R01-237 RESOLUTION NO. R01-,~"/ A RESOLUTION OF rile CITY COMMISSION )F THE CITY OF BOYNTON BEACH, FLORIDA, AUTHOt %ZING THE MAYOR AND CITY CLERK TO EXECUTE CI~ ANGE ORDERS NOS. 1, 2 AND 3 WITH S ~LECT CONTRACTING, INC., REGARDING THE TWO yrATER TREAMENT PLANT PRE-ENGINEERED fETAL BUILDINGS IN THE AMOUNT OF $47,662.11; AND PROVIDING AN EFFECTIVE DATE. WIIEREAS, the City Commission has previously approved and authorized the urchase of two 50' by 100' metal pre-engineered warehouse buildings for use by the Utility )epartment for general operations, the storage of emergency repair parts, spare pumpmg equipment and supplies needed during power failures or storm events; WIIEREAS, staff's recommendation for the purchase of the warehouses did not include costs of installing the plumbing and electrical improvements that are required; NOW, TItEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF TIlE CITY OF BOYNTON BEACII, FLORIDA, TIlAT: Section 1. The City Commission of the City of Boynton Beach, Florida does ~ereby authorize and direct the Mayor and City Clerk to approve and execute Change Orders ~To. 1, 2 and 3 with Select Contracting, ]nc., in the amount of $47,662.11, for installation of ~lumbing and electrical improvements for the two Water Treatment Plant Pre-Engineered Vietal Buildings. Section 2. This Resolution shall'become effective immediately upon passage. ,TTEST: Clerk PASSED AND ADOPTED this ,~ ! day of August, 2001. CITY OF, qBOYNTON BE-ACH, FLORIDA ~ice Mayor Commissioner )rders 1,2,3 - Metal Buildings Water Treatment Plant CHANGE -ORDER FOR CHANGE PROPOSAL Distribution to: OWNER X ARCHITECT X CONTRACTOR X FIELD X OTHtiR PROJECT: EAST WATER PLANT WAREHOUSE CHANGE ORDER NUMBER: # 2 INITIATION DATE: June 20, 2001 TO Select Contracting 1751 West l0th Street Riviera Beach, F1 33404 ARCFflTECT'S PROJECT N~: CONTRACT FOR: Construction of 2 Warehouse Bldgs. CONTRACT DATE: June 18, 2001 You are directed to make the following changes in this Contract: INCLUDE COST OF ALL ELECTRICAL WORK PER COR # 3 FOR $27,927.45 ~. INCLUDE COST OF ALL PLUMBING WORK PER COR # 2 FOR $14,943.63 The original (Contract Sum) (Guaranteed Maximum Cost) was... $168,708.00 Net cha~ge by previously authorized Change Orders... The (Contract Sum) (Guaranteed Max/mum Cost) prior to this Chang Order was... The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) 0 by this C~ange Order .... Th~ n~w (Contract Sum) (Guarant~d Max/mum Cost) including this Change Order... The Contract Time will be (increased) by...__Thir~ Days The Date of Substantial Completion as of tl~ date of this Change Order therefore is ENGINEER $ 1,763.84 $I70,471.84 BY DATE $ 42,871.08 $ 213,342.92 (30) Days. Oct. 15~ 2~01 BY DATI Select Contracting, Inc. General Contractor 1751 West l~th Street[ Riviera Beact~ Fior~a 33404 {S61) 844-2764 FAX: (561) 844-3155 CONSTRUCTION CHANOEPROPOSAL(CCP) TO: CITY OF BO:YNTON BEACH UTILITIES DEPARTMENT CCP NUMBER: PROJECT NAME; PROJECT NUMBER: 02-Revised MAJNT. WAREHOUSE 503 We propose to accomplish the CHANGES identified in FIELD SULLETIN/PROPOSAL REQUEST N/A and as described herein. Except as medified be ow the org hal contract and all prior amendments shall remain in full force and effect. DESCRIPTION: PROVIDE ARCHITECTURAL DRAWINGS FOR PERMITTING. PROVIDE INSTALLATION OF PLUMBING SYSTEMS FOR BOTH THE NORTH AND THE WEST BUILDINGS. PROPOSED CONTRACT PRICE CHANGE (increases) $14.943.63 PROPOSED CONTRACT TIME CHANGE (increases) 30 days THIS CONSTRUCTION CHANGE PROPOSAL IS VALID FOR 15 DAYS DISTRIBUTION: FROM: ,T.~d Hutch ns, Pro ect Manaoer 06113/2001 503ccp02 R. 123 PAGE 2 OF 3 SELECT CONTRACTING.INC. 503 CCP02R __CONSTRUCTION CHANGE PROPOSAL NO. 2-R®vlaed DATE: PROJECT NAME: 0611312001 BOYNTON BEACH MAINTENANCE WAREHOUSE DE~CRtPTION OF PROPOSED CHANGES: ' - PROVIDE DESIGN AND COST FOR PLUMBING SYSTEMS, BOTH BUILDINGS A (SEE DETAILED BREAKDOWN PAGE 3 OF 3) I MATERIAL 0.00 2 LABOR 0.00 3 EQUIPMENT 0.00 4 GENERAL REQUIREMENTS I 5% ) 0.0~ --SUBTOTAL 0.00 GENERAL CONTRACTOR'S OVERHEAD/PRO~IT - ~5.00% 0.00 TOTAL 0.00 COST BREAKDOWN: WORK PERFORMED BY GENERAL CONTRACTOR'iS_E._L.~¥ CONTP~._CTING~Ii~'~:}'I' B WORK PERFORMED BY SUBCONTRACTOR'S I MPA ARCHITECTS - PLUMBING DRAWINGS 300.00 2 SUBCONTRACTOR(SEE A]-~ACHED PROPOSAL) 11.900.00 4 GENERAL REQUIREMENTS ( 5% ) 610.00 8{JBTOTAL GENERAL CONTRACTOR'S OVERHEAD/PROFIT ~ 5.00% TOTAL C CREDIT {TEMS 1 MATERIAL 0.00 2 LABOR 0.00 3 EQUIPMENT 0.00 4 SUBCONTRACTORS 0,00 D SUBTOTAL "A" + "B" - "C" TOTAL 12.~1o.o~ 1.921.50 14.731 $0 ! 0.00 14.731.50 E PERFORMANCEAND PAYMENT BOND 1.44% 212.13 TOTAL COST OF CONSTRUCTION CHANGED PROPOSAL NO. 2-Revised $14,943.63 R. L. D'Addio Plumbing Co., Inc. I 12~, Omt~ood ik~levara Pboa~ (56{,) ~82-~9~0 t'~# (~1) ${{-~?'* CF CO~'12~ Today'-, dine ........ : .lur~ 13. 2001 R. L. D. Pmp,~al #..: MAY.14A (1) ADA Compl~ Wall Hung Lsv~too', (1) 3" Toilet l,'loor ~ (2) 4' Wm'~ou~ Dzai~, (4) Wsmt Lin~ Co~ions to liosm Bibbs. Inda~s~ k, tl, ls Permits; Fees Metro Work/Restoration Cl~nrt611 For BaCilli l~moval oi'l~c-~-s FiB Labo~lor~ fee$. elect Contracting, Inc. General Contractor 1751 West 10th Street Riviera Beach, Flodda 33404 (561) 844-2764 FAX: (561) 844-3155 CGCA 145~o CONSTRUCTION CHANGE PROPOSAL (CCP) TO: CITY OF BOYNTON BEACH UTlUTIES DEPARTMENT cc. NUMBE~: ~.~ ~ PROJECT NAME: M;~NT.W HOUSE PROJECT NUMBER: 503 We propose to accomplish the CHANGES identified in FIELD BULLETiN/PROPOSAL REQUEST N/A and as described herein. Except as modified below, the original contract and alt pdor amendments shall remain in full force and effect. DESCRIPTION: PROVIDE ARCHITECTURAL DRAWINGS FOR PERMITTING. PROVIDE INSTALLATION OF ELECTRICAL SYSTEMS FOR BOTH THE NORTH AND THE WEST BUILDINGS. PROPOSED CONTRACT PRICE CHANGE (increases) $ 27,927.45 PROPOSED CONTRACT TIME CHANGE (increases) 30 days THIS CONSTRUCTION CHANGE PROPOSAL IS VALID FOR 15 DAYS DISTRIBUTION: FROM: Steve Rush, Marketin.q SIGNED: -f'~'~-~-~ ~- ,5/99-W; Master Le['ters and Fom~'~roject Management\Construction Change prop<3sal 503ccp03.123 SELECT CONTRACTING,INC. CONSTRUCTION CHANGE PROPOSAL NO. 3 BOYNTON BEACH MAINTENANCE WAREHOUSE PAGE 2 OF 3 503 CCP03 :DESCRIPTION OF PROPOSED CHANGES: 1 PROVIDE DESIGN AND COST FOR ELECTRICAL SYSTEM_S, BOTH BUILDINGS COST BREAKDOWN: ) BY GENERAL CONTRAt; I OR (SELECT CONTRACTING;INC.) (SEE DETAt! FD BREAKDOWN PAGE 3 OF 3) o.001 0.00 0-00t 0.00 MATERIAL 2 LABOR 3 EQUIPMENT 4 GENERAL REQUIREMENTS (5%) t SUBTOTAL GENERAL CONTRACTOR'S OVERHEAD/PROFIT 15.oo%1 o.00I I TOTAL 0-001 B WORK PERFORMED BY SUBCONTRACTOR'S I MPA ARCHITECTS - PLUMBING DRAWINGS 300.00 2 SUBCONTRACTOR(SEE ATTACHED PROPOSAL) 22,500.00 4 GENERAL REQUIREMENTS ( 5% ) . 1,140.00 1 SUBTOTAL ' 23,940.00 GENERAL CONTRACTOR'S OVERHEAD/PROFIT 15.00% 3,5~1.00 1 TOTAL 27,531.00 C CREDIT ITEMS I MATERIAL 2 LABOR 3 EQUIPMENT 4 SUBCONTRACTORS 0.00 0.00t 0.00 0.00 TOTAL D SUBTOTAL "A" + "B" - "C" 27,531.00 E PERFORMANCE AND PAYMENT BOND 1.44% I 396.45 TOTAL COST OF CONSTRUCTION CHANGED PROPOSAL NO. 3 $27,927.45 JUN-I% 01 14:E~J ~ROM: T0:~44~I$5 PAGE:~ ROTHELL ELECTRIC, 1NC. 342~-C West 45~ Street West Palm Beach, Florida 3340? Voice (561) 689-5151 - Fax (561) 689-5299 State License EC0001589 Visit our W~b-stte ~ ww~.rothelletectric, com June 11, 2001 Select Contracting. Inc. 1751 West 10~ Street Riviera Beach. Florida 3340~; Re: East WaTer Plant Metal Buildings, Boynton Beach Base .Bid for each building as per dimwing dated 5/16/01 ............... $11,250.00 Proposal Includes: 1) Eight 200 watt Metal Halid~ canopy lights 2) One 4' - 2 light florescent wrap-around 3) Tv~o combination exit/emergency lights with battery back-up 4) Two incandescem wall bracket fixtures 5) One Nutone bathroom exhaust faa 6) Three single pole ~vitch 7) Four 3-Way switch 8) Twenty One standard duplex receptacle with indas~al cover 9) One 50 amp weatllerproo f discolmect a~d wiring for compr¢~or 10) Wi,4~g for two wall mounted exha~t fans provided by others 1 i) Th-me junction boxes and 2" conduit back to panel A 12) One 100A, 3F, 600V, N1 Disc with 100 amp fuses 13) On* 75kva, 3 phase, N1, 480 to 120/208 volt ~ansformer ~4) One 200 amp, 3ph. lw, t20/208v, N1, main ¢ireait breaker panel Proposal 1) ?~'mit fees 2) FPL or Southern Bell fees 3) 100amp primary service f¢¢d to 100 amp di~ormect 4) Telephone service 5) S~pply ~nd instailafio~ of ~¢ t'wo wall mou~ted exhaust fa~s 6) D~ct~ork from bath exhaust fan to the exterior Sincerely, Rothell Electric, Douglas I. Dorsey Vice President