Loading...
PNC NSP DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME PNC Bank APPLICANT'S AGENT: Edward M. McDonald, Bohler Engineering AGENT'S ADDRESS• 1000 Corporate Drive, Suite 250, Fort Lauderdale, FL 33334 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: August 16, 2011 TYPE OF RELIEF SOUGHT: Request new site plan approval to construct a 3,300 square foot bank building with detached drive - through and related site improvements on a 0.70 acre parcel zoned C -3 Community Commercial. LOCATION OF PROPERTY: 1520 S Federal Highway, Boynton Beach, FL DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant HAS HAS NOT established by substantial competent evidence a basis for the relief requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included ". 4. The Applicant's application for relief is hereby .1 GRANTED subject to the conditions referenced in paragraph 3 hereof DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other /t ��/� • DATED: I / / // c. i,r _ �►. f City Clerk -- , lJ t-,-' S \Planning \SHARED \WP \PROJECTS \PNC Bank - 1520 S Federal Hwy \NWSP 11- 001 \STAFF REPORT\DO doc Cl EXHIBIT "C" - CONDITIONS OF APPROVAL Project Name PNC Bank File number: NWSP 11 -001 Reference: 2nd review plans identified as a New Site Plan with a June 7, 2011 Planning and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT ENGINEERING DIVISION Comments 1. Comments #25 and #26 on attached standard comments form are not satisfied; two (2) fire hydrants will need to be added. Suggest one off of North Federal Highway (the 6" w.m.) to the northwest of proposed building, and one off of Woolbright Road (the 12" w.m.) to the X southeast of proposed building. Please coordinate this with the Utilities Department. 2 Proposed gnnder station to be approved by Utilities Department (Chris Roschek, Engineering Manager (561- 742 - 6413), noted in two X (2) places on sheet C -9, not the Engineering Division. FIRE Comments: 3. No comments at this time. Any issues will be addressed in Plan Review during the Building Permit process. X POLICE Comments 4. Construction sites Conditions of Approval: Prior to the first building permit, the applicant shall prepare a construction side security and management plan for approval by the City's Police Department X CPTED official. 5. Security measures at a construction site are determined after a security survey is conducted using the following procedures a. One (1) staging area, to store equipment and park machinery, must be fenced. b. The staging area must be visible from an accessible roadway to X allow effective police patrol. c. Lighting must be provided to allow complete visibility to the area. d. Approved padlock for all storage trailers and equipment trailers and park within staging area. 6. Banks should include the following security needs a. Height markers at main exit doors. DEPARTMENTS INCLUDE REJECT b. For potential criminal activity detection, a high resolution color X digital video camera system with monitoring and photo processing capabilities shall be installed above exit doors, teller counters, and dnve -thru lanes. c. Installation of money lever switches within teller cash drawers that will activate system in emergency situations. d. ATM shall comply with F.S.S. 655 -965 relating to Automated Teller Machines: e. Shall be visible from roadway f Shall not be obscured by any landscaping or other fixed object that would prevent clear visibility. g. Shall install high resolution color digital video camera system. h. High illumination of ATM and walkway leading to and from it. Lighting should be positioned so as not to cause glare of video recording. i. Install and strategically place a convex mirror to allow operator of ATM to identify any approaching person(s) and /or potential suspect. j. Drive -thru should provide signage stating one -way only. 7. All lighting shall be metal halide. a. Landscaping shall not conflict with lighting. b. Canopy trees are not to be located within the area of security lighting or light poles. X c. Entry signage should be lighted. d. Building lighting (non - glare) should be around perimeter of all sides and on pedestrian sidewalk. 8. Landscaping should not obstruct view from doors, windows, or walkways. X BUILDING DIVISION Comments None (all previous comments have been addressed). PARKS AND RECREATION Comments: None. FORESTER/ENVIRONMENTALIST Comments 9. The Landscape Architect should amend the "Existing Trees Disposition Chart" on sheet LD -1 to indicate the following Trees 1 -5 (5 trees) and trees 9 -15 (7 trees) should be preserved in place on site X (not removed). 10. The Landscape Architect should amend the "Existing Trees Disposition Chart" on sheet LD -1 to indicate the following: Trees 7 -8 X to be removed. (2 trees, 54" DBH inches total) are required to be replaced (mitigated) on the site with an equal number of diameter inches. The replacement trees should be shown with a separate DEPARTMENTS INCLUDE REJECT symbol on the landscape plan sheet LP -1 (Environmental Regulations, Chapter 7.5, Article I. Section 3.C. of the LDR). 11 Add a note to the Landscape Plan that indicates "all utility boxes or structures (not currently known or shown on the plan) shall be X screened with a Cocoplum hedge on three sides ". 12 There was no irrigation plan submitted with the landscape plan. An irrigation plan will be required to be submitted for review and approval X at the time of permitting. PLANNING AND ZONING Comments: 13. Revise plans at time of permitting to depict plant material a minimum of one -half the wall height of the CBS enclosure required to screen the proposed lift station. Also, plant material on the south wall side of X the lift station other than the man gate entry. The gate should be designed to restrict view into the lift station compound 14. Revise plans at time of permitting to include additional architectural enhancements to exterior building elevations to add visual interest and variety and prevent a monotonous facades per the Community Design Standards (Ch. 4, Art III, Sec. 3.A. of the LDR). Staff X suggests utilizing decorative medallions or other architectural features consistent with surrounding commercial buildings. 15. The north and east elevations on Sheet A02 do not appear to match those on A07 and A08. Please indicate which are correct, then X modify all to match at time of permitting. 16. Revise site plan at time of permitting to include a detail of garbage can storage area screening. X 17. Revise plans at time of permitting to plant more areas of the site with landscape material to eliminate the smaller areas of sod, to reduce X irrigation demand Substitute hardy groundcovers and shrubs in place of the sod. 18. At time of permitting, revise landscape plan to provide additional landscape material for the screening of the drive- through center in accordance with Chapter 4, Article II, Section 6 D. of the Land Development Regulations. Staff recommends (as part of the added X landscaping) that the proposed Gumbo Limbo tree (partially deciduous) be replaced with a canopy tree that will provide better screening of the drive - through center from Woolbnght Road. 19. Label buffer wall on both site plan and landscape plan. X DEPARTMENTS INCLUDE REJECT 20. Additional landscaping and greater height of landscape material (understory plant material needs to be between the knee wall height and tree canopy height) should be utilized in the south landscape X buffer along Woolbright Road and the west landscape buffer along Federal Highway, to minimize the view of the drive - through operation. 21. Provide a sign detail for proposed monument sign that includes sign dimensions, height, and total proposed sign face area, color, and X font/logo. 22. Provide details of all other proposed signage on building and wall, including sign dimensions, font, colors, and sign face area per sign. X 23. The base of the monument signs should be totally surrounded and enhanced with colorful groundcover and a minimum of two (2) colorful X shrub species. 24. All monument signs shall clearly indicate the project street address at the top of the sign. X 25. All proposed signage would be required to comply with the applicable sign regulations and be consistent with the community design standards of the Land Development Regulations. Preliminary sign X details submitted will be required to be revised at time of permitting to comply with the monument sign face area maximum and include all sign calculations. ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments Reject condition #1 (condition has been satisfied) X Amend condition #2 as follows to include alternative sewer design: 2. Proposed grinder station or proposed gravity sewer connection to the Bermuda Cay property to be approved by Utilities Department (Chris X Roschek, Engineering Manager (561- 742 - 6413), noted in two (2) places on sheet C -9, not the Engineering Division. Amend condition #7 to include revisions made to the new Green Building Program table 405.2 and 405.3 and to allow LED lighting consistent with LEED standards: 7. All exterior lighting shall comply with the requirements of the Green Building Program Table 405.2 and 405.3 for the exterior lighting X appropriate to the budding site. It is recommended that "Automatic Lighting Reduction Requirements" shall be established after which total outdoor lighting lumens shall be reduced by at least 30% except where code requires lighting for stairs, walkways, and building entrances. We recommend the use of LED lighting vs. Metal Halide for its Energy Consumption, Rated Life, Environmental Considerations, Lumen Maintenance and Start/Restrike Time. In addition to requiring that: DEPARTMENTS INCLUDE REJECT a. Landscaping shall not conflict with lighting. b. Canopy trees are not to be located within the area of security lighting or light poles. c. Entry signage should be lighted. d. Building lighting (non - glare) should be around perimeter of all sides and on pedestrian sidewalk. ADDITIONAL CITY COMMISSION CONDITIONS Comments To be determined. /140.47t S \Planning \SHARED\WP \PROJECTS \PNC Bank —1520 S Federal Hwy \NWSP 11- 001 \STAFF REPORT\COA doc