R01-237 RESOLUTION NO. R01-,~"/
A RESOLUTION OF rile CITY COMMISSION )F THE
CITY OF BOYNTON BEACH, FLORIDA, AUTHOt %ZING
THE MAYOR AND CITY CLERK TO EXECUTE CI~ ANGE
ORDERS NOS. 1, 2 AND 3 WITH S ~LECT
CONTRACTING, INC., REGARDING THE TWO yrATER
TREAMENT PLANT PRE-ENGINEERED fETAL
BUILDINGS IN THE AMOUNT OF $47,662.11; AND
PROVIDING AN EFFECTIVE DATE.
WIIEREAS, the City Commission has previously approved and authorized the
urchase of two 50' by 100' metal pre-engineered warehouse buildings for use by the Utility
)epartment for general operations, the storage of emergency repair parts, spare pumpmg
equipment and supplies needed during power failures or storm events;
WIIEREAS, staff's recommendation for the purchase of the warehouses did not
include costs of installing the plumbing and electrical improvements that are required;
NOW, TItEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
TIlE CITY OF BOYNTON BEACII, FLORIDA, TIlAT:
Section 1. The City Commission of the City of Boynton Beach, Florida does
~ereby authorize and direct the Mayor and City Clerk to approve and execute Change Orders
~To. 1, 2 and 3 with Select Contracting, ]nc., in the amount of $47,662.11, for installation of
~lumbing and electrical improvements for the two Water Treatment Plant Pre-Engineered
Vietal Buildings.
Section 2. This Resolution shall'become effective immediately upon passage.
,TTEST:
Clerk
PASSED AND ADOPTED this ,~ ! day of August, 2001.
CITY OF, qBOYNTON BE-ACH, FLORIDA
~ice Mayor
Commissioner
)rders 1,2,3 - Metal Buildings Water Treatment Plant
CHANGE
-ORDER
FOR CHANGE PROPOSAL
Distribution to:
OWNER X
ARCHITECT X
CONTRACTOR X
FIELD X
OTHtiR
PROJECT: EAST WATER PLANT WAREHOUSE CHANGE ORDER NUMBER: # 2
INITIATION DATE: June 20, 2001
TO
Select Contracting
1751 West l0th Street
Riviera Beach, F1 33404
ARCFflTECT'S PROJECT N~:
CONTRACT FOR: Construction of 2 Warehouse Bldgs.
CONTRACT DATE: June 18, 2001
You are directed to make the following changes in this Contract:
INCLUDE COST OF ALL ELECTRICAL WORK PER COR # 3 FOR $27,927.45
~. INCLUDE COST OF ALL PLUMBING WORK PER COR # 2 FOR $14,943.63
The original (Contract Sum) (Guaranteed Maximum Cost) was... $168,708.00
Net cha~ge by previously authorized Change Orders...
The (Contract Sum) (Guaranteed Max/mum Cost) prior to this Chang Order was...
The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) 0
by this C~ange Order ....
Th~ n~w (Contract Sum) (Guarant~d Max/mum Cost) including this Change Order...
The Contract Time will be (increased) by...__Thir~ Days
The Date of Substantial Completion as of tl~ date of this Change Order therefore is
ENGINEER
$ 1,763.84
$I70,471.84
BY
DATE
$ 42,871.08
$ 213,342.92
(30) Days.
Oct. 15~ 2~01
BY
DATI
Select Contracting, Inc.
General Contractor
1751 West l~th Street[
Riviera Beact~ Fior~a 33404
{S61) 844-2764
FAX: (561) 844-3155
CONSTRUCTION CHANOEPROPOSAL(CCP)
TO: CITY OF BO:YNTON BEACH
UTILITIES DEPARTMENT
CCP NUMBER:
PROJECT NAME;
PROJECT NUMBER:
02-Revised
MAJNT. WAREHOUSE
503
We propose to accomplish the CHANGES identified in FIELD SULLETIN/PROPOSAL
REQUEST N/A and as described herein. Except as medified be ow the org hal contract and
all prior amendments shall remain in full force and effect.
DESCRIPTION:
PROVIDE ARCHITECTURAL DRAWINGS FOR PERMITTING.
PROVIDE INSTALLATION OF PLUMBING SYSTEMS FOR BOTH THE NORTH AND THE
WEST BUILDINGS.
PROPOSED CONTRACT PRICE CHANGE (increases) $14.943.63
PROPOSED CONTRACT TIME CHANGE (increases) 30 days
THIS CONSTRUCTION CHANGE PROPOSAL IS VALID FOR 15 DAYS
DISTRIBUTION:
FROM: ,T.~d Hutch ns, Pro ect Manaoer
06113/2001 503ccp02 R. 123
PAGE 2 OF 3
SELECT CONTRACTING.INC.
503 CCP02R
__CONSTRUCTION CHANGE PROPOSAL NO. 2-R®vlaed
DATE:
PROJECT NAME: 0611312001
BOYNTON BEACH MAINTENANCE WAREHOUSE
DE~CRtPTION OF PROPOSED CHANGES: ' -
PROVIDE DESIGN AND COST FOR PLUMBING SYSTEMS, BOTH BUILDINGS
A
(SEE DETAILED BREAKDOWN PAGE 3 OF 3)
I MATERIAL 0.00
2 LABOR 0.00
3 EQUIPMENT 0.00
4 GENERAL REQUIREMENTS I 5% ) 0.0~
--SUBTOTAL 0.00
GENERAL CONTRACTOR'S OVERHEAD/PRO~IT - ~5.00% 0.00
TOTAL 0.00
COST BREAKDOWN:
WORK PERFORMED BY GENERAL CONTRACTOR'iS_E._L.~¥ CONTP~._CTING~Ii~'~:}'I'
B WORK PERFORMED BY SUBCONTRACTOR'S
I MPA ARCHITECTS - PLUMBING DRAWINGS 300.00
2 SUBCONTRACTOR(SEE A]-~ACHED PROPOSAL) 11.900.00
4 GENERAL REQUIREMENTS ( 5% ) 610.00
8{JBTOTAL
GENERAL CONTRACTOR'S OVERHEAD/PROFIT ~ 5.00%
TOTAL
C CREDIT {TEMS
1 MATERIAL 0.00
2 LABOR 0.00
3 EQUIPMENT 0.00
4 SUBCONTRACTORS 0,00
D SUBTOTAL "A" + "B" - "C"
TOTAL
12.~1o.o~
1.921.50
14.731 $0 !
0.00
14.731.50
E PERFORMANCEAND PAYMENT BOND
1.44% 212.13
TOTAL COST OF CONSTRUCTION CHANGED PROPOSAL NO.
2-Revised $14,943.63
R. L. D'Addio Plumbing Co., Inc.
I 12~, Omt~ood ik~levara
Pboa~ (56{,) ~82-~9~0 t'~# (~1) ${{-~?'*
CF CO~'12~
Today'-, dine ........ : .lur~ 13. 2001
R. L. D. Pmp,~al #..: MAY.14A
(1) ADA Compl~ Wall Hung Lsv~too', (1) 3" Toilet l,'loor ~ (2) 4' Wm'~ou~ Dzai~,
(4) Wsmt Lin~ Co~ions to liosm Bibbs.
Inda~s~ k, tl, ls
Permits; Fees
Metro
Work/Restoration
Cl~nrt611 For BaCilli
l~moval oi'l~c-~-s FiB
Labo~lor~ fee$.
elect Contracting, Inc.
General Contractor
1751 West 10th Street
Riviera Beach, Flodda 33404
(561) 844-2764
FAX: (561) 844-3155
CGCA 145~o
CONSTRUCTION CHANGE PROPOSAL (CCP)
TO: CITY OF BOYNTON BEACH
UTlUTIES DEPARTMENT
cc. NUMBE~: ~.~ ~
PROJECT NAME: M;~NT.W HOUSE
PROJECT NUMBER: 503
We propose to accomplish the CHANGES identified in FIELD BULLETiN/PROPOSAL
REQUEST N/A and as described herein. Except as modified below, the original contract and
alt pdor amendments shall remain in full force and effect.
DESCRIPTION:
PROVIDE ARCHITECTURAL DRAWINGS FOR PERMITTING.
PROVIDE INSTALLATION OF ELECTRICAL SYSTEMS FOR BOTH THE NORTH AND THE
WEST BUILDINGS.
PROPOSED CONTRACT PRICE CHANGE (increases) $ 27,927.45
PROPOSED CONTRACT TIME CHANGE (increases) 30 days
THIS CONSTRUCTION CHANGE PROPOSAL IS VALID FOR 15 DAYS
DISTRIBUTION:
FROM: Steve Rush, Marketin.q
SIGNED: -f'~'~-~-~ ~-
,5/99-W; Master Le['ters and Fom~'~roject Management\Construction Change prop<3sal
503ccp03.123
SELECT CONTRACTING,INC.
CONSTRUCTION CHANGE PROPOSAL NO. 3
BOYNTON BEACH MAINTENANCE WAREHOUSE
PAGE 2 OF 3
503 CCP03
:DESCRIPTION OF PROPOSED CHANGES: 1
PROVIDE DESIGN AND COST FOR ELECTRICAL SYSTEM_S, BOTH BUILDINGS
COST BREAKDOWN:
) BY GENERAL CONTRAt; I OR (SELECT CONTRACTING;INC.)
(SEE DETAt! FD BREAKDOWN PAGE 3 OF 3)
o.001
0.00
0-00t
0.00
MATERIAL
2 LABOR
3 EQUIPMENT
4 GENERAL REQUIREMENTS (5%)
t SUBTOTAL
GENERAL CONTRACTOR'S OVERHEAD/PROFIT
15.oo%1 o.00I
I TOTAL 0-001
B WORK PERFORMED BY SUBCONTRACTOR'S
I MPA ARCHITECTS - PLUMBING DRAWINGS 300.00
2 SUBCONTRACTOR(SEE ATTACHED PROPOSAL) 22,500.00
4 GENERAL REQUIREMENTS ( 5% ) . 1,140.00
1 SUBTOTAL ' 23,940.00
GENERAL CONTRACTOR'S OVERHEAD/PROFIT 15.00% 3,5~1.00
1 TOTAL 27,531.00
C CREDIT ITEMS
I MATERIAL
2 LABOR
3 EQUIPMENT
4 SUBCONTRACTORS
0.00
0.00t
0.00
0.00
TOTAL
D SUBTOTAL "A" + "B" - "C" 27,531.00
E PERFORMANCE AND PAYMENT BOND 1.44% I 396.45
TOTAL COST OF CONSTRUCTION CHANGED PROPOSAL NO. 3 $27,927.45
JUN-I% 01 14:E~J ~ROM:
T0:~44~I$5
PAGE:~
ROTHELL ELECTRIC, 1NC.
342~-C West 45~ Street
West Palm Beach, Florida 3340?
Voice (561) 689-5151 - Fax (561) 689-5299
State License EC0001589
Visit our W~b-stte ~ ww~.rothelletectric, com
June 11, 2001
Select Contracting. Inc.
1751 West 10~ Street
Riviera Beach. Florida 3340~;
Re: East WaTer Plant Metal Buildings, Boynton Beach
Base .Bid for each building as per dimwing dated 5/16/01 ............... $11,250.00
Proposal Includes:
1) Eight 200 watt Metal Halid~ canopy lights
2) One 4' - 2 light florescent wrap-around
3) Tv~o combination exit/emergency lights with battery back-up
4) Two incandescem wall bracket fixtures
5) One Nutone bathroom exhaust faa
6) Three single pole ~vitch
7) Four 3-Way switch
8) Twenty One standard duplex receptacle with indas~al cover
9) One 50 amp weatllerproo f discolmect a~d wiring for compr¢~or
10) Wi,4~g for two wall mounted exha~t fans provided by others
1 i) Th-me junction boxes and 2" conduit back to panel A
12) One 100A, 3F, 600V, N1 Disc with 100 amp fuses
13) On* 75kva, 3 phase, N1, 480 to 120/208 volt ~ansformer
~4) One 200 amp, 3ph. lw, t20/208v, N1, main ¢ireait breaker panel
Proposal
1) ?~'mit fees
2) FPL or Southern Bell fees
3) 100amp primary service f¢¢d to 100 amp di~ormect
4) Telephone service
5) S~pply ~nd instailafio~ of ~¢ t'wo wall mou~ted exhaust fa~s
6) D~ct~ork from bath exhaust fan to the exterior
Sincerely,
Rothell Electric,
Douglas I. Dorsey