R17-041 1 RESOLUTION NO. R17-041
2 A RESOLUTION OF THE CITY OF BOYNTON BEACH,
3 FLORIDA, AUTHORIZING CHANGE ORDER #1 TO MC
TEAGUE CONSTRUCTION IN THE AMOUNT OF $30,100 FOR
THE PURPOSE OF CORRECTING UNKNOWN CONDITIONS
• DURING HESTER CENTER LOBBY RENOVATION,
REVISING THE ESTIMATED PROJECT COSTS FROM $53,150
TO $83,230; AND PROVIDING AN EFFECTIVE DATE.
9
10 WHEREAS, the City of Boynton Beach has reviewed Change Order#1 requested by
11 McTeague Construction for the purpose of correcting conditions that were discovered during
1 the Hester Center Lobby Renovations such as rebuilding the exterior components of the wall
13 in the amount of$30,100 and has determined that the contract changes set forth therein are
14 both necessary and appropriate.
1 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
1. THE CITY OF BOYNTON BEACH, FLORIDA, THAT:
1 Section 1: The foregoing "Whereas" clauses are hereby ratified and confirmed as
1 being true and correct and are hereby made a specific part of this Resolution upon adoption
1• hereof.
21 Section 2. The City Commission of the City of Boynton Beach, Florida does
21 hereby authorize execution of Change Order#1 requested by McTeague Construction for the
2. purpose of correcting conditions that were discovered during the Hester Center Lobby
2 ' Renovations such as rebuilding the exterior components of the wall in the amount of
241 $30,100, revising the estimated project costs from $53,150 to $83,230, a copy of the Change
2 Order#1 is attached hereto as Exhibit"A".
2: Section 3. The City Commission of the City of Boynton Beach,_ Florida does
C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\Temporary Internet
Piles\Content.IE5\VAGZE6PO\Change_Order_1_McTeague_Constru ction_-_Reso.doc
27 hereby approve and authorize execution of Change Order#1 by the City Manager.
28 Section 4. This Resolution shall become effective immediately upon passage.
29 PASSED AND ADOPTED this�i day of !ud , 2017.
30 CITY OF BOYNTON BEACH, FLORIDA
31
32 YES NO
33
34 Mayor—Steven B. Grant
35
36 Vice Mayor—Justin Katz
37
38 Commissioner—Mack McCray 1r
39
40 Commissioner—Christina L. Romelus
41
42 Commissioner—Joe Casello
43
44
45 VOTE S.-'0
46
47 ATTEST:
48
49 r ��{
50
51 Judt(A. Pyle, CMC
52 Ci Clerk
54 i..,
55 .
56 (Corporate Seal) 103
VA
4r
57 AVS
z
At
C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\Temporary Internet
Files\Content.IE5\VAGZE6P0\Change_Order_l_McTeague_Construction_-_Reso.doc
McTeague Construction Co., Inc.
POSPOSAL
City of Boynton Beach March 30 2017
222 N.E. 9th Ave
Boynton Beach FL 33435
Attn: Gail Mooyz
Project: Hester Center C.O. 1
1. Remove all stucco and plywood on existing entrance and east side of Hester center
2. Install 5/8 plywood on existing metal frames
3. Install 30lb felt on plywood
4. Install wire lath and stucco over plywood
5. Remove and install metal cap on parpit wall
6. Install new 2x4 bucks-for=windows
7. Additional time required 20 days
Total -$ 19;100:00
Michael H McTeague
McTeague Construction Co Inc.
624 S.E.Central Parkway Stuart FL 34994(772)286-6100 Fax(772)286-7130 E-mail mcteagueconstruct@att.net