Minutes 05-22-08
MINUTES OF THE GOLF COURSE ADVISORY COMMITTEE
REGULAR MEETING HELD ON THURSDAY, MAY 22, 2008
AT 3:00 P.M. IN THE CITY COMMISSION CHAMBERS,
BOYNTON BEACH, FLORIDA
Present:
Herb Suss, Chair
Lynda Frederick, Vice Chair
Arthur Gabler
James Smith
Frank Scicchitano, City Alternate
Ron Levy, County Alternate
Dan Hager, Manager of Golf Operations
Scott Wahlin, Manager of Golf Maintenance
Absent:
Corrado P. Giangreco
Arthur L. Matthews, Jr.
Kurt Bressner, Non-Voting Member
I. Openings
A. Call to Order
Chair Suss called the meeting to order at 3:01 p.m. He inquired whether anyone in the
audience had any comments. No one came forward.
Self introductions were made by the board members.
B. Agenda Approval
1. Additions, Deletions, Corrections
There were no additions, deletions or corrections.
2. Adoption
Motion
Vice Chair Frederick moved approval of the agenda. Mr. Scicchitano seconded the
motion that passed unanimously.
C. Announcements
Park Vista Ace's Team celebration, Thursday, May 29, 2008, 11:30 a.m.
Meeting Minutes
Golf Course Advisory Committee
Boynton Beach, Florida
May 22, 2008
Dan Hager, Manager of Golf Operations, announced a celebration for Park Vista High
School's autistic unit would be held Thursday, May 29, 2008, at 11 :30 a.m. on the deck.
Pizza and cake would be served and trophies would be awarded. The event would
celebrate the success of the team and efforts of the supervisors, and for all the
assistance the team provided to the golf course during the year. All were encouraged
to attend.
II. Minutes
A. Minutes of Golf Course Advisory Committee Meeting of December 13,
2007
There were no corrections to the minutes.
Motion
Mr. Gabler moved to approve the minutes. Mr. Scicchitano seconded the motion that
passed unanimously.
III. Reports
A. Manager of Golf Maintenance Report
1. Brownfield Status
Scott Wahlin, Manager of Golf Maintenance, advised the final Phase II Environmental
Site Assessment Report was received. The report indicated remediation was necessary
if residential housing were to be built on the golf course property. Further assessments
were necessary in order to determine the extent of the remediation.
2. Championship Course Greens Resurfacing
Staff was in the process of developing specifications for the project which would be
awarded following a formal bid process. Staff was looking at different grasses,
primarily TifDwarf, which was beneficial for high play. One of the TifDwarf grasses
being considered, Jones Dwarf, was specified by Ben Crenshaw. The Village Golf Club
was in the process of being renovated and Jones Dwarf was used on their putting
greens. Mr. Wahlin would visit Village Golf Club to inspect the grass. One of the
benefits of TifDwarf versus Ultra Dwarf was that it recovered quickly from wear
damage. The resurfacing would begin in mid-May 2009.
2
Meeting Minutes
Golf Course Advisory Committee
Boynton Beach, Florida
May 22,2008
3. Gold Course Maintenance Guidelines
The maintenance guidelines were presented to the board which provided information
on mowing heights and frequencies, cultivation programs for putting surfaces, bunker
and cart path maintenance, reshaping of tees and fairways, fertility, pesticide
application and equipment maintenance.
In June, staff would be verticutting rather than aerifying the greens on the
Championship Course, which would provide a very playable surface. As the greens
would be resurfaced next year, it was not staffs intent to do much in the way of
improving the soil and ratios between organic matter and mineral constituents. Staff,
however, would take measures to ensure a good putting surface through the remainder
of the year. In August and September, staff would reevaluate whether aerification was
needed on the Championship Course. As the greens on the Family Course were not
going to be resurfaced during the ensuing year, they would be aerified and the holes
would be backfilled with sand.
It was staffs intent to begin resurfacing the golf course in mid-May, and Mr. Hager
anticipated work would be completed by early September. Staff anticipated a revenue
loss of $210,000 in cart and green fees while the golf course was partially closed. The
driving range and family course would remain open, and temporary greens and putting
surfaces would be provided for 18 holes. It was conservatively estimated the golf
course would retrieve approximately $60,000 of the estimated $210,000 loss. Costs for
permits would r~mge from $10 to $17. The cost to play 18 holes of golf on the
Championship course while temporary greens are in use should range in price from $10
to $17.
4. Irrigation System/Water Shortage
The new irrigation control system was approved, and staff sent an $87,000 purchase
order to the company. It was intended the system, which would be radio and computer
controlled, be installed in-house this summer. Adjustable heads would be replaced
around the greens and if Phase III water restrictions were in effect in January, there
would be an ample supply of water. With labor at $20,000, the cost of the program
was estimated at $110,000.
Chair Suss inquired about the lifespan of the underground Polyvinyl Chloride (PVC). Mr.
Wahlin explained he was aware of incidents where the PVC remained in the ground for
40 years with no split pipes, while in other situations, pipes had split each year. If
multiple incidents were observed in a year's time, staff would explore options. Staff
would continue to fund the reserve accounts in the event main line replacement was
necessary. With the design of the golf course, there were numerous main lines
providing water, and the original pipe sizing on the property was designed to water the
landfill as well.
3
Meeting Minutes
Golf Course Advisory Committee
Boynton Beach, Florida
May 22,2008
Chair Suss complimented staff for their fine work on the Audubon sanctuary. Mr.
Wahlin indicated in order to maintain the current certification, the area would be
naturalized and would include flowers to be used as a nectar source for wasps that kill
mole crickets.
At the current time, the golf course was on a 30% water reduction, which provided an
average of 390,000 gallons of water per day, half of the course's historical usage. It
was estimated an inch of water was lost on dry, windy days. In order to keep up with
the amount of water lost, approximately 800,000 gallons would have to be put down,
which exceeded the course's capacity. As a result there were brown spots in the
fairways. Weed control could be accomplished around the greens, but most of the
herbicides used would cause minor stress to turf, even when the turf was healthy.
Thus, during a drought period, staff could not aggressively control the weed problem.
B. Manager of Golf Operations Report
1. Business Report
Mr. Hager circulated the national averages reported by the National Golf Foundation for
private and public courses. Public courses consisted of three classifications: premium
(more than $70 per round for 18 holes), standard ($40-70) and value, (less than $40).
The Links was in the standard category. The national averages from October 1, 2007
to the current period were down 3.4% on the standard and 6.8% on the value, and up
1.2% on the premium courses. The averages could be directly traced to the economy.
When comparing starts for the same time period, the program was down 4.5%, which
was attributable to the opening of another public golf course in the immediate area.
Lower averages were also caused by 14 bad weather days in 2006/2007 and 24 in
2007/2008.
The plans for next year's budget year were to move the 2:00 p.m. tee time holders to
1:00 p.m., the 3:00 p.m. to 2:30 p.m. and the nine-hole rounds to 2:00 p.m. Mr. Hager
discussed the business relationship with a Canadian company, CanAm Group, which
allowed the Links to fill "dead time" and provide a source of revenue. CanAm employed
bilingual operators that booked the tee times and sent a good deal of business to the
Links last year. CanAm had already contacted Mr. Hager with regard to next year.
Chair Suss inquired into the feasibility of integrating the nine-hole course with the
Championship course to create a 27-hole course in order to collect additional fees for
rounds. Mr. Hager asserted this had been tested and did not produce the desired
effect. Chair Suss inquired whether the City's brownfields could be integrated to
enlarge the course. Mr. Hager explained it would not be financially feasible to bring in
the brownfields.
4
Meeting Minutes
Golf Course Advisory Committee
Boynton Beach, Florida
May 22, 2008
2. Events Held Since December 13, 2007
. The Play for Pink Event raised more than $9,500 for breast cancer
research, and provided an opportunity to showcase the golf course
as women-friendly.
. Seventh Annual South Florida PGA Senior-Junior Pro Championship
had 102 entries, and also presented an opportunity to showcase
the golf course. Tom Durick was responsible for the course
marking and set up, and was Mr. Hager's team partner. Out of 51
teams, Mr. Hager and Tom Durick finished in the top 50. The golf
professionals were very impressed with the course and had already
solidified a date of May 1st for next year.
. Eighth Annual Adult-Child Championship had 64 participants. Ron
Tapper ran the event and did an outstanding job. While
participation dwindled each year, the event was beneficial to
families. At this point, staff was not certain whether this event
would be continued.
. State Qualifier of the United States Golf Association, U.S. Women's
Amateur Public Links was held for the past four years at the Links.
Mr. Hager noted Tom Durick ran this event and he and the
maintenance team should be commended for an outstanding job.
3. Junior Program
Since the last meeting, a winter school was held in February, and the spring school for
May was currently in session. Two schools were slated for the summer, and would be
open for registration in June and July. Basic golf skills, rules history and etiquette were
covered in the course. The current data base consisted of 396 junior players. Rick
Novack took over the Junior Golf Academy this year. The difficulty with the Junior Golf
program was there were not enough opportunities for casual players, who did not
believe they could compete with the more skilled players. Several events were held
monthly as an incentive to attract junior players.
Chair Suss inquired whether there was a way for the members to transport the
youngsters to the golf course without the threat of liability to the members or to the
City. Risk Management advised there would be liability to the individuals. However,
staff was exploring other options and was working with Recreation and Parks through
their after-school programs.
5
Meeting Minutes
Golf Course Advisory Committee
Boynton Beach, Florida
May 22, 2008
4. Pace of Play Report
Mr. Hager reported on the success of the programs as follows:
. In January, the program was 97% successful before 8:00
a.m., 96% between 8:00 and 12 noon, and 100% after 12
noon.
. In February, 91% successful before 8:00 a.m.; 95% between
8:00 a.m. and 12 noon; and 99% after 12 noon.
. In March, 91% successful before 8:00 a.m.; 97% from 8:00
a.m. to 12 noon, and 99% after 12 noon.
. In April, 92% successful before 8:00 a.m.; 99% successful
between 8:00 a.m. and 12 noon; and 91 % after 12 noon.
5. Restaurant Report
Mr. Hager reported losses continued to grow each year, drawing on the entire
operation. As such, a consultant visited the restaurant, and staff received a report late
yesterday afternoon. It was likely the restaurant was going to be more of a snack bar.
While food was an amenity, the greens are what attracted the players and provided the
impetus for their return. Staff discussed streamlining the menu, repainting, and other
enhancements. Suggestions from members included designing a drive-up window. This
item would be revisited pending further discussions with the consultant. Mr. Hager
would provide a copy of the consulting report to the members prior to the next
meeting.
IV. New Business
1. Pro Shop Renovation
Mr. Hager had hoped to have the renovations completed in June, but was not sure this
could be accomplished. The renovations included moving the counter out and building
a horseshoe counter, assembling it in-house. Also included would be the repositioning
of the handicap computer area and point-of-sale register, adding two register wells, and
creating a dressing room, reservation and display area.
2. Credit Card Integration with POS
Prior to the next season, Mr. Hager hoped to have credit card integration with a point-
of-sale system. This would save time for purchasers in line and labor in transmitting
6
Meeting Minutes
Golf Course Advisory Committee
Boynton Beach, Florida
May 22, 2008
information from the software to the City's Finance Department program entitled Golf
Trac.
3. New Tee Signs
This item was previously discussed. The vendors would offer tee signs at no cost.
Their revenue would come from the advertising on the signs. At the conclusion of the
first two years, the vendors would start sharing the revenues received. The revenue
stream would be increased with each year. Staff solicited bids and the low bid came in
under $7,000. The total cost for the project would be less than $9,000. It was
anticipated the signs would be installed within the next two months.
V. Old Business
None
VI. Adjournment
Jker being no further business to discuss, the meeting adjourned at 4:00 p.m.
~ ~.Dt(
'4~
,
Stephanie D. Kahn
Recording Secretary
070304
7