22 Mixed I/O Interface Block 1 554.75
23 Operator Panel custom sheet metal 1 43.98
24 Horn and Light 1 130.90
25 Sq. D 3 Position Selector Switch w/ 4 NO contacts 2 100.72
26 Sq. D Hand/Off/Auto Nameplate 2 6.90
27 Sq. D LED Run Light 2 90.87
28 Sq D Pump Run Nameplate 2 13.47
29 Custom Engraved Tags 1 9.52
30 Momentary Push Button 1 21.84
31 Hour Meter 2 92.82
32 Assembly and Prewire 1 47.38
33
34
35
36
37
38
39
40
41 Professional Enginneer 1 113.70
42 OEM Drawing 1 23.90
43 Administration 1 6.63
44 Acceptance Testing 1 69.50
45 Warranty 1 34.75
46 Truck Rental 1 80.00
47 Hotels (GSA Rates) 2 192.00
48 Meals (GSA Rates) 2 128.00
49 State Sales Tax 7.00% 342.91
50 Freioht 2.50% 122.47
51 Bond
SHEET TOTALS 8,879.88
, $ 8,879.88
East Well Field
DESCRIPTION TOTAL
NO ITEM/DESCRIPTION QTY COST
1 F7574, ACE3600 FOR CM200 UHF 1 1,279.00
2 V851, CM200 RADIO 1 535.00
3 V214, 38 X 38 CM METAL CHASSIS 1 196.00
4 V1t:l3, 31/0 SLOTS FRAME 1 205.50
5 V261 , AC PS85-264 V WITH BATTERY.CHARGER 1 364.00
6 V114, 6.5 AH BACKUP BATTERY 1 164.50
7 V245, 16DI4 DO EE 4 AI20MA 1 686.50
8 V20; ADD: BLANK MODULE 2 55.38
9 F7502, ACE CPU3640
10,., " ..,. . ,
. ..
11 RTU/HMI Applications and Software Configuration 1 189.50
12 RTU Mount, Antenna and Cabling, Low Profile Antenna 1 510.62
13 AC Surge Suppression (Hesco) 1 64.15
14 Backup Pump Controller BR560 (2 pump control)
15 Analog Voltage Monitor BR549 (300V/600V) 1 407.90
16 3 Ph Fuse Block w/ CC fuses (for phase monitor) 1 113.49
17 Ammeters (each 1 required for each pump 5/8" Hole) 1 167.66
18 RTU Intrusion Switch and Bracket 1 71.91
19 PCP/Site Intrusion Switch and Bracket 1 112.96
20 Prepreparation and Installation 1 284.25
21 Controller CoversionlTurnaround 1 717.25
22 Mixed I/O Interface Block 1 554.75
23 Operator Panel custom sheet metal
24 Horn and Light
25 Sq. D 3 Position Selector Switch w/4 NO contacts
26 Sq. D Hand/Off/Auto Nameplate
27 Sq. D LED Run Light
28 Sq D Pump Run Nameplate
29 Custom Engraved Tags
30 Momentary Push Button
31 Hour Meter
32 Assembly and Prewire
33
34
35
36
37
38
39
40
41 Professional Enginneer 1 113.70
42 OEM Drawing 1 203.90
43 Administration 1 6.63
44 Acceptance Testing 1 69.50
45 Warranty 1 34.75
46 Truck Rental 1 80.00
47 Hotels (GSA Rates) 2 192.00
48 Meals (GSA Rates) 2
49 State Sales Tax 7.00% 281.00
50 Freioht 2.50% 100.36
51 Bond
SHEET TOTALS 7,762.16
, i $ 7,762.16
West Well Field
DESCRIPTION TOTAL
NO ITEM/DESCRIPTION QTY COST
1 F7574, ACE3600 FOR CM200 UHF 1 1,279.00
2 V85t,CM200 RADIO ,.. 1 535.00
3 V214, 38 X 38 CM METAL CHASSIS 1 196.00
'4 V103, 3 I/O SLOTS FRAME . 1 205.50
5 V261 '. AC PS 85-264 VWITH BATTERY CHARGER 1 364.00
6 V114, 6.5AH BACKUP BATTERY 1 164.50
7 V245,16Di4 DOEE 4 AI20MA 1 686.50
8 V20, ADD: BLANK MODULE 2 55.38
9 F7502.ACE CPU3640 . .
10 ',>;. . .,,;>2,. , ,. .., .,
11 RTU/HMI Applications and Software Configuration 1 189.50
12 RTU Mount, Antenna and Cabling, Low Profile Antenna 1 510.62
13 AC Surge Suppression (Hesco) 1 64.15
14 Backup Pump Controller BR560 (2 pump control)
15 Analog Voltage Monitor BR549 (300V/600V) 1 407.90
16 3 Ph Fuse Block w/ CC fuses (for phase monitor) 1 113.49
17 Ammeters (each 1 required for each pump 5/8" Hole) 1 167.66
18 RTU Intrusion Switch and Bracket 1 71.91
19 PCP/Site Intrusion Switch and Bracket 1 112.96
20 Prepreparation and Installation 1 284.25
21 Controller CoversionlTurnaround 1 717.25
22 Mixed I/O Interface Block 1 554.75
23 Operator Panel custom sheet metal
24 Horn and Light
25 Sq. D 3 Position Selector Switch w/4 NO contacts
26 Sq. D Hand/Off/Auto Nameplate
27 Sq. D LED Run Light
28 Sq D Pump Run Nameplate
29 Custom Engraved Tags
30 Momentary Push Button
31 Hour Meter
32 Assembly and Prewire
33
34
35
36
37
38
39
40
41 Professional Enginneer 1 113.70
42 OEM Drawing 1 203.90
43 Administration 1 6.63
44 Acceptance Testing 1 69.50
45 Wanranty 1 34.75
46 Truck Rental 1 80.00
47 Hotels (GSA Rates) 2 192.00
48 Meals (GSA Rates) 2
49 State Sales Tax 7.00% 281.00
50 FreiQht 2.50% 100.36
51 Bond
SHEET TOTALSI i 7,762.16
I
I 1$ 7,762.16
Remote Water Storage and Pumping
(based on a triplex station)
DESCRIPTION TOTAL
NO ITEM/DESCRIPTION QTY COST
1 F7574, ACE3600 FOR CM200 UHF 1 1,279.00
2 V851 , CM200 RADIO 1 535.00
3 V214, 38 X 38 CM METAL CHASSIS 1 196.00
4' V103, 31/0 SLOTS FRAME 1 . 205.50
5 V261 , AC PS 85-264 V WITH BATTERY CHARGER 1 364.00
6 V114, 6.5 AH BACKUP BATTERY 1 164.50
7 V245, 16 DI4DO EE 4 AI20MA . 2 1,373.00
8 V20, ADD: BLANK MODULE 1 27.70
9 F7502, ACE CPU3640
10 .., '... ... .
11 RTU/HMI Applications and Software Configuration 1 1.516.00
12 RTU Mount, Antenna and Cabling, Low Profile Antenna 1 510.62
13 AC Surge Suppression (Hesco) 1 64.15
14 Backup Pump Controller BR560 (2 pump control) 1 473.35
15 Analog Voltage Monitor BR549 (300V/600V) 1 407.90
16 3 Ph Fuse Block w/ CC fuses (for phase monitor) 1 113.49
17 Ammeters (each 1 required for each pump 5/8" Hole) 3 502.97
18 RTU Intrusion Switch and Bracket 1 71.91
19 PCP/Site Intrusion Switch and Bracket 1 112.96
20 Prepreparation and Installation 1 1,819.20
21 Controller CoversionlTurnaround 1 1,058.35
22 Mixed I/O Interface Block 2 1,109.50
23 Operator Panel custom sheet metal
24 Hom and Light
25 Sq. D 3 Position Selector Switch w/ 4 NO contacts
26 Sq. D Hand/Off/Auto Nameplate
27 Sq. D LED Run Light
28 Sq D Pump Run Nameplate
29 Custom Engraved Tags
30 Momentary Push Button
31 Hour Meter
32 Assembly and Prewire
33
34
35
36
37
38
39
40
41 Professional Enginneer 1 113.70
42 OEM Drawing 1 395.90
43 Administration 1 6.63
44 Acceptance Testing 1 69.50
45 Warranty 1 34.75
46 Truck Rental 1 80.00
47 Hotels (GSA Rates) 2 192.00
48 Meals (GSA Rates) 2
49 State Sales Tax 7.00% 375.78
50 Freioht 2.50% 134.21
51 Bond
SHEET TOTALS 13,307.57
I
! $ 13,307.57
FlU Telemetry Units
I DESCRIPTION TOTAL
NO ITEM/DESCRIPTION QTY COST
1 F7564, ACE3600 WITH CDM750 403-512 MHZ 4 7,586.00
2 V446, ACE CPU3640 4 936.00
3 V108, 81/0 SLOTS 19" FRAME 4 1,886.00
4 V051, 19" RACK BRACKETS 'FOR 8 I/O SLOTS FRM 4 727.00
5 V261 , AC PS 85-264 V WITH BATTERY CHARGER 4 1,456.00
6 V328, 10 AH BACKUP BATTERY 4 848.00
7 V103, 3 I/O SLOTSFRAME . 4 822.00
8 V20, ADD: BLANK MODULE 12 332.25
9 ----..
10 ..,G',:, < <, < .
11 RTU/HMI Applications and Software Configuration 4 3,032.00
12 Antenna Mast and Cabling, Low Profile Vagi 4 2,042.48
13 AC Surge Suppression (Hesco) 4 256.54
14 Modbus Driver 4 1,536.40
15 Modbus Adapter Cable 4 119.00
16 72" Rackmount Enclosure 1 919.60
17 Rackmount VTScada Server PC (Allowance) 1 4,024.80
18
19
20 Prepreparation and Installation 1 2,512.00
21 Installation 1 2,512.00
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41 Professional Enginneer 1 113.70
42 OEM Drawing 1 23.90
43 Administration 1 6.63
44 Acceptance Testing 1 69.50
45 Warranty 1 34.75
46 Truck Rental 1 80.00
47 Hotels (GSA Rates) 2 192.00
48 Meals (GSA Rates) 2
49 State Sales Tax 7.00% 1,269.55
50 Freiaht 2.50% 453.41
51 Bond
SHEET TOTALS 33,791.51
I
1$ 33,791.51
Repeaters
DESCRIPTION TOTAL
NO ITEMIDESCRIPTION QTY COST
1
2
3
4
5
6
7 .. .
8
9 :c .
10 I';' ,..' .'...,..,... .,.
11 MTR2000 (UHF) 1 4,852.20
12 UHF Circulator (30W) R4 1 3,445.05
13 Conventional Operation 1 3,540.25
14 Add Repeater Operation 1 1,213.80
15 Factory Installed Duplexor 1 1,642.20
16 Hardware Rack Kit for repeater 1 59.50
17 AC Surge Suppression Citel 1 225.57
18 NEMA 1 SS White Enclosure 30"x24"x24" Locking 1 1,793.41
19 Swingframe Rackmount Rails for enclosure 2 751.04
20 Antenna, 30' Mast and Cabling, 7dB Omni 1 2,300.93
21 Polyphaser UHF 1 102.67
22 Intrusion Switch and Bracket 1 71.91
23 Filter/Fan 1 246.03
24 Thermostat 1 395.75
25 35 Amp Rackmount DC Power Supply/Charger 1 455.81
26 100 ah Batteries, Deep Cycle Gel 1 396.48
27 Rackmount Fusable DC Distribution Panel 1 260.82
28 Battery Tray/Shelf Rackmount 1 140.70
29 Rackmount Panel Blanks 3 85.39
30 AC Supply, Conduit, Breaker, Wire 1 573.80
31 Frequency Search 4 2,728.80
32 FCC Application Forms 4 1,292.10
33 Follow up Forms 4 212.20
34
35
36
37
38
39
40
41 Professional Enginneer 1 113.70
42 OEM Drawing
43 Administration
44 Acceptance Testing 1 556.00
45 Warranty 1 34.75
46 Truck Rental 2 160.00
47 Hotels 2 192.00
48 Meals 2 128.00
49 State Sales Tax 7.00% 947.49
50 Freioht 2.50% 338.39
51 Bond
SHEET TOTALS 29,256.74
I $ 29,256.74
SlIbject
[Tate,..'.
Linked to'
FroiTh!'; '.'
T ()',;~,J ;:,: ' ..
,. : BOY'lton,. Beactl ,Upgrades . . :,',.'~
: Mcin,4JLII12007 09:35:00-0300
i;!'lt~lf .,. .
;,,:-".i-,:,; -
" ,. '''-''':_-S::t;H~{'{;>>:i:~;;-:'~:'r< c),
,. < <',_>-:i.' .'\
Type
Expiry
Proposed Expiry
License Value
Update Price
License
20334
7730
Gold Full
Gold Full
Gold VIS
Gold VIC
VISNIS
Feb. 1/05
Feb. 1/05
June 5, 2008
June 5, 2008
Sept5,2007
Sept 5, 2007
June 5, 2008
$ 8,795.00
$ 8,795.00
$ 3,957.75
$ 3,957.75
$ 3,370.00
$ 13,500.00
$ 1,897.88
$ 26,683.38
All prices represent End User pricing. OCR will receive a 25% discount if the software is purchased
through OCR.
Regards
Director of Marketing
Office: 902 835-1575 Ext 228
Direct: 902 832-6160
Cell: 902441-9565
Hypoluxo Ro
Buttonwood Park
,,(iJ.\S.E1lvd
,5)""
.~
S
'0
cr:
Boynton Beach Sites, FL
ia'mBea~~~!'~e~~ipOrt
Lantana Rc;---
,-. ,LS918
-c,?'i~'''''''
,.J~ ,.........:.::..::~-cc.:;, <,.... ......_, ...'
-, tl:}'-::-:~::-~ Gateway $Tvd
;-...,:........;:.:': ,
. ,:,Alil(j!lll)jl.ve .
C~lebs.Ave.
SW- 23Cd Ave
Goit
~R<t S
Co,,1'I
.~Dr
S>J(\'II'I'
U'%/nitOf
~es .
Saba\ ..., . t
Ri ..era <> r~
.- or
...,""
~
?j'ou"
<3
iJi
. \
()~,
"',.~~-
m(
I
. ~otJ,~~~1
! ._.. I,!
palmlan~
SltllJ/lJit Q1
;0
c.
~
..
..
&
g>
rJ
~
'c,'
..;J..
DO\'l(\ellY Dr ~
0-
<ll-
'0
cr:
U
.s::
r::. .c..,
Cl
~ :f
z
. _.. 1>
iD i lS309
L________
.,
~RidgetlMl
NWllthSt
~ 9thSt
Omi
- '0
Cl::
<b
-8'
0:
.s::
Cl
:f
0.5
I
I
W L.~ntanaRcl 812
W i>alm-.S\'
W..Ocea.n'./>.ve--. - :.~: -
W Pl'1e SI iD
. .. -.3:
~."D
111
0'
Drew St -,jj
ri)
Ne:~,-Ave
1
.-l)
.if
~
811 .~
. : ~
Z Parks and''@
m Recreation i0
~/!
.c. ~
Ii
ii.
i'?
-;
;;
1"'-
Lantana
~ ~ t
II
II
'I
II
l1J'p<IIlIxq
I
tIC."
~-,-'-_,,",.,
"
'-f.ycee
J f'ark
o AlA
o
;f
~
a;
r::
B
o
z
Copynght~j8n(l (p) 1988-2006 Microsoft Corpcralion IInd!orlts supphers. AJI n[lhlS reserved 1'l1lp:/I\WiW_mu::rololl com'$I~IS
e>ol1,onsl':l 'S'i~WOti IMtaUSl'tleld SOt.wilre COro:Ylllion, All ngl'lll reserved_ Cel'lalT1 mappIng and dlfecl,on Gala 0 2005 NAVTEQ_ All n9Mts reser.red lhe Data for ..reas of c.:anada mCI...ces InfOfTll.al.lOn laker, W11~ ~flTIIS$IO" from CanadIan ",ult1onlies
'r\CluCIf19: ~ He' r.late$ly l~ Que." In fl,gl'll of C8nada, '" Queen'$ Pnnterll)/' Qn:ario. NAV1EO llnd NAVTEO ON BOARD IIr" t'lIdemat1ts of NAVTEQ, to 2005 Tele AtlaS Nor:~, Amen::.. Inc, All fighll fes8eved, Tale Atlal; IInd T818 Alias NOttI'l America
a'slfaoemat1ts of ToiileAUill;, Inc
1.5
.iLc
,II. "c<.,.
'I~~
__ ..__ : .J .B.8.hia. Way........
-- '.rNw-Re~tl!r. .-- .....
(l i 26*32'43"N X 8O*6'44"W
-- <l>, 4290 Royal Manor 8I'id . .. . ,Edgar Ave
\1!<!Y~}I~!c;h. FL:lli3-~TaN:-Vel'deDC
. 809
Paerll ,B'L.
e.",- westwTPiRoPla~-u_- . ~l.FO-t'Tf;l .'~
,.. 26.52886Nx 8O.12982W 'd' ... .__. ,,_E;
-----,' ~.~-.-1'r--DOYn(:D0'::;.-"-:>~~';-~~~,T-~:, ..'-
. . .
:2
Gi
>
111
:I: Hypoluxo
CloCk ' Rd
Canal Dr' - Canal Dr
Palm Way
do
4>
~
'"
-.J
Z
~\~ Glen Blvd en;
Palazzo ~'~I 0 '6ke Dr
'mi
-<I
-i
i
II
Flavor Pic! Rd' Coconut Ln
i
Sunrise Blvd i I
WOOdland Dr fbe'ray
(;ardens
Via Delray
3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3: 3:
r--- N r--- -q- ~ r--- co <.0 U; en 0 N "" <.0 ~ "" "" <.0 r--- "" -q- 0 N r--- "" -q- -q- -q- Ltl ""
r--- "" "" Ltl 0 "" N ~ Ltl N <.0 "" <.0 Ltl en en N "" -q- <.0 en <.0 0 0 r--- N Ltl -q-
"": "" r--- N <.0 <.0 r--- CO N "" ~ ~ -q- CO 0 I"-: r--- ~ N N <.0 <.0 Ltl 0 en ~ -q- ""
..t -q- c.O N N c.O 0 0 <.0 N 00 0 N ..t .0 c.O ~ ~ ~ ai .0 ai ..t ..t .0 0 N C"i .0 .0
Ltl -q- 0 0 0 0 ~ ~ "" "" "" "" "" -q- -q- Ltl N ~ ~ 0 0 0 Ltl Ltl -q- -q-
"" "" -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- r--- CO CO CO CO CO CO r--- r--- r--- r---
*1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO
Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z
N 0 <.0 0 "" <.0 -q- "" r--- "" <.0 "" <.0 "" <.0 Ltl "" Ltl en -q- 0 r--- 0 <.0 0 <.0 Ltl 0 <.0 ~
en en en ~ "" N "" r--- r--- Ltl 0 <.0 en N en <.0 N Ltl en 0 N ~ Ltl "" <.0 0 0 0 Ltl N
<.0 "" "" Ltl "" "" Ltl "! <.0 CO Ltl CO N r--- r--- ~ Ltl N -q- en "": Ltl -q- en ~ CO N
0 00 U; U; c.O c.O c.O 0 CO .0 N ..t 00 C"i ai ai ..t ~ c.O C"i ai 0 U; en 0 0 0 C"i N c.O
Ltl -q- -q- -q- -q- Ltl Ltl Ltl 0 -q- "" "" N N "" -q- -q- -q- 0 ~ -q- 0 0 0 -q- -q- -q-
0 0 0 0 0 0 0 0 0 0 M 0 0 0 0 0 0 0 0 M N N M ~ N N N ~ M ~
"" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" ""
<.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0 <.0
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
I c c c c c c 'E 'E 'E 'E 'E
'E 'E Q) Q) Q) Q) Q) Q) Q) Q) Q) Q) Q)
rn rn 0 0 0 0 0 0 Q) Q) Q) Q) 0.> Q) Q) Q) Q) Q) rn .!!! .!!! Q) 0.> rn .!!!
c c c c c c c c c c c c c c c a: c c a:
a: a: -'" -'" -'" -'" ~ -'" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a. a. 0 0 a.
LlJ LlJ ro ro ro ro rn ro c c c c c c c c c c c c c c c 3: 3: 3: c c 3: 3:
a. a. a. a. a. a.
~ Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl Ltl r--- r--- r--- r--- r--- r--- r--- r--- r--- r--- r--- r--- r---
"" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" ""
-q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q- -q-
"" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" ""
"" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" "" ""
en
z
0 "0 "0 "0 "0 "0 "0
i= rn rn rn rn rn rn
0 0 0 0 0 0
ct c::: c::: c::: c::: c::: c:::
U ~ ~ ~ ~ ~ ~ en
0 Cl Cl Cl Cl Cl Cl
...J ~ ~ ~ ~ ~ ~ rn
LlJ
Cl '0 '0 '0 '0 '0 '0 Q) Q)
0 0 0 0 0 0 >
...J (/) 3: 3: 3: 3: 3: 3: -0 c ~ -0 -0
W rn
(/) > ....J en en > >
U. LlJ ~ ~ ~ ~ ~ ~ CO ~ ~ rn rn CO CO
c::: LlJ LlJ
...J 0 0 0 0 0 0 0 .J:: Q) U5 .J:: .J:: "0
...J -0 -0 0 0 0 0 0 0 () <Jl 0.> Q) Q) () ()
W 0 > > "" "" "" "" "" "" rn Q) :; ~ > > .~ rn rn c:::
<( Q) ~ "" 8 ~ 0.> 0.>
s: co co a:; a:; a:; co z >, co 25 co co ~
en en -'" -'" -'" -'" -'" -'" !!! !!! !!! (3 Ltl rn en ~ ~ Cl
ro ro ro ro ro ro c ~ 3: oil ~ c c ~
Q) Q) Ci5 Ci5 Ci5 Q) 0.> Q) Q) 0 ~ Q) 0 0
a. a. a. a. a. a. 'E -q- U5 U5 'E 'E -0
U U Q) 0.> Q) Q) > > > > Q; en () r--- (/) > '0
rn rn Q) 0.> 0.> 0.> 0.> 0.> 'E "0 "0 C C C C (5 (5 ~ ;5 >, ~ 0 "" r--- <.0 8 >, >, 0 c:::
0.> 0.> ::l ::l ::l ::l ::l ::l "" M M rn rn rn rn 0 co E co N co Ltl 0 0 3: Q;
(/) (/) Cl Cl Cl Cl Cl Cl ....J ....J ....J ....J 0.> 0.> 0.> 0.> co ,g 0.> en r--- <.0 <.0 ~ co co
rn rn rn rn rn rn 3: 3: 3: .J:: .J:: .J:: .J:: 1ii 1ii 1ii 1ii c 'iil c en en en c
vi vi 0.> 0.> 0.> 0.> 0.> Q) r:::: r:::: r:::: r:::: ~ ::l :2 0.> U5 ~ ~ ~ :E
....J ....J ....J ....J ....J ....J (/) (/) (/) 0 0 0 0 (/) <Jl "0 "0 "0
~ ~ <Jl ~ .!: c c
0 0 0.> E 0.> E Q) 0.> 0 ~ 0 0. e- o. 0. "" co 0 ~ :c :c 0 C1> en ~ 0
N N B B B B 0 3: 3: 3: 3: 0 0 0 C1> Ltl U .J:: "" <.0 <.0 ;0 0
<.0 <.0 N N N 0 <.0 0 C1> 0.> 0.> 0.> Q) r--- -q- -q- <.0
~ ::J ::J ::J ::J ::J ::J (/) (/) (/) (/) 0 0 0 0 -q- <.0 <( C1> co co co co en Ltl Ltl N ""
~ ~ ~
rn rn rn ~ 0.> 0.> ~ 0.> 0.> "0
1: 'E 'E <Jl <Jl () () () () > en en en en en
0.> 0.> 0.> -0.> -0.> Q; Q; Q; Q; Q; Q; co rn rn rn rn rn 2 ~ -'" -'"
Z ~ 2 "0 "0 "0 "0 "0 "0 E E E ?; ?; E E E E E E .J:: >, >, >, LlJ LlJ LlJ LlJ LlJ U5 (/) c c
0 Qj Qj Qj Qj Qj Qj Q) 0.> 0.> 0 0 E E E E E E () ..!!1 ..!!1 ..!!1 rn rn
~ (/) U5 i:iJ i:iJ i:iJ ....J ....J rn <ii <ii <ii >, >, >, >, >, 'E 1: l- I-
u: u: u: u: u: u: 0 0 0 0 0 0 Q) ..!!1 ..!!1 ..!!1 ~ ~ rn rn Q)
'0 '0 0 0 0 0 0 0 > > > 0.>
en en -'" -'" -'" co <ii <ii <ii rn rn a: a: Cl Cl
0 rn rn <ii <ii <ii <ii <ii <ii ro ro ro c .!: c c c c c c c c c c > > > > > rn rn
0 LlJ LlJ co co co co co co a. a. a. :c .J:: 0 0 0 0 0 0 0 ::l ::l ::l en en 0 0
....J 0.> 0.> 'E 'E 'E 1: 1: 'E 1: (/) (/) (/) c c c c C 0.> 0.> Ci5 Ci5
en en en ::l ::l ::l ::l ::l ~ ~
e e >, >, >- >, >, >- >, (/) (/) (/) (/) (/)
Q) Q) !!! 0 0 0 0 0 0 0
0 0 0 co co co co co co co
LL LL LL
~I LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ LlJ 3: ~ ~ ~ 3: 3: ~ 3: ~ ~ 3: 0 0
N <.0 r--- co en 0 ~ N "" -q- Ltl <.0 r--- co en 0 N ~ ~ N ~ :2 :2
~ ~ N N N ~ -q- Ltl <.0 r--- co C1> ~ ~ ""
LIFT STATIONS DIRECTORY FOR TASK ORDER
Master Lift Station 356 B.B.R east of US 1 Triplex
Master Lift Station 309 Rainbow City / Seacrest and NW 19th Ave Triplex
Master Lift Station 319 Knollwood / SE corner of Lawerence Rd and Miner Triplex
Master Lift Station 316 SW 23th Ave and Military Tr Triplex
Master Lift Station 317 Burger King / RB.B. and Congress Quad
Master Lift Station 801 NW corner ofRB.B. blvd and Lawerence Rd Triplex
Lift Station 411 N Swinton Rd SW 34th Ave Duplex
Lift Station 407 Mission Hill Rd and Church Hill Dr Duplex
Lift Station 406 Chapel Hill Blvd and Westwood Ln Duplex
Lift Station 405 SW 27th Ave and SW 6th ST NW corner Duplex
Lift Station 102 St Andrews / S AlA Duplex
Lift Station 414 S Federal Hwy and SE 21st Ave Duplex
Lift Station 605 SW 16th St Between SW13th Terrace and SW 11 th Ave Duplex
Lift Station 612 Congress Ave N of Woolbright /Lakes of Tara Blvd Duplex
Lift Station 603 SE ofSW 4th Ave / Behind Home Depot Duplex
Lift Station 206 Boynton Isles / Greenbriar Dr and Kepner Dr Duplex
Lift Station 811 Oakwood Lakes / Oakwood Lakes Dr and Silver Lace Ln Duplex
Lift Station 907 Palm chase Duplex
Lift Station 900 West Water Plant Duplex
Lift Station 908 Cypress Park / Military Tr north ofRB.B. Duplex
Lift Station 808 Cypress Creek / SE corner of Calliandra Dr and Palo Verde Duplex
Lift Station 720 Gateway Blvd West of Congress / Mahogany Bay Duplex
Lift Station 921 N autica Duplex
Lift Station 307 NE 26th Ave and Seacrest Duplex
Lift Station 210 Yacht Club / N US 1 Duplex
Lift Station 303 Bristol Springs / N Seacrest and Hypoluxo Duplex
Lift Station 924 Hampton Lakes / S Military Tr Duplex
Lift Station 923 Military 6 / S Military Tr Duplex
Lift Station 806 Hunters Run / Charterworld Duplex
Lift Station 807 Silver Lakes / S Congres Ave south ofSW 2ih Ave Duplex
Lift Station 609 SW 27th Ave and SW 13th Ct Duplex
Lift Station 608 SW 11 th St west side of road north of bridge Duplex
Lift Station 207 Colonial Club Duplex
Lift Station 101 St Andrews Golf Course Duplex
Lift Station 604 Clubhouse parking lot SW Congress Blvd and SW 18th St Duplex
Lift Station 901 Banyon Springs Duplex
Lift Station 904 K Mart / RRR and Military Tr Duplex
Lift Station 914 Plantina / West RB.R Duplex
Lift Station 802 Bent Tree Villas / West B.RB. Duplex
Lift Station 911 Cypress Creek 5/ Old Boynton Rd Duplex
Lift Station 503 NW 13 tn Ave and NW 10th St / East boat ramp Duplex
Lift Station 809 Palo Verde Dr / Caryota Dr Duplex
Lift Station 810 Cypress Creek Country Club Duplex
Lift Station 903 Rainbow Lakes / Military Tr and Tartan Lakes Blvd Duplex
Lift Station 204 Mariner Way / NE 12 Ave and Willard Way Duplex
Lift Station 203 Yachtmans Plaza / US 1 and Shore Dr Duplex
Lift Station 310 Four Sea Suns / NE 4th St / north Of 16th Ave Duplex
Lift Station 308 Royal Palm Club / Gateway west of Federal Duplex
Lift Station 512 Quantum Park West /Chilis Shopping Center Duplex
Lift Station 704 Sunny South Ave / E side at Sun Top Lane Duplex
Lift Station 906 Rainbow Lakes / NE comer ofNW 22na Ave and Brian Blvd Duplex
Lift Station 311 Quadrille Villas / Miner Rd Duplex
Lift Station 315 The Crossings / NE 26th Ave and NE 4th St Duplex
Lift Station 209 Hypoluxo Point Duplex
Lift Station 205 Half Moon Bay / Federal Highway and Hypoluxo Rd Duplex
Lift Station 520 Boynton Lakes Blvd! NE comer of E Chesterfield Duplex
Lift Station 517 N Boynton Lakes blvd! E. Side on bend Duplex
Lift Station 714 Hypoluxo Rd in Homes Of Lawerence Duplex
Lift Station 922 Nautica Sound Duplex
Lift Station 920 J onathans Groves Duplex
Lift Station 929 Colony Club Apartments / Hypoluxo and Military Duplex
Lift Station 930 Montreux / Pernell Pines Rd Duplex
Lift Station 915 Coco Pines Duplex
Lift Station 813 Hunters Run / Club House Ln and Summit Dr Duplex
Lift Station 812 Hunters Run / W Southport and Summit Duplex
Lift Station 803 Hunters Run / Intersection of Summit Dr and Woods Ln Duplex
Lift Station 716 Hunters Run / Brentwood / next to pool Duplex
Lift Station 927 Tuscany Duplex
Lift Station 925 Lester P.U.D. / Military south of GulfRd Duplex
Lift Station 406 Chapel Hill Duplex
Lift Station 409 SE 2na Court dead end! SE 34th Ave and Seacrest Duplex
Lift Station 208 Tradewinds / South US 1 Duplex
Lift Station 410 East Side SE 2nd St and SE 2ih Way Duplex
Lift Station 104 Bellamar / S AlA east side Duplex
Lift Station 412 SE 23rd Ave and US 1 Duplex
Lift Station 606 SW 18th St and / south east comer SW 19th Ave Duplex
Lift Station 607 Congress Ave/ SW 19th Ave / NE comer of Roma Way Duplex
Lift Station 705 S Congress Ave / SW side at Woolbright Corp Center Duplex
Lift Station 815 Villas of Pine Tree Duplex
Lift Station 910 Fairmont Place Duplex
Lift Station 814 Pine Tree Villas / W side of Lawerence :12 mile N woolbright Duplex
Lift Station 703 NW comer Quail Covey Rd and Tanarsky Trail Duplex
Lift Station 614 Banyan Creek Duplex
Lift Station 702 NW comer Quail Covey Rd and Tanarisk Trail Duplex
Lift Station 805 Greentree / SE comer of Ceder Point Blvd & Storkwood Duplex
Lift Station 601 Ocean Ave / NE comer of Lake Terrace Duplex
Lift Station 513 BBB / Casa Blanca / West side Duplex
Lift Station 501 Industrial Ave Duplex
Lift Station 715 Cypress Creek South Duplex
Lift Station 902 Mirror Lakes Duplex
Lift Station 721 Artesa / Lawerence Rd Duplex
Lift Station 701 Lawerence Rd / Winfield Rd / N Side of Holt St Duplex
Lift Station 502 NW comer ofNW Sth Ave and NW 10th St Duplex
Lift Station 507 NW 10th Ct / west ofNW 9th Way Duplex
Lift Station 719 Catalina Club / SW comer Holiday Inn / Congress Ave Duplex
Lift Station 700 Renaissance South / North Congress Ave Duplex
Lift Station 509 Quantum Park! Publix Warehouse Duplex
Lift Station 510 SE comer of Quantum Blvd and Quantum Lks Dr Duplex
Lift Station 70S Sunny South Duplex
Lift Station 917 Jamaica Bay North Duplex
Station 500 Portable Generator Telemetries unit Duplex