Loading...
R94-196RESOLUTION NO. R94-/~ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AMENDING RESOLUTION NO. R94-87, EXPANDING THE SCOPE OF SERVICES FOR ROSSI AND MALAVASI ENGINEERS FOR ENGINEERING SERVICES FOR MINER ROAD; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on May 17, 1994, the City Commission approved the execution of a Contract with Rossi and Malavasi, Engineers, Inc., or engineering services for Miner Road; and WHEREAS, it is in the best interests of the City to expand the scope of services for that Contract; and WHEREAS, the expanded scope of services is attached hereto s Exhibit "A" NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: ~ The City Commission of the City of Boynton Beach, Florida does hereby amend Resolution No. R94-87, to encompass the expanded scope of services, attached hereto as Exhibit "A" ~ That this Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this /~- day of ~/~, 1994. CITY OF BOYNTON BEACH, FLORIDA Mayor ~/ ATTEST: Cit~ Clerk Commissioner (Corporate Seal) Authsig.doc RTC.611 N.E. 6th 8/11/94 ROSSI AND M,~LAVAS! ENGINEERS, INC. CONSULTING ENGINEERS_.. THE BARRISTERS BUll 1615 FORUM PLACE, SU WEST PALM BEACH, FL 407-689-0554 FAX 407.689.5598 Carrie Parker, City Manager City of Boynton Beach P.O. Box 310 Boynton Beach, FI. 33425-0310 November 4, 1994 Re: Miner Road, Congress Avenue to Lawrence Road Additional Professional Services Dear Miss Parker: As discussed with Mr. Javier Lopez, Prject Manager for Miner Road; we feel the funds allocated between the City of Boynton Beach and Palm Beach County will be enough to cover the additional cost for the construction of a third lane within the limits of the existing road along Chalet IV Subdivision, approximately 1200 feet of roadway. This office proposes to provide the additional engineering services to include the following: Topographical Work a. As-Built of the existing Drainage and Paving. b. Cross section every 1 00 feet. c. Setting up targets for aerial photography. Aerial Photography Engineering Design Additional Soils Survey In addition to the above this office will prepare the survey for the one acre parcel to be located on Mr. Glick's property for the Drainage Retention Pond. This office proposes to provide the above described services for the Lump Sum Price of $ 7,400.00. Please if you have any questions do not hesitate to contact the writer. Very truly yours, RO~SSI & MALA.VASI ENGINEERS, INC. Santiago Malavasi, P.E. RECEIVE[ CITY MANAGER'S OFFI~ DING TE 4-E 33401 E