Loading...
R17-097 1 RESOLUTION NO. R17-097 2 3 A RESOLUTION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, AUTHORIZING THE CITY 5 MANAGER TO SIGN THE PROPOSAL FROM M&M 6 ASPHALT MAINTENANCE, INC., D/B/A ALL 7 COUNTY PAVING OF DELRAY BEACH, FL FOR 8 THE PURPOSE OF REHABILITATING COMMERCE 9 ROAD UTILIZING THE CITY OF WEST PALM 10 BEACH'S PAVING CONTRACT #16393 PRICING, 11 TERMS AND CONDITIONS IN THE AMOUNT OF 12 $89,285, PLUS A 10% CONTINGENCY IN THE 13 AMOUNT OF $9,000 FOR A TOTAL COST OF 14 $98,285; AND PROVIDING AN EFFECTIVE DATE. 15 16 17 WHEREAS, over the past several years, City staff and elected officials have 18 received a growing number of complaints from the commercial businesses and the 19 residents that frequent those businesses regarding the pavement condition of Commerce 20 Road; and 21 WHEREAS, the proposal from M&M Asphalt Maintenance, Inc., is a piggy-back 22 of the City of West Palm Beach General and Miscellaneous Construction Contract#16393 23 and it has been confirmed with the City of West Palm Beach and the contractor that we are 24 able to piggy-back their contract; and 25 WHEREAS, upon recommendation of staff, the City Commission of the City of 26 Boynton Beach does hereby approve the piggy-backing of the City of West Palm Beach 27 Contract #16393 pricing, terms and conditions with M&M Asphalt Maintenance, Inc., 28 d/b/a All County Paving of Delray Beach, FL in the amount of $89,285, plus a 10% 29 contingency in the amount of $9,000 for a total cost of $98,285 for the purpose of 30 rehabilitating Commerce Road. 31 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION 32 OF THE CITY OF BOYNTON BEACH, FLORIDA,THAT: C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VAGZE6POWI_M_Asphalt_Resurfacing_Commerce_Road_proposal__Reso.doc • 33 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed 34 as being true and correct and are hereby made a specific part of this Resolution upon 35 adoption hereof. 36 Section 2. The City Commission of the City of Boynton Beach, Florida, 37 hereby approves the piggy-backing of the City of West Palm Beach Contract #16393 38 pricing, terms and conditions with M&M Asphalt Maintenance, Inc., d/b/a All County 39 Paving of Delray Beach, FL in the amount of $89,285, plus a 10% contingency in the 40 amount of$9,000 for a total cost of$98,285 for the purpose of rehabilitating Commerce 41 Road. 42 Section 3. That the City Manager is hereby authorized to sign the proposal 43 with M&M Asphalt Maintenance, Inc., d/b/a All County Paving of Delray Beach, FL, a 44 copy of which is attached hereto. 45 Section 4. That this Resolution shall become effective immediately. 46 PASSED AND ADOPTED this 17th day of October, 2017. 47 CITY OF BOYNTON BEACH, FLORIDA 48 YES NO 49 50 Mayor—Steven B. Grant 51 52 Vice Mayor—Justin Katz ✓ 53 54 Commissioner—Mack McCray 55 56 Commissioner—Christina L. Romelus 57 58 Commissio er—Joe Casello 59 60 ATTEST: >` VOTE 51)._ 61 / A . • 62 44 63 Jul A. Pyle, CMC / 64 C'er Clerk 65 sovN. C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\52FYTEOE\M_M_Asphalt_Resurfacing_Commerce_Road_proposal__Reso.doc -,qqq Palm Beach County: U- 21491 Broward County: 13 -3A- 17799 -Rs; Collier County: LCC20110001485 Martin County: MCP5910 General Contractor: CGC1509632 PROPOSAUCONTRACT October 3, 2017 Customer Name /Address: Property Location: Attn: Gary Dunmyer City of Boynton Beach City of Boynton Beach Commerce Road 100 E Boynton Beach Blvd 1 Boynton Beach, FL 33425 "REVISION 2" T. 561.742 -6231 $ 1,566.77 E. DunmyerG @bbfl.us 2 As per the City of West Palm Beach Annual Contract: Contractor's Proposal for City Road Repairs Item No. Item Description Unit Quantity Unit Cost Cost 1 Mobilization LS 1 $ 1,566.77 $1,566.77 2 Maintenance of Traffic LS 1 $ 1,500.00 $1,500.00 4 Insurance LS i 1 $ 10.00 $10.00 11 Excavation, Removal & Disposal of excess material CY 225 I $ 25.00 $5 ,625.0 0 14 Asphalt & Base Removal, up to 24" SY I 1265 $ 11.85 $14,990.25 16 FDOT Optional Base Group 4 Ton 260 $ 40.00 $10,400.00 19 Type SP -9.5 Asphaltic Concrete Ton 330 $ 110.00 $36,300.00 49 Concrete Removal up to 6" thick SY 74 $ 10.15 $751.10 50 ! 4" Concrete Sidewalk I SY 70 $ 34.50 $2,415.00 51 6" Concrete Pathway /Driveway SY 20 $ 42.50 $850.00 54 6" ADA Compliant Ramp with Armor -Tile Tactile System or an approved equivalent EA 2 $ 975.00 $1,950.00 55 Remove Concrete Curb All Type include asphalt restoration and sawcut LF 20 $ 4.50 $9 0.00 58 Concrete Header Curb (up to 12" X12 ") LF 70 $ 20.00 $1,400.00 65 6" Double Yellow Thermoplastic Striping LF 50 $ 1.76 $88.00 69 24" Solid White Thermoplastic Striping LF 24 $ 3.30 $79.20 74 6" White Temporary Striping Paint LF 1 96 $ 0.33 $31.68 Page 1 of 3 M &M Asphalt Maintenance Inc., d /b /a All County Paving Office 561-588-09491 Fax 561 - 588 -2140 11180 SW 10' Street, Delray Beach, FL 33444 Office 407 - 610 -8069 i Fax 407-380-200114800 Patch Road, Orlando, FL 32822 info(a)-allcountypaving.com Members of ICSC, CAI, SEFAA, IREM, CREW, AAGO, BBB, FTBA, FHEA, UCA, ABC, NAIOP, BOMAA, FHBA, APWA, PRISM, NEYRA VF DOT CERTIFIED CONTRACTORS Note: All County cannot work around vehicles. Management is responsible for towing when owners fail to comply with paving and/or seal coat schedule. Proposal # 2017.10.03.01.SE Martin County: MCP5910 General Contractor: CGC1509532 76 1 6" Yellow Temporary Striping Paint i LF 100 $ 0.33 $33.00 93 Regrade Swales SY 830 $ 13.50 $11,205.00 Total $89,285.00 *Car stops break during handling. *Any broken car stops will be replaced at an additional cost of $35.00 Each. *New pavement is susceptible to scuffing and marks until it has properly cured. *As asphalt is a petroleum based product the prices are subject to change if oil prices increase dramatically. *Existing Cracks with vegetation growing should be prepared with a weed killer such as 'Round Up' for several treatments before we arrive on the job. *The asphalt surface that will be placed on this project will not have the firish and look of a sealcoat application. if sealcoat is desired at a later date, we will be happy to quote you separately. *Large cracks in the existing asphalt may reflect through the new asphalt in time. *There will be a tire 'tracking' -this cannot be avoided, but the tracking marks will disappear in time. *This proposal specifically excludes the acceptance of a "Pay when Paid Clause" payment clause. *All County shall be provided with suitable access to the work area. If All County's work is dependent upon or must be undertaken in conjunction with the work of others, such work sha4 be performed and completed so as o permit All County to perform its vrork hereunder in a. r, uninterrupted single sh ft cperaton. Delays to All County shall be paid at a rate of $200.00 per half hour. `,n the event that any work is done under this agreement as amended, or any side agreement, by All County which work is on public property, the (Chen +t/Owner) agrees and understands that the project property which it owns shall be charged with all indebtedness hereunder. *Any punch list items must be submitted in writing. No repairs will be made until 90% of the invoice amount has beer. paid. *This contractor cannot guarantee elimination of standing water. *Job site will be barricaded during work. The contractor will not be responsible for persons breaking through barricades, tracking of materials or paint, damages to cars or persons trespassing in designated areas. * Permit, Procurement fees and any additional work required by the permit will be extra to the contract amount. *This contractor recommends a civil engineer be retained for ADA upgrades. As such this contractor makes no claim that ADA upgrades will meet any /all local, state and federal guidelines on ADA compliance. *Due to price fluctuations on material costs this contractor reserves the right to withdraw the proposal at any time prior to the commencement of work. PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions stated herein, for the sum of: $ 89,285.00 EIGHTY -NINE THOUSAND TWO HUNDRED EIGHTY -FIVE DOLLARS WITH PAYMENTS TO BE MADE AS FOLLOWS: Net due upon completion. Not responsible for any damage to underground utilities. A certificate of Insurance will be issued upon request prior to commencement of work. All County reserves the right to revisit the site if time has elapsed from the original proposal to acceptance. All County guarantees the sealer against peeling or flaking off of stable asphalt for a period of (1) year, excluding normal wear & tear. All County guarantees all workmanship and materials for up to (1) year, excluding normal wear & tear. Warranty starts at conclusion of work and is not valid until payment has been made in full. Any additional mobilizations for Sealcoating will be billed at a rate of $1,295.00 each. Any additional mobilizations for Paving will be billed at a rate of $2,45C.00 each. All material is guaranteed to be as specified. Reflective Pavement Markers are excluded from the warranty. Any additional reflective pavement markers that are required by the city code will be an additional charge of $10.00 each to the contract. amount. Ail work is to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specificatio =ns involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Due to the fluctuations in the petroleum markets, All County reserves the right to impose a fuel surcharge. Owner to carry fire tornado and other necessary insurance upon above work. Our workers are covered by Workmen's Compensation Insurance. "In the event of any litigation or other proceeding arising out of this agreement, the prevailing party shall be entitled to collect its attorneys' fees and all costs of litigation from the other party, ircluding appellate attorneys' fees. The proposal /contract including all terms and conditions shall become a legally binding attachment to any contract entered into between Ali County Paving and the financ'ally responsible company for which the work will be performed. ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Page 2 of 3 M &M Asphalt Maintenance !nc., d /b /a All County Paving Office 561 - 588 -0949 1 Fax 561 - 588 -2140 11180 SW 10 Street, Delray Beach, FL 33444 Office 407 - 610 -8069 1 Fax 407-380-200114800 Patch Road, Orlando, FL 32822 infoCa.allcountypaving. com Members of ICSC, CAI, SEFAA, IREM, CREW, AAGO, BBB, FTBA, FHEA, UCA, ABC, NAIOP, BOMAA, FHBA, APWA, PRISM, NEYRA QFDOT CERTIFIED CONTRACTORS Note: All County cannot work around vehicles. Management is responsible for towing when owners fail to comply with paving and /or seal coat schedule. Proposal # 2017.10.03.01.SE Palm Beach County: U -21491 I 4lll Broward County: 13 -3A- 17799 -R I MS Collier County: LCC20110001485 Martin County: MCP5910 General Contractor: CGC1509532 ACCEPTANCE OF PROPOSAL: Signature of Approval by Client Ze " i Z'A 0?4' e� 111,4 A Printed Name and Title and Date APPROVED AS T OR flM1 I RE Jeffery Cohen Project Manager Page 3 of 3 M &M Asphalt Maintenance Inc., d /b /a All County Paving Office 561-588-09491 Fax 561-588-2140! 1180 SW 10` Street, Delray Beach, FL 33444 Office 407 -610 -8069 i Fax 407-380-200114800 Patch Road, Orlando, FL 32822 info( D-allcountypaving.com Members of ICSC, CAI, SEFAA, (REM, CREW, AAGO, BBB, FTBA, FHEA, UCA, ABC, NAIOP, BOMAA, FHBA, APWA, PRISM, NEYRA P ! FDOT CERTIFIED CONTRACTORS Note: All County cannot work around vehicles. Management is responsible for towing when owners fall to comply with paving and/or seal coat schedule. Proposal # 2017.10.03.01.SE Palm Beach County: U -21491 Broward County: 13- 3A- 17799 -R Collier County: LCC20110001485