R08-141 II I 1 RESOLUTION NO. R08-1J/1 2 3 A RESOLUTION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, AUTHORIZING EXECUTION OF 5 TASK ORDER NO. U04-08-10 IN THE AMOUNT OF 6 $99,580.00 TO GLOBAL TECH, INC., FOR 7 ENGINEERING SERVICES TO PREPARE A 8 PRELIMINARY DESIGN REPORT TO INCREASE 9 THE CAPACITY OF THE EAST WATER 10 TREATMENT PLANT; AND PROVIDING AN 11 EFFECTIVE DATE. 12 13 14 WHEREAS, this task order involves an investigation into what work is required to 15 bring the capacity of the East Water Treatment Plant back up to 21.5-24 MGD; and 16 WHEREAS, the City Commission of the City of Boynton Beach upon 17 recommendation of staff, deems it to be in the best interest of the citizens of the City of 18 Boynton Beach to authorize execution of Task Order U04-08-1 0 in the approximate amount 19 of $99,580.00 to Globaltech, Inc. 20 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 21 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 22 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 23 being true and correct and are hereby made a specific part of this Resolution upon adoption 24 hereof. 25 Section 2. The City Commission of the City of Boynton Beach, Florida does 26 hereby approve and authorize the City Manager to execute Task Order U04-08-10 in the 27 approximate amount of $99,580.00 to Globaltech, Inc., for engineering services to prepare a 28 preliminary design report to increase the capacity of the East Water Treatment Plant to 29 approximately 21.5 to 24 mgd, a copy of which is attached hereto as Exhibit "A". S\CA\RESOlAgreements\Task - Change Orders\Globaltech - Task Order U04-08-10.doc , , I 1 Section 3. This Resolution shall become effective immediately upon passage. 11 2 PASSED AND ADOPTED this !2PLJ day of December, 2008. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Commissioner - Marlene Ross 20 21 ATTEST: 22 23 , , c 24 ( 1 i 25 26 27 28 29 30 (Corporate Seal) 31 S:ICAIRESOlAgreementslTask - Change OrderslGlobaltech - Task Order U04-08-10.doc ;(/lJ//1/ Globaltech, Inc. Task Order No. U04-08-10 Engineering Services to Prepare a Preliminary Design Report to Increase the Capacity of the East Water Treatment Plant to Approximately 21.5 to 24 mgd A. Background The City of Boynton Beach (CITY) desires to increase the permitted capacity of the East Water Treatment Plant (WTP) from 19.2 mgd to approximately 21.5 to 24 mgd. The increase in capacity will enable the East WTP to treat surficial aquifer water from the CITY's eastern and western wellfields. Currently, the western wellfield provides surficial water to the West WTP and the eastern wellfield provides surficial water to the East WTP. However, the CITY plans to change the water source and corresponding treatment process at the West WTP to the Floridan Aquifer, which is a brackish water source. The surficial water once used at the West WTP would then be diverted to the East WTP for treatment under a separate project. Because the East WTP will need to treat more water and its equipment is aging, the CITY desires to evaluate the East WTP equipment with regards to capacity, physical condition, and reliability. The East WTP is a lime softening facility that was originally constructed in 1962. It has under gone two major modifications/expansions in 1975 and 1992 and currently has a permitted capacity of 19.2 mgd. Therefore, some of equipment is 16 to 46 years old and are difficult to control and maintain. Permitting requirements have also changed and the East WTP would not be permitted as high as 19.2 mgd under today's regulatory conditions. The CITY has requested that Globaltech, Inc (CONSULTANT) provide engineering services to evaluate the existing equipment at the East WTP and prepare a Preliminary Design Report (PDR) and provide order of magnitude costs for the required improvements for the East WTP to treat a maximum daily flow of 21.5 to 24 mgd. The equipment evaluation will cover the following topics: . Hydraulic Capacity . Physical Condition of Equipment . Firm Capacity . Required Chemical Storage . CT 4-10g virus removal/inactivation Criteria . Implementation of I&C improvements (valve actuators) Hydraulic testing of some of the existing equipment will be required to determine their upper installed capacities. Structural testing of some of the existing equipment will also be required to determine if they need modifications. TASK ORDER No. U04-08-1O Based on the testing results, a PDR will be provided outlining the required modifications for each unit process of the plant except those being addressed by others in order to eliminate duplication of effort. Where necessary, the CONSULTANT will coordinate with others to gather information that is needed for the evaluation. These areas include the following: . On Site Generation of Sodium Hypochlorite . Sludge Thickener and Vacuum Press Rehabilitation . Electrical System and Emergency Power B. Scope of Services Task 1 - Hydraulic Evaluation of Equipment The East WTP is currently operating at approximately 8 mgd, well below its permitted capacity of 19.2 mgd due to limitations imposed by the South Florida Water Management District on the eastern wellfield. As such, the plant has not operated some of its equipment at higher capacities. Full scale testing of system components are needed to determine their hydraulic capacities and to identify any deficiencies if the equipment is to be used to treat a maximum day flow of 21.5 to 24 mgd. Manufacturer representatives will be consulted during the evaluation. The following facilities shall be flow tested to determine functionality and capacity. . Softeners . Filters . Sludge blow down pit pumps . Backwash recovery basin decant pumps . Backwash recovery basin sludge pumps . High service pumps The CONSULTANT shall coordinate with the Palm Beach County Health Department (PBCHD) to facilitate the hydraulic testing of the softeners and filters. It is anticipated that one of the InfiIco softeners will be operated at 12 mgd and two filters will be operated at 6 mgd for 3 to 4 weeks. Where necessary, CONSULTANT shall prepare a testing protocol for approval by the PBCHD. The CITY shall operate the system and provide analytical measurements as required. The CONSULTANT shall evaluate the data and provide a summary letter for the PBCHD as required. In order to evaluate the gravity flow components, spot elevations shall also be conducted by a surveyor. The surveyor shall re-establish two benchmarks on-site form County Benchmark Network and obtain spot elevations at the direction of the CONSULTANT. A desk-top analysis shall be conducted for the gravity flow components at the 21.5 and 24 mgd flow rate. The CITY is planning on replacing control valves at the plant with newer valves and actuators that can interface with the SCADA East WTP. However, there are other manual valves that may need to be replaced due to their age and/or condition. The CONSULTANT shall witness all the valves being operated by plant staff to determine which ones if any need replacing. Those control valves already scheduled to be replaced shall not be evaluated. 20f7 TASK ORDER No. U04-08-10 Results and recommendations from this hydraulic evaluation shall be summarized in the Preliminary Design Report (PDR). Task 2 - Structural Evaluation of Equipment The steel components of the plant are showing various degrees of corrosion. There are also minor leaks in the concrete water holding basins at pipe penetrations. A structural engineer shall inspect the condition of the following items and make recommendations for improvements where necessary for the following areas. . Softeners . Steel Lime Silos . Fluoride tank containment . Clearwell (exterior only) . Pipe penetrations for filters The structural engineer shall review the 2002 or later diver video of the interior of the clearwell but will not conduct any physical underwater inspection of the interior of the clearwell. Results and recommendations from the structural evaluation shall be summarized in the PDR. Task 3 - Firm Treatment Capacity Evaluation In order for the East WTP to be rated and permitted at 21.5 to 24 mgd, each treatment process will need to have firm capacity with the largest component/equipment out of service. A desk top evaluation shall be conducted to identify any firm capacity deficiencies. This evaluation shall consider the results of the hydraulic evaluation from Task 1. The firm treatment capacity evaluation shall include but not limited to the following. . Softening capacity . Filter capacity . Filter backwash capacity . Chemical storage capacity for 30 days . Chemical feed capacity (excluding chlorine gas or sodium hypochlorite) . Clearwell capacity . High service pump capacity . CT requirements for 4-10g virus inactivation/removal . Backwash recovery pond capacity The desktop evaluation shall not include the following unit processes that are being considered by others: . Chlorination: Removal of gas chlorine and installation of onsite sodium hypochlorite generator 30f7 TASK ORDER No. U04-08-10 . Instrumentation and controls . Hydraulic modeling of finished water including storage tank capacity and high service pumping to meet peak hour demand and raw water systems to meet maximum day demands. Results and recommendations from the firm capacity evaluation shall be summarized in the PDR. Task 4 - Electrical Power Evaluation The existing electrical systems will also be examined in its ability to provide adequate normal power and emergency power for the future flow rates. Future electrical demand for the plant will be estimated based on equipment horsepower determined in Task 3 above as well as future power requirements from the proposed onsite sodium hypochlorite generator. The electrical evaluation shall include the following: . Interface with the local power utility (FPL) to discuss normal power service redundancy . Analyze the water plant's power system with the new electrical loads for the proposed upgrades. . Prepare single line drawings including emergency power . Prepare conceptual grounding drawings . Provide cutsheets of new electrical equipment, if available Results and recommendations from this electrical evaluation shall be summarized in the Preliminary Design Report (PDR). Task 5 - Preliminary Design Report A Preliminary Design Report shall be prepared to identify the improvements necessary to increase the East WTP capacity to 21.5 and 24 mgd. The following tasks shall be conducted in preparing the PDR. 1. Meet with the OWNER to review the design parameters and results of Task 1 through 4. 2. Provide construction cost estimate for the various work. 3. Prepare a draft PDR for the improvements with order of magnitude cost estimates as a result of the evaluations conducted in Task 2 through 4. Submit 5 copies of each to the OWNER for review. 4. Meet with the OWNER to discuss the review comments. The OWNER may decide to select alternative equipment based on costs versus features. 5. Incorporate the review comments and prepare a final PDR. Submit 5 copies to the Owner. 6. The PDR will consist of schematic half-size drawings, process descriptions, literature, and equipment cut sheets. 40f7 TASK ORDER No. U04-08-10 C. Assumptions In addition to the work items discussed above, the following assumptions were made in establishing the scope of work and associated fee. Changes and/or modifications in the above work items or these assumptions are considered an Additional Service Item under the terms of the contract. . CITY will provide utility maps in CAD format or will provide hard copies for inclusion in the report. . The CITY will accompany CONSULTANT or their SUBCONSUL T ANTS on all the site visits if as requested. . The CITY will operate equipment as necessary. . The surveyor will only obtain spot elevations. A full site plan survey is not included. . The CITY will provide video of the clearwell interior for structural engineer review. . The CITY will provide required data and water quality analysis for testing. . The CITY will determine the instrumentation and control requirements. CONSULTANT shall provide input on the mechanical components in relationship to the instrumentation and controls equipment. D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement for General Consulting and Engineering Services dated February 21, 2006 between the City of Boynton Beach and Globaltech, Inc. E. Additional Services The following are examples of some specific Additional Service Items that may be required, but are not included within this Task Order. Generally, a condition contrary to the work described in Section B or assumptions of Section C (upon which the fee is based) is considered an Additional Service Item. Examples include: . Development of a Capacity Analysis Report (CAR) . Permit application for capacity upgrade. . Hydraulic modeling of raw water transmission system or finish water distribution system. . Detail design (specifications and drawings) for recommended upgrades. These and other services can be provided, if desired by the CITY, under separate Task Order or by an amendment to this Task Order. Services performed will be on an as-directed basis in accordance with a written Notice to Proceed from the CITY. F. Compensation Compensation by the CITY to Globaltech for all tasks will be on a lump sum basis in accordance with the above-mentioned Agreement and as shown in the Table below. Individual task limits will not be exceeded without prior written authorization from the CITY. Work completed by 50f7 TASK ORDER No. U04-08-1O Globaltech will be invoiced monthly on a percent complete basis. The compensation for the services described in this Task Order is $99,580.00. Softener & Filter Test Senior Engineer 50 $130 $6,500 $500 $7,000 Project Engineer 24 $85 $2,040 $100 $2,140 Administrative 8 $55 $440 $440 Flow Testing: Pumps Senior Engineer 24 $130 $3,120 $150 $3,270 Project Engineer 12 $85 $1,020 $100 $1,120 Survey Senior Field Rep 20 $105 $2,100 $50 $2,150 Surveyor Sub. $2,680 $2,680 Desk-Top Evaluation Senior Engineer 30 $130 $3,900 $200 $4,100 Project Engineer 12 $85 $1,020 $100 $1,120 Valve Review Senior Engineer 12 $130 $1,560 $1,560 Senior Field Rep 24 $105 $2,520 $100 $2,620 Task 1 - Subtotal $28,200 ~""-'-,' "-,,,,,,,,,,,.',,,", ~,,,,,,,,:,,"", z< ..........11;........ Structural Inspections Senior Engineer 15 $130 $1,950 $100 $2,050 Structural Eng. Sub. $6,380 $6,380 Task 2 - Subtotal $8,430 "'1:1.:::.1.: .......1.11.'._ ........ .........."......:... ....:..1.'.....,. ..:.:.: Desk-Top Evaluation Senior Engineer 70 $130 $9,100 $500 $9,600 Project Engineer 24 $85 $2,040 $50 $2,090 Administrati ve 8 $55 $440 $440 Task 3 - Subtotal $12,130 .1111'I~i:.'::...::III' ........ .........'2...+<<<_ - ......jJ::...::::.:::..~. ~:.~ .::I:.1~1.:1:::.:...:.:..1.1..ll... .1'.1...:1'~~.... 111:::':,.1:".:.1.:.1:1 < ..... . ..::..m::m...::.';:,x..;"'" Electrical Evaluation Senior Engineer 16 $130 $2,080 $100 $2,180 Elect. Eng. Sub $17,890 $17,890 Task 4 - Subtotal $20,070 ..... I:::'<L:: ............. '::. - I_~L" "'li.ll".ill.:"111i:::I: Review Meetings Senior Engineer 30 $130 $3,900 $100 $4,000 PDR Preparation Draft Senior Engineer 100 $130 $13,000 $500 $13,500 Project Engineer 48 $85 $4,080 $200 $4,280 Senior Designer 46 $85 $3,910 $200 $4,110 Administrative 16 $55 $880 $880 PDR Preparation Final Senior Engineer 24 $130 $3,120 $200 $3,320 Administrative 12 $55 $660 $660 Task 5 - Subtotal $30,750 ill>',':":::"'.."":;.' .",...:.:.' :..::::...,. ..::12 ..2....::........;::....... uk. ..::.::.:.~..I.'8" 6 of7 TASK ORDER No. U04-08-10 G. Schedule The CONSULTANT will commence work upon receipt of written authorization. The Table below shows the proposed schedule: Table 2: Schedule Table for Task Order No. U04-08-10 Hydraulic Evaluation of Equipment 12 Weeks from NTP Structural Evaluation of Equipment 10 Weeks from NTP Firm Treatment Capacity Evaluation 10 Weeks from NTP Electrical Evaluation 12 Weeks from NTP Submit Draft PDR 14 Weeks from NTP Submit Final PDR 2 weeks from receipt of review comments from Draft PDR DATED this day of ,2008. CITY OF BOYNTON BEACH GLOBAL TECH, INC. Kurt Bressner, City Manager ~~~ Attest/Authenticated: (Corporate Seal) City Clerk Approved as to Form: Attest/Authenticated Office of the City Attorney Notary 7of7 TASK ORDER No. U04-08-10 G. Schedule The CONSULTANT will commence work upon receipt of written authorization. The Table below shows the proposed schedule: Table 2: Schedule Table for Task Order No. U04-08-10 Hydraulic Evaluation of Equipment 12 Weeks from NTP Structural Evaluation of Equipment 10 Weeks from NTP Firm Treatment Capacity Evaluation 10 Weeks from NTP Electrical Evaluation 12 Weeks from NTP Submit Draft PDR 14 Weeks from NTP Submit Final PDR 2 weeks from receipt of review comments from Draft PDR DATED this ,0 day of ~ ,2008. CITY OF BOYNTON BEACH GLOBAL TECH, INC. KOOBr~ ~~~ (Corporate Seal) Attest! Authenticated Notary 70f7