Loading...
R07-146 1 2 3 4 5 6 7 8 9 10 11 12 RESOLUTION NO. R07- ,'-lie, A RESOLUTION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE TASK ORDER NO. U07-17-3 IN THE AMOUNT OF $38,322.00 WITH SFRN, INC., FOR THE PREPARATION OF A STORMWATER OPERATION AND MAINTENANCE MANUAL; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, with the recent expansions in the downtown and Industrial Avenue 13 systems, the Utilities Department has identified the need for a standardized Operations and 14 Maintenance Manual; and 15 WHEREAS, the proposed Stormwater Operation and Maintenance Manual will 16 review all facets of the City's stormwater operation, providing needed standard operating 17 procedures, safety procedures, training and equipment information in a concise and 18 comprehensive document; and 19 WHEREAS, the City Commission of the City of Boynton Beach upon 20 recommendation of staff, deems it to be in the best interest of the citizens of the City of 21 Boynton Beach to authorize execution of Task Order U07-17-3 in the amount of $38,322.00 22 with SFRN, Inc. 23 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 24 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 25 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 26 being true and correct and are hereby made a specific part of this Resolution upon adoption 27 hereof. 28 Section 2. The City Commission of the City of Boynton Beach, Florida does S:ICAIRESO\AgreementsITask - Change OrderslSFRN U07-17-03.doc 1 II 1 hereby authorize and direct the approval and execution by the City Manager of Task Order 2 U07-17-03 in the amount of $38,322.00 with SFRN, Inc., for the preparation of a 3 Stormwater Operation and Maintenance Manual, a copy of which is attached hereto as 4 Exhibit "A". 5 Section 3. This Resolution shall become effective immediately upon passage. 6 PASSED AND ADOPTED this ~ day of December, 2007. 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ATTEST: 25 26 27 Ja t M. Prainito, CMC 28 . Y Clerk 29 30 31 CITY OF BOYNTON BEACH, FLORIDA ~ 6 /~ &yor-J T~ ~ '\ CO~Sioner - Ronald we~ /(;~Z /-4o~~. issioner - W oOdr. ow .t. Hay. / )///zJ~4?~ Commissioner - Marlene Ross S:ICAIRESOlAgreementslTask - Change OrderslSFRN U07-17-03.doc 2 Inc. En,ln..rs Surveyors GIS lI.pper. K07 - "-/b C.AndreR.ym.n, P.S.tJ., G.I.S.P. K.ith I. J.ckson, P.E. LiliA. Trop.pt, P.E. Task Order #U07-l7-3 BACKGROUND The City of Boynton Beach (CITY) is requesting SFRN, Inc. (CONSULTANT) to prepare an Operations and Maintenance Manual for that portion of its stormwater system that is owned, operated, and maintained by the CITY. SCOPE OF SERVICES Task 1: Develop standard operating procedures in the form of an Operations and Maintenance Manual for evaluating and maintaining the stormwater system that is owned, operated, and maintained by the CITY. A Table of Contents for the Operations and Maintenance Manual is attached to this Task Order (see Exhibit A). Task 2: Meet with CITY staff on three occasions to discuss the content ofthe Manual. The first meeting is to be a workshop with maintenance personnel when the Manual is 40-50% complete. CONSULTANT will have personnel with extensive field experience attend the first meeting. The second meeting will discuss the progress of the Manual at 75% and the third meeting will discuss comments generated from review of a draft copy of the Manual at 95% completion. Task 3: CONSULTANT will submit 10 draft copies of the Operations and Maintenance Manual for review by the CITY. Once approved, CONSULTANT will provide the CITY with 10 copies of the final Operations and Maintenance Manual. CONTRACT REFERENCE Above is performed under the terms and conditions described within the Agreement for General Engineering and Consulting Services dated November 18, 2003, with renewals, between the City of Boynton Beach and SFRN, Inc. ADDITIONAL SERVICES Anything that may be needed and can or may be assigned by an amendment/change to the Task Order. OBLIGATIONS OF THE CITY No materials or information are required from the CITY. Page 1 of2 1201 Belvedere Road, West Palm Beach, Florida 33405 TEL: (561 )-655-1151 FAX:( 561 )-832-9390 E-Mail: info@sfrninc. com Official Website: www.sfrninc.com COMPENSATION The CITY shall pay CONSULT ANT a lump sum fee of Thirty Nine Thousand One Hundred Seventy Two and Zero Hundredths Dollars for the services described on this Task Order. A breakdown of the fee is shown in the attached Table (Exhibit B) which is included in this Task Order. SCHEDULE 50% complete in 60 days. Draft completed in 100 days. Completed and ready for final payment within 30 days of receiving CITY comments on the draft. Method of Payment - Percentages oflump sum payment shall be tied to the acceptance of deliverables by the City. 25% Draft of Standard Operating Procedures 40% Workshop with maintenance personnel 95% Submittal of draft 100% Final completion and acceptance by CITY APPROVED BY: ::TY O~CH' FLORIDA Kurt Bressner City Manager . Dated this ,q day of Vo=em ber ,2007. SUBMITTED BY: SFRN'~ By: (L~ Lisa A. Tropepe. P. E. Vice President Page 2 of2 '"'~~L m. fi~ ~~~ of the City Attorney Exhibit A Stormwater System Operations and Maintenance Manual City of Boynton Beach, Florida TABLE OF CONTENTS Introduction Purpose Why Maintain the Stormwater System? Legal Authority. Statutory and Code Requirements Governing the Stormwater System Method for Creating this Manual. Safety Introduction Prevention Management's Safety Responsibilities Treatment of Injuries Sewer Maintenance Hazards Manhole Atmosphere Testing Electrical System Hazards Mechanical Equipment Hazards Lockout/Tag Out Explosion and Fire Hazards Bacterial Infections and Health Hazards OSHA Confined Spaces Permit Requirements Safety Equipment General Safety Vehicle Safety Safety Publications Available Safety References Facilities Operation and Maintenance - Standard Operating Procedures Access Roads and Easements Catch Basins and Inlets Debris Barriers/Trash Racks Dry Detention Basins Dry Drainage Ditches Energy Dissipaters Exfiltration Trenches Flow Control Structures Filtration Systems Manholes Outfalls Pipe Page 1 of2 Exhibit A Stormwater System Operations and Maintenance Manual City of Boynton Beach, Florida TABLE OF CONTENTS Pumping Stations Streets Swales Water-Bearing Drainage Ditches Wet Detention Basins Wetlands Municipal Activities Landscaping Vehicle Fueling Vehicle and Equipment Maintenance Vehic1e and Equipment Washing Hazardous Material Storage Erosion and Sediment Control Management of Sediments Litter Control Vegetation and Pest Management General Practice Control Facilities Conveyance Facilities Storage Facilities Wetland Areas Fertilizer Application Control Pesticide Use Control Water Quality Operations Emergency Operations Measurable Goals Employee Training and Education Appendix List of subcontractors, their contact information, and their scope Page 2 of2 Exhibit B Fee Breakdown Table Task Labor Hours Labor Cost Expenses Total 1 306 $34,318.00 $0.00 $34,318.00 2 24 $3,060.00 $50.00 $3,110.00 3 16 $944.00 $800.00 $1,744.00 Totals: 346 $38,322.00 $850.00 $39,172.00 Staff Classification Labor Rate Labor Hours Total Lisa Tropepe Corporate Officer $160.00 20 $3,200.00 Mike Hanseter Department Director $150.00 100 $15,000.00 Kyle Grandusky Project Engineer $105.00 134 $14,070.00 Mitch Fleury Sr. Field Representative $98.00 16 $1,568.00 Lisa Broz Sr. Admin. Assistant $59.00 76 $4,484.00 Totals: $38,322.00 (The total of this table should match total oflabor cost) Page 1 of 1