Loading...
R09-127 .. I 1 RESOLUTION NO. R09 - I at 2 3 4 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 5 FLORIDA, APPROVING AND AUTHORIZING THE CITY 6 MANAGER TO EXECUTE MODIFICATION NUMBER 7 THREETOSUBGRANTAGREEMENT~THTHESTATE 8 DIVISION OF EMERGENCY MANAGEMENT TO 9 ACCEPT A HAZARD MITIGATION GRANT; APPROVING 10 AN AWARD OF A SOLE SOURCE CONSTRUCTION 11 CONTRACT TO SPECIFIED ARCHITECTURAL 12 SYSTEMS, INC., TO REPLACE THE EXISTING SKY 13 ROOF PANELS AT CITY HALL FOR A TOTAL BUDGET 14 APPROPRIATION OF $297,265.00 AND AUTHORING THE 15 CITY MANAGER TO EXECUTE THAT CONTRACT; 16 AUTHORIZING AMENDMENT TO THE CITY'S 17 CAPITOL IMPROVEMENT PLAN FOR FISCAL YEAR 18 2008/09; PROVIDING AN EFFECTIVE DATE. 19 20 WHEREAS, on March 17, 2009, the City Commission agreed to move forward with 21 the replacement of the sky roof panels and complete the Hazard Mitigation Grant which 22 project dated back to September, 2002; and 23 WHEREAS, the City applied for and was awarded a second Hazard Mitigation Grant 24 following Hurricane Francis for a project to protect the remaining 41 window openings in 25 City Hall; and 26 WHEREAS, upon final inspection in 2007, it was noted that the sky roof panels 27 should be protected before approving the disbursement of the grant; and 28 WHEREAS, the State has offered the City a grant modification that would increase 29 the amount payable to reimburse the City for the previous project to protect the second floor 30 window openings plus this project to replace the sky roof panels in City Hall. 31 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 32 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: S\CA\RESQ\AgreementsISubGranl Agreement-Kalwall- SAS doc IT , 1 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 2 being true and correct and are hereby made a specific part of this Resolution upon adoption 3 hereof. 4 Section 2. The City Commission ofthe City of Boynton Beach hereby authorizes and 5 directs the City Manager to execute Modification Number Three to Subgrant Agreement between 6 the Division of Emergency Management and the City of Boynton Beach to accept a Hazard 7 Mitigation Grant for a maximum amount of$345,084.00 (DCA Contract Number 07HM-4@-10- 8 60-02-006, dated September 28, 2006 - FEMA Project 1 545-74-R), a copy of which is attached 9 hereto as Exhibit "A". 10 Section 3. The City Commission of the City of Boynton Beach hereby authorizes and 11 directs the City Manager to execute a Sole Source Construction Contract with Specified 12 Architectural Systems, Inc., to replace the existing Kalwall Corporation sky roof panels in City 13 Hall and the West Wing in the amount of $265,868.00 with a manufacturers five year material 14 warranty in the amount of $4,810.00 and a 10% construction contingency of $26,587.00 for a 15 totalof$297,265.00. The Sole Source Construction Contract shall be in a form acceptable to the 16 City Attorney. 17 Section 4. The City Commission of the City of Boynton beach hereby approves the 18 amendment of the City's Capital Improvement Plan (CIP) for fiscal year 2008/09 by increasing 19 estimated grant revenues by $345,000.00 and budgeted appropriations by $300,000.00. 20 Section 5. This Resolution shall become effective immediately upon passage. S\CA\RESQ\AgreementsISubGrant Agreemenl-Kalwall SAS_doc .. I i 1 PASSED AND ADOPTED this L day of September, 2009. 2 3 4 CITY OF BOYNTON BEACH, FLORIDA 5 "", " . -l 6 7 8 9 10 11 12 13 14 15 16 17 18 - 19 -' 20 21 ~~ 22 23 24 Commissioner - Marlene Ross 25 ATTEST: 26 27 28 29 30 M. Prainito, CMC 31 Clerk 32 33 34 35 36 37 S ICA\RESO\Agreements\SubGrant Agreement-Kalwall . SAS,doc RD<j-1t),7 Agreement Number: 07HM4@-1O-60..o2..o06 Project Number: l545-74-R MODIFICATION TO SUB GRANT AGREEMENT BETWEEN THE DIVISION OF EMERGENCY MANAGEMENT AND THE CITY OF BOYNTON BEACH This Modification Number Three is made and entered into by and between the State of Florida, Division of Emergency Management, ("the Division"), and the City of Boynton Beach ("the Recipient") to modify DCA Contract Number 07HM-4@-10.60.02-006, dated September 28,2006 ("the Agreement"). WHEREAS, the Division and the Recipient desire to modify the Agreement. NOW, THEREFORE, in consideration of the mutual promises of the parties contained herein, the parties agree as follows: 1. The Agreement is amended to increase the maximum amount payable under the Agreement to Three Hundred Forty Five Thousand Eighty Four and Noll 00 Dollars ($345,084.00). 2. The Budget Attachment A to the Agreement, are hereby modified as set forth in Revised Attachment A to this Modification, a copy of which is attached hereto and incorporated herein by reference. 3. All provisions of the Agreement being modified and any attachments in conflict with this Modification shall be and are hereby changed to conform with this Modification, effective on the date of execution of this Modification by both parties. 4. All provisions not in conflict with this Modification remain in full force and effect, and are to be performed at the level specified in the Agreement. 5. Quarterly reports are due to the Division no later than 15 days after the end of each quarter of the program year and shall be sent each quarter until submission of the administrative close-out report. The ending dates for each quarter of the program year are March 31, June 30, September 30 and December 31. IN WITNESS WHEREOF, the parties hereto have executed thi, document as of the dates set out below. RECIPIENT: CITY OF BOYNTON DIVISION OF EMERGENCY BEACH MANAGEMENT I By: ~ By: Ta lor Name and Title: Ruben D. Almaguer, Interim Director Date: Date: Attachment A Budget and Scope of Work ScoDe of Work As a Hazard Mitigation Grant Program project, the Recipient, the City of Boynton Beach, will wind retrofit the City Hall Building located at 100 East Boynton Beach Boulevard, Boynton Beach, Florida 33435, by purchasing and installing Exeter storm shield hurricane barriers forty one (41) window openings. If deemed necessary, wind protection wili be provided on any other openings such as skylights, vents, iouvers and exhaust fans. All installations will be done in strict compliance with the Fiorida Building Code or Miami-Dade Specifications. All materials will be certified to meet the wind and impact standards of the current local codes. The local municipal or county building department will inspect and certify installation according to the manufacture specification. This is FEMA project 1545-74-R, funded under 1545-DR-FL. The Period of Performance for this project ends on December 31,2009. Schedule of Work State Contracting: 3 Months Prepare Competitive Bid Process for Purchase and Installation: 1 Month Award of Purchase and Installation Contract: 6 Months Verify Field Dimensions for Fabrication and Engineering Review: 6 Months Site Specific Engineering Submittal and Order Materials: 6 Months Company Fabricates, Obtain Permits, Recv. Materials: 1 Month 5 Days Installation: 4 Months Punch-Out and Final Inspection: 3 Months Submit Project Close Out: 0 Months 14 Days Submit Reimbursement Request: 0 Months 14 Days Unoredictable Weather: 3 Months Total Period of Performance: 34 Months 3 Days Budaet Line Item Budaet' Project Cost Federal Share Local Share Materials and Installation: $426,459.00 $319,844.00 $106,615.00 Fees Including Permits, Insurance: $ 20.404.00 $ 15,303.00 $ 5,101.00 Sub-total: $446,863.00 $335,147.00 $111,716.00 Administrative Cost: $ 0.00 $ 9,937,00 $ 0.00 Total: $446,863.00 $345,084.00 $111,716.00 , Any line item amount in this Budget may be increased or decreased 10% or less without an amendment to this Agreement being required, so long as the overall amount of the funds obligated under this Agreement is not increased. Fundina Summary Federal Share: $335,147.00 (75%) Local Share: $111.716.00 (25%) Total Project Cost: $446,863.00 (100%) Recipient Administrative Allowance up to $9,937.00. The materials and work funded pursuant to this Subgrant Agreement are intended to decrease the vulnerability of the building to property losses and are specifically not intended to provide for the safety of inhabitants before, during or after a natural or man made disaster. The funding provided by the Division of Emergency Management (DEM) under this subgrant is only intended to pay for the materials and labor for the installation of storm shutters and/or other hardening activities as a retrofit measure for the Recipient's buifding to reduce and/or mitigate the damage that might otherwise occur from severe weather or other hazards. The funding of this project by DEM in no way confers or implies any warranty of use or suitabifity for the modifications made or installed. The State of Florida disclaims all warranties with regard to this mitigation project, express or implied, including but not limited to, any implied warranties and/or conditions of satisfactory quality and fitness for a particular purpose, merchantability, or merchantable quality. This project has not been evaluated as meeting the standards of the Department of Homeland Security, Federal Emergency Management Agency (FEMA) as outlined in the guidance manual, FEMA 361-Design and Construction for Community Shelter. It is understood and agreed by DEM and the Recipient that the buifding has vulnerabilities due to age, design and location which may result in damage to the building even after the installation of the mitigation measures funded under this Subgrant Agreement. It is further understood and agreed by DEM and the Recipient that this mitigation project is not intended to make the building useable as a shelter for the Recipient's staff or any other citizens in the event of any natural or man-made disaster. CITY OF BOYNTON BEACH, FLORIDA CONTRACT FOR CONSTRUCTION SERVICES THIS CONTRACT, made and entered into this Fj day of 00.2t • , 2009, by and between the CITY OF BOYNTON BEACH, a municipal corporation of Florida, hereinafter called the "CITY" or "OWNER" and SPECIFIED ARCHITECTURAL SYSTEMS, INC., a Florida Corporation ( X) Check One a Florida General Partnership ( ) a Florida Limited Partnership ( ) a Sole Proprietor ( ) hereinafter called "CONTRACTOR ". WITNESSETH WHEREAS, Contactor has been found to be a suitable sole source vendor for the replacement of the Kalwall translucent panels at City Hall and West Wing Buildings; and WHEREAS, on the March 17, 2009, the City Commission reviewed options and voted to move forward with the replacement of the Kalwall and complete the City Hall wind - retrofit hazard mitigation grant project; and, WHEREAS, the Contractor has represented that it has the experience, manpower, and resources to substantial complete the Project within one hundred forty (140) calendar days from a Notice to Proceed when a Notice is issued by the CITY. NOW, THEREFORE, in consideration of these premises and the mutual conditions and covenants contained herein, the parties agree as follows: 1. AGREEMENT 1.1. The Parties agree that: 1.1.1. The foregoing "Whereas" clauses are true and correct and incorporated herein by this reference. 1.1.2. The CITY does hire and employ the CONTRACTOR to provide construction services for completion of the Project as described in the August 13, 2009 Bid Proposal attached as Exhibit "A ". 1.1.3. The CONTRACTOR does accept this Contract and does agree to furnish the necessary labor, tools, equipment, materials and supplies, etc., and to complete the Project by performing all the work as set forth in the August 13, 2009 Bid Proposal attached as Exhibit "A. supplies, etc" and to complete the Project by performing all the work as set forth in the August 13, 2009 Bid Proposal attached as Exhibit "A. I.IA. That this Contract and the Bid Proposal establishes the fixed price for the Project, provided: General Note #3 is deleted. 1.1.5. Contractor is an independent contractor, 2, SCOPE OF SERVICES 2.1. The Project consists of those improvements described and set forth in the Bid Proposal. 3. OBLIGA nONS OF CONTRACTOR 3.1. Contractor shall: . 3.1.1. Furnish all materials, supplies, machines, equipment, tools. superintendents, labor, insurance, and other accessories and services necessary to complete said project in accordance with the conditions and prices as stated in the Bid Proposal. 3.1.2. Perform all the work and labor pursuant to this contract and all of the materials furnished shall be in strict conformity with the Bid Proposal. CONTRACTOR further accepts and consents to the conditions contained in said Bid Proposal and expressly agrees to comply with every requirement and stipulation therein contained, 3.1.3. Furnish all tools, equipment, materials and supplies and to do all the work above mentioned in a first-class, substantial and workmanlike manner, and in conformity with the Bid Proposal. 3.1.4. CONTRACTOR shall furnish each subcontractor or material supplier with a copy of his Public Construction Bond within five (5) days of subcontractors' work or material supplying and shall maintain records to establish that notice. A copy of said notice shall be provided to the City's at time of issuance. 3.1.5. Guarantee all work and materials for a period of one (1) year of completion of the Project. 3.1.6. Pay promptly, before final settlement, any and all claims or liens by subcontractors or matcrial suppliers, incurred in and about this work. 3,1.7, Remove and clean up all rubbish, debris, excess material, '1 temporary structures, tools and equipment from streets, alleys, parkways and adjacent property that may have been used or worked on by the CONTRACTOR in connection with the project promptly as such section or portion is completed and ready for use, leaving the same in a neat and presentable condition. 3.1.8. Observe and comply with the provisions of the charter, ordinances, codes and regulations of the City of Boynton Beach, Florida. 3.1.9. Obtain written approval from the CITY of all subcontractors not disclosed in the Contractor's bid document. 3.1.1 O. Perform such other tasks as set forth in the Bid Proposal. 3.1.11. Shall provide a payment bond and performance bond in the amount of 100% of the contract amount, insurance certificates and any other required security for performance of the Project within ten (10) days of the Award of the Project and prior to commencement of the work, 3.2. The CONTRACTOR will be held responsible for the care, protection and condition of all work until final completion and acceptance thereof, and will be required to make good at his own cost any damage or injury occurring from any cause resulting from their acts or omissions, or the acts or omissions of their subcontractors or suppliers, including but not limited to stored materials which are damaged or stolen. 4. CITY'S OBLIGATIONS 4.1. City shall provide a written Notice to Proceed signed by the City Manager. 4.2. Make timely payments for the work in accordance with the procedures and time frames set forth in the Bid Proposal. 4.3, On satisfactory completion of the Project, provide a written final acceptance and payment for the entire project. 5. COMMENCEMENT OF WORK 5.1. CONTRACTOR hereby agrees to commence work under this contract within (10) calendar days of the Commencement Date specified in the written "Notice to Proceed," and to achieve Substantial Completion without interruption within one hundred forty (140) calendar days thereafter. 5.2. Time is the essence of the contract. In the event the CONTRACTOR shall " -' fail to timely commence the work following Notice to Proceed or fail in the performance of the work specified and required to be performed within the time limit set forth in the contract, after due allowance for any extension or extensions of time made in accordance with the Bid Proposal, the CONTRACTOR shall be liable to the CITY, as liquidated damages, the amount stipulated in Section 6.0 herein below for each and every calendar day that the CONTRACTOR shall be in default of achieving certification of Substantial Completion. 5.3. CONTRACTOR shall notify the City Project Manager in writing of any change in the names and addresses of each subcontractor proposed for principal parts of work, and any changes in subcontractors from those proposed in CONTRACTOR's bid proposal, and for such others as the City Project Manager may direct, and shall not employ any that CITY may, within a reasonable time. object to as incompetent or as unfit. 6, LIQUIDATED DAMAGES 6.1. The CONTRACTOR further agrees to pay $ per day as liquidated damages, for failure to begin within ten (10) days of CITY's issuance of the "Notice to Proceed" or failure to achieve Substantial Completion within one hundred forty (140) calendar days from the Commencement Date as indicated in the written "Notice to Proceed", The CITY shall have the right to deduct said liquidated damages from any amount due, or that may become due the CONTRACTOR, or to collect such liquidated damages from the CONTRACTOR or his Surety. 6.2. Punch list items recorded as a result of inspections for Substantial Completion are to be corrected by the CONTRACTOR within thirty (30) calendar days and prior to any request for Final Inspection, Testing and Acceptance, If the Substantial Completion punch list items have not been corrected by the CONTRACTOR within the thirty (30) calendar day period Liquidated Damages will be applied as described above. 7. PROTECTION OF EXISTING FACILITIES AND WORK IN PROGRESS 7.1. The CONTRACTOR warrants that quoted prices include the protection and continuous use of all existing work in process, property or operations of the CITY. 8. INDEMNIFICATION 8.1. The CONTRACTOR shall indemnify and save harmless and defend the CITY, its agents, servants. and employees from and against any claim. demand, or cause of action of whatsoever kind or nature arising out of error, omission or negligent act of CONTRACTOR, its agents, servants. or employees in the performance of services under this Agreement. 4 8.2. CONTRACTOR shall indemnify and save harmless and defend CITY, its agents, servants and employees from against any kind and all causes, claims, demands, actions, losses, liabilities, settlements, judgments, damages, costs, expenses, and fees (including without limitation reasonable attorney's and paralegal expenses at both the trial and appellate levels) of whatsoever kind or nature for damages to persons or property caused in whole or in part by any act, omission, or default of the CITY, its agents, servants or employees arising from this contract or its performance. The CONTRACTOR and the CITY hereby agree and covenant that the CONTRACTOR has incorporated in this original bid, which constitutes the Contract sum payable by the CITY to the CONTRACTOR, specific additional consideration in the amount of ten dollars ($10.00) sufficient to support this obligation of indemniflcation provided for in this paragraph, The indemnification required pursuant to the Contract shall in no event be less than $1 million per occurrence or no more than the limits of insurance required of the CONTRACTOR by the Contract, whichever is greater. It is the CITY'S and CONTRACTOR'S full intention that this provision shall be enforceable and said provision shall be in compliance with Sectiun 725.06, Florida Statute. 8.3. The execution of this Agreement by the CONTRACTOR shall obligate CONTRACTOR to comply with the foregoing indemnification provision, as well as the insurance provisions which are set forth in the General Conditions for Construction. However, the indemnification provision, and the insurance provision contained m the General Conditions for Construction are not interdependent of each other, but rather each on~ is separate and distinct from the other. 8.4. The obligation of the CONTRACTOR to indemnify the CITY is not subject to any offset, limitation or defense as a result of any insurance proceeds available to either the CITY or the CONTRACTOR. 9, PAYMENT BY CITY 9.1. The CITY agrees to pay the CONTRACTOR in current funds for the performance of the contract only once materials are installed, subject to additions and deductions as provided in the Bid Proposal. There will be no payment for materials stored on site. Progress payments will be on a monthly basis, 10. CHANGES IN THE WORK 10.1. The CITY, without invalidating the Contract, may order extra work or make changes by altering, adding to or deducting from the work, the 5 Contract sum being adjusted accordingly. All such work shall be executed under the conditions of the original Contract. Any claim for extension of time caused thereby shall be made in writing at the time such change is ordered. Changes in the work which increase price set forth in the Bid Proposal must be approved by the City Commission. 10.2. All change orders and adjustments shall be in writing and approved by the Project Manager, otherwise, no claim for extras will be allowed. 10.3. Claim of payment for extra work shall be submitted by the CONTRACTOR upon certified statement supported by receipted bills, Such statements shall be submitted for the current contract payment for the month in which the work was done. No claim for extra work shall be allowed unless same was ordered, in writing, as aforesaid and the claim presented at the time of the first estimate after the work is completed. 11. CITY PROJECT MANAGER 11.1. The City Project Manager is Andrew Mack. 11.2. The City Project Manager shall have general supervision and direction of the work. 113. As the City Project Manager is, in the first instance, the interpreter of the conditions of the contract and the judge of its performance. 12. INSURANCE 12.1. The Contractor shall obtain and maintain insurance as set forth in Exhibit HB", 13. TIME OF ESSENCE 13.1. Inasmuch as the provisions of the Bid Proposal relating to the times of performance and completion of the work are for the purpose of enabling the CITY to complete the construction of a public improvement in accordance with a predetermined program, all such time limits are of the essence of the Contract. 14. REMEDY FOR DELAY 14.1. In the event of any delay in the project caused by any act or omission of the CITY, its agents or employees, by the act or omission of any other party other than the CONTRACTOR, his agents, employees or (, subcontractors, or delay caused by weather conditions or unavailability of materials, the sole remedy available to CONTRACTOR shall be by extension of the time allocated to complete the project. 14.2. NO MONETARY DAMAGES SHALL BE CLAIMED OR AWARDED TO CONTRACTOR IN ASSOCIATION WITH ANY DELAY IN THE PROJECT CAUSED BY AN ACT OR OMISSION OF THE CITY, ITS AGENTS OR EMPLOYEES. CONTRACTOR ACKNOWLEDGES THIS LlMITATION ON RECOVERY AND ASSUMES ALL MONET AR Y RISK ASSOCIATED WITH THIS LIMIT A TlON. CONTRACTOR hereby acknowledges that he has read and understands the above provision. INITIALS 14.3, Failure on the part of CONTRACTOR to timely process a request for an extension of time to complete the work shall constitute a waiver by CONTRACTOR and CONTRACTOR shall be held responsible for completing the work within the time allocated by this contract. 14.4. All requests for extension of time to complete the work shall be approved by the City Manager. 14.5, For the purpose of this section, the phrase "the CITY, its agents and employees" shall include but shall not be limited to the City Project Manager and Project Manager. IS. DISPUTES 15.1. Disputes shall be resolved by an independent decision maker pursuant to the American Arbitration Association Construction Industry Initial Decision Make (10M) Procedures. IN WITNESS WHEREOF, the CITY has caused these presents to be signed by its City Manager, attested to by the City Clerk with the Corporate Seal of the said CITY and the CONTRACTOR has executed these presence the day and year herein before written, Signed, sealed and witnessed CITY OF BOYNTON BEACH, FLORIDA in the presence of: City Manager 7 IN WITNESS WHEREOF, the CITY has caused these presents to be signed by its City Manager, attested to by the City Clerk with the Corporate Seal of the said CITY and the CONTRACTOR has executed these presence the day and year herein before written. Signed, sealed and witnessed CITY OF BOYNTON BEACH, FLORIDA in the presence of: d~~Umo_ Attest: ~ 'fY1. f3;n. M. +.0 City Clerk Signed, sealed and witnessed CONTRACTOR in the presence of: or Vice President ~ Attest as to CONTRACTOR State of Florida ) ) ss: County of Palm Beach ) On this ~ 7 day of ~ 2009, personally appeared before me, duly authorized to administer oaths, ..Jc:n. ~OJ'I\- T~ known to be the person described herein or who has produced as identification and who executed the foregoing instrument and has acknowledged before me that they have executed same. fYl((~AJfo#d , Notary Public My Commission Expires: NOTARY PUBIlC-STATE OF FLORIDA .'".......... Michele L. Reed i. ECommission #DD690222 ~........'" Expires: JUNE 28, 2011 BONDED TIiRU ATLANTIC BONDING CO., INC. 8 EXHIBIT "B" City of Boynton Beach Risk Manogement Department INSURANCE ADVISORY FORM Under the terms and conditions of all contracts. leases, and agreements, the City requires appropriate coverages listing the City of Boynton Beach as Additional Insured. This is done by providing a Certificate of Insurance listing the City as "Certificate Holder" and "The City of Boynton Beach is Additional Insured as respect to coverages noted." ]nsurance companies providing insurance coverages must have a current rating by AM. Best Co. of "8+" or higher (NOTE An Insurance contract or binder may be accepted as proofofmsurance ifCertijicate is provided upon selection a/vendor,) The following is a list of types of insurance required of contractors, lessees, etc., and the limits required by the City: (NOTE: This list is not all inclusive, and the City reserns the right to require additional types of insurance, or to raise or lower the stated limits, based upon identified risk.) ~~__~___~_~~______h~__._~____h_____~_~___~___._~___~_~_~______~~_~~~___~__.___~~___~___~_~____~________~~___~_~._____~_"h_~._____~_~__h__~_h_____~_~~ TYPE (Occurrence Based On]y) MINIMUM LIMITS REQUIRED _~__~_~_~__~____.____________~______h____~_____~______~___________________~~____________~~______~__________.~____h_____.~_____.h______~_____~~___._h_~_ Genera] Liability Genera] Aggregate $ ] .000.000.00 Commercial General Liability Products-Comp/Op Agg. $ 1.000,000.00 Owners & Contractor's Protective (OCr) Personal & Adv Injury $ 1.000.000.00 Liquor Liability Each Occurrence $ 1.000.000.00 Professional Liability Fire Damage (anyone fire) $ 50,000.00 Employees & Officers Med,Expense (anyone person) $ 5,000.00 Pollution Liability Asbestos Abatement Lead Abatement Broad Form Vendors Premises Operations Underground Explosion & Collapse Products Completed Operations Contractual Independent Contractors Broad Form Property Damage Fire Lega] Liabilit) ~--._~-~-----------~------~--._---------------~~-------_..__.~------~--._-~------------------------._-~-----~--_._--~--_._---.---~------------~------~-_._. Automobi]e Liabi]ity Combined Single Limit $ 500,000.00 Any Auto Bodily Injury (per person) to be detennined All Owned Autos Bodily lnjury (per accident) to be determined Scheduled Autos Property Damage to be determined Hired Autos Trailer Interchange $ 50,000.00 Non-Owned Autos PIP Basic Intermoda] __~___________________________________._____._______._______________________~__n__~______________.___~_~______~___~___________________~__._______~_________ Garage Liabi]ity Auto Only, Each Accident $ 1.000,000.00 Any Auto Other Than Auto Only $ 100,000.00 Garage Keepers Liability Each Accident $ 1.000,000.00 Aggregate $ ],000,000.00 .______________~___._~_...__~______~._____.__________M_________.________________~__.__._________.____.__._~____.______~___________.__________________~__.__ Excess Liability Each Occurrence to be determined Umbrella Form Aggregate to be determined ~__~_n_n__n_._____~_~~__.~_~_n_~~_nn_~nn____n___~_n___~_n__~n__n_n_n_~___._~~__.__~____~__n__~_____M_____n____h____.~____________n____~_ Worker's Compensation Statutory Limits Employer's Liability Each Accident $ ] 00.000.00 Disease. Policy Limit $ 500,000.00 Disease Each Employee $ ]00.000.00 ____..~___.___~_____________~__~____.~______M~________._~_~____~~~___.________~___.________________.______________.____.____._______~______~______~________ Property Homeowners Revocable Permit $ 300,000.00 Builder's Risk Limits based on Project Cost ____~______n_.___________._____.~_.____~___~____~______~_n_~_~_.__~_.__~__._n_____________nn______~______n.__M__________________h_______.__~__n____ Other ~ As Risk Identified to be determined __h___.______~_n__~__.__._~_.__n_______~_~________.______~__~____n_________n_h_____~______n_.__n_n_____________~______~nn________n__~________~_ INSURANCEADV] SOR YFORM05 Revised 07/2009 S PECIFIEDARCHITECTURAL SYSTEMS, INC. 1950 Northgate Blvd., Ste, 06' Sarasota, FL 34234 (941) 360-6900 . Fax (941) 360-6977 www.specarcsys,com' CGC150B102 BID PROPOSAL DATE: August 13, 2009 TO: City of Boynton Beach RE: Boynton Beach Govt, Complex P,Q. Box 310 Boynton Beach, FL Boynton Beach, FL 33435 Kalwall Skyroof Panel Replacement Attention: Andrew Mack We are pleased to submit the following revised proposal for the replacement of the existing Kalwall skyroof panels with new Kalwalllnsulated Translucent Skyroof Panel System: DESCRIPTION: Price 1 - Citv Hall New Kalwall skyroof panels, aluminum batten system and associated flashings for (1) supported shed skyroof 161'-5" long x 38'-1 W' wide on stope (20'" with the following cut-out areas: (1) 15'10"x24'-4%" (1) 8'-0" x 16'-4 W' (2) 8'-0"x 8'-4" (1) 36'-6 %" x 24'-4 %" (1) 61'-1" x 29'-10 s;." (1) 9'-1" x 24'-43/.' + 29'-10s;." Notes: 1) Shed roof has canopy section 61'-1" x 8'-2 Vi' on slope, Kalwall panels in this area have .070" super-weathering white exterior faces, ,070" Type A white interior faces and .55 "U" factor. 2) Kalwall skyroof is designed for a 30 PSF live load, 82 PSF wind load and U180 deflection, 3) Pricing is based on utilizing existing supports to limit panel span to a maximum of 8'-3", 4) Commission Chamber skylights are not included in this price. Unless noted above, new thermally broken Kalwall translucent panels to have ,060" super-weathering Hurricane-impact white exterior faces, ,045" Type 25 white interior faces, 8" x 20" shoji grid pattern and a .15 "U" factor, All exposed aluminum to receive Kalwall CRF finish in standard colors, TOTAL COSTS: $216,806.00. Price 2 - West Wino New Kalwall skyroof panels, aluminum batten system and associated flashings for (1) supported shed skyroof, with (1) endwall, 27'-0" long x 15'-4" wide on slope (47,94"', Notes: 1) Kalwall skyroof is designed for a 30 PSF live load, 82 PSF wind load and U180 deflection. 3) Pricing is based on utilizing existing supports to limit panel span to a maximum of 9'-5". New thermally broken Kalwall translucent panels to have .060" super-weathering Hurricane-impact white exterior faces, .045" Type 25 white interior faces, 8" x 20" shoji grid pattern and a ,15 "U" factor. All exposed aluminum to receive Kalwall CRF finish in standard colors. TOTAL COSTS: $49,062.00. Pricing Note: In order to minimize equipment, pricing for West Wing replacement is contingent on doing City Hall skyroof replacement at same mobilization period, Pricing will be invalid it West Wing replacement is performed at a different time. BOYNTON BEACH GOVT. COMPLEX - BOYNTON BEACH, FL REVISED BID PROPOSAL. KALWALL TRANSLUCENT SKYROOF PANEL REPLACEMENT 4/16109 - PAGE 2 OF 2 INCLUDED IN THIS PROPOSAL: - Required submittals and Engineering for Kalwall system only - Removal and disposal of existing Kalwall material - New Kalwall material delivered and installed - 1-year standard manufacturer's material warranty and 2-year standard installation warranty - Payment and Performance Bond -Permits EXCLUDED IN THIS PROPOSAL: - Any repairs to existing skylight curbs or intermediate supports that may be required when old panel system is removed. We do not anticipate any repairs but this is an unknown entity until existing panels are removed. - Repairs or replacement of building materials other than the Kalwall skyroof panel system - Safety netting under roofs during install that may be deemed necessary - Sales Tax - Any item not specnically noted herein GENERAL NOTES: 1) This bid proposal is based on the dimensions from Kalwall's drawing #K87-1060. 2) Labor and equipment costs are based on doing the work on (6) successive 3-day weekends, 3) For a manufacturer's (5) year material warranty ADD $4075.00 for Price 1 and $735 for Price 2 4) The Kalwall system has Florida Product Approval and meets the wind-borne debris requirements of the Florida Building Code. 3) Pricing is subject to review after (30) days and upon final engineering and approval. We appreciate the opportunity to submit this revised proposal and look forward to working with you on this project. SPECIFIED ARCHITECTURAL SYSTEMS, INC. $~g-~ Kalwall ';, i~ !\ J :i' '1: ' '" '.,111"1 h..I:'; 'h 'I' ,;! '-,l' ,._ c,' ~-.... ! \' ,.,( ,<I;,', COFiP R ,C\ rI ['., July 1:i,;OO9 To Whom It May Concern: Please be advised thaI SpecIfied ..\n::hite;;tural SY"II':I\1$ ba$t!d 1Il Sarasow, 1"1, IS 'Ill!' 4'xc!n,ivc distrihutor in J'toriaa, cxdudlng t!w pan-h:mJk. 'vh' [,l'quIrt' highly l':;pt~T'it'nc::d. lrained (!Istribmufs f()l' the sut,;,:,,~sS or oLlr products ami systems and S~cdkd .\rCl'\ltccturaJ Systems has prvvidcd thiS ,en'ice ti) OlIt CUSII'J1K'Y" n,l' many years Plci:lsl: do not htoslla!", to (',)muet 11':(' If there are any questions Sincerdy, KAl \\-':\11 CORPORA jlON I I )r" 'V'/j ,__,,1 \ 1(...1 f /i . ,~-\~-../ 'o<__--,--,,~ :11m..,.fcs R. Andrus Vice-President Sales North America' JRA:si ~, '. I < '; ... [ ; Ii. " .. "{ , ,. ,.\"..li", ;i: The Boynton Beach City Clerk's Office 100 E BOYNTON BEACH BLVD BOYNTON BEACH FL 33435 (561) 742-6060 FAX: (561) 742-6090 e-mail: prainitoj@cLboynton-beach.fl.us www.boynton-beach.org MEMORANDUM TO: Carol Doppler Purchasing Agent FROM: Janet M. Prainito, CMC City Clerk DATE: September 2, 2009 SUBJECT: R09-127 Modification to Subgrant Agreement Between the I Division of Emergency management and the City of Boynton ii Beach Attached for your handling are four sets of the original agreement mentioned above and a copy of the Resolution. Once the documents have been executed, please return the original documents to the City Clerk's Office for further processing. Thank you. ~1n.fJ~ Attachments (2) C: Central File S:\CC\WP\AFrER COMMISSlON\Departmental Transmittals\2009\Carol Doppler R09-I2l.doc America's Gateway to the Gulfstream . CITY CLERK'S OFFICE MEMORANDUM TO: Andrew Mack Engineering FROM: Janet M. Prainito, CMC City Clerk DATE: October 6, 2009 RE: R09-127 Contract for Construction Services Between City of Boynton Beach and Specified Architectural Systems, .Inc. Attached for your information and use are three originals of the above mentioned Contract. Since the documents have been fully executed, I have retained one original for Central File. Please contact me if there are any questions. Thank you. ~ 'JYJ Pj,~l~b Attachments cc: Central File S:\CC\WP\AFTER COMMISSION\Departmental Transmittals\2009\Andrew Make R09-I2l.doe SICC\WP\AFTER COMMISSIONIOepartmental Transmittals\2009\Andrew Make R09-127 doc