Loading...
Agenda 02-28-17 CITY OF BOYNTON BEACH PLANNING & DEVELOPMENT BOARD MEETING AGENDA DATE: Tuesday, February 28, 2017 TIME: 6:30 P.M. PLACE:Commission Chambers, 100 E. Boynton Beach Boulevard, Boynton Beach, Florida ___________________________________________ __________________________ ___________ 1. Pledge of Allegiance 2. Roll Call 3. Agenda Approval 4. Approval of Minutes from December 27, 2016 meeting 5. Communications and Announcements: Report from Staff 6. Old Business: 7. New Business: A.1. Ocean One (REZN 16-001) – Approve Ocean One rezoning from Central Business District (CBD) to Mixed Use High Intensity (MU-H) District with a proposed two-phase master plan for a total of 358 multi-family rental units, 12,075 square feet of commercial retail space and a 120-room hotel. Applicant: Davis Camalier / Ocean One Boynton, LLC. A.2. Ocean One (ABAN 17-001)– Approve request for abandonment of a portion of right- th of-way of Boynton Beach Boulevard east of Federal Highway, and NE 6 Court between Boynton Beach Boulevard and Ocean Avenue, in conjunction with request for new site plan approval of Ocean One mixed use project. Applicant: Davis Camalier / Ocean One Boynton, LLC. A.3. Ocean One (CDPA 17-001 & 17-002) – Approve requests for a Community Design Appeal of 1) Chapter 3, Article III, Section 5.C., “Build-to-line”, which requires buildings to be constructed with a build-to-line of 0 to 15 feet, to allow a setback of approximately 19 feet; and 2) Chapter 4, Article III, Section 6.F., “Off-Street Parking Area Standards”, which requires facades of parking garages that front on an arterial or collector roadway to be wrapped with habitable space. Applicant: Davis Camalier / Ocean One Boynton, LLC. A.4. Ocean One (NWSP 16-002)– Approve request for a New Site Plan for multi-family residential (rental apartments) consisting of 231 dwelling units within an eight (8)-story building, retail space, and associated recreational amenities and parking on 1.93 acres. Applicant: Davis Camalier / Ocean One Boynton, LLC. 8. Other 9. Comments by members 10. Adjournment The Board may only conduct public business after a quorum has been established. If no quorum is established within twenty minutes of the noticed start time of the meeting the City Clerk or her designee will so note the failure to establish a quorum and the meeting shall be concluded. Board members may not participate further even when purportedly acting in an informal capacity. Planning and Development Board Meeting Agenda Page 2 February 28, 2017 NOTICE ANY PERSON WHO DECIDES TO APPEAL ANY DECISION OF THE PLANNING AND DEVELOPMENT BOARD WITH RESPECT TO ANY MATTER CONSIDERED AT THIS MEETING WILL NEED A RECORD OF THE PROCEEDINGS AND FOR SUCH PURPOSE MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDING IS MADE, WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. (F.S. 286.0105) THE CITY SHALL FURNISH APPROPRIATE AUXILIARY AIDS AND SERVICES WHERE NECESSARY TO AFFORD AN INDIVIDUAL WITH A DISABILITY AN EQUAL OPPORTUNITY TO PARTICIPATE IN AND ENJOY THE BENEFITS OF A SERVICE, PROGRAM, OR ACTIVITY CONDUCTED BY THE CITY. PLEASE CONTACT THE CITY CLERK’S OFFICE, (561) 742-6060 AT LEAST TWENTY (24) HOURS PRIOR TO THE PROGRAM OR ACTIVITY IN ORDER FOR THE CITY TO REASONABLY ACCOMMODATE YOUR REQUEST. NEW BUSINESS 7.A.1 Ocean One (REZN 16-001) Rezoning Page 2 Ocean One REZN 16-001 Adjacent Uses: North: Right-of way for NE 2nd Avenue (eastward extension of Boynton Beach Blvd), and farther north Casa Costa condominiums/mixed use project, classified Mixed Use Core (MXC) future land use and zoned Mixed Use High Intensity (MU-H); to the northeast, a City-owned property (drainage pond/park) classified Mixed Use Core (MXC) future land use and zoned Central Business District (CBD); South: Right-of-way for Ocean Avenue, and farther south the Ocean Plaza developed commercial property classified Mixed Use (MX) future land use and zoned Central Business District (CBD); East:First Financial Plaza office commercial condominiums, classified Mixed Use Core (MXC) and zoned Central Business District (CBD); further east, the mixed use project Boynton Beach Marina Village classified Mixed Use Core (MXC) and zoned Mixed Use High (MU-H). West: Right-of-way for Federal Highway, and farther west, developed commercial properties designated Mixed Use (MX) land use and zoned CBD Central Business District. BACKGROUND The 3.63 acre property, currently vacant, consists of two parcels. The smaller, 0.47 acre parcel on the northern side of the property is presently owned by the Community Redevelopment Agency. The applicant proposes to develop the property in two phases: phase I, to include 231 multifamily apartment units and 6,175 feet of retail space, and phase II, with 127 multifamily units, 3,500 square feet of retail space and a 120-room hotel. (A site plan for phase I is being processed concurrently.) The property has been classified Mix Use Core (MXC) since 2002. It was included in the City-initiated Future Land Use amendment that reclassified 19.4 acres of land in the downtown from Mixed Use (MX) to MXC. The action represented the ongoing implementation of the 2001 Federal Highway Corridor Community Redevelopment Plan, which divided the corridor into five planning areas and recommended the most intensive land use category for Planning Area III, the Central Business District (CBD)-zoned downtown. The intended zoning for MXC-classified properties was Mixed Use-High (MX-H), to be requested by a developer and reviewed concurrently with the application for a master plan or a site plan. Three projects have since availed themselves of the MX-H zoning district: Marina Village, Casa Costa and 500 Ocean, with the latter being currently under constuction. 2 Page 3 Ocean One REZN 16-001 The subject property (together with the adjoining First Financial Plaza) was already the subject of an application for a MX-H zoning once, in 2006. The proposed project, consisting of a hotel, multi-family residential and commercial uses, was withdrawn, likely because of the already looming housing market collapse. The property is under three transportation-related designations: the Downtown Transit- Oriented Development (DTOD) District, Transportation Concurrency Exception Area (TCEA) and Coastal Residential Exception. The DTOD district covers a ½ mile radius around the station (to be located just south of Boynton Beach Boulevard) of the planned Tri-Rail Coastal Link commuter service on the FEC Rail line; the district’s regulations support increased intensity of development through a 25% density bonus. The TCEA, in addition to the Coastal Residential Exception applicable east of I-95, exempts all projects within a predetermined threshold from Palm Beach County traffic concurrency thus allowing denser development in the eastern, redeveloping areas of the county. Since the maximum density for the MX-H zoning district is 80 du/acre, the DTOD density bonus would allow the project to reach a total density of 100 du/acre. REVIEW BASED ON CRITERIA The following criteria used to review Comprehensive Plan Map amendments and rezonings are listed in the Land Development Regulations, Chapter 2, Article II, Section 2.B and Section 2.D.3: a. Demonstration of Need. A demonstration of need may be based upon changing conditions that represent a demand for the proposed land use classification and zoning district. Appropriate data and analysis that adequately substantiates the need for the proposed land use amendment and rezoning must be provided within the application. The subject request reflects an ongoing high demand for rental apartments. According to the Marcus & Millichap’s multifamily market report for the second quarter of 2016, the vacancy rate in Palm Beach County reached 4.0%, the lowest level of empty apartments since 2005. The rental market will be upheld by “stable employment in service-related positions supporting a large base of retirees,” and gains in office jobs commonly held by young professionals, with the latter group contributing to absorbtion of luxury rentals. According to the company’s research, over the last 12 months the Boynton Beach/Delray submarket posted outsize rent growth of 8%, bringing the average rent to $1,530. The company’s fourth quarter report notes that developers have been adding a large number of new apartments, and that, in the short term, new construction will produce increases in the vacancy rate; however “rent growth will not be affected to a great degree, supporting the seventh consecutive year of increases”. Aside from the market consideration, the need for the requested reclassification and rezoning of the subject site is closely aligned with the City’s long standing vision and desire to expand housing in and around the downtown to foster pedestrian activity 3 Page 4 Ocean One REZN 16-001 needed for creation of a vibrant city center. The City has supported this vision by allowing the highest residential densities in the area; more so in recent years, as the plan for a new Tri-Rail commuter service with a downtown station provided a heightened rationale for intensification of future redevelopment in proximate locations. The increased development intensity and related regulations for the Downtown Transit- Oriented Development (DTOD) District, established in 2014, are consistent with recommendations of the Florida Department of Transportation (FDOT). However, the FDOT model for the Boynton Beach DTOD District is a Community Center station with stipulated densities between 11 and 16 dwelling units per acre, much higher than 7.0 dwelling units per acre, the current gross density within the District. b. Consistency. Whether the proposedFuture Land Use Map amendment (FLUM) and rezoning would be consistent with the purpose and intent of, and promote, the applicable Comprehensive Plan policies, Redevelopment Plans, and Land Development Regulations. Consistency with the Comprehensive Plan and Redevelopment Plan The proposed zoning district (MU-H) ia consistent with the recommendation of the recently approved 2016 CRA Community Redevelopment Plan (the plan upheld the recommendation of the 2006 update of the Federal Highway Corridor Community Redevelopment Plan for the area). The proposed future land use amendment and rezoning are also consistent with several applicable policies of the Comprehensive Plan, such as: Policy 1.18.1 The City shall implement the Transit-Oriented Development (TOD) approach, as described in the 2012 Florida Department of Transportation’s TOD Guidebook, to manage future growth within a ½ mile radius around the intersection of Ocean Avenue and the Florida East Coast rail corridor, which is the anticipated location of the Downtown Boynton Beach Station for the planned commuter Tri-Rail Coastal Link service on the FEC Corridor. This area will be referred as the Downtown TOD District hereforth. The inner ¼-mile core of this District shall be designed to accommodate the greatest density and intensity of development. Policy 1.18.2 The City shall aim to transform the Downtown TOD District area into an active, mixed-use, pedestrian-friendly activity zone, supporting new housing to increase potential ridership, intensifying land development activity, and adding amenities and destination uses for future transit riders. The City shall strive to achieve this goal through facilitating compact, high density and intensity development of a varied mix of land uses. Note that the subject property is located within the inner 1/4–mile core of the DTOD 4 Page 5 Ocean One REZN 16-001 District. Consistency with Land Development Regulations (LDR) The application for the Master/Site Plan complies with the development regulations of the Mixed Use High (MU-H) zoning district, other than the build-to requirements along the north side of the property and the community design standards that require the parking garage to be wrapped with habitable floor area. The agent has submitted concurrent Community Design Appeal applications and justifications, in an effort to deviate from those design regulations. c. Land Use Pattern. Whether the proposed Future Land Use Map amendment (FLUM) and rezoning would be contrary to the established land use pattern, or would create an isolated zoning district or an isolated land use classification unrelated to adjacent and nearby classifications, or would constitute a grant of special privilege to an individual property owner as contrasted with the protection of the public welfare. This factor is not intended to exclude FLUM reclassifications and rezonings that would result in more desirable and sustainable growth for the community. The proposed rezoning will not be contrary to the established land use pattern, will not create an isolated district, nor will it constitute a grant of special privilege to the owner. As already noted in comments for criterion “b,” the project is consistent with recommendations of the 2016 CRA Community Redevelopment Plan. Areas to the north and east of subject property carry the same MXC classification, and the Casa Costa and Marina Village properties are already zoned MU-H as is the 500 Ocean project under construction nearby. The proposed rezoning/master plan will further advance a desirable, sustainable, growth-promoting land use pattern for the location— high density mixed use. d. Sustainability. Whether the proposed Future Land Use Map amendment (FLUM) and rezoning would support the integration of a mix of land uses consistent with the Smart Growth or sustainability initiatives, with an emphasis on 1) complementary land uses; 2) access to alternative modes of transportation; and 3) interconnectivity within the project and between adjacent properties. The proposed rezoning meets the definition of “sustainable” as it supports a mixed use, high density infill development whose residents will have access to public transit via Palm Tran bus service along the US 1 corridor (a bus stop is located in front of the proposed project). Eventually, they will also find themselves within walking distance to the Coastal Link commuter station. e. Availability of Public Services / Infrastructure. All requests for Future Land Use Map amendments shall be reviewed for long-term capacity availability at the maximum intensity permitted under the requested land use classification. 5 Page 6 Ocean One REZN 16-001 The request is for rezoning only. (Long-term capacity availability for potable water, sewer and solid waste was reviewed as a part of the area-wide FLUM amendment in 2002.) The Palm Beach County Solid Waste Authority determined that sufficient disposal capacity will be available at the existing landfill through approximately the year 2046. The traffic statement was submitted to the Palm Beach County for information only as the location of the subject property makes it exempt from the Palm Beach County Traffic Performance Standards. The School Capacity Availability Determination (SCAD) letter from the School District of PBC confirmed that capacity for the project is available. Drainage will be reviewed in detail as part of the site plan, land development, and building permit review processes. f. Compatibility. The application shall consider the following factors to determine compatibility: (1) Whether the proposed Future Land Use Map amendment (FLUM) and rezoning would be compatible with the current and future use of adjacent and nearby properties, or would negatively affect the property values of adjacent and nearby properties; and (2) Whether the proposed Future Land Use Map amendment (FLUM) and rezoning is of a scale which is reasonably related to the needs of the neighborhood and the City as a whole. The proposed rezoning would be compatible with the current and future use of adjacent and nearby properties (see response to criterion “c”), and would have a positive impact on the property values. Also—see commentary under criterion “a”—the proposed rezoning represents the scale that would contribute to the creation of a vibrant downtown, benefiting the neighborhood as well as the City as a whole. g. Direct Economic Development Benefits. For rezoning/FLUM amendments involving rezoning to a planned zoning district, the review shall consider the economic benefits of the proposed amendment, specifically, whether the proposal would: (1) Further implementation of the Economic Development (ED) Program; (2) Contribute to the enhancement and diversification of the City’s tax base; (3) Respond to the current market demand or community needs or provide services or retail choices not locally available; (4) Create new employment opportunities for the residents, with pay at or above the county average hourly wage; (5) Represent innovative methods/technologies, especially those promoting sustainability; (6) Be complementary to existing uses, thus fostering synergy effects; and 6 Page 7 Ocean One REZN 16-001 (7) Alleviate blight/economic obsolescence of the subject area. The proposed project would be yet another major catalyst and synergy contributor in support of a successful, lively downtown (“g1” and “g6”), bringing more development to the area and attracting more residents and visitors to the City. As already noted in this report, the request reflect the ongoing economic recovery and the current market demand, adhering to criterion “g3”, and would, if approved, effect a significant enhancement of the City’s tax base (criterion “g2”). Direct impact on job generation would be negligible, with indirect (multiplier) effects having a more significant potential through increased demand for retail and restaurant uses. h. Commercial and Industrial Land Supply. The review shall consider whether the proposed rezoning/FLUM amendment would reduce the amount of land available for commercial/industrial development. If such determination is made, the approval can be recommended under the following conditions: (1) The size, shape, and/or location of the property makes it unsuitable for commercial/industrial development; or (2) The proposed rezoning/FLUM amendment provides substantiated evidence of satisfying at least four of the Direct Economic Development Benefits listed in subparagraph “g” above; and (3) The proposed rezoning/FLUM amendment would result in comparable or higher employment numbers, building size and valuation than the potential of existing land use designation and/or rezoning. The proposed rezoning does not reduce the amount of land available for commercial/industrial development. The MXC future land use classification is already in place; however, although we encourage more commercial uses in mixed use developments and would have liked the project to have a more substantial commercial component, developers have a great deal of flexibility to respond to the market. i. Alternative Sites. Whether there are adequate sites elsewhere in the City for the proposed use in zoning districts where such use is already allowed. No, there are not. The City has little vacant land left. This is a large vacant property downtown; moreover, the location presented an opportunity for a CRA parcel to expand the size of the project. j. Master Plan and Site Plan Compliance with Land Development Regulations. When master plan and site plan review are required pursuant to Section 2.D.1.e above, both shall comply with the requirements of the respective zoning district regulations of Chapter 3, Article III and the site development standards of Chapter 4. For the master plan/site plan review, see the corresponding staff report. The application 7 Page 8 Ocean One REZN 16-001 for the Master/Site Plan complies with the development regulations of the Mixed Use High (MU-H) zoning district, other than the build-to requirements along the north side of the property and the community design standards that require the parking garage to be wrapped with habitable floor area. The agent has submitted concurrent Community Design Appeal applications and justifications, in an effort to deviate from those design regulations. CONCLUSION/RECOMMENDATION As indicated herein, staff has reviewed the proposed rezoning and determined that it constitutes the implementation of the CRA Community Redevelopment Plan and the policies of the Comprehensive Plan. However, the subject request cannot be approved without a concurrent approval of the Community Design Appeal applications. S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\REZN 16-001\\REZN 16-001 Ocean One Staff Report.doc 8 EXHIBIT "A" SITE LOCATION MAP OCEAN ONE (REZONING 16-001) ve h A 4t NE NE 4th Ave e d Av E 3r N MU-H N E 2nd Ave vd Beach Bl E Boynton MU-H SITE Loma Blvd Casa st Ave NE 1 MU-H (proposed) an Ave E Oce 1st Ave SE MU-H e t Av E 1s S SE 2nd Ave ¯ Legend 03570140210280 Feet ZONING DISTRICTS C4 General Commercial R3 Multi Family CBD Central Business District Source: Palm Beach County GIS Digital Data 2006-2015 C2 Neighborhood Commercial M1 Light Industrial Copyright Palm Beach County Florida 2006-2015 All rights reserved - Subject to a Licence Agreement C3 Community Commercial MU-H Mixed Use High NEW BUSINESS 7.A.2 Ocean One (ABAN 17-001) Abandonment Page 2 Memorandum No. PZ 17-007 ABAN 17-001 Financial Building) zoned CBD (Central Business District) and Marina Village zoned MU-H (Mixed Use-High); and West:Vacant land under concurrent development review and known as the Ocean One project and farther west is right-of-way for Federal Highway and farther west is developed commercial properties zoned CBD (Central Business District). BACKGROUND The applicant is requesting to abandon a portion of Boynton Beach Boulevard right-of-way immediately east of Federal Highway, which currently is comprised of sidewalk and landscape th improvements and a right turn lane onto NE 6 Court. While the proposed abandonment of this section of Boynton Beach Boulevard reduces the right-of-way width, it will not affect the existing th number or size of travel lanes within the roadway, only the loss of the right turn lane onto NE 6 Court, which is not warranted based upon predicted traffic volumes. The developer will be creating a new paver walk and landscape area, between 10 feet and 24 feet in width, on his property to offset the loss of the existing sidewalk and landscape area along the south side of Boynton Beach Boulevard, including a 10 foot wide sidewalk easement dedicated to the City. th Also, the applicant is requesting to abandon the west 10 feet of NE 6 Court, between Boynton Beach Boulevard and Ocean Avenue, to compensate for the 10 feet of the applicant’s property to be dedicated from the west side of the project to the Florida Department of Transportation to expand the Federal Highway right-of-way, in order to provide the required on-street parking. The th right-of-way on NE 6 Court will be reduced from 50 feet to 40 feet, with a minimum 7 foot wide sidewalk on the west side, partially in the right-of-way and partially on private property (a 5 foot wide sidewalk easement would be dedicated to the City), on-street parallel parking, a 20 foot wide two lane drive and finally, a 4 foot wide sidewalk on the east side of the street. As noted, staff supports th the addition of on-street parallel parking on both Federal Highway and NE 6 Court, which justifies the abandonment request. Additionally, the applicant has submitted a justification statement for the requests (see Exhibit “C” – Applicant’s Justification). ANALYSIS Owners of properties within 400 feet of the subject site were mailed a notice of this request and its respective hearing dates. The applicant has certified that they posted signage and mailed notices in accordance with Ordinance No. 04-007. A summary of the responses follows: CITY DEPARTMENTS/DIVISIONS Engineering - No objection w/ provision of necessary easements. Public Works/Utilities - No objection w/ provision of necessary easements. Planning and Zoning - No objection Page 3 Memorandum No. PZ 17-007 ABAN 17-001 PUBLIC UTILITY COMPANIES Florida Power and Light - No objection w/ provision of necessary easements and relocation of utilities at developer’s cost, if necessary. AT & T - No objection w/ provision of necessary easements and relocation of utilities at developer’s cost, if necessary. Florida Public Utilities - No objection Comcast - No objection w/ provision of necessary easements and relocation of utilities at developer’s cost, if necessary. Hotwire - No objection PBC Traffic Engineering - No objection RECOMMENDATION Staff has determined that the subject portion of the rights-of-way requested to be abandoned do not adversely impact traffic or other City functions, do not adversely impact other adjacent property owners, and the proposed improvements to be made by the developer in the areas to be abandoned promote better pedestrian movement and create desirable on street parking in the downtown. Based on the above analysis, staff recommends APPROVAL of the applicant’s request to abandon these portions of the rights-of-way, subject to the attached conditions. Any conditions requested by the Planning and Development Board or required by the Commission will be placed in Exhibit “D” - Conditions of Approval. S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\ABAN 17-001\\Staff Report.doc EXHIBIT "A" SITE LOCATION MAP ve rd A E 3 N NE 2nd Ave Blvd n Beach E Boynto SITE 1st Ave NE Ocean Ave E 1st Pl SE E 1st Ave S ¯ ve t A E 1s S 0204080120160 Feet Source: Palm Beach County GIS Digital Data 2006-2015 Copyright Palm Beach County Florida 2006-2015 All rights reserved - Subject to a Licence Agreement Ocean One Abandonment Justification Boynton Beach Blvd & NE 6th Court Ocean One Boynton, LLC owner of the +/- 3.63 gross acre parcel located at 114 North Federal Highway, which is generally located on the northeast corner of Federal Highway and Boynton ture Land Use Map and is - proposes to redevelop the Property with two hundred thirty seven (237) multi-family residential units order to develop the Project, Petitioner is also requesting a rezoning Use-- This particular district is intended to create a downtown core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. The Project seeks to redevelop this vacant lot with a luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. The Project will help satisfy a community need and is compatible with surrounding residential and commercial development. In order to develop the Project, Petitioner is seeking the abandonment of a portion of Boynton Beach Boulevard adjacent to the Property. This portion of Boynton Beach Boulevard is a local road where the right-of-way terminates. As such, a smaller right-of-way is more ideal to serve the propertiesin the immediate area. This will also allow for a large pedestrian plaza that will create a vibrant development. Further, in order to accommodate on-street parking along Federal Highway, Petitioner is also seeking th abandonment of ten (10) feet of NE 6 Court and will be dedicating ten (10) feet for right-of-way along Federal Highway. In support of the abandonment request, Petitioner will demonstrate that the abandonment meets the criteria listed in Part III, Chapter 2, Article II, Section 2.G.3 of the Citys Code of Ordinances (Code) as follows: (a) Access the subject land provides a legal means of access to a lot of record; the abandonment does not result in a permanent stoppage, interruption or an unacceptable level of service for the subject lot or neighbors lots or developments with respect to police, fire or other emergency services or solid waste removal; (b) Utilities The subject land does not contain, support or allow potable water, sanitary sewer, or other utility which would be permanently stopped or interrupted or cause an unacceptable level of service to the subject lot or neighboring lots or development; (c) Drainage and Wastewater Management The subject land does not contain, support or allow a legal means of drainage or wastewater for such lot or on neighboring lots, subdivisions or developments which would cause or result in a stoppage, interruption or unacceptable level of service; (d) Conservation the subject land does not contain, support or allow the means for conservation or preservation of flora or fauna. (a) Access Does the subject land provides a legal means of access to a lot of record? Would the abandonment result in a permanent stoppage, interruption or an unacceptable level of service for the subject lot or neighboring lots or developments with respect to police, fire or other emergency services or solid waste removal? The subject land does provide a legal means of access to a lot of record. However, the abandonment will not interrupt or prevent access to adjacent properties and developments. The Project seeks to abandon only a portion of the right-of-way adjacent to the Property and will not interrupt vehicular traffic to adjacent properties. The right-of-way along Boynton Beach Boulevard included in this request contains a turn-lane which is not required based on the anticipated vehicular traffic servicing the Project and adjacent parcels. This portion of Boynton Beach Boulevard is a local road which terminates as it approached the Intracoastal Waterway and is unnecessary to accommodate vehicles traveling in the area. th Further, the additional right-of-way being vacated along NE 6 Court would narrow the roadway servicing the Property and the adjacent parcel to the east. It will not prevent legal access to any lot of record. Narrowing the right-of-way will also slow down vehicles traveling in the area and allow for safer vehicular movements and pedestrian crossing. Further, the abandonment requests will not result in a permanent stoppage, interruption or an unacceptable level of service for the neighboring developments with respect to police, fire, other emergency services or solid waste removal. As part of the site plan approval process for the Project, the proposed right-of-ways and related abandonment requests have been reviewed by th police and fire and deemed acceptable for emergency services. Further, the abandonment for NE 6 Court is proposed with a dedication along Federal Highway to allow for on-street parking at the request of the City. As such, the abandonment request for the Project complies with this criteria. (b) Utilities Does the subject land contain, support or allow potable water, sanitary sewer, or other utility which would be permanently stopped or interrupted or cause an unacceptable level of service to the subject lot or neighboring lots or development? The subject land does not contain, support or allow potable water, sanitary sewer or other utility which would be permanently stopped or interrupted. Petitioner has reviewed the request with the Citys Utilities and Engineering Departments to determine any impacts of the proposed abandonment to the adjacent properties. Petitioner will be relocating any necessary facilities in order to accommodatethe Project and has been working closely with the City to ensure there is no interruption to any neighboring th lot or developed serviced by the existing facilities in this area. Further, the abandonment for NE 6Court is proposed with a dedication along Federal Highway to allow for on-street parking at the request of the City. As such, the abandonment request will not cause an interruption or an unacceptable level of service to those properties service by any existing potable water, sanitary sewer or other utilities contained within these right-of-ways. (c) Drainage and Wastewater Management Does the subject land contain, support or allow a legal means of drainage or wastewater for such lot or on neighboring lots, subdivisions or developments which would cause or result in a stoppage, interruption or unacceptable level of service? The subject land does not contain, support or allow a means of drainage or wastewater for neighboring lots, subdivisions or other developments which would cause or result in a stoppage, interruption or unacceptable level of service. As part of the site plan process, Petitioner has submitted civil plans which address drainage and wastewater management in the vicinity of the Property. Petitioner has been working closely with the Citys utilities and engineering divisions to ensure the Project complies with all drainage requirements and does not have an adverse impact to any adjacent Properties. Any facilities impacted by the Project will be relocated to ensure there is no interruption or unacceptable level of service. As such, the abandonment request meets this criteria. (d) Conservation Does the subject land does not contain, support or allow the means for conservation or preservation of flora or fauna? The abandonment area does not contain or allow the means for conservation or preservation of flora or fauna. The existing right-of-way proposed for abandonment is currently paved and does not contain any plant materials or animal life. As such, the proposed abandonment meets this criteria. EXHIBIT “D” CONDITIONS OF APPROVAL Project Name: Ocean One File number: ABAN 17-001 Reference: 5threview plans identified as a New Site Plan with a February 13, 2017 Planning and Zoning Department date stamp marking. INCLUDEREJECT DEPARTMENTS ENGINEERING / PUBLIC WORKS / FORESTRY / UTILITIES Comments: 1. A utility easement needs to be provided if the storm sewer line, located on the NE corner of Boynton Beach Boulevard and NE th 6 Court, will be inside the property line after the building is th shifted 10 feet towards NE 6 Court. FIRE Comments: None. POLICE Comments: None. BUILDING DIVISION Comments: None. PARKS AND RECREATION Comments: None. PLANNING AND ZONING Comments: 2. The abandonment is subject to recording of sidewalk easement agreements acceptable to the City. 3. Any conditions of approval from the various utility companies requiring new or revised easements and developer relocation of their facilities will be required to be addressed prior to issuance of a building permit. Ocean One (ABAN 17-001) Conditions of Approval Page 2 of 2 INCLUDEREJECT DEPARTMENTS 4. Approval is subject to approval of the concurrent applications for Rezoning, New Site Plan and Community Design Appeals. COMMUNITY REDEVELOPMENT AGENCY Comments: None. PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: To be determined. CITY COMMISSION CONDITIONS Comments: To be determined. S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\ABAN 17-001 \\COA.doc DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: Ocean One (ABAN 17-001) APPLICANT: Davis Camalier, Ocean One Boynton LLC APPLICANT’S ADDRESS: 9816 S. Military Trail, Suite C2-3, Boynton Beach, FL 33436 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: April 4, 2017 APPROVAL SOUGHT: Request for abandonment of a portion of right-of-way of Boynton Beach th Boulevard east of Federal Highway, and NE 6 Court between Boynton Beach Boulevard and Ocean Avenue, in conjunction with request for new site plan approval of the Ocean One mixed use project. LOCATION OF PROPERTY: 114 N. Federal Highway DRAWING(S): SEE EXHIBIT “B” ATTACHED HERETO. ________ THIS MATTER was presented to the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the approval sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the approval sought was made by the Applicant in a manner consistent with the requirements of the City’s Land Development Regulations. 2. The Applicant ___ HAS ___ HAS NOT established by substantial competent evidence a basis for the approval requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit “C” with notation “Included.” 4. The Applicant’s request is hereby ___ GRANTED subject to the conditions referenced in paragraph 3 above. ___ DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other: _______________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ DATED:__________________________ _____________________________________________ City Clerk S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\ABAN 17-001\\DO.doc NEW BUSINESS 7.A.3 Ocean One (CDPA 17-001 & 17-002) Community Design Appeal Staff Report – Ocean One (CDPA 17-001 & 17-002) Memorandum No PZ 17-006 Page 2 box displays. BACKGROUNDAND ANALYSIS The first application submitted for Community Design Plan Appeal involves Land Development Regulations (LDR) Chapter 3, Article III, Section 5.C., which requires buildings to be constructed along the roadway frontages with a build-to-line of 0 to 15 feet. Approval may be granted by staff of up to a 15 foot setback in order to 1) optimize landscape design; 2) maximize on-site drainage solutions; 3) accommodate architectural features and building enhancements; or 4) to otherwise enhance public spaces such as sidewalks, plazas, fountains, or outdoor seating area.There is only one side of the building (north) proposed to be located outside of the build-to-line (proposed at approximately 19 feet, or 4 feet in excess of that allowed), and accordingly, is the subject of this specific appeal request. The applicant has submitted a Justification Statement (Exhibit “C”) date- stamped November 4, 2016 addressing each of the following review criteria for such applications: a) Whether the proposed request will demonstrate consistency with the Comprehensive Plan; b) Whether the proposed request will not significantly detract from the livability or appearance of the city and will be consistent with the established or desired character of the area, or with the redevelopment plan, where applicable; c) On balance, whether the proposed request will be consistent with the purpose of the standard for which a deviation is requested. Granting the request will equally or better meet the purpose of the standard to be appealed; d) Whether the proposed request is intended to save or preserve existing trees or desired flora; e) Whether the proposed request will have adverse environmental impacts that cannot be prevented by the imposition of conditions; f) Whether the proposed request will have an adverse impact on property values of abutting or adjacent land; g) Whether the proposed request will seriously reduce the quality or quantity of light and air available to adjacent properties; h) Whether the proposed request is necessary to further the objectives of the City to assist with economic development and business promotion; and i) Whether the proposed request meets the purpose and intent of these regulations but conflicts with another site development standard or requirement, including sustainable development and green initiatives. The applicant is proposing a public plaza at the NW corner of the site, in which the building is setback approximately 45 feet, and which is consistent with the Community Redevelopment Agency (CRA) design guidelines, encouraging public spaces at focal points of downtown mixed use projects. However, further east along the north side of the property, the building setback varies from 15 feet measured from certain building columns, to nearly 19 feet. This is a very minor deviation of the 15 feet allowed and provides for a more active pedestrian environment, permitting greater opportunities for larger planting areas to facilitate a grander planting scheme (allowing for the placement of large Medjool Date palms Staff Report – Ocean One (CDPA 17-001 & 17-002) Memorandum No PZ 17-006 Page 3 and 24 foot tall Oak trees), and creating a more prominent entry into the Marina District to the east. The second application submitted for Community Design Plan Appeal involves Land Development Regulations (LDR) Chapter 4, Article III, Section 6.F., “Off- Street Parking Area Standards”, which requires facades of parking garages that front on an arterial or collector roadway to be wrapped with habitable space. Once again, the applicant has prepared responses to the review criteria (see Exhibit “C” - Justification Statement) and believes that the building as proposed will not significantly detract from the livability or appearance of the downtown and will be consistent with the desired character of the area and redevelopment plan. By providing the ground level retail space, the applicant believes an active pedestrian experience will be promoted, and since the balance of the garage façade is designed utilizing similar architectural features of the residential units, it will be difficult to distinguish between habitable and uninhabitable space in the building. While staff believes the appearance between habitable and non-habitable space will be distinguishable, the architectural treatments are such that the residential building and garage blend well together as a cohesive structure, as opposed to two distinct buildings. Additionally, the fact that the applicant proposes to incorporate art and lighted display boxes in the windows of the garage, above the retail space facing Federal Highway, should add interest to the façade, enhance the pedestrian experience, and further the artistic ambiance of the downtown. In conclusion, staff has determined that the project meets the intent of the review criteria for Community Design Appeals in relation to 1) the relatively minor (4 foot deviation) in the build-to-line criteria; and 2) the façade of the garage (through the use of retail space on the ground floor, utilization of similar architectural features of the residential portion of the building on the remainder, and through the provision of art and lighted display boxes in the windows of the garage, above the retail space, facing Federal Highway), understanding the proposed design of the project is not inconsistent with the Comprehensive Plan,will not significantly detract from the livability or appearance of the City, should enhance the pedestrian experience downtown, will provide opportunity for planting of large Medjool Date palms and Oak trees,and should not have any adverse impact on property values of abutting or adjacent land. RECOMMENDATION Staff has reviewed these requests for Community Design Appeal approval. Based on the analysis contained herein, staff recommends approval contingent upon City Commission approval of the concurrent requests for Rezoning, New Site Plan, and Abandonment, and satisfying all comments indicated in Exhibit “D” – Conditions of Approval. Any additional conditions recommended by the Board or City Commission shall be documented accordingly in the Conditions of Approval. S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\CDPA 17-001 & 17-002\\CDPA Staff Report.doc EXHIBIT "A" SITE LOCATION MAP ve rd A E 3 N NE 2nd Ave Blvd n Beach E Boynto SITE 1st Ave NE Ocean Ave E 1st Pl SE E 1st Ave S ¯ ve t A E 1s S 0204080120160 Feet Source: Palm Beach County GIS Digital Data 2006-2015 Copyright Palm Beach County Florida 2006-2015 All rights reserved - Subject to a Licence Agreement ELEVATIONS A4.1 Ocean One 114 North Federal Highway Community Design Appeal Build-to-Line Ocean One Boynton, LLC owner of the +/- 3.63 gross acre parcel located at 114 North Federal Highway, which is generally located on the northeast corner of Federal Highway and Boynton ture Land Use Map and is - proposes to redevelop the Property with two hundred thirty seven (237) multi-family residential units order to develop the Project, Petitioner is also requesting a rezoning Use-- This particular district is intended to create a downtown core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. properties that have been rezoned to the MU-H district, as proposed by Petitioner. Specifically, the Project is consistent with the high densities of the Marina Village Condominium to the east of the Property and the Casa Costa project (f/k/a Promenade) to the north, which have been developed with high-density residential projects and with the property at the southwest corner of Federal Highway and Ocean Avenue which also allows residential densities of up to one hundred (100) dwelling units per acre. It is clear by zoning district that high-density and mixed-use residential projects are desired for the Property as it is in close proximity to the marina and future transit station. The Project proposes a high-quality development that serves the redevelopment needs for this particular area of the City. The Project seeks to redevelop this vacant lot with a luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. The Project will help satisfy a community need and is compatible with surrounding residential and commercial development. In order to develop the Project, Petitioner is requesting a community design appeal as follows: Relief from Part III, Chapter 3, Article III, Section I.E. (Table 3-4) to a build-to-line in excess of nineteen (19) feet in lieu of zero feet required. In support of the community design appeal, Petitioner will demonstrate that the request meets the review criteria of Chapter 2, Article II, Section 4.B.3 of the Land Development Regulations (Code) as follows: (a) whether the proposed request is consistent with the Comprehensive Plan; (b) whether the proposed request will not significantly detract from the livability or appearance of the city and will be consistent with the established or desired character of the area, or with the redevelopment plan, where applicable; (c) on balance, the proposed request is consistent with the purpose of the standard for which a deviation is requested. Granting the request will equally or better meet the purpose of the standard to be appealed; (d) whether the proposed request is intended to save or preserve existing trees or desired flora (1) whether the applicant is unable to design or locate proposed buildings, structures, or improvements and preserve the tree(s) and comply with all provisions of these community design standards without causing the applicant undue hardship; and (2) whether it is not feasible to transplant the trees to another location on the subject site considering the following: 1) shape and dimensions of the real property; 2) location of existing structures and infrastructure improvements; and 3) size, age, health and species of trees sought to be protected; (e) whether the proposed request will have an adverse environmental impact that cannot be prevented by the imposition of conditions; (f) whether the proposed request will have an adverse impact on property values of abutting or adjacent land; (g) whether the proposed request will seriously reduce the quality or quantity of light and air available to adjacent properties; (h) whether the proposed request is necessary to further the objectives of the city to assist with economic development and business promotion; (i) whether the proposed request meets the purpose and intent of these regulations but conflicts with another site development standard or requirement, including sustainable development and green initiatives. ΛğΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ źƭ ĭƚƓƭźƭƷĻƓƷ ǞźƷŷ ƷŷĻ /ƚƒƦƩĻŷĻƓƭźǝĻ tƌğƓ͵ As noted above, the Property has a future land use designation of Mixed- Comprehensive Plan, the MX-C category is intended to provide for the vertical or horizontal mixing of land uses within a single site in order to allow for redevelopment in specific areas of the City that take maximum advantage of existing utility systems and services and promote compact development, safe and pedestrian friendly streets, and provide for transportation choices. The MX-C category east of I-95 specifically provides for high density residential development far above the density permitted in the CBD zoning district. As such, the Project would allow for this higher-density residential development that was sive Plan. The requested relief is required to provide a larger pedestrian promenade along East Boynton Beach Boulevard. East of Federal Highway, Boynton Beach Boulevard becomes a local road servicing only a handful of properties. As part of the Project, Petitioner is requesting the abandonment of a portion of Boynton Beach Boulevard which will narrow the right-of- way and slow down vehicles traveling in the area. The Project further provides a more expansive pedestrian area along Boynton Beach Boulevard to create an active pedestrian environment that allows for greater interaction with the proposed commercial uses. The Project is further consistent with the goals, policies and objectives outlined in the Citys Comprehensive Plan as follows: Objective 1.3 Future development and redevelopment within the City shall continue to be regulated through administration of Land Development Regulations and Community Redevelopment Plans The Project is consistent with the CRAs Downtown Master Plan and the intended development on the Property. Policy 1.1.3.d The Project provides for the vertical mixing of land uses within a single site in order to allow for redevelopment that takes advantage of existing utility systems; and promotes compact development, safe and pedestrian-friendly streets and transportation choices The requested relief will provide for a larger pedestrian promenade and a safer street with slower vehicular traffic. Objective 1.7 The City shall eliminate blighted residential neighborhoods and business districts through the adoption and implementation of Community Redevelopment Plans within commercial and residential Community Redevelopment Areas, including areas east of I-95, notably the Federal Highway corridor The Project proposes to transform a large vacant parcel along the Federal Highway corridor with a vibrant mixed-use project that will serve the community. Policy 1.7.3 The City shall require that designs for redevelopment and infill projects encourage use of public transit, pedestrian and bicycle travel as alternatives to the car and shall maximize personal safety The Project provides for an infill mixed-use development that encourages pedestrian activity and use of alternate transportation options in the vicinity of the Property. Policy 2.4.12 The City shall provide a variety of transportation choices within the CRA by supporting the following design features for street new continuous and permanent on-street parking; bus stops and transit enhancements; widening sidewalks - The Project proposes wider sidewalks along Boynton Beach Boulevard to create a safe area for pedestrian activities. The Project also proposes on-street parking and an integrated bus stop. Objective 2.12 Promote a pedestrian environment by providing adequate facilities, such as wider sidewalks, buffer from travel lanes, etc. for pedestrians and bicyclists Petitioner is seeking relief from the built-to-line in order to create a wider pedestrian area and promote a safe pedestrian environment. ΛĬΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ Ǟźƌƌ ƓƚƷ ƭźŭƓźŅźĭğƓƷƌǤ ķĻƷƩğĭƷ ŅƩƚƒ ƷŷĻ ƌźǝğĬźƌźƷǤ ƚƩ ğƦƦĻğƩğƓĭĻ ƚŅ ƷŷĻ ĭźƷǤ ğƓķ Ǟźƌƌ ĬĻ ĭƚƓƭźƭƷĻƓƷ ǞźƷŷ ƷŷĻ ĻƭƷğĬƌźƭŷĻķ ƚƩ ķĻƭźƩĻķ ĭŷğƩğĭƷĻƩ ƚŅ ƷŷĻ ğƩĻğͲ ƚƩ ǞźƷŷ ƷŷĻ ƩĻķĻǝĻƌƚƦƒĻƓƷ ƦƌğƓͲ ǞŷĻƩĻ ğƦƦƌźĭğĬƌĻ͵ The proposed request will not significantly detract from the livability or appearance of the City. The build- to-line requirement is intended to create a more vibrant and pedestrian friendly downtown area where parking areas are setback and main buildings are pushed forward towards the Property line. The Code provides for major variations to build-to-line requirements through the approval of a Community Design Appeal Applications where portions of buildings are proposed in excess of the distance specified in order to enhance public spaces such as sidewalks, plazas, fountains or outdoor seating areas. Petitioner is requesting relief from the build-to-line requirements in order to create wider sidewalks, plazas and outdoor seating areas to promote pedestrian activity along East Boynton Beach Boulevard. Further, the sidewalks will be buffered from the street through enhanced landscaping in order to create a true pedestrian feel along this frontage. Petitioner is proposing relief to allow the building in excess of nineteen feet from the ultimate property line in order to create such an environment. It is clear the variations noted in Chapter 3, Article III, Section 5.C.2. contemplates relief in such situations that enhance the public spaces. Further, the request is consistent with the desired character of the area and applicable redevelopment plan. As noted above, the Property is further located within the TOD District around the future transit station under the Downtown Master Plan. This particular district is intended to create a downtown core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. -use urban zoning districts are intended to implement the community redevelopment plans by providing for a mixture of land uses, accommodating varying densities and intensities for each planning area and by establishing a compact urban setting. These districts area also intended to support transit ridership, and in particular the development of transit-oriented development near planned passenger train stations. The Property is within a special focus area, the DTODD Overlay district, as it is in close proximity to a planned station area. Specifically, the DTODD Overlay zone is intended to improve land development patterns around the future station of the planned commuter service and further enhance the vision embodied by the mixed-use zoning districts with increased density and intensity as well as a strong emphasis on interconnectivity throughout the area. Again, there is an emphasis of high density development for this overlay district which includes the Property. TheProject will allow for the higher density development encouraged by such provisiLand Development Regulations. As such, the Project is consistent with the purpose and intent of the applicable Comprehensive Plan policies, redevelopment plans and land use regulations. ΛĭΜ hƓ ĬğƌğƓĭĻͲ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ źƭ ĭƚƓƭźƭƷĻƓƷ ǞźƷŷ ƷŷĻ ƦǒƩƦƚƭĻ ƚŅ ƷŷĻ ƭƷğƓķğƩķ ŅƚƩ Ǟŷźĭŷ ğ ķĻǝźğƷźƚƓ źƭ ƩĻƨǒĻƭƷĻķ͵ DƩğƓƷźƓŭ ƷŷĻ ƩĻƨǒĻƭƷ Ǟźƌƌ ĻƨǒğƌƌǤ ƚƩ ĬĻƷƷĻƩ ƒĻĻƷ ƷŷĻ ƦǒƩƦƚƭĻ ƚŅ ƷŷĻ ƭƷğƓķğƩķ Ʒƚ ĬĻ ğƦƦĻğƌĻķ͵ The request is consistent with the purpose of this provision. The build-to-line requirement is intended to create a more vibrant and pedestrian friendly downtown area where parking areas are setback and main buildings are pushed forward towards the Property line. The Code provides for major variations to build- to-line requirements through the approval of a Community Design Appeal Applications where portions of buildings are proposed in excess of the distance specified in order to enhance public spaces such as sidewalks, plazas, fountains or outdoor seating areas. Petitioner is requesting relief from the build-to- line requirements in order to create wider sidewalks, plazas and outdoor seating areas to promote pedestrian activity along East Boynton Beach Boulevard. Further, the sidewalks will be buffered from the street through enhanced landscaping in order to create a true pedestrian feel along this frontage. Petitioner is proposing relief to allow the building in excess of nineteen feet from the ultimate property line in order to create such an environment. It is clear the variations noted in Chapter 3, Article III, Section 5.C.2. contemplates relief in such situations that enhance the public spaces. Further, the Project will redevelop this vacant lot with a luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. ΛķΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ źƭ źƓƷĻƓķĻķ Ʒƚ ƭğǝĻ ƚƩ ƦƩĻƭĻƩǝĻ ĻǣźƭƷźƓŭ ƷƩĻĻƭ ƚƩ ķĻƭźƩĻķ ŅƌƚƩğ ΛЊΜ ǞŷĻƷŷĻƩ ƷŷĻ ğƦƦƌźĭğƓƷ źƭ ǒƓğĬƌĻ Ʒƚ ķĻƭźŭƓ ƚƩ ƌƚĭğƷĻ ƦƩƚƦƚƭĻķ ĬǒźƌķźƓŭƭͲ ƭƷƩǒĭƷǒƩĻƭͲ ƚƩ źƒƦƩƚǝĻƒĻƓƷƭ ğƓķ ƦƩĻƭĻƩǝĻ ƷŷĻ ƷƩĻĻΛƭΜ ğƓķ ĭƚƒƦƌǤ ǞźƷŷ ğƌƌ ƦƩƚǝźƭźƚƓƭ ƚŅ ƷŷĻƭĻ ĭƚƒƒǒƓźƷǤ ķĻƭźŭƓ ƭƷğƓķğƩķƭ ǞźƷŷƚǒƷ ĭğǒƭźƓŭ ƷŷĻ ğƦƦƌźĭğƓƷ ǒƓķǒĻ ŷğƩķƭŷźƦͳ ğƓķ ΛЋΜ ǞŷĻƷŷĻƩ źƷ źƭ ƓƚƷ ŅĻğƭźĬƌĻ Ʒƚ ƷƩğƓƭƦƌğƓƷ ƷŷĻ ƷƩĻĻƭ Ʒƚ ğƓƚƷŷĻƩ ƌƚĭğƷźƚƓ ƚƓ ƷŷĻ ƭǒĬƆĻĭƷ ƭźƷĻ ĭƚƓƭźķĻƩźƓŭ ƷŷĻ ŅƚƌƌƚǞźƓŭʹ ЊΜ ƭŷğƦĻ ğƓķ ķźƒĻƓƭźƚƓƭ ƚŅ ƷŷĻ ƩĻğƌ ƦƩƚƦĻƩƷǤͳ ЋΜ ƌƚĭğƷźƚƓ ƚŅ ĻǣźƭƷźƓŭ ƭƷƩǒĭƷǒƩĻƭ ğƓķ źƓŅƩğƭƷƩǒĭƷǒƩĻ źƒƦƩƚǝĻƒĻƓƷƭͳ ğƓķ ЌΜ ƭźǩĻͲ ğŭĻͲ ŷĻğƌƷŷ ğƓķ ƭƦĻĭźĻƭ ƚŅ ƷƩĻĻƭ ƭƚǒŭŷƷ Ʒƚ ĬĻ ƦƩƚƷĻĭƷĻķ͵ The proposed relief will not have an impact on existing trees or desired flora. The Property currently has several street trees along the street frontages. Petitioner has hired an arborist and submitted an arborists report with the site plan application for the Project to determine whether any trees can be saved. Street trees will be provided along all street frontages as required by the Citys Code. This specific request relates to habitable space along the upper levels of the garage and is required to provide a safe and functioning garage facility. As noted above, the garage has been designed to continue the appearance of the livable space in the associated residential building. As such, this criteria is not applicable to the Project. ΛĻΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ Ǟźƌƌ ŷğǝĻ ğƓ ğķǝĻƩƭĻ ĻƓǝźƩƚƓƒĻƓƷğƌ źƒƦğĭƷ ƷŷğƷ ĭğƓƓƚƷ ĬĻ ƦƩĻǝĻƓƷĻķ ĬǤ ƷŷĻ źƒƦƚƭźƷźƚƓ ƚŅ ĭƚƓķźƷźƚƓƭ͵ The proposed request will not have an adverse environmental impact. The proposed request will not significantly detract from the livability or appearance of the City. The build-to-line requirement is intended to create a more vibrant and pedestrian friendly downtown area where parking areas are setback and main buildings are pushed forward towards the Property line. The Code provides for major variations to build-to-line requirements through the approval of a Community Design Appeal Applications where portions of buildings are proposed in excess of the distance specified in order to enhance public spaces such as sidewalks, plazas, fountains or outdoor seating areas. Petitioner is requesting relief from the build-to-line requirements in order to create wider sidewalks, plazas and outdoor seating areas to promote pedestrian activity along East Boynton Beach Boulevard. Further, the sidewalks will be buffered from the street through enhanced landscaping in order to create a true pedestrian feel along this frontage. Petitioner is proposing relief to allow the building in excess of nineteen feet from the ultimate property line in order to create such an environment. It is clear the variations noted in Chapter 3, Article III, Section 5.C.2. contemplates relief in such situations that enhance the public spaces. ΛŅΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ Ǟźƌƌ ŷğǝĻ ğƓ ğķǝĻƩƭĻ źƒƦğĭƷ ƚƓ ƦƩƚƦĻƩƷǤ ǝğƌǒĻƭ ƚŅ ğĬǒƷƷźƓŭ ƚƩ ğķƆğĭĻƓƷ ƌğƓķ͵ The proposed request will not have an adverse impact on property values of abutting or adjacent land. The Property is currently vacant. The Project seeks to redevelop this vacant lot with a luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. Further, this request will revitalize the Property with a Project that is consistent with the Citys master plans. As noted above, the Property is further located within the TOD CRA Downtown Master Plan. This particular district is intended to create a downtown core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. The relief requested further allows for the enhancement of pedestrian sidewalks, plazas and outdoor seating areas that will create a quality development with the desired pedestrian activities along the ground levels. As such, this request will not have an adverse impact on property values. ΛŭΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ Ǟźƌƌ ƭĻƩźƚǒƭƌǤ ƩĻķǒĭĻ ƷŷĻ ƨǒğƌźƷǤ ƚƩ ƨǒğƓƷźƷǤ ƚŅ ƌźŭŷƷ ğƓķ ğźƩ ğǝğźƌğĬƌĻ Ʒƚ ğķƆğĭĻƓƷ ƦƩƚƦĻƩƷźĻƭ͵ The request will not reduce the quality or quantity of light and air available to adjacent properties. Petitioner is requesting relief from the build-to-line requirements in order to create wider sidewalks, plazas and outdoor seating areas to promote pedestrian activity along East Boynton Beach Boulevard. Further, the sidewalks will be buffered from the street through enhanced landscaping in order to create a true pedestrian feel along this frontage. Petitioner is proposing relief to allow the building in excess of nineteen feet from the ultimate property line in order to create such an environment. As such, it will not impact the quality or quantity of light or air available to adjacent properties. ΛŷΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ źƭ ƓĻĭĻƭƭğƩǤ Ʒƚ ŅǒƩƷŷĻƩ ƷŷĻ ƚĬƆĻĭƷźǝĻƭ ƚŅ ƷŷĻ ĭźƷǤ Ʒƚ ğƭƭźƭƷ ǞźƷŷ ĻĭƚƓƚƒźĭ ķĻǝĻƌƚƦƒĻƓƷ ğƓķ ĬǒƭźƓĻƭƭ ƦƩƚƒƚƷźƚƓ͵ As noted above, the Property is further located within the TOD District around the future transit station CRA Downtown Master Plan. This particular district is intended to create a downtown core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. Petitioner is requesting relief from the build-to-line requirements in order to create wider sidewalks, plazas and outdoor seating areas to promote pedestrian activity along East Boynton Beach Boulevard and further these objectives. The sidewalks will be also buffered from the street through enhanced landscaping in order to create a true pedestrian feel along this frontage. Petitioner is proposing relief to allow the building in excess of nineteen feet from the ultimate property line in order to create such an environment. properties that have been rezoned to the MU-H district, as proposed by Petitioner. Specifically, the Project is consistent with the high densities of the Marina Village Condominium to the east of the Property and the Casa Costa project (f/k/a Promenade) to the north, which have been developed with high-density residential projects and with the property at the southwest corner of Federal Highway and Ocean Avenue which also allows residential densities of up to one hundred (100) dwelling units per acre. It is clear by zoning district that high-density and mixed-use residential projects are desired for the Property as it is in close proximity to the marina and future transit station. The Project proposes a high-quality development that serves the redevelopment needs for this particular area of the City. The request is necessary to redevelop this vacant lot with the Project which contains luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. The Project will help satisfy a community need and is compatible with surrounding residential and commercial development. As such, the request is consistent with this criteria. ΛźΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ ƒĻĻƷƭ ƷŷĻ ƦǒƩƦƚƭĻ ğƓķ źƓƷĻƓƷ ƚŅ ƷŷĻƭĻ ƩĻŭǒƌğƷźƚƓƭ ĬǒƷ ĭƚƓŅƌźĭƷƭ ǞźƷŷ ğƓƚƷŷĻƩ ƭźƷĻ ķĻǝĻƌƚƦƒĻƓƷ ƭƷğƓķğƩķ ƚƩ ƩĻƨǒźƩĻƒĻƓƷͲ źƓĭƌǒķźƓŭ ƭǒƭƷğźƓğĬƌĻ ķĻǝĻƌƚƦƒĻƓƷ ğƓķ ŭƩĻĻƓ źƓźƷźğƷźǝĻƭ͵ The build-to-line requirement is intended to create a more vibrant and pedestrian friendly downtown area where parking areas are setback and main buildings are pushed forward towards the Property line. The Code provides for major variations to build-to-line requirements through the approval of a Community Design Appeal Applications where portions of buildings are proposed in excess of the distance specified in order to enhance public spaces such as sidewalks, plazas, fountains or outdoor seating areas. Petitioner is requesting relief from the build-to-line requirements in order to create wider sidewalks, plazas and outdoor seating areas to promote pedestrian activity along East Boynton Beach Boulevard. Further, the sidewalks will be buffered from the street through enhanced landscaping in order to create a true pedestrian feel along this frontage. Petitioner is proposing relief to allow the building in excess of nineteen feet from the ultimate property line in order to create such an environment. As such, the relief requested complies with this criteria. Ocean One 114 North Federal Highway Community Design Appeal Habitable Space Ocean One Boynton, LLC owner of the +/- 3.63 gross acre parcel located at 114 North Federal Highway, which is generally located on the northeast corner of Federal Highway and Boynton - proposes to redevelop the Property with two hundred thirty seven (237) multi-family residential units order to develop the Project, Petitioner is also r Use-- This particular district is intended to create a downtown core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. properties that have been rezoned to the MU-H district, as proposed by Petitioner. Specifically, the Project is consistent with the high densities of the Marina Village Condominium to the east of the Property and the Casa Costa project (f/k/a Promenade) to the north, which have been developed with high-density residential projects and with the property at the southwest corner of Federal Highway and Ocean Avenue which also allows residential densities of up to one hundred (100) dwelling units per acre. It is clear by zoning district that high-density and mixed-use residential projects are desired for the Property as it is in close proximity to the marina and future transit station. The Project proposes a high-quality development that serves the redevelopment needs for this particular area of the City. The Project seeks to redevelop this vacant lot with a luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. The Project will help satisfy a community need and is compatible with surrounding residential and commercial development. In order to develop the Project, Petitioner is requesting a community design appeal as follows: Relief from Part III, Chapter 4, Article III, Section VI.F.1.c. & d. to allow uninhabitable space along approximately one hundred ten (110) feet of garage area on the Federal Highway frontage forfloors two (2) through seven (7) in lieu of habitable gross building area wrapped along entire garage as required. In support of the community design appeal, Petitioner will demonstrate that the request meets the review criteria of Chapter 2, Article II, Section 4.B.3 of the Land Development Regulations as follows: (a) whether the proposed request is consistent with the Comprehensive Plan; (b) whether the proposed request will not significantly detract from the livability or appearance of the city and will be consistent with the established or desired character of the area, or with the redevelopment plan, where applicable; (c) on balance, the proposed request is consistent with the purpose of the standard for which a deviation is requested. Granting the request will equally or better meet the purpose of the standard to be appealed; (d) whether the proposed request is intended to save or preserve existing trees or desired flora (1) whether the applicant is unable to design or locate proposed buildings, structures, or improvements and preserve the tree(s) and comply with all provisions of these community design standards without causing the applicant undue hardship; and (2) whether it is not feasible to transplant the trees to another location on the subject site considering the following: 1) shape and dimensions of the real property; 2) location of existing structures and infrastructure improvements; and 3) size, age, health and species of trees sought to be protected; (e) whether the proposed request will have an adverse environmental impact that cannot be prevented by the imposition of conditions; (f) whether the proposed request will have an adverse impact on property values of abutting or adjacent land; (g) whether the proposed request will seriously reduce the quality or quantity of light and air available to adjacent properties; (h) whether the proposed request is necessary to further the objectives of the city to assist with economic development and business promotion; (i) whether the proposed request meets the purpose and intent of these regulations but conflicts with another site development standard or requirement, including sustainable development and green initiatives. ΛğΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ źƭ ĭƚƓƭźƭƷĻƓƷ ǞźƷŷ ƷŷĻ /ƚƒƦƩĻŷĻƓƭźǝĻ tƌğƓ͵ As noted above, the Property has a future land use designation of Mixed- Comprehensive Plan, the MX-C category is intended to provide for the vertical or horizontal mixing of land uses within a single site in order to allow for redevelopment in specific areas of the City that take maximum advantage of existing utility systems and services and promote compact development, safe and pedestrian friendly streets, and provide for transportation choices. The MX-C category east of I-95 specifically provides for high density residential development far above the density permitted in the CBD zoning district. As such, the Project would allow for this higher-density residential development that was sive Plan. The Project is further consistent with the goals, policies and objectives outlined in the Citys Comprehensive Plan as follows: Objective 1.3 Future development and redevelopment within the City shall continue to be regulated through administration of Land Development Regulations and Community Redevelopment Plans The Project is consistent with the CRAs Downtown Master Plan and the intended development on the Property. Policy 1.1.3.d The Project provides for the vertical mixing of land uses within a single site in order to allow for redevelopment that takes advantage of existing utility systems; and promotes compact development, safe and pedestrian-friendly streets and transportation choices The requested relief will provide for a larger pedestrian promenade and a safer street with slower vehicular traffic. Objective 1.7 The City shall eliminate blighted residential neighborhoods and business districts through the adoption and implementation of Community Redevelopment Plans within commercial and residential Community Redevelopment Areas, including areas east of I-95, notably the Federal Highway corridor The Project proposes to transform a large vacant parcel along the Federal Highway corridor with a vibrant mixed-use project that will serve the community. Policy 1.7.3 The City shall require that designs for redevelopment and infill projects encourage use of public transit, pedestrian and bicycle travel as alternatives to the car and shall maximize personal safety The Project provides for an infill mixed-use development that encourages pedestrian activity and use of alternate transportation options in the vicinity of the Property. Policy 2.4.12 The City shall provide a variety of transportation choices within the CRA by supporting the following design features for street new continuous and permanent on-street parking; bus stops and transit enhancements; widening sidewalks - The Project proposes wider sidewalks along Boynton Beach Boulevard to create a safe area for pedestrian activities. The Project also proposes on-street parking and an integrated bus stop. Objective 2.12 Promote a pedestrian environment by providing adequate facilities, such as wider sidewalks, buffer from travel lanes, etc. for pedestrians and bicyclists Petitioner is seeking relief from the built-to-line in order to create a wider pedestrian area and promote a safe pedestrian environment. ΛĬΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ Ǟźƌƌ ƓƚƷ ƭźŭƓźŅźĭğƓƷƌǤ ķĻƷƩğĭƷ ŅƩƚƒ ƷŷĻ ƌźǝğĬźƌźƷǤ ƚƩ ğƦƦĻğƩğƓĭĻ ƚŅ ƷŷĻ ĭźƷǤ ğƓķ Ǟźƌƌ ĬĻ ĭƚƓƭźƭƷĻƓƷ ǞźƷŷ ƷŷĻ ĻƭƷğĬƌźƭŷĻķ ƚƩ ķĻƭźƩĻķ ĭŷğƩğĭƷĻƩ ƚŅ ƷŷĻ ğƩĻğͲ ƚƩ ǞźƷŷ ƷŷĻ ƩĻķĻǝĻƌƚƦƒĻƓƷ ƦƌğƓͲ ǞŷĻƩĻ ğƦƦƌźĭğĬƌĻ͵ The Code requires that integrated parking garages within mixed-use developments provide habitable gross building area wrapped around the facility on all levels. The intent of this provision is to ensure there are active uses along pedestrian walkways and to create the feeling of a vibrant, dynamic building along visible thoroughfares. Petitioner has designed the Project to provide habitable space on the ground level along the entire Federal Highway frontage. By providing ground level retail along the garage, Petitioner is creating an active pedestrian experience that will bring life to this corridor. On the upper levels of the garage, Petitioner is requesting relief to allow for uninhabitable space along the garage façade fronting Federal Highway. The garage has been designed to continue the appearance of the residential units along this façade to create the same feel of livable space. The garage area uses similar architectural features and designs which makes it difficult to distinguish the habitable space from the inhabitable space that is the garage. As such, the request will not detract from the appearance of the City. Further, the request is consistent with the desired character of the area and applicable redevelopment plan. As noted above, the Property is further located within the TOD District around the future transit s intended to create a downtown core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. -use urban zoning districts are intended to implement the community redevelopment plans by providing for a mixture of land uses, accommodating varying densities and intensities for each planning area and by establishing a compact urban setting. These districts area also intended to support transit ridership, and in particular the development of transit-oriented development near planned passenger train stations. The Property is within a special focus area, the DTODD Overlay district, as it is in close proximity to a planned station area. Specifically, the DTODD Overlay zone is intended to improve land development patterns around the future station of the planned commuter service and further enhance the vision embodied by the mixed-use zoning districts with increased density and intensity as well as a strong emphasis on interconnectivity throughout the area. Again, there is an emphasis of high density development for this overlay district which includes the Property. The Project will allow for the higher de Development Regulations. As such, the Project is consistent with the purpose and intent of the applicable Comprehensive Plan policies, redevelopment plans and land use regulations. ΛĭΜ hƓ ĬğƌğƓĭĻͲ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ źƭ ĭƚƓƭźƭƷĻƓƷ ǞźƷŷ ƷŷĻ ƦǒƩƦƚƭĻ ƚŅ ƷŷĻ ƭƷğƓķğƩķ ŅƚƩ Ǟŷźĭŷ ğ ķĻǝźğƷźƚƓ źƭ ƩĻƨǒĻƭƷĻķ͵ DƩğƓƷźƓŭ ƷŷĻ ƩĻƨǒĻƭƷ Ǟźƌƌ ĻƨǒğƌƌǤ ƚƩ ĬĻƷƷĻƩ ƒĻĻƷ ƷŷĻ ƦǒƩƦƚƭĻ ƚŅ ƷŷĻ ƭƷğƓķğƩķ Ʒƚ ĬĻ ğƦƦĻğƌĻķ͵ The request is consistent with the purpose of this provision. The addition of habitable space along Federal Highway would create a hazardous condition through the garage as ramps would be shorter and steeper in order to accommodate additional habitable areas. Rather, Petitioner is creating the same appearance of habitable space along the garage frontage by continuing the same architectural design elements along the garage façade. Petitioner is meeting the purpose of this provision by creating the appearance of active uses along Federal Highway and producing a dynamic product which will revitalize the Property. Granting the request will better meet the purpose of this standard as it results in a safer and more functional garage that and a vibrant Project. The Project will further redevelop this vacant lot with a luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. ΛķΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ źƭ źƓƷĻƓķĻķ Ʒƚ ƭğǝĻ ƚƩ ƦƩĻƭĻƩǝĻ ĻǣźƭƷźƓŭ ƷƩĻĻƭ ƚƩ ķĻƭźƩĻķ ŅƌƚƩğ ΛЊΜ ǞŷĻƷŷĻƩ ƷŷĻ ğƦƦƌźĭğƓƷ źƭ ǒƓğĬƌĻ Ʒƚ ķĻƭźŭƓ ƚƩ ƌƚĭğƷĻ ƦƩƚƦƚƭĻķ ĬǒźƌķźƓŭƭͲ ƭƷƩǒĭƷǒƩĻƭͲ ƚƩ źƒƦƩƚǝĻƒĻƓƷƭ ğƓķ ƦƩĻƭĻƩǝĻ ƷŷĻ ƷƩĻĻΛƭΜ ğƓķ ĭƚƒƦƌǤ ǞźƷŷ ğƌƌ ƦƩƚǝźƭźƚƓƭ ƚŅ ƷŷĻƭĻ ĭƚƒƒǒƓźƷǤ ķĻƭźŭƓ ƭƷğƓķğƩķƭ ǞźƷŷƚǒƷ ĭğǒƭźƓŭ ƷŷĻ ğƦƦƌźĭğƓƷ ǒƓķǒĻ ŷğƩķƭŷźƦͳ ğƓķ ΛЋΜ ǞŷĻƷŷĻƩ źƷ źƭ ƓƚƷ ŅĻğƭźĬƌĻ Ʒƚ ƷƩğƓƭƦƌğƓƷ ƷŷĻ ƷƩĻĻƭ Ʒƚ ğƓƚƷŷĻƩ ƌƚĭğƷźƚƓ ƚƓ ƷŷĻ ƭǒĬƆĻĭƷ ƭźƷĻ ĭƚƓƭźķĻƩźƓŭ ƷŷĻ ŅƚƌƌƚǞźƓŭʹ ЊΜ ƭŷğƦĻ ğƓķ ķźƒĻƓƭźƚƓƭ ƚŅ ƷŷĻ ƩĻğƌ ƦƩƚƦĻƩƷǤͳ ЋΜ ƌƚĭğƷźƚƓ ƚŅ ĻǣźƭƷźƓŭ ƭƷƩǒĭƷǒƩĻƭ ğƓķ źƓŅƩğƭƷƩǒĭƷǒƩĻ źƒƦƩƚǝĻƒĻƓƷƭͳ ğƓķ ЌΜ ƭźǩĻͲ ğŭĻͲ ŷĻğƌƷŷ ğƓķ ƭƦĻĭźĻƭ ƚŅ ƷƩĻĻƭ ƭƚǒŭŷƷ Ʒƚ ĬĻ ƦƩƚƷĻĭƷĻķ͵ The proposed relief will not have an impact on existing trees or desired flora. The Property currently has several street trees along the street frontages. Petitioner has hired an arborist and submitted an arborists report with the site plan application for the Project to determine whether any trees can be saved. Street trees will be provided along all to habitable space along the upper levels of the garage and is required to provide a safe and functioning garage facility. As noted above, the garage has been designed to continue the appearance of the livable space in the associated residential building. As such, this criteria is not applicable to the Project. ΛĻΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ Ǟźƌƌ ŷğǝĻ ğƓ ğķǝĻƩƭĻ ĻƓǝźƩƚƓƒĻƓƷğƌ źƒƦğĭƷ ƷŷğƷ ĭğƓƓƚƷ ĬĻ ƦƩĻǝĻƓƷĻķ ĬǤ ƷŷĻ źƒƦƚƭźƷźƚƓ ƚŅ ĭƚƓķźƷźƚƓƭ͵ The proposed request will not have an adverse environmental impact. As noted in more detail above, this specific request relates to habitable space along the upper levels of the garage and is required to provide a safe and functioning garage facility. The garage has been also designed to continue the appearance of the livable space in the associated residential building. The Project will further redevelop this vacant lot with a luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. As such, this request will not have an adverse environmental impact. ΛŅΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ Ǟźƌƌ ŷğǝĻ ğƓ ğķǝĻƩƭĻ źƒƦğĭƷ ƚƓ ƦƩƚƦĻƩƷǤ ǝğƌǒĻƭ ƚŅ ğĬǒƷƷźƓŭ ƚƩ ğķƆğĭĻƓƷ ƌğƓķ͵ The proposed request will not have an adverse impact on property values of abutting or adjacent land. The Property is currently vacant. The Project seeks to redevelop this vacant lot with a luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. Further, this request the Property is further located within the TOD CRA Downtown Master Plan. This particular district is intended to create a downtown core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. As such, this request will not have an adverse impact on property values. ΛŭΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ Ǟźƌƌ ƭĻƩźƚǒƭƌǤ ƩĻķǒĭĻ ƷŷĻ ƨǒğƌźƷǤ ƚƩ ƨǒğƓƷźƷǤ ƚŅ ƌźŭŷƷ ğƓķ ğźƩ ğǝğźƌğĬƌĻ Ʒƚ ğķƆğĭĻƓƷ ƦƩƚƦĻƩƷźĻƭ͵ The request will not reduce the quality or quantity of light and air available to adjacent properties. The request relates to an area internal to the garage on the upper levels. As noted in more detail above, this specific request relates to habitable space along the upper levels of the garage and is required to provide a safe and functioning garage facility. The garage has been also designed to continue the appearance of the livable space in the associated residential building. As such, it will not impact the quality or quantity of light or air available to adjacent properties. ΛŷΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ źƭ ƓĻĭĻƭƭğƩǤ Ʒƚ ŅǒƩƷŷĻƩ ƷŷĻ ƚĬƆĻĭƷźǝĻƭ ƚŅ ƷŷĻ ĭźƷǤ Ʒƚ ğƭƭźƭƷ ǞźƷŷ ĻĭƚƓƚƒźĭ ķĻǝĻƌƚƦƒĻƓƷ ğƓķ ĬǒƭźƓĻƭƭ ƦƩƚƒƚƷźƚƓ͵ As noted above, the Property is further located within the TOD District around the future transit station core that builds momentum for other redevelopment, allowing for provisions today which will accomplish the long-term vision of the commuter rail transit station. This district creates transit-supportive densities within walking distance of the marina and the future transit station. Redevelopment of the Property with high density residential development and a ground-floor retail component coincides with the goal contemplated by the TOD district. properties that have been rezoned to the MU-H district, as proposed by Petitioner. Specifically, the Project is consistent with the high densities of the Marina Village Condominium to the east of the Property and the Casa Costa project (f/k/a Promenade) to the north, which have been developed with high-density residential projects and with the property at the southwest corner of Federal Highway and Ocean Avenue which also allows residential densities of up to one hundred (100) dwelling units per acre. It is clear by zoning district that high-density and mixed-use residential projects are desired for the Property as it is in close proximity to the marina and future transit station. The Project proposes a high-quality development that serves the redevelopment needs for this particular area of the City. The request is necessary to redevelop this vacant lot with the Project which contains luxury residential units that will serve the community. The proposed Project is compatible with development in the adjacent areas with high-density residential development to the north and east, as well as the commercial redevelopment in the area. Further, it provides access to adjacent municipalities because of its proximity to both the Federal Highway thoroughfare, I-95 and the future transit station, making it an ideal location for residential development as individual can easily commute from home to work. The Project will help satisfy a community need and is compatible with surrounding residential and commercial development. As such, the request is consistent with this criteria. ΛźΜ ‘ŷĻƷŷĻƩ ƷŷĻ ƦƩƚƦƚƭĻķ ƩĻƨǒĻƭƷ ƒĻĻƷƭ ƷŷĻ ƦǒƩƦƚƭĻ ğƓķ źƓƷĻƓƷ ƚŅ ƷŷĻƭĻ ƩĻŭǒƌğƷźƚƓƭ ĬǒƷ ĭƚƓŅƌźĭƷƭ ǞźƷŷ ğƓƚƷŷĻƩ ƭźƷĻ ķĻǝĻƌƚƦƒĻƓƷ ƭƷğƓķğƩķ ƚƩ ƩĻƨǒźƩĻƒĻƓƷͲ źƓĭƌǒķźƓŭ ƭǒƭƷğźƓğĬƌĻ ķĻǝĻƌƚƦƒĻƓƷ ğƓķ ŭƩĻĻƓ źƓźƷźğƷźǝĻƭ͵ The intent of this provision is to ensure there are active uses along pedestrian walkways and to create the feeling of a vibrant, dynamic building along visible thoroughfares. Petitioner has designed the Project to provide habitable space on the ground level along the entire Federal Highway frontage. By providing ground level retail along the garage, Petitioner is creating an active pedestrian experience that will bring life to this corridor. On the upper levels of the garage, Petitioner is requesting relief to allow for uninhabitable space along the garage façade fronting Federal Highway. The garage has been designed to continue the appearance of the residential units along this façade to create the same feel of livable space. The garage area uses similar architectural features and designs which makes it difficult to distinguish the habitable space from the inhabitable space that is the garage. The addition of habitable space along Federal Highway would create a hazardous condition through the garage as ramps would be shorter and steeper in order to accommodate additional habitable areas. Rather, Petitioner is creating the same appearance of habitable space along the garage frontage by continuing the same architectural design elements along the garage façade. As such, the relief requested complies with this criteria. EXHIBIT “D” CONDITIONS OF APPROVAL Project Name: Ocean One File number: CDPA 17-001 & 17-002 Reference: 5threview plans identified as a New Site Plan with a February 13, 2017 Planning and Zoning Department date stamp marking. INCLUDEREJECT DEPARTMENTS ENGINEERING / PUBLIC WORKS / FORESTRY / UTILITIES Comments: None. FIRE Comments: None. POLICE Comments: None. BUILDING DIVISION Comments: None. PARKS AND RECREATION Comments: None. PLANNING AND ZONING Comments: 1. Approval is subject to approval of the concurrent applications for Rezoning, New Site Plan and Abandonment. COMMUNITY REDEVELOPMENT AGENCY Comments: None. PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: To be determined. Ocean One (CDPA 17-001 & 17-002) Conditions of Approval Page 2 of 2 INCLUDEREJECT DEPARTMENTS CITY COMMISSION CONDITIONS Comments: To be determined. S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\CDPA 17-001 & 17-002\\COA.doc DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: Ocean One (CDPA 17-001 & 17-002) APPLICANT: Davis Camalier, Ocean One Boynton LLC APPLICANT’S ADDRESS: 9816 S. Military Trail, Suite C2-3, Boynton Beach, FL 33436 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: April 4, 2017 APPROVAL SOUGHT: Requests for a Community Design Appeal approval of 1) Chapter 3, Article III, Section 5.C., “Build-to-line”, which requires buildings to be constructed with a build-to-line of 0 to 15 feet, to allow a setback of approximately 19 feet; and 2) Chapter 4, Article III, Section 6.F., “Off-Street Parking Area Standards”, which requires facades of parking garages that front on an arterial or collector roadway to be wrapped with habitable space. LOCATION OF PROPERTY: 114 N. Federal Highway DRAWING(S): SEE EXHIBIT “B” ATTACHED HERETO. ________ THIS MATTER was presented to the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the approval sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the approval sought was made by the Applicant in a manner consistent with the requirements of the City’s Land Development Regulations. 2. The Applicant ___ HAS ___ HAS NOT established by substantial competent evidence a basis for the approval requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit “C” with notation “Included.” 4. The Applicant’s request is hereby ___ GRANTED subject to the conditions referenced in paragraph 3 above. ___ DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other: _______________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ DATED:__________________________ _____________________________________________ City Clerk S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\CDPA 17-001 & 17-002\\DO.doc NEW BUSINESS 7.A.4 Ocean One (NWSP 16-002) New Site Plan Ocean One Staff Report (NWSP 16-002) Memorandum No PZ 17-005 Page 2 North:Right-of-way for Boynton Beach Boulevard and farther north is a developed mix use project (Casa Costa) zoned MU-H (Mixed Use-High); South:Vacant land designated as Phase II of the Ocean One project and farther south is right-of-way for Ocean Avenue; th East:Right-of-way for NE 6 Court and father east are developed properties (First Financial Building) zoned CBD (Central Business District) and Marina Village zoned MU-H (Mixed Use-High); and West:Right-of-way for Federal Highway and farther west is developed commercial properties zoned CBD (Central Business District). To the southwest is the Ocean 500 project currently under construction and zoned MU-H (Mixed Use-High). PROPERTY OWNER NOTIFICATION Owners of properties within 400 feet of the subject request were mailed a notice of this request and its respective hearing dates. The applicant certifies that they posted signage and mailed notices in accordance with Ordinance No. 04-007. BACKGROUND Proposal: Ms. Bonnie Miskel, agent for Ocean One Boynton LLC, is requesting approval of several concurrent applications for the development of the Ocean One project. The first application is to rezone the property from CBD (Central Business District) to MU-H (Mixed Use-High), including a two-phase master plan that would allow the construction of a total of 358 multi-family residential units (rental apartments), a 120-room hotel and 12,075 square feet of commercial space. The second application is for new site plan approval for Phase I of the project (north portion), which proposes 231 dwelling units within an eight (8)-story building, 8,575 square feet of commercial space, and associated recreational amenities and parking. The next two (2) applications are for community design appeal; one for the northernmost build-to-line deviation and the other for a deviation from the requirement to completely wrap the parking garage along Federal Highway with habitable space. Lastly, an application has been submitted for abandonment of a portion of Boynton Beach Boulevard, east of Federal th Highway, and a ten (10) foot strip of NE 6 Court in exchange for a dedication of a ten (10) foot strip of the west side of the property to the Federal Highway right-of-way. The one (1) block site in the heart of downtown is currently vacant and was previously developed with a motel and bank. The Community Redevelopment Agency is the owner of the northerly portion of the Phase I site and has provided the applicant authorization to submit applications for Ocean One Staff Report (NWSP 16-002) Memorandum No PZ 17-005 Page 3 development. Phase II of the master plan (the southern portion of the site) will be subject to separate site plan review. ANALYSIS Concurrency: Traffic: A traffic study was sent to the Palm Beach County Traffic Division for their review and information and they have responded that the project is located within the boundaries of the City of Boynton Beach TCEA (Traffic Concurrency Exception Area) and therefore meets the Palm Beach County Traffic Performance Standards. The traffic study was performed for both phases, and indicates that the project would generate a total of 217 AM Peak Hour trips and 310 PM Peak Hour trips. School: The School District of Palm Beach County has confirmed that area schools have adequate capacity to accommodate the potential public school students who will reside in the proposed dwelling units with their families. Utilities:The City’s water capacity, as increased through the purchase of up to five (5) million gallons of potable water per day from Palm Beach County Utilities, would meet the projected potable water for this project. Sufficient sanitary sewer and wastewater treatment capacity is also currently available to serve the project. The applicant will be making several upgrades to utility lines in the vicinity of the project as part of the site development. Police/Fire: The Police Department has reviewed the site plan and all review comments have been acknowledged by the applicant and will be addressed at the time of permitting. The Fire Department notes that they will be able to provide an adequate level of service for this project with current or expected infrastructure and/or staffing levels. Further plan review by Police and Fire will occur during the building permit process. Drainage:Conceptual drainage information was provided for the City’s review. The Engineering Division has found the conceptual information to be adequate and is recommending that the review of specific drainage solutions be deferred until time of permit review. The developer will be constructing in close proximity to the City’s 72” RCP storm line, and will be required to inspect and video the line in advance and post construction (see Exhibit “C” – Conditions of Approval). Access:Three (3) points of ingress/egress are proposed for the project, one of which is located on Federal Highway, near the midpoint of the block. This right- in/right-out only driveway acts as a service drive, providing access to the surface parking lot to the south, the garage entrance to the north, and also thth through access to NE 6 Court. The second is located on NE 6 Court at the east terminus of the service drive noted above. The third driveway provides th direct entry into the parking garage from NE 6 Court. Sidewalks are provided completely around the site, with the sidewalk Ocean One Staff Report (NWSP 16-002) Memorandum No PZ 17-005 Page 4 th proposed along NE 6 Court at a minimum of 7 feet in width and 10 feet in width along Ocean Avenue and Boynton Beach Boulevard. The sidewalk along Federal Highway is proposed at 19 feet in width, within which landscape planters would be spaced in rhythym along the front of the building. Segments of the sidewalk along Federal Highway will be covered by an arcade, with a minimum of 8 feet of clear/uninterupted walk underneath. There are also two (2) separate plazas proposed to encourage pedestrian interaction, with the first located at the NW corner of the site. A second plaza is proposed in Phase II, at the SW corner of the block. Parking:Off-street parking for the MU-H zoning district requires 1.33 parking spaces for one-bedroom units and 1.66 parking spaces two (2) or more bedroom units. Phase I of the project proposes 231 units (a mixture of one and two, bedrooms), which would require 335 parking spaces. Additionally, the code requires the provision of guest parking at a rate of 0.15 spaces per unit, which adds another 35 parking spaces to the total. The commercial space, which would allow a mix of retail, office and restaurant uses, requires one (1) parking space per 200 square feet of gross floor area. The site plan proposes 8,575 square feet of retail, thereby requiring an additional 43 parking spaces. Under this standard methodology for calculating required off- street parking spaces, a grand total of 413 parking spaces would be required. The site plan proposes 438 parking spaces, or an excess of 25 spaces. Regular parking space dimensions would conform to code requirements for the CRA of 9 feet by 18 feet for 90 degree parking and 9 feet by 25 feet for parallel spaces. Handicap spaces would be dimensioned 12 feet wide by 18 feet in length. The applicant is proposing a seven (7)-story parking garage that would accommodate up to 359 vehicles. A resident gate would be placed at the top of the first floor ramp, with a turnaround space for non-residents. The developer will be required to comply with the City’s residential parking requirements to ensure that the designated resident parking spaces are reserved for, and made available to the residents, so that there is no reason for residents to utilize guest and retail parking spaces. This requirement shall be monitored and enforced by the developer (see Exhibit “C” – Conditions of Approval). A surface parking lot is located immediately south of the parking structure and would accommodate 40 parking spaces. There are also five (5) parallel parking spaces on the south side of the service drive off of Federal Highway, and 34 spaces proposed on-street, around the perimeter of the site. Staff notes that the parking and any landscaping proposed in state rights-of-way is subject to FDOT approval (see Exhibit “C” – Conditions of Approval), and that the provision of on-street parking is strongly promoted by staff, which will support the applicant’s efforts with FDOT. Lastly, as parking for Phase I of the project is depicted on the Phase II portion of the site, these parking improvements will need to be constructed as part of the Phase I project and a Unity of Title, Unity of Control or an alternative legal instrument acceptable to the City Attorney will be required to be executed prior to issuance of any permits (see Exhibit “C” – Conditions of Approval). Ocean One Staff Report (NWSP 16-002) Memorandum No PZ 17-005 Page 5 Landscaping: The Plant List (Sheets L1.00 & L1.01) indicates that the project would add a total of 179 canopy and palm trees, 1,442 accent and shrub specimens, and 3,623 small shrubs/groundcover plants. All plant materials to be used in the landscape design are required to be Florida number one grade and must be identified as having “low” or “medium” watering needs in the South Florida Water Management’s “Waterwise” publication. The proposed tree species would include the following: Oak, Gumbo Limbo, Silver Buttonwood and East Palatka Holly trees. Palm species would include Medjool Date, Montgomery, Thatch, and Sabal. Projects proposed in the Mixed Use High (MU-H) zoning district are subject to the “Streetscape Design” portion of the landscape code regulations. These code provisions recognize the desire for reduced building setbacks and encourage building placement abutting the street, thus creating an urban setting. The purpose of the “Streetscape Design” concept is to create a landscape design that encompasses both the private and public domain, to blend the two areas into one unified landscape scheme and pedestrian experience. This is accomplished through hardscape and landscape choices, covered walkways (arcades, awnings, tree canopy), and streetscape amenities (benches/seatwalls, lighting, accent plantings). The landscape design proposed by the applicant depicts the use of street trees and covered arcades to create the streetscape theme, with the lower landscape material placed at points along the building foundation and between the street and sidewalk, in an effort to provide maximum clear pedestrian pathways. The applicant has worked with staff to provide the street trees and covered walkways necessary to meet the required 50% shaded sidewalk along building frontages along arterial roadways. As noted on the drawings the landscaping of the south portion of the master plan site and along the rights-of-way will be accomplished as part of Phase I. Building and Site: The proposed master plan site area totals 3.58 acres, while the site area of Phase I is 1.93 acres, plus those components in Phase II to be completed in Phase I. The dwelling units are located above the retail spaces fronting Federal Highway and Boynton Beach Boulevard, and wrapping the ground floor amenity deck, with the garage structure connected to the south end of the mixed use building. The retail portion of Phase I of the project totals 8,575 square feet and borders the public plaza at the NW corner of the site. The parking garage, as noted previously, has seven (7) levels of parking, with dedicated resident parking beginning on the second level, behind gate access and continuing to the top. Of the 231 residential units, 152 are studio or one (1) bedroom and 79 are two (2) bedroom units. The units range in size from a 560 square foot studio unit to a 1,600 square foot, 2 bedroom/2 bath unit. Each unit also has a balcony or terrace that either faces out towards the street or in towards the courtyard. Relative to the floor area ratio (FAR) regulations within the code, the Mixed Use High (MU-H) zoning district has a maximum FAR of 4.0. The project is Ocean One Staff Report (NWSP 16-002) Memorandum No PZ 17-005 Page 6 also located within the “Transit Core” (1/4 mile radius of the station), which requires that new development have a minimum density of 40 dwelling units per acre and maximum of 100 dwelling units per acre (116.7 du/ac proposed) and a minumum FAR of 2.0 (3.26 proposed). As the density proposed in Phase I of the project relies upon the entire master plan site in order to comply with the maximum density regulations, staff once again notes the condition of approval requiring the applicant to record a Unity of Title, Unity of Control or an alternate legal instrument acceptable to the City Attorney prior to issuance of any permits (see Exhibit “C” – Conditions of Approval). Phase II of the project proposes 127 dwelling units, in order to comply with the maximum 100 dwelling units per acre for the entire site (358 units on 3.58 acres). As noted earlier, the applicant is requesting the abandonment of a portion of the right-of-way of Boynton Beach Boulevard east of Federal Highway (ABAN 17-001). The area of request currently includes the pavered and th landscaped sidewalk and right turn lane onto NE 6 Court. Projected traffic volumes indicate the lane is not warranted, and therefore unnecessary. The applicant will be providing the City a sidewalk easement to compensate the loss of the existing improvements, and create an even more enhanced pedestrian environment. Additionally, the request includes the abandonment th of the west 10 feet of NE 6 Court, to compensate for the 10 feet of the applicant’s property to be dedicated from the west side of the project to the Florida Department of Transportation to expand the Federal Highway right- of-way. This is intended to facilitate the provision of on-street parking as requested by the City. Staff is recommending approval of the applications as being in the City’s best interest. Building Height: The maximum building height allowed in the Mixed Use High (MU-H) zoning district is 150 feet. The proposed building elevations depict the typical roof deck height of the residential building at 85.5 feet, with typical parapet walls at approximately 90 feet. Tower elements/architectural treatments would extend up to 110 feet, 40 feet below the maximum allowable height allowed in the MU-H and comparable with previously approved projects in the immediate vicinity. The Casa Costa project to the north has a roof deck at 142 feet, and roof elements extending to 167 feet in height, through approval of a height exception. The Marina Village project to the east has a roof deck at 144 feet, and roof elements extending to 168 feet in height, also acheived through approval of a height exception. The 500 Ocean Project to the southwest of the site was approved with a roof deck at 59 feet and tower elements reaching 75 feet in height. The garage structure for Ocean One is depicted with staggered and repeating parapet wall heights varying between 67 feet and 71.5 feet Setbacks:The MU-H zoning district requires no building setbacks, but rather a zero (0) build-to line. However, the building setbacks may be increased up to 15 feet administratively, without benefit of a community design appeal, in areas where the intent is to 1) enhance public spaces such as sidewalks, plazas, fountains, or outdoor seating areas; 2) optimize landscape design; 3) maximize on-site drainage solutions; and/or 4) accommodate architectural Ocean One Staff Report (NWSP 16-002) Memorandum No PZ 17-005 Page 7 features and building enhancements. This requirement would apply to all building facades fronting on a street. The building setback is measured from the property line to the exterior surface of the building or supporting columns. Along Federal Highway, the proposed building setback along the length of the building, with the 8 foot wide arcade, is between zero and one foot to the arcade columns, and 10 feet in front of the garage, south of the th arcade. Along NE 6 Court, the building and balcony/terraces range in setback from 3.1 feet to nearly 10.2 feet. The south side of the project is 266 feet from Ocean Avenue; however, the proposed Phase II buildings are intended to meet the build-to line, with the exception of a grand landscaped courtyard designed in the center. Finally, along the north property line abutting Boynton Beach Boulevard, the setback varies from 15 feet to certain building columns, to nearly 19 feet, and nearly 45 feet at the plaza. This side of the building exceeds the allowable build-to requirement, necessitating community design appeal approval, which the applicant submitted for review (CDPA 17-002). The greater setback has allowed for a more active pedestrian environment, greater opportunities for larger planting areas to facilitate a grander planting scheme (allowing for the placement of large Medjool Date palms and 24 foot tall Oak trees), and creating a more prominent entry into the Marina District. A thorough review of the setbacks and site design was conducted by staff, who concluded that the benefits associated with the larger setback outweigh the requirement for the building to be placed closer to the right-of-way. Amenities: As noted above, the master plan depicts the inclusion of two (2) plazas along Federal Highway, located at the NW and SW corners of the site. The Phase I plaza is located at NW the corner (Federal Highway & Boynton Beach Boulevard) and is 2,122 square feet, providing for a nice focal point for the project and enhanced entrance to the Marina District. The project has also been designed with a large interior pool courtyard for resident use, containing the community pool, spa, summer kitchen/grill stations, outdoor dining areas, fountain wall and lush tropical landscaping. The amenities located within the building include a clubhouse with three (3) club rooms, large screen TV’s, business center, concierge service and interior bike storage. A separate health club is proposed fronting on Federal Highway. The developer will also be working with Palm Tran of Palm Beach County to relocate and create a new transit shelter, designed utilizing some of the architectural characteristics of the mixed use project. Design:The proposed building has a contemporary design, featuring a smooth stucco finish, parapet roof with tower features, decorative cornices and banding, modulation of the facades, balconies with decorative aluminum railings, building score lines, stone veneers and trims, fabric awnings, decorative grilles, arcades, and an earthtone color palette. Lighting:The photometric plans (Sheets PH-1 & PH-2) include 35 freestanding pole light fixtures, all of which would be 21.5 feet in height, with the light fixture at 18 feet, and designed to match the poles and light fixture design the City has already adopted along the Casa Costa, 500 Ocean and Boynton Promenade projects. The poles and fixtures would be constructed of cast aluminum, Ocean One Staff Report (NWSP 16-002) Memorandum No PZ 17-005 Page 8 black in color and the light fixtures would have a flat lens to ensure the on- site illumination would not “spill over” onto adjacent properties and rights-of- way as required by code. There are no spot readings in excess of the maximum 5.9 foot-candles allowed. Signage: Site and building signage has not been finalized and a Sign Program will need to be approved for the site prior to requesting any sign permits for the site (see Exhibit “C” – Conditions of Approval). Public Art: The project is subject to the Art in Public Places requirement, and the applicant has been in discussions with the Public Arts Administrator regarding the art and its placement. The proposed location is the west building elevation along Federal Highway. According to the proposed construction estimates, the project would have an art budget of approximately $283,500. RECOMMENDATION Staff has reviewed this request for a new site plan and recommends APPROVAL, subject to approval of the accompanying applications and satisfying all comments indicated in Exhibit “C” – Conditions of Approval. Any additional conditions recommended by the Board or required by the City Commission shall be documented accordingly in the Conditions of Approval. S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\NWSP 16-002\\Staff Report.doc EXHIBIT "A" SITE LOCATION MAP ve rd A E 3 N NE 2nd Ave Blvd n Beach E Boynto SITE 1st Ave NE Ocean Ave E 1st Pl SE E 1st Ave S ¯ ve t A E 1s S 0204080120160 Feet Source: Palm Beach County GIS Digital Data 2006-2015 Copyright Palm Beach County Florida 2006-2015 All rights reserved - Subject to a Licence Agreement ENLARGED TYPICAL LEVEL PLAN ELEVATIONS A4.0 ELEVATIONS A4.1 BUILDING SECTIONS A5.0 A-A N.T.S. B-BB-B KEY PLAN A-A SL PLANTN ELL LT PTNAL " LAYER  STNE BEL RATETE ASED RER RK N TREE PENN SL PLANTN TREE R PALM TRNKENTER N PENN " LAYER TE ASEDPENN LEEL T RATE RER RK N TREE P N  ABE D L KP N M    P KPP  M K K LLAP KK A A  L KP  A  P P A  L A  P  D E  A A    L K L K L P M P P M    P   P  K PP   Cast from 100% recycled Iron, opening for pedestriansafety and A.D.ACompliance. 1/4 Maximum slot N P  L K K L two sections. Two covers as shown. 72" x 72" tree grate in lightwells with bolted P N   TREE GRATE 7208-1STARBURST  N L K  P  P B A  EXHIBIT “C” Conditions of Approval Project Name: Ocean One File number: NWSP 16-002 th Reference: 5 review of plans identified as a New Site Plan with a February 13, 2017 Planning and Zoning Department date stamp marking. INCLUDEREJECT DEPARTMENTS ENGINEERING / PUBLIC WORKS / FORESTRY / UTILITIES Comments: 1. Please note if triggered in the pending FDOT pre-application letter, a 12 foot wide right turn lane with appropriate storage and transition shall be provided on Federal Highway. If the turn lane is not required, a 30 foot turning radius shall be provided in the permitting phase. 2. Proposed bus shelter/stop location is contingent upon Palm Tran approval. Please coordinate with Palm Tran. 3. At time of permit submittal, please demonstrate compliance with ADA requirements for H/C parallel parking space along Federal Highway. 4. Developer will be responsible for replacement of existing FPL Street lighting adjacent to site with underground decorative street lighting to match existing poles and fixtures adjacent to property at Boynton Beach Boulevard. 5. At time of permit submittal, please demonstrate sight lines meet FDOT Standard Index 546 for the sight triangles along Federal Highway. 6. Please note that the City will require the 72” RCP storm line to be inspected via diver (pre and post construction) at the applicant’s cost. Dive shall be video recorded and findings presented in a report. 7. At time of building permit submittal, please provide specific details on how the footer will be built to prevent damaging the City’s 72” RCP storm pipe. 8. Please provide a proposed addressing plan. Addressing plan indicating all possible addresses for site, including all commercial spaces and units is required, prior to submittal of building permits. Ocean One (NWSP 16-002) Conditions of Approval Page 2 of 4 INCLUDEREJECT DEPARTMENTS 9. Where public sidewalk is provided on private property, a 5 foot wide or larger easement will be required to be dedicated to the City prior to issuance of any permits. Indicate location of all public access easements and on all cross sections. 10. Any public drainage system that crosses on to private property will require a drainage easement. 11. Any existing easements, but specifically FPL, located on the property not proposed to be retained, will have to be vacated prior to permit issuance for building. 12. The existing 6-inch AC pipe along U.S.1 will be removed; therefore, the proposed fire hydrant cannot be connected to that line, as depicted. Per our last meeting on October 12, 2016, the following alternatives were proposed by the Utility Director: a. Remove and replace the existing line, and connect the hydrant to the new line, or b. Extend the water main from the fire hydrant on SW corner of the property to the U.S. 1 entrance, and connect the proposed fire hydrant. 13. The Developer shall, upon completion of the site improvements, install a ¾” course of Type S-III asphalt on Boynton Beach Boulevard, from Federal Highway’s eastern edge of pavement to the concrete header curb forming the paver crosswalk at NE 6th Court. This requirement serves to overlay the existing road and conceal the road repairs resulting from the Developer’s connecting with utilities under the paved road. 14. Each restaurant shall have its own grease trap. 15. At time of permit submittal, please provide an additional utility sheet that only shows site plan and proposed work. FIRE Comments: All previous comments addressed at DART meeting. POLICE Comments: All previous comments addressed at DART meeting. BUILDING Comments:All previous comments addressed at DART meeting. Ocean One (NWSP 16-002) Conditions of Approval Page 3 of 4 INCLUDEREJECT DEPARTMENTS PARKS AND RECREATION Comments: 16. Per City Ordinance, the Park Impact Fee is based upon a factor of $595 per unit for multi-family dwellings. Based upon the proposed 231 units in Phase I, the fee will be $137,445 (231 X $595). The fees associated with Phase II will be determined at time of site plan submittal for that portion of the site. PLANNING AND ZONING Comments: 17. It is the applicant’s responsibility to ensure that the application requests are publicly advertised in accordance with Ordinance 04- 007 and Ordinance 05-004 and an affidavit provided to the City Clerk and Planning & Zoning. 18. The garage shall be lined with commercial spaces on Federal Highway and wrapped on upper floors by habitable space anywhere the project has frontage on a public street per the LDR, Chapter 4, Article 3, Section 6.F.2.d., or an application for Community Design Plan Appeal must be approved as part of the project approval. 19. On Sheet C4.00 and the Master Plan, the building setback from the north property line appears to be approximately 19 feet. The build-to line required for Mixed Use High zoning is zero (0) feet, with an allowance of up to 15 feet for various design considerations. An application for Community Design Plan Appeal must be approved as part of the project approval in order to deviate from this design detail. 20. With the provision of the turnaround space at the gate in the parking garage, one parking space was lost, reducing the parking on that level from 55 to 54, total garage parking from 360 to 359 spaces, and reducing the excess parking to 25 spaces. At time of permitting, please revise all sheets to correspond accordingly. 21. Since Phase 1 of the project relies upon the entire site to meet the density and parking requirements, a Unity of Title, Unity of Control, or an alternate legal instrument acceptable to the City Attorney will be required for the entire site prior to the issuance of any permits. 22. At time of permit submittal, please provide a narrative explaining how parking will be monitored to ensure residents are not parking in guest and retail parking spaces. Ocean One (NWSP 16-002) Conditions of Approval Page 4 of 4 INCLUDEREJECT DEPARTMENTS 23. Please know that on-street parking is supported by this Division, and that parking and any landscaping proposed in the Federal Highway right-of-way is subject to FDOT approval. Should any changes result from FDOT permitting in the design or number of parking spaces, the site plan will be required to be modified accordingly. 24. Clearly depict any proposed sign band where signage will be allowed on the building. As depicted, the sign locations do not appear to meet code. A subsequent site plan modification may be necessary for facade changes to accommodate tenant signage. 25. A Sign Program will be required for building identification and tenants. 26. Any review and approval of the project is subject to approval of the concurrent right-of-way abandonment request. COMMUNITY REDEVELOPMENT AGENCY Comments: 27. Please ensure a well-designed parking sign plan is in place to direct the public to parking entry. PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: To be determined. CITY COMMISSION CONDITIONS Comments: To be determined. S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\NWSP 16-002\\COA.doc DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: Ocean One (NWSP 16-002) APPLICANT: Davis Camalier, Ocean One Boynton LLC APPLICANT’S ADDRESS: 9816 S. Military Trail, Suite C2-3, Boynton Beach, FL 33436 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: April 4, 2017 APPROVAL SOUGHT: Request for New Site Plan approval for multi-family residential (rental apartments) consisting of 231 dwelling units within an eight (8)-story building, retail space, and associated recreational amenities and parking on 1.93 acres. LOCATION OF PROPERTY: 114 N. Federal Highway DRAWING(S): SEE EXHIBIT “B” ATTACHED HERETO. ________ THIS MATTER was presented to the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the approval sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the approval sought was made by the Applicant in a manner consistent with the requirements of the City’s Land Development Regulations. 2. The Applicant ___ HAS ___ HAS NOT established by substantial competent evidence a basis for the approval requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit “C” with notation “Included.” 4. The Applicant’s request is hereby ___ GRANTED subject to the conditions referenced in paragraph 3 above. ___ DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other: _______________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ DATED:__________________________ _____________________________________________ City Clerk S:\\Planning\\SHARED\\WP\\PROJECTS\\Ocean One\\NWSP 16-002\\DO.doc