Loading...
R16-061 1 RESOLUTION NO. R16 -061 2 3 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 4 FLORIDA, APPROVING AND AUTHORIZING THE CITY 5 MANAGER TO SIGN AMENDMENT NO. 1 TO TASK ORDER NO. 6 R13- 063 -09 WITH CH2M HILL TO PROVIDE PROFESSIONAL 7 SERVICES RELATED TO IDENTIFICATION OF LANDFILL 8 GASES AND THEIR MIGRATION AND DESIGN OF REVISED 9 SYNTHETIC LINER IN THE AMOUNT OF $32,016.40; AND 10 PROVIDING AN EFFECTIVE DATE. 11 12 WHEREAS, on December 1, 2015, the City Commission passed Resolution No, R15- 13 149 authorizing task order R13- 063 -09 in the amount of $47,126.26 to CH2M; and 14 WHEREAS, during field operations for the repair of cover material on the retired 15 Boynton Beach landfill, a small portion of landfill cover lining material was exposed and 16 found to be damaged; and 17 WHEREAS, additional design services regarding liner history and repair techniques is 18 required; and 19 WHEREAS, staff is recommending that the City Commission approve Amendment 20 No. 1 to Task Order R13- 063 -09 with CH2M HILL to provide professional services related to 21 identification of landfill gases and their migration and design of revised synthetic liner in the 22 amount of $32,016.40. 23 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 24 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 25 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 26 being true and correct and are hereby made a specific part of this Resolution upon adoption 27 hereof. 28 Section 2. The City Commission of the City of Boynton Beach, Florida does 29 hereby approve and authorize the City Manager to sign Amendment No. 1 to Task Order R13- 30 063 -09 with CH2M HILL to provide professional services related to identification of landfill S:\CC \WP \Resolutions12016 \R16 -061 CH2M_ Hill _Amendment_No_1_Task_Order_R13 - 063 -09_- _Reso.doc 1 gases and their migration and design of revised synthetic liner in the amount of $32,016.40, a 2 copy of which is attached hereto as Exhibit "A ". 3 Section 3. This Resolution shall become effective immediately upon passage. 4 PASSED AND ADOPTED this ('9 - day of i.- jAr/G- , 2016. 5 CITY OF BOYNTON BEACH, FLORIDA 6 7 YES NO 8 9 Mayor - Steven B. Grant 10 11 Vice Mayor - Mack McCray 12 13 Commissioner - Justin Katz 7 14 15 Commissioner - Christina L. Romelus / 16 17 Commissioner - Joe Casello 18 19 -� 20 VOTE 21 22 ATTEST: 23 24 25 / a-6 - 26 J -4 ith A. Pyle, CMC 27 I terim City Clerk 28 30 w 31 (Corporate Seal) 6 iP J2 „fit 33 ka> S: \CC \WP \Resolutions\20161R16 -061 CH2M_ HiII _Amendment_No_1_Task_Order_R13- 063 -09_ _Reso.doc tc, _CD Task Order No. R13- 063- 09- Amendment 1 Boynton Beach Landfill Post - Closure Maintenance Assistance PLEASE NOTE: Amendments to the original Task Order are shown with bold underlining, and deletions with strikcthrough tcxt. A. Background Since 2010, CH2M HILL Engineers, Inc. (CH2M) has assisted the City of Boynton Beach (City) with the preparation and certification of semi - annual groundwater sampling reports for the City's Class I landfill (Landfill) in accordance with the Palm Beach County Health Department (PBCHD) Permit Number 124522 - 005 -SF for post - closure monitoring. Additionally, CH2M helped the City develop a groundwater investigation program, accepted by the PBCHD, designed to evaluate a decision to cease Tong -term groundwater monitoring. The hydrogeologic investigation is expected to take place during Fiscal Year 2015/16; this investigation is not considered as part of this scope of work. Concurrently, CH2M's proposed scope of work in this proposal is aligned with the City's goal to meet regulatory guidelines by repairing sections of final cover damaged by erosion during the Tong -term care period of the City's Landfill; to investigate landfill gas generation and potential for migration; and to research a discontinued synthetic liner material used during closure, determine appropriate patching techniques, and develop specifications and details to document repair procedures. The professional services consist of the following activities, which are detailed in the Scope of Work: • CH2M will conduct a brief site visit to review the findings of the September 3, 2015 Florida Department of Environmental Protection Inspection Checklist. • CH2M will convene a teleconference with PBCHD - • .. Ei • .. •• - • - - •• - • . Protection (FDEP) officials to confirm the process and requirements to obtain regulatory approval for required remedial actions prior to the City procuring a qualified contractor and commencing repairs to the final cover system; CH2M will facilitate a teleconference with the City and the Lake Worth Drainage District (LWDD) to discuss procurement of access approval and to memorialize any LWDD permit or restoration requirements in the procurement package prepared by the City; • CH2M will prepare a written corrective action plan (CAP) as required by Question 3.4 in the September 3, 2015 Florida Department of Environmental Protection Inspection Checklist. It is assumed that the design criteria package including a grading plan and synthetic liner repair details and specifications will serve as the basis for the CAP, which will be submitted to the PBCHD FDEP by the City. • CH2M will prepare a design criteria package to include plans and specifications for synthetic I liner repair and landfill gas probe installation, which will be included in the procurement package prepared by the City; • CH2M will prepare an opinion of probable construction cost based upon estimated quantities. The estimate will include mobilization / demobilization, synthetic liner repair, granular fill, topsoil, ate sod or seed covering, and landfill gas probe installation; PAGE 1 OF 7 • CH2M will serve as a technical resource during the bid review process; a4 • CH2M will provide limited services during construction including submittal reviews and field observation necessary to prepare the certification of construction completion documentation at the conclusion of the project for submission to the PBCHDFDEP; and • CH2M will test approximately fourteen (14) installed landfill gas perimeter probes for a period of one (1) year, review the data and report the results to the City at the conclusion of the testing period. B. Scope of Services The scope of services included in this authorization, including amendments shown with bold underlining, and deletions with °trikcthr^tugh tcxt are as follows: Task 1 —Site Visit and Teleconference with FD€P the PBCHD CH2M will conduct a brief site visit with City staff to review the findings of the September 3, 2015 Florida Department of Environmental Protection Inspection Checklist. CH2M will then facilitate a teleconference with the City and the PBCHD FDEP to confirm the requirements to obtain regulatory approval for required remedial actions prior to commencing repairs to the final cover system. CH2M will prepare a meeting agenda for distribution and discussion with attendees. The teleconference is expected to last up to two (2) hours. Following the meeting, CH2M will prepare a draft meeting summary, identifying critical discussion points for review and comment by all participants. For budgetary purposes, it is assumed the Principal, Senior Project Manager and Project Manager will participate in the teleconference on behalf of CH2M. Deliverables - Agenda, electronic - Draft and Final Meeting Summary (draft for review by all) Task 2 — Teleconference with LWDD CH2M will facilitate and participate in a teleconference with the City and LWDD representatives to negotiate access approval to the site and address any LWDD requirements in the procurement package prepared by the City. For budgetary purposes, it is assumed the Principal and Senior Project Manager will participate on behalf of CH2M. Deliverables - Agenda, electronic - Draft and Final Meeting Summary (draft for review by all) Task 3 — Produce Bid Package and Bid Form CH2M will prepare a written corrective action plan (CAP) that will serve as the basis for the bid package that includes construction drawings, technical construction specifications, a site plan that delineates the work limits, specifications and details to document repair procedures for a discontinued synthetic liner PAGE 2 OF 7 material used during closure, and a grading plan, and gas probe details and specifications. The bid package will be incorporated into the procurement package prepared by the City. It should be noted that CH2M will need to obtain current topographic information from the City to prepare preliminary design drawings. It is assumed that the City will engage a qualified surveying firm to perform a pre- construction survey. CH2M will provide technical assistance to the City to develop the scope of work for the selected surveying firma Using the pre- construction survey, CH2M will develop • plans for construction of the final cover of portions where erosion damage has occurred and will include standard erosion control drawings or FDOT call outs (e.g., silt fence, hay bales) where needed. CH2M will review the LWDD requirements for access to the Landfill, and address relevant contract documentation in the drawings and specifications as necessary. Should the LWDD access right of way require stabilization, the City shall perform the stabilization or direct the City's selected Contractor to perform the work as a bid alternate in in the Bid Form. CH2M will prepare and submit a draft bid package for the City's review and comment. For budgetary purposes, it is assumed that the Senior Project Manager and Project Manager will participate in a teleconference with the City following the draft submittal to discuss written comments received from the City and respond to questions. The City is requested to provide one set of consolidated written comments prior to the teleconference. CH2M will respond to the City's comments to finalize the bid package that will be incorporated into the procurement package prepared by the City. Once the bid package has been approved by the City, CH2M will provide electronic files. CH2M will prepare a bid form in MS -Word format for inclusion in the City's front -end documents. Deliverables — Draft and final corrective action plan. — Draft and final bid package. — Bid Form. Task 4 — Prepare an Opinion of Probable Construction Cost CH2M will prepare an opinion of probable construction cost based upon estimated quantities. The estimate will include mobilization /demobilization, synthetic liner repair, granular fill, topsoil, afiel. sod or seed covering, and landfill gas probe installation. Bid quantities will be based upon either LS, CY or SY as appropriate. CH2M will perform a quantity take -off based on the best available information, including the most recent FDEP Inspection Report. Deliverable - Opinion of Probable Construction Cost based upon estimated quantities. • PAGE 3 OF 7 Task 5 — Contractor Selection Assistance CH2M will assist the City as a technical resource during the bid evaluation phase. Activities include attending the pre -bid meeting and providing technical input during the evaluation including responding to bidder questions and preparing addenda. Once bids are received, CH2M will review the bids submitted and provide a summary for City consideration prior to contractor selection. CH2M will conduct a teleconference with the City to discuss pro and cons, as well as any outstanding issues related to CH2M's technical review. Deliverables - Attend pre -bid meeting. - Respond to bidder questions and provide technical input to addenda. - Prepare draft and final bid evaluation summary memorandum. Task 6 — Services During Construction CH2M will provide services during construction including reviewing and responding to up to fifteen (15) eighteen (18) contractor submittals including the location of the borrow pit(s) where granular material and topsoil will be obtained, components for synthetic liner repair, and materials for gas probe installation. CH2M's field support includes daily observation by one CH2M staff member (48 hours) for 3915 days. Additionally, CH2M will provide Field Safety Instructions applicable to all CH2M staff. Following project construction completion, CH2M will draft, finalize and submit to the PBCHD FDEP an application for certification of construction completion, signed and sealed by a professional engineer, at the completion of this project. A draft of the application for certification of construction completion will be submitted for review and comment by the City. CH2M will adjudicate City comments and finalize the application prior to submission to the PBCHD FDEP. Following submittal to the PBCHD FDEP, CH2M will respond to up to 2 (two) Requests for Additional information within this task order. Upon acceptance by the PBCHD FDEP, the Certification of Construction Completion should be placed in the operating record. Deliverables - Submittal Review Forms - Submittal Tracking Log - Construction Logbook - Draft and final certification of construction completion for submission to the PBCHD FDEP - Response to up to 2 (two) Requests for Additional information Task 7 — Perform Perimeter Landfill Gas Probe Testing As part of an investigation for the potential for landfill gas generation and possible migration, CH2M will perform landfill gas testing where the liner has been exposed from erosion noted in the current Consent Order. Positive test results for the presence of methane at or above the lower explosive limit (LEL) will necessitate further investigation (development and delivery of the investigation work plan is not included under this scope of work). Subsequent to the initial investigation described in the previous paragraph, CH2M has been requested by the City to test for the possible presence of landfill gas along the north and east Landfill perimeter, • PAGE 4 OF 7 where residences abut the Landfill property line. Following the installation of approximately fourteen (14) perimeter landfill gas probes, CH2M will conduct seven (7) sampling events with a GEM 2000 and calibration gases, review the data, and report the findings to the City. Should testing of all monitoring probes result in non - detect for methane, CH2M will recommend discontinuation of the sampling, as well as sealing or removal of the shallow probes. However, readings above 100% LEL at the property boundary will be addressed in a technical memorandum and discussed further with the City. Deliverables — Gas probe test results (7) - Draft and Final Perimeter Landfill Gas Investigation Technical Memorandum C. Assumptions This estimated cost is based on the following assumptions: • Additional meetings with the City, FDEP, PBCHD or the contractor are fiet included in this scope of services. • The City will be responsible for satisfying any site access requirements negotiated under Task 2,, but CH2M will revise specifications to comply with the requirements of the LWDD. • The City will complete the site survey by December 4, 2015. • The City will be responsible for managing the procurement process and meeting the timelines presented in the Consent Order. • on the draft Bid Package and draft Bid Form within Packa The City will review and provide comments g one (1) week of submittal by CH2M. • The City will be responsible for submitting all required documents to the PBCHD as specified in the Consent Order. • CH2M is not responsible for City nor contractor delays that result in penalties specified in the Consent Order. • No subcontractors will be utilized by CH2M during the delivery of the scope included herein. • The City is responsible for continuing the yearly maintenance program implemented for the post closure monitoring period as specified in the Consent Order once the Contractor has completed contractual maintenance obligations of the newly installed vegetation. • If the duration of the selected Contractor's work is greater than the time assumed in this Task Order or if the City self - performs some of the inspections during construction, the level of effort for the services during construction may be amended. • Should landfill gases be found at or above concentrations of concern, CH2M will notify the City. Development of appropriate remedial actions are not included in this scope amendment. • Abandonment of perimeter gas probes, if determination is made that the probes are no longer necessary, is not a part of this scope. PAGE5OF7 1 iJ D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement titled Hydrogeological Consulting Services, dated August 19, 2013, between the City of Boynton Beach and CH2M Hill Engineers, Inc., as amended, and under the terms and conditions described within Task Order R13- 063 -09, amended herein. E. Compensation Compensation by the City to CH2M will be on a time and materials basis in accordance with the above - mentioned Agreement. The estimated compensation for the additional services described in this Task . Order Amendment 1 is $32,016.40. TABLE 1. - FEE COMPENSATION AMENDED QUANTITIES TASK HOURS RATE TOTAL 1. Site Visit and Teleconference with i`B€R the PBCHD (NO CHANGE) 2. Teleconference with LWDD (NO CHANGE) 3. Produce Design Criteria Package and Bid Tab (AMENDED) Office 2 $86.22 $172.44 Engineer 24 $120.00 $2,880.00 Senior Engineer 6 $155.00 $930.00 Senior Project Manager 4 $208.14 $832.56 Expenses $0.00 TASK SUBTOTAL $4,815.00 4. Prepare an Opinion of Probable Construction Cost (AMENDED) • Engineer 0 $120.00 $0.00 Senior Engineer 2 $155.00 $310.00 Senior Project Manager 2 $208.14 $416.28 Expenses $0.00 TASK SUBTOTAL $726.28 5. Contractor Selection Assistance (NO CHANGE) 6. Services During Construction (AMENDED) Office 4 $86.22 $344.88 Engineer 80 $120.00 $9,600.00 Senior Engineer 8 $155.00 $1240.00 Senior Project Manager 4 $208.14 $832.56 Expenses $2,000.00 PAGE 6 OF 7 TASK SUBTOTAL $14,017.44 7. Perimeter Landfill Gas Probe Testing (NEW) Engineer 56 $120.00 $6,720.00 Senior Engineer 8 $155.00 $1,240.00 Senior Project Manager 12 $208.14 $2,497.68 Expenses $2,000.00 TASK SUBTOTAL $12,457.68 AMENDMENT 1 SUBTOTAL $32,016.40 (THIS AUTHORIZATION) ORIGINAL TASK ORDER TOTAL $47,126.26 TOTAL INCLUDING AMENDMENT 1 $79,142.66 F. Schedule CH2M estimates that its scope of work will be completed as presented below in Table 1. Every effort will be made to expedite the completion of the tasks. Table 1 Project Schedule (REVISED) Activity Target Completion Date Task Order Executed (Actual) December 8, 2015 Site Visit and Teleconference with FDEP (Actual) January 15, 2016 Teleconference with LWDD (Actual) February 1, 2016 Draft Bid Package and Bid Form March 11, 2016 Final Bid Package and Bid Form March 21, 2016 Submit an Opinion of Probable Construction Cost April 14, 2016 City Advertises Bid Pursuant to the Consent Order June 13, 2016 Contractor Selection Assistance August 12, 2016 Services During Construction September 11, 2016 PAGE 7 OF 7 G. Authorization APPROVED BY: CITY OF BOYNTON BEACH, FLORIDA By: Dated this day of March, 2016. SUBMITTED BY: CH2M By: Matthew B. Alvarez, PE Vice President and Area Manager Dated this 3rd day of March, 2016 • PAGE 8 OF 7 Boynton Beach Landfill Post - Closure Maintenance Assistance PLEASE NOTE: Amendments to the original Task Order are shown with bold underlining and deletions with s A. Background Since 2010, CH2M HILL Engineers, Inc. (CH2M) has assisted the City of Boynton Beach (City) with the preparation and certification of semi - annual groundwater sampling reports for the City's Class I landfill (Landfill) in accordance with the Palm Beach County Health Department (PBCHD) Permit Number 124522 - 005 -SF for post - closure monitoring. Additionally, CH21VI helped the City develop a groundwater investigation program, accepted by the PBCHD, designed to evaluate a decision to cease long -term groundwater monitoring. The hydrogeologic investigation is expected to take place during Fiscal Year 2015/16; this investigation is not considered as part of this scope of work. Concurrently, CH2M's proposed scope of work in this proposal is aligned with the City's goal to meet regulatory guidelines by repairing sections of final cover damaged by erosion during the long -term care period of the City's Landfill to investigate landfill gas generation and potential for migration: and to research a discontinued synthetic liner material used during closure, determine appropriate patching techniques, and develop specifications and details to document repair procedures The professional services consist of the following activities, which are detailed in the Scope of Work: • CH21VI will conduct a brief site visit to review the findings of the September 3, 2015 Florida Department of Environmental Protection Inspection Checklist. • CH21VI will convene a teleconference with PBCHD FleFida D t me-In t o f PpeteetieR (FDE-P officials to confirm the process and requirements to obtain regulatory approval for required remedial actions prior to the City procuring a qualified contractor and commencing repairs to the final cover system; CH21VI will facilitate a teleconference with the City and the Lake Worth Drainage District (LWDD) to discuss procurement of access approval and to memorialize any LWDD permit or restoration requirements in the procurement package prepared by the City; • CH21VI will prepare a written corrective action plan (CAP) as required by Question 3.4 in the September 3, 2015 Florida Department of Environmental Protection Inspection Checklist. It is assumed that the design criteria package including a grading plan and synthetic liner repair details and specifications will serve as the basis for the CAP, which will be submitted to the PBCHD FD€P by the City. • CH21VI will prepare a design criteria package to include plans and specifications for synthetic liner repair and landfill gas probe installation which will be included in the procurement package prepared by the City; • CH21VI will prepare an opinion of probable construction cost based upon estimated quantities. The estimate will include mobilization / demobilization, synthetic liner repair, granular fill, topsoil, a-nd sod or seed covering, and landfill gas probe installation PAGE 1 OF 7 • CH2M will serve as a technical resource during the bid review process; aR4 • CH2M will provide limited services during construction including submittal reviews and field observation necessary to prepare the certification of construction completion documentation at the conclusion of the project for submission to the PBCHD DEP; and • CH2M will test approximately fourteen (14) installed landfill gas perimeter probes for a period of one (1) year, review the data and report the results to the City at the conclusion of the testing period. B. Scope of Services The scope of services included in this authorization including amendments shown with bold underlining, and deletions with °}°fkethF9Ugh teNt are as follows: Task 1 —Site Visit and Teleconference with FIDEP the PBCHD CH2M will conduct a brief site visit with City staff to review the findings of the September 3, 2015 Florida Department of Environmental Protection Inspection Checklist. CH2M will then facilitate a teleconference with the City and the PBCHD PUP to confirm the requirements to obtain regulatory approval for required remedial actions prior to commencing repairs to the final cover system. CH2M will prepare a meeting agenda for distribution and discussion with attendees. The teleconference is expected to last up to two (2) hours. Following the meeting, CH2M will prepare a draft meeting summary, identifying critical discussion points for review and comment by all participants. For budgetary purposes, it is assumed the Principal, Senior Project Manager and Project Manager will participate in the teleconference on behalf of CH2M. Deliverables - Agenda, electronic - Draft and Final Meeting Summary (draft for review by all) Task 2 — Teleconference with LWDD CH2M will facilitate and participate in a teleconference with the City and LWDD representatives to negotiate access approval to the site and address any LWDD requirements in the procurement package prepared by the City. For budgetary purposes, it is assumed the Principal and Senior Project Manager will participate on behalf of CH2M. Deliverables - Agenda, electronic - Draft and Final Meeting Summary (draft for review by all) Task 3 — Produce Bid Package and Bid Form CH2M will prepare a written corrective action plan (CAP) that will serve as the basis for the bid package that includes construction drawings, technical construction specifications, a site plan that delineates the work limits specifications and details to document repair procedures for a discontinued synthetic liner PAGE 20F 7 material used during closure, a-n4 a grading plan and gas probe details and specifications The bid package will be incorporated into the procurement package prepared by the City. It should be noted that CH2M will need to obtain current topographic information from the City to prepare preliminary design drawings. It is assumed that the City will engage a qualified surveying firm to perform a pre- construction survey. CH2M will provide technical assistance to the City to develop the scope of work for the selected surveying firm. Using the pre- construction survey, CH2M will develop plans for construction of the final cover of portions where erosion damage has occurred and will include standard erosion control drawings or FDOT call outs (e.g., silt fence, hay bales) where needed. CH21VI will review the LWDD requirements for access to the Landfill, and address relevant contract documentation in the drawings and specifications as necessary. Should the LWDD access right of way require stabilization, the City shall perform the stabilization or direct the City's selected Contractor to perform the work as a bid alternate in in the Bid Form. CH2M will prepare and submit a draft bid package for the City's review and comment. For budgetary purposes, it is assumed that the Senior Project Manager and Project Manager will participate in a teleconference with the City following the draft submittal to discuss written comments received from the City and respond to questions. The City is requested to provide one set of consolidated written comments prior to the teleconference. CH2M will respond to the City's comments to finalize the bid package that will be incorporated into the procurement package prepared by the City. Once the bid package has been approved by the City, CH2M will provide electronic files. CH2M will prepare a bid form in MS -Word format for inclusion in the City's front -end documents. Deliverables — Draft and final corrective action plan. — Draft and final bid package. — Bid Form, Task 4 — Prepare an Opinion of Probable Construction Cost CH2M will prepare an opinion of probable construction cost based upon estimated quantities. The estimate will include mobilization /demobilization, synthetic liner repair, granular fill, topsoil, a-R4 sod or seed covering, and landfill gas probe installation Bid quantities will be based upon either LS, CY or SY as appropriate. CH2M will perform a quantity take -off based on the best available information, including the most recent FDEP Inspection Report. Deliverable - Opinion of Probable Construction Cost based upon estimated quantities. PAGE 3 OF 7 Task 5 — Contractor Selection Assistance CH2M will assist the City as a technical resource during the bid evaluation phase. Activities include attending the pre -bid meeting and providing technical input during the evaluation including responding to bidder questions and preparing addenda. Once bids are received, CH2M will review the bids submitted and provide a summary for City consideration prior to contractor selection. CH2M will conduct a teleconference with the City to discuss pro and cons, as well as any outstanding issues related to CH2M's technical review. Deliverables w Attend pre -bid meeting. Respond to bidder questions and provide technical input to addenda. - Prepare draft and final bid evaluation summary memorandum. Task 6 — Services During Construction CH2M will provide services during construction including reviewing and responding to up to f i ft een 5) eighteen (18) contractor submittals including the location of the borrow pit(s) where granular material and topsoil will be obtained components for synthetic liner repair, and materials for gas probe installation CH2M's field support includes daily observation by one CH2M staff member (4 8 hours) for 48 15 days. Additionally, CH2M will provide Field Safety Instructions applicable to all CH2M staff. Following PPejeGt construction completion, CH2M will draft, finalize and submit to the PBCHD 9€P an application for certification of construction completion, signed and sealed by a professional engineer, at the completion of this project. A draft of the application for certification of construction completion will be submitted for review and comment by the City. CH2M will adjudicate City comments and finalize the application prior to submission to the PBCHD P9€P Following submittal to the PBCHD FD€P CH2M will respond to up to 2 (two) Requests for Additional information within this task order. Upon acceptance by the PBCHD €PEP the Certification of Construction Completion should be placed in the operating record. Deliverables - Submittal Review Forms - Submittal Tracking Log - Construction Logbook - Draft and final certification of construction completion for submission to the PBCHD €PEP - Response to up to 2 (two) Requests for Additional information Task 7 — Perform Perimeter Landfill Gas Probe Testing As part of an investigation for the potential for landfill gas generation and possible migration, CH2M will perform landfill gas testing where the liner has been exposed from erosion noted in the current Consent Order. Positive test results for the presence of methane at or above the lower explosive limit (LEL) will necessitate further investigation (development and delivery of the investigation work plan is not included under this scope of work). Subsequent to the initial investigation described in the previous paragraph, CH2M has been requested by the City to test for the possible presence of landfill gas along the north and east Landfill perimeter, PAGE 4 OF 7 where residences abut the Landfill property line. Following the installation of approximately fourteen (14) perimeter landfill gas probes, CH2M will conduct seven (7) sampling events with a GEM 2000 and calibration gases, review the data, and report the findings to the City. Should testing of all monitoring probes result in non - detect for methane, CH2M will recommend discontinuation of the sampling, as well as sealing or removal of the shallow probes. However, readings above 100% LEL at the property boundary will be addressed in a technical memorandum and discussed further with the City. Deliverahles — Gas probe test results (7) — Draft and Final Perimeter Landfill Gas Investigation Technical Memorandum C. Assumptions This estimated cost is based on the following assumptions: • Additional meetings with the City, FDEP, PBCHD or the contractor are +�&t included in this scope of services. • The City will be responsible for satisfying any site access requirements negotiated under Task 2,. but CH2M will revise specifications to comply with the requirements of the LWDD • The City will complete the site survey by December 4, 2015. • The City will be responsible for managing the procurement process and meeting the timelines presented in the Consent Order. • The City will review and provide comments on the draft Bid Package and draft Bid Form within one (1) week of submittal by CH2M. • The City will be responsible for submitting all required documents to the PBCHD as specified in the Consent Order. • CH2M is not responsible for City nor contractor delays that result in penalties specified in the Consent Order. • No subcontractors will be utilized by CH2M during the delivery of the scope included herein. • The City is responsible for continuing the yearly maintenance program implemented for the post closure monitoring period as specified in the Consent Order once the Contractor has completed contractual maintenance obligations of the newly installed vegetation • If the duration of the selected Contractor's work is greater than the time assumed in this Task Order or if the City self - performs some of the inspections during construction, the level of effort for the services during construction may be amended. • Should landfill gases be found at or above concentrations of concern, CH21M will notify the City. Development of appropriate remedial actions are not included in this scope amendment. • Abandonment of perimeter gas probes if determination is made that the probes are no longer necessary, is not a part of this scope. PAGE 5 OF 7 D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement titled Hydrogeological Consulting Services, dated August 19, 2013, between the City of Boynton Beach and CI-12M Hill Engineers, Inc., as amended and under the terms and conditions described within Task Order R13- 063 -09, amended herein. E. Compensation Compensation by the City to CH2M will be on a time and materials basis in accordance with the above - mentioned Agreement. The estimated compensation for the additional services described in this Task Order Amendment 1 is $32,016.40. TABLE 1. - FEE COMPENSATION AMENDED QUANTITIES - TASK HOURS RATE TOTAL 1. Site Visit and Teleconference with ;DrzP the PBCHD (NO CHANGE) 2. Teleconference with LWDD (NO CHANGE) 3. Produce Design Criteria Package and Bid Tab (AMENDED) Office 2 $86.22 $172.44 Engineer 24 $120.00 $2,880.00 Senior Engineer 6 $155.00 $930.00 Senior Project Manager 4 $208.14 $832.56 Expenses TASK SUBTOTAL 4. Prepare an Opinion of Probable Construction Cost (AMENDED) Engineer 0 $120.00 Senior Engineer 2 $155.00 Senior Project Manager 2 $208.14 Expenses TASK SUBTOTAL S. Contractor Selection Assistance (NO CHANGE) 6. Services During Construction (AMENDED) $0.00 $4,815.00 $0.00 $310.00 $416.28 $0.00 $726.28 Office 4 $86.22 $344.88 Engineer 80 $120.00 $9,600.00 Senior Engineer 8 $155.00 $1240.00 Senior Project Manager 4 $208.14 $832.56 Expenses $2,000.00 PAGE 6OF7 TASK SUBTOTAL $14,017.44 7. Perimeter Landfill Gas Probe Testing (NEW) Target Completion Date Engineer 56 $120.00 $6,720.00 Senior Engineer 8 $155.00 $1,240.00 Senior Project Manager 12 $208.14 $2,497.68 Expenses $2,000.00 TASK SUBTOTAL $12,457.68 AMENDMENT 1 SUBTOTAL $32,016.40 (THIS AUTHORIZATION) June 13, 2016 ORIGINAL TASK ORDER TOTAL $47,126.26 TOTAL INCLUDING AMENDMENT 1 $79,142.66 F. Schedule CH2M estimates that its scope of work will be completed as presented below in Table 1. Every effort will be made to expedite the completion of the tasks. Table 1 Proiect Schedule (REVISED) Activity Target Completion Date Task Order Executed (Actual) December 8, 2015 Site Visit and Teleconference with FDEP LActual January 15, 2016 Teleconference with LWDD Actual February 1, 2016 Draft Bid Package and Bid Form March 11, 2016 Final Bid Package and Bid Form March 21, 2016 Submit an Opinion of Probable Construction Cost April 14, 2016 j City Advertises Bid Pursuant to the Consent Order June 13, 2016 Contractor Selection Assistance Augrust 12, 2016 Services During Construction September 11, 2016 PAGE 7 OF 7 G. Authorization APPROVED BY: CITY OF BOYNTON BEACH, FLORIDA APPRM �. Dated this 21 day of April 2016. SUBMITTED BY: CH2M By: Matthew B. Alvarez, PE Vice President and Area Manager Dated this 3rd day of March 2016 PAGE 8 OF 7