Loading...
R17-041 1 RESOLUTION NO. R17-041 2 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 3 FLORIDA, AUTHORIZING CHANGE ORDER #1 TO MC TEAGUE CONSTRUCTION IN THE AMOUNT OF $30,100 FOR THE PURPOSE OF CORRECTING UNKNOWN CONDITIONS • DURING HESTER CENTER LOBBY RENOVATION, REVISING THE ESTIMATED PROJECT COSTS FROM $53,150 TO $83,230; AND PROVIDING AN EFFECTIVE DATE. 9 10 WHEREAS, the City of Boynton Beach has reviewed Change Order#1 requested by 11 McTeague Construction for the purpose of correcting conditions that were discovered during 1 the Hester Center Lobby Renovations such as rebuilding the exterior components of the wall 13 in the amount of$30,100 and has determined that the contract changes set forth therein are 14 both necessary and appropriate. 1 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 1. THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 1 Section 1: The foregoing "Whereas" clauses are hereby ratified and confirmed as 1 being true and correct and are hereby made a specific part of this Resolution upon adoption 1• hereof. 21 Section 2. The City Commission of the City of Boynton Beach, Florida does 21 hereby authorize execution of Change Order#1 requested by McTeague Construction for the 2. purpose of correcting conditions that were discovered during the Hester Center Lobby 2 ' Renovations such as rebuilding the exterior components of the wall in the amount of 241 $30,100, revising the estimated project costs from $53,150 to $83,230, a copy of the Change 2 Order#1 is attached hereto as Exhibit"A". 2: Section 3. The City Commission of the City of Boynton Beach,_ Florida does C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\Temporary Internet Piles\Content.IE5\VAGZE6PO\Change_Order_1_McTeague_Constru ction_-_Reso.doc 27 hereby approve and authorize execution of Change Order#1 by the City Manager. 28 Section 4. This Resolution shall become effective immediately upon passage. 29 PASSED AND ADOPTED this�i day of !ud , 2017. 30 CITY OF BOYNTON BEACH, FLORIDA 31 32 YES NO 33 34 Mayor—Steven B. Grant 35 36 Vice Mayor—Justin Katz 37 38 Commissioner—Mack McCray 1r 39 40 Commissioner—Christina L. Romelus 41 42 Commissioner—Joe Casello 43 44 45 VOTE S.-'0 46 47 ATTEST: 48 49 r ��{ 50 51 Judt(A. Pyle, CMC 52 Ci Clerk 54 i.., 55 . 56 (Corporate Seal) 103 VA 4r 57 AVS z At C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VAGZE6P0\Change_Order_l_McTeague_Construction_-_Reso.doc McTeague Construction Co., Inc. POSPOSAL City of Boynton Beach March 30 2017 222 N.E. 9th Ave Boynton Beach FL 33435 Attn: Gail Mooyz Project: Hester Center C.O. 1 1. Remove all stucco and plywood on existing entrance and east side of Hester center 2. Install 5/8 plywood on existing metal frames 3. Install 30lb felt on plywood 4. Install wire lath and stucco over plywood 5. Remove and install metal cap on parpit wall 6. Install new 2x4 bucks-for=windows 7. Additional time required 20 days Total -$ 19;100:00 Michael H McTeague McTeague Construction Co Inc. 624 S.E.Central Parkway Stuart FL 34994(772)286-6100 Fax(772)286-7130 E-mail mcteagueconstruct@att.net