Loading...
R08-112 II 1 RESOLUTION NO. R08- 11z.... 2 3 A RESOLUTION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, AUTHORIZING THE CITY 5 MANAGER TO EXECUTE TASK ORDER NO. U08-03- 6 06 IN THE AMOUNT OF $94,500.00 WITH BROWN 7 AND CALDWELL, FOR A STRATEGIC WATER 8 MASTER PLAN UPDA TE; AND PROVIDING AN 9 EFFECTIVE DATE. 10 11 12 WHEREAS, the Utilities Department must periodically update their Master Plan 13 components to assure that they are adequately planning for future growth, regulatory changes 14 and market conditions; and 15 WHEREAS, this proposed Task Order will provide a synopsis of the work done to 16 date, and also look beyond the limits of those studies, examining possible challenges and 17 opportunities in the area of potential regulatory impacts on drinking water quality and 18 opportunities for providing cost-effective services to other smaller municipal water utilities 19 in the region, including a review of staffing needs; and 20 WHEREAS, the City Commission of the City of Boynton Beach upon 21 recommendation of staff, deems it to be in the best interest of the citizens of the City of 22 Boynton Beach to authorize execution of Task Order U08-03-06 in the amount of 23 $94,500.00 with Brown and Caldwell. 24 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 25 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 26 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 27 being true and correct and are hereby made a specific part of this Resolution upon adoption 28 hereof. S \CAIRESOlAgreements\Tasi< - Change Orders\Brown and Caldwell U08-03-06 (Strategic Water Master Plan Update) doc II I 1 Section 2. The City Commission of the City of Boynton Beach, Florida does 2 hereby approve, authorize and direct the execution by the City Manager of Task Order U08- 3 03-06 in the amount of $94,500.00 with Brown and Caldwell, for a Strategic Water Master 4 Plan Update, a copy of which is attached hereto as Exhibit "A". 5 Section 3. This Resolution shall become effective immediately upon passage. 6 PASSED AND ADOPTED this iB ... day of September, 2008. 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ATTEST: 24 m. p~ 25 26 27 28 29 30 (Corp~r.at~ Seal) S \CA\RESOlAgreementsITask . Change OrderslBrown and Caldwell U08.03.06 (Strategic Water Master Plan Update) doc 2 f(o~-/IV Task Order #U08-03-06 Engineering Services for the Preparation of a Strategic Water Master Plan Update For the City of Boynton Beach A Master Plan is prepared for a utility to summarize its physical assets, operating policies and required improvements. In addition, a Master Plan must also attempt to anticipate the trends in technology and regulations that a utility must plan for or contemplate. The City of Boynton Beach Utilities Department last prepared a formal Master Plan in 1989. Much of the information presented in the 1989 Master Plan is still accurate, however, the environment in which the utility operates has changed significantly. This Task Order will provide authorization for Brown and Caldwell to prepare a Strategic Master Plan Update for the City's Water Utility. A. Background In February 1989, the City of Boynton Beach completed a Water and Wastewater Master Plan that provided a detailed evaluation of the City's projected water and wastewater demands and flows through the year 2000. The plan presented recommended improvements to the City's water supply, treatment, distribution and storage, and wastewater transmission system. Since the Master Plan was completed, many of the recommended improvements have been implemented into the City's water system. However, many of the conditions within the City with respect to the pattern of growth and the City's water use permit from South Florida Water Management District (SFWMD) have changed the environment under which the utility operates. During the past several years, changes have occurred to the pattern of grown within the City and the long-term availability of traditional water supplies. The City's shift towards redevelopment of the eastern portion of the City will shift the center of future demand more towards the City's East Water Treatment Plant. This shift in demand has required a re-evaluation of where the City produces and distributes its potable water. In addition, SFWMD has stated that future water supplies from the regional system will be limited. This change in management approach will require that the City place greater emphasis on water conservation, re-use and the development of alternative water supplies to provide potable water needs in the future. This shift, combined with the uncertainty of future water supply and treatment requirements, warrants an update to the City's water supply and treatment portions of the Master Plan. During the past three years, Brown and Caldwell has assisted the City with the development of many of the components that will make up the Strategic Water Master Plan Update. These documents, however, were developed in isolation from one another. Therefore, integrating these individual documents into one coherent plan and leveraging any potential synergy will provide value from a planning perspective. Specific documents will include the following: Potable Water Supply Strate2Y - In August 2006, Brown and Caldwell completed an evaluation of future water projects for the City of Boynton Beach. The plan developed an approach to interconnect the City's two water treatment plants, take full advantage of seasonal allocation from the Surficial Aquifer and ultimately convert the City's West Water Treatment Plan into a Low Pressure Reverse Osmosis facility using water from the Floridan Aquifer. This report built upon an evaluation process conducted during the Business Case Evaluation. Water Distribution System Modelin2 Study - In 2006, Brown and Caldwell completed an evaluation of the City potable water distribution network. This study evaluated the redevelopment of the City's downtown area and considered fire-flow and peak water demand requirements. A model was prepared on the City's potable water distribution system and specific recommendations were made for the system to continue to operate within the City's desired level of service. to-Year Water Supply Facilities Work Plan - In April 2008, Brown and Caldwell completed a IO-Year Water Supply Facilities Work Plan for the City of Boynton Beach. The plan was required by the Department of Community Affairs to demonstrate that the City had considered future water demands prior to developing or redeveloping land. This report inventoried existing facilities, projected population and potable water demand, and identified the water projects planned to ensure that the City could provide water for the anticipated growth. These three reports make up the core information provided in a traditional Water Master Plan. This information will again be summarized and the previous works cited in the Strategic Water Master Plan Update. In addition, the Utilities Department has expressed the foresight to recognize that changes are occurring in the operational environment that will impact the way in which the Utility will provide service in the future. To address these impacts, Brown and Caldwell will sponsor a series of workshops with City staff to discuss the anticipated changes and opportunities presented in water quality regulations, treatment requirement, new technologies and regionalization. The findings of these sessions will be summarized along with an executive overview of previously published reports in a single Strategic Water Master Plan Update. ') B. Scope of Work The Scope of Work for Task Order U08-03-06 will be formulated around the proposed outline for the Strategic Water Master Plan Update. The Scope of work will consist of the following elements: Task 1 - Summary of Existing Information This portion of the project will include summarizing information from existing reports. Conclusions previously reached will be reviewed against the backdrop of anticipated future trends in technological improvements and new regulations. Existing information will make up the first four sections of the report as follows: Section 1 - Summary of Existing conditions Section I will include a current snap-shot of the Water Utility. It will include a description of the service area, current population, current water demand and an inventory of the wells, raw water piping, treatment systems, potable water storage facilities and distribution systems. Section 2 - Future Conditions Section 2 will include a projection of the growth that the Water Utility will face through 2026. Population growth and projected water demands for each of the municipalities that make up the City's service area will be provided. The anticipated impacts from conservation and water re-use will be incorporated into the water demand projections. Population numbers and per-capita average daily demand numbers will be those developed as part of the lO-Year Water Facilities Supply Plan (Brown and Caldwell. April 2008) Section 3 - Proposed Water Supply Projects A number of water supply projects have been proposed by the City to satisfy potable water demand through 2026. The projects were originally identified in the Potable Water Supply Strategy (Brown and Caldwell, 2006) and were confirmed in the lO-Year Water Facilities Supply Plan (Brown and Caldwell, April 2008). A summary of the water supply projects, implementation schedules and projected costs will be prepared in Section 3. Section 4 - Analysis of Distribution System An analysis of the City's potable water distribution system was performed by Brown and Caldwell in 2006. The analysis consisted of performing a hydraulic model of the distribution network to project system adequacy considering projected down-town redevelopment and peak fire-flow requirements. A summary of the Water Distribution System Modeling Study will be presented in Section 4. In addition, the assumptions, 3 limitations, and recommended improvements to the distribution system will be incorporated into this section of the report. DeliverabIes . Kick-off meeting - a kick off meeting will be conducted following the notice to proceed to discuss Task 1 activities. The sources of all data as well as an order of magnitude for each section will be defined. It is anticipated that the kick-off meeting will be conducted within one week of the project NTP and that meeting minutes will be drafted within 3 days of the meeting. . Request for information - following the kick off meeting, a request for information will be prepared by Brown and Caldwell to obtain current information from the City. . Draft Report of Sections 1 - 4 - A Draft Report containing Sections 1 - 4 will be delivered to the City approximately 2 weeks from the NTP. Three paper copies will be delivered to the City for review and comment. The City will compile a single set of comments on Sections 1 - 4 and return to Brown and Caldwell within one week of Draft Report submission . Final Report of Sections 1 - 4 - The City's comments on the Draft Report will be incorporated into the report. Three copies of the final sections will then be delivered to the City. Sections I - 4 will ultimately be incorporated into the Final Strategic Water Master Plan Update. Task 2 - Review of Water Quality Issues Regulatory requirements drive many of the modifications and improvements required for the water utility. Under Task 2, Brown and Caldwell will conduct a series of workshops with SFWMD, Florida Department of Environmental Protection (FDEP) and the Palm Beach County Health Department (PBCHD) and City Staff to discuss issues that will be impacting water quality, treatment and water quality monitoring. During these meetings, the City will gain a better understanding of the strategic direction of each of the regulatory agencies through discussions with senior level staff. Kick off Meeting - A kick off meeting will be scheduled with the City Water Utility Staff at their earliest convenience following the project NTP. During the kick-off meeting the following issues will be discussed: . Workshop organization . Appropriate City staff to attend . Points of contact for each agency Meeting with SFWMD - A meeting will be scheduled with senior level planners at the SFWMD. The meeting will be attended by representatives from Boynton Beach and Brown and Caldwell. The primary focus of this meeting will be trends in per capita allocation, reduced reliance on the Surficial Aquifer, regulation of the Floridan Aquifer, interaction between the Surficial Aquifer and reclaimed water and potential impacts of reclaimed water on the City's West Well Field. Following the meeting, Brown and Caldwell will prepare and distribute meeting minutes. 4 Meeting with FDEP - A meeting will be scheduled with senior level managers with FDEP. The meeting will be attended by representatives from Boynton Beach and Brown and Caldwell. The primary focus of this meeting will be to evaluate trends with concentrate disposal, aquifer storage and recovery, potable water disinfection and water quality issues. Following the meeting, Brown and Caldwell will prepare and distribute meeting minutes Meeting with PBCHD - A meeting will be scheduled with senior level managers with PBCHD. The meeting will be attended by representatives from Boynton Beach and Brown and Caldwell. The primary focus of this meeting will be to evaluate trends with water plant operations and reporting, potable water disinfection, monitoring of pharmaceuticals in raw water, and water quality sampling within the distribution system. Following the meeting, Brown and Caldwell will prepare and distribute meeting minutes. Water Quality Issues - In addition to regulatory issues on a local level, drinking water standards are issued by the U.S. Environmental Protection Agency at a national level. Brown and Caldwell will utilize industry experts to review trends with disinfection / disinfection by-products, the groundwater disinfection rule and proposed changes in primary and secondary drinking water standards. Meeting with City Laboratory Staff - An interview will be conducted with City laboratory staff to review operating issues, capabilities and future requirements to remain accredited and in compliance. During this meeting, BC staff will review existing capabilities and identify additional equipment and resources required to permit the City laboratory to address regional opportunities. A summary of capabilities and additional capacity will also be prepared for use in Section 6 of the Strategic Water Master Plan Report. Preparation of Draft Section 5 - Following the completion of the workshops and interviews, Brown and Caldwell will prepare Draft Section 5 that will address regulatory changes and their impact on the City's Water Utility. The emphasis of Section 5 will be to address strategic trends in the regulatory arena and to identify incremental steps for the City to take to prepare for their arrival. Three paper copies of Section 5 will be delivered to the City for review and comment. The City will compile a single set of comments on Sections 5 and return to Brown and Caldwell within two weeks from the submission of the Draft Report. Preparation of Final Section 5 - The City's comments on the Draft Section 5 will be incorporated into the report. Three copies of the Final Section 5 will then be delivered to the City. Section 5 will ultimately be incorporated into the Final Strategic Water Master Plan Update. Deliverables - The following deliverables will be prepared under Task 2: · Kick-off meeting - a kick off meeting will be conducted as soon as possible after the project NTP. Meeting minutes will be drafted within 3 days of the meeting. 5 . Meeting minutes from meeting with SFWMD. Minutes will be drafted within 3 days of the meeting. . Meeting minutes from meeting with FDEP. Minutes will be drafted within 3 days of the meeting. . Meeting minutes from meeting with PBCHD. Minutes will be drafted within 3 days of the meeting. . A Draft of Section 5 will be delivered to the City approximately 4 weeks from the final workshop. Three paper copies will be delivered to the City for review and comment. The City will compile a single set of comments on Sections 5 and return to Brown and Caldwell within two weeks from the submission of the Draft Report. . Final Section 5 - The City's comments on the Draft Section 5 will be incorporated into the report. Three copies of the final section will then be delivered to the City. Sections 5 will ultimately be incorporated into the Final Strategic Water Master Plan Update. Task 3 - Regionalization Opportunities The current financial and regulatory environment has made operating a water utility much more challenging. Complying with regulatory requirements, monitoring, reporting, staffing, and maintaining a utility requires full-time, fully-trained staff which several of Boynton Beach's neighbors are having difficulty providing. Because of Boynton Beach's central location, far reaching distribution network, proximity to small coastal communities and leadership position as a water utility in South Florida, opportunities exist for the City to provide support to their neighbors. Regionalization opportunities may include remote operations, monitoring, reporting, staffing and automation. Although the benefits that the City's Utility can provide may be generated by the Utilities Department Staff, the dialogue for such endeavors must be initiated at the executive level. It is therefore anticipated that the City's Executive Leadership must be involved in this task. Such an effort, if successful, will work to reduce the Utility's unit operating costs and may yield significant savings in its overall operations. Kick off Meeting - A kick off meeting will be scheduled with the City Water Utility Staff at the completion of Tasks 1 and 2. During the kick-off meeting the following issues will be discussed: . Adjacent Municipality needs . Services that the City can provide . Identification of local municipalities and their contacts . Cost and benefit of providing services to remote customers It is suggested that an Assistant City Manager be assigned to this task to help look for opportunities, gage the City's receptiveness to provide such service and then to coordinate a dialogue with adjacent municipalities. Workshop 1- Work Force Dynamics - The majority of the utility staff will retire during the planning horizon of this Strategic Water Master Plan Update. Issues will arise 6 and impact the utility as equally trained staff is not available to replace the staff that retires. This workshop will address work force diversity, automation and subcontracting maintenance activities. Automation will be the significant service that the City can provide to other utilities through the use of remote monitoring and centralized control. This service may provide a necessary service and cost savings. In addition, emerging technologies will be discussed in relation to increasing the efficiency of the operation and reducing labor requirements. Workshop 2 - Regulatory Regionalization - It is anticipated that water utilities will become increasingly regionalized as the SFWMD implements water projects that will have regional implications. During this workshop, representatives from Palm Beach County Water Utilities Department and the SFWMD will be invited to discuss their visions and discuss the roles that a regional water providers and a regional reservoir may play in the future for South-Central Palm Beach County. Discussions with Adjacent Municipalities - Following the meetings to discuss regionalization opportunities, Brown and Caldwell will pmticipate in up to four meetings with adjacent communities to discuss regionalization opportunities and services that the City can provide. Brown and Caldwell will present opportunities identified during previous workshops and will document issues and concerns identified by the adjacent municipalities. Preparation of Draft Section 6 - Following the completion of the workshops and interviews, Brown and Caldwell will prepare a Draft Section 6 summarizing regionalization opportunities. Three paper copies of Section 6 will be delivered to the City for review and comment. The City will compile a single set of comments on Sections 6 and return to Brown and Caldwell within two weeks from the submission of the Draft Report. Preparation of Final Section 6 - The City's comments on the Draft Section 6 will be incorporated into the report. Three copies of the Final Section 6 will then be delivered to the City. Section 6 will ultimately be incorporated into the Final Strategic Water Master Plan Update. DeliverabIes - The following deliverables will be prepared under Task 3: . Kick-off meeting - a kick off meeting will be conducted as soon as possible after the completion of Tasks 1 and 2. Meeting minutes will be drafted within 3 days of the meeting. . A Draft of Section 6 will be delivered to the City approximately 2 weeks from the final meeting with the adjacent municipalities. Three paper copies will be delivered to the City for review and comment. The City will compile a single set of comments on Sections 6 and return to Brown and Caldwell within two weeks from the submission of the Draft Report. . Final Section 6 - The City's comments on the Draft Section 6 will be incorporated into the report. Three copies of the final section will then be delivered to the City. 7 Sections 6 will ultimately be incorporated into the Final Strategic Water Master Plan Update. Task 4 - Preparation of Final Report Following the finalization of Section 6, Brown and Caldwell will assemble the Strategic Master Plan Update report. The report will incorporate each of the six sections developed under Tasks 1 through 3. In addition, linkages between sections, a table of contents and an Executive Summary will be prepared to join the sections into a cohesive document. Preparation of Draft Master Plan Update - Following the finalization of Section 6, Brown and Caldwell will prepare a Draft Master Plan Update. Five paper copies of the draft report will be delivered to the City for review and comment. The City will compile a single set of comments on the Draft Report and return to Brown and Caldwell within two weeks of the Draft Report submission Meeting to Review City Comments - following the receipt of the City's comments on the Draft Report a meeting will be conducted to discuss the comments, their incorporation and the final distribution of the report. Preparation of Final Strategic Water Master Plan Update - The City's comments on the Draft Report will be incorporated into the final Report and ten (10) paper copies of the Final Report will be delivered to the City. In addition, Brown and Caldwell will prepare an electronic version of the Final Strategic Water Master Plan Update (in .pdf format). The electronic version will be formatted to print the entire report with tables and figures embedded. Deliverables: . Fi ve paper copies of Draft Report . Attendance at meeting to discuss City's comments on draft report . Ten paper copies of final Report . Ten electronic copies of Final Report delivered on compact disk. C.INFORMATION NEEDED FROM THE CITY In order to thoroughly address the goals of this Strategic Water Master Plan Update it is assumed that Brown and Caldwell will have to work closely with City staff to obtain the most current information available. A partial list of the items needed includes the following: . Current design capacity ratings for the East and West Water Treatment Plant including firm capacity evaluation . Updated figure illustrating production well "zones of influence" for the east and west well fields. 8 · Potable water demand information including annual average, peak day, and peak hourly demand. · Conveyance projects completed since the inception of the Water Distribution System Modeling Study. D. ASSUMPTIONS The following assumptions were considered in the development of Task Order U)8-03-06: · Sections 1 - 4 will primarily be a cursory review of information pre,riously developed and documented. In some cases, references to previous reports may be substituted for repeating work. · It is anticipated that representatives from the City will attend meeting with the regulatory agencies. Meetings will be conducted in the regulatory offices or in Brown and Caldwell's West Palm Beach office. · The workshops presented under Task 3 are intended for the generation of a dialogue relevant to the City. It is anticipated that each workshop will last approximately 4 hours. The workshops will be intended to increase the City's awareness to certain topics rather than solving that particular issue. · The City will assign an ,\ssistant City ~lanager to interface with adjacent municipalities during Task 3. The City will coordinated all meetings and make initial contacts with municipalities prior to meeting or contact by Brown and Caldwell. · Cost estimations and preliminary designs to provide assistance to adjacent municipalities are not included in this task order. E. COMPENSATION Compensation for services rendered under this Task Order will be in a Lump Sum Fee of $94,950 in accordance with terms and conditions defined in the Professional Services Agreement dated November 18,2003, and as revised from time to time. Periodic invoices will be based on percent complete. The total fee is based on the attached estimated level of effort (Attachment A) and is distributed among the five (5) tasks, as shown below. Project Management Task I - Summary of Existing Information Task 2 - Review of Water Quality Issues Task 3 - Regionalization Opportunities Task 4 - Preparation of final Report $ 4,500 $ 15,200 $ 24,950 $ 44,400 $ 5,900 Total Lump Sum Fee $94,500 9 F. AUTHORIZATION APPROVED BY: CITY OF BOYNTON BEACH DA TED this 613 day of Seprember ,2008 ~ Caldwell, In', Kurt Bressner Albert Basulto, c.G,C City Manager Office Manager Attest / Authenticated: ~m. Attest / Authenticated: Secretary / Notary 10 Attachment A Client Senior Services Project Staff Graphics Admin. Para- Hours Labor Direct Total Manager Engineer Engineer Specialist Support Professional Cost Expenses $ 190 $ 140 $ 95 $ 80 $ 75 $ 80 Project Management 18 0 0 0 12 0 30 $ 4,320 $ 180 $ 4,500 Task 1 - Summary of Existing Conditions 48 6 16 12 0 26 108 $ 14,520 $ 680 $ 15,200 Task 2 - Review of Water Quality Issues 76 42 18 6 0 18 160 $ 23,950 $ 1,000 $ 24,950 Task 3 - Regionalization Opportunities 168 64 0 8 0 18 258 $ 42,960 $ 1 ,440 $ 44,400 Task 4 - Preparation of Final Report 16 4 12 0 0 12 44 $ 5,700 $ 200 $ 5,900 $ 326 116 46 26 12 74 600 $ 91,450 $ 3,500 $ 94,950 CITY CLERK'S OFFICE MEMORANDUM TO: Barb Conboy Utilities Manager FROM: Janet M. Prainito City Clerk DATE: September 24, 2008 RE: R08-112 - Task Order #U08-03-06 Engineering Service for the Preparation of a Strategic Water Master Plan Update for the City of Boynton Beach Attached for your information and use are two originals of the above mentioned Task Order. Since the documents have been fully executed, I have retained one original for Central File. Please contact me if there are any questions. Thank you. ~Lm Pll~';<.t{; Attachments cc: Central File S:ICCIWPIAFTER COMMISSIONIDepartmental Transmittalsl2008lBarb Conboy - R08-112.doc