Loading...
Villages at East Ocean - North - MSPM 17-003DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: Villages at East Ocean- North (MSPM17 -003) APPLICANT: Arthur B. D'Almeida APPLICANT'S ADDRESS: 105 East Palmetto Park Road, Boca Raton, FL, 33432 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: September 19, 2017 APPROVAL SOUGHT: Request for a Major Site Plan Modification approval for a mixed -use development consisting of 336 dwelling units, commercial space, and associated recreational amenities and parking on a 3.379 acre site. LOCATION OF PROPERTY: South side of Boynton Beach Boulevard to Ocean Avenue between the F.E.C. Railroad and NE 3' Street DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. THIS MATTER was presented to the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the approval sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: Application for the approval sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant HAS HAS NOT established by substantial competent evidence a basis for the approval requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included." 4. The Applica is request is hereby GRANTED subject to the conditions referenced in paragraph 3 above. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other: DATED: 11 City Clerk SAP!anning \SHARED \WP \PROJECTS\V Ilages at East Ocean \Villages North (MSPM 17- 003) \StaffReport\MSPM17 -003_ DO.doc EXHIBIT "C" Conditions of Approval Project Name: Villages at East Ocean (North) File number: MSPM 17 -003 Reference: 4 th review of plans identified as a Maior Site Plan Modification with a July 14, 2017 Planning and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT ENGINEERING / PUBLIC WORKS / FORESTRY / UTILITIES Comments: 1. Civil plans, including drainage calculations, in accordance with the X 2010 LDR, Chapter 4, Article VIII, Section 3.G. will be required at the time of permitting. 2. Coordinate with Stormwater Utilities to ensure that the consultant X models the stormwater discharge to the ultimate outfall. 3. Prior to permit application, please contact the Public Works X Department (561- 742 -6200) regarding the removal of refuse during the construction phase per the CODE, Section 10 -26 (a). 4. Section 26 -34(A) of the code mandates the payment of water X and /or sewer capital facilities charges when a project is to receive services from the city's systems, and as an option, a capacity reservation fee may be obtained at an additional cost and will only be valid for a period of one (1) year after the fee has been paid. Capacity reservation fees shall be paid upon the request for the Utilities Department's signature on the Health Department application forms or within seven (7) days of site plan approval, whichever occurs first. All fees will be determined based on the final meter size(s), or expected demand. 5. The existing drainage infrastructure to remain within the project X limits and along the project frontage shall be Tele- inspected before and after construction. Prior to the post construction tele- inspection, the same lines shall be cleaned. 6. Please provide an Addressing Plan, prior to permit issuance. X 7. Provide irrigation plans with the landscape plan, prior to permit X issuance. 8. Applicant shall work with the Utilities Department to determine the X project wastewater flow discharge, which will be entered into the Villages at East Ocean (North) MSPM 17 -003 4' Review Comments Paqe 2 of 5 DEPARTMENTS INCLUDE REJECT City's hydraulic model to determine if a lift station is required. 9. Please address storm water treatment for first inch of rainfall, as well as conception detail and conveyance. Please note SFWMD requirements may be more restrictive. Calculations for exfiltration shall be submitted at time of permitting. I X 10. The attendance at a mandatory Pre - Construction Conference is required prior to the start of any utilities work on site. X FIRE Comments: None. All previous comments addressed at DART Meeting. POLICE Comments: None. All previous comments addressed at DART Meeting. BUILDING DIVISION Comments: Building comments will be addressed at time of permitting. PARKS AND RECREATION Comments: 11. Per City Ordinance, the Park Impact Fee for the North Parcel is $199,920 (336 apartments X $595.00). X PLANNING AND ZONING Villages at East Ocean (North) MSPM 17 -003 4 th Review Comments Paae 3 of 5 DEPARTMENTS INCLUDE REJECT Comments: 12. Sheet AS100 has the incorrect boundary for the project area X proposed to be rezoned. Please revise boundary to exclude properties not owned by the applicant. 13. Sheet AS1.10 data Sheet AS1.10 data is incomplete. Please add X FAR calculations and revise parking calculations to accurately reflect the plan. 14. In order to promote interconnectivity, as required per code, to X support the 5% parking reduction for the non - residential uses, the applicant shall remove any fencing and gates at the north and south termination of the pedestrian path adjacent to the railroad, in order to allow free public access from Ocean Ave to Boynton Beach Blvd along the east side of the project and to the public space noted on the plans. 15. Please provide a detail drawing of the design of the bus shelter, X matching the architectural design, materials and colors of the building. 16. Please depict the access points from the garage to the retail X spaces. Enhance public access points so they are clearly discernable for the public. 17. Revise elevations to consistently match the submitted color chip, X "Adventure Orange ". 18. Please provide calculations and dimensions of ground floor X building facades which indicate that 50% (all mixed use buildings) and 30% (for all residential buildings) of the area is occupied by transparent windows or door openings. Note that the maximum sill height of 2' and minimum head height of 6'8" is required. 19. Please provide details of any proposed building signs. A Sign X Program will be required for the project. No sign permits will be issued until the program is approved. 20. All applicable drawings should depict the improvements within the X right -of -way along the west side of the abutting condominium building, including roadway, sidewalk, light poles, landscaping, etc., in order to continue the proposed streetscape design from Villages at East Ocean (North) MSPM 17 -003 4 Review Comments Page 4 of 5 DEPARTMENTS INCLUDE REJECT Boynton Beach Boulevard south to Ocean Avenue. 21. Any approvals are subject to the approval of the associated right- X of -way abandonment applications. HISTORIC PRESERVATION Comments: Comments have been acknowledged and will be addressed during site construction. I COMMUNITY REDEVELOPMENT AGENCY Comments: 22. Clearly identify the location of the required parking spaces X associated with the proposed retail /restaurant and guests. Sheets AS 1.10 parking table, AS 1.11 and A1.01. 23. As part of the applicant's design and construction of the NE 3 rd X Street r -o -w improvements, continue the pedestrian improvements all the way to the corner of NE 3rd Street and E. Ocean Avenue. Sheets AS1.11 and A1.01. 24. Overhead utilities must be undergrounded. An easement may X need to be retained in order to continue the undergrounding of utilities along 3 d Street to continue south of Ocean Ave. PLANNING & DEVELOPMENT BOARD CONDITIONS 25. The applicant and staff shall discuss the possibility of live /work X units as an option for the commercial space along Boynton Beach Boulevard. CITY COMMISSION CONDITIONS 26. Replace the 1st floor space located along Boynton Beach Blvd X and designated "Retail" with live /work units. Villages at East Ocean (North) MSPM 17 -003 4 th Review Comments Page 5 of 5 DEPARTMENTS INCLUDE REJECT 27. Extend the plaza planned along Ocean Avenue eastward to linear X open space, at the same depth that is currently shown on the plans S:\ Planning \SHARED \WP \PROJECTSWillages at East OceanWillages North (MSPM 17- 003) \StaffReport\ExhibitC_C0A - P &D.doc EXHIBIT A ! ' EXHIBIT "B ": PROJECT PLANS 2 SITE NOTES m t m5 PxoEC. s"xLL eE EN iPP Mm Fla ir¢ 4°IaxxlEn iGE PUUP 17x0 sief+OPFES R�u NFg1FEO ev mF c "c. I i I I � �s�E� _ _ __ _____________________ _ .. ... - - .. __....__._._ a°en.acs. s,xu . amrsmE.¢a vt x - i L. S, x Pa OZ., S— O s 5 ME $ y E 6IE ° — ___ —_ —_ OF 2D,a FB Ox ,fiD9 L XGS ,1W E s, xGxFF EN E tl °SF it, 9� k £ epv �_ RolipA Fi1gr wi cwv : MM uurVs o me PaDPDUD FO— . 111 — A10x 4 gee gg frM,M E .. +F / _ PPBC WG 4,f "s w,Enuu ED nt cna oE, ( ti p fe R g4 L Zi37 x" ' -a '- w� �� T±5'• � _,. _ -. —E i GEB 1 —L 4UIL NFLi x TM E nuE OF PFWU apPUiena E i°c°ir ,wo mE - 1—L E G4 W �/C2oi?ca LEGEND M vI _ i —[L I - - i C �`T z UJ W a a o..m, n u. xE nxoo NBU—rG J rnux lrnrn ES) 2 >OL Q Z a A - S..x,e „E 3 .: x ExME,laMxDS, of,...x "xDG f f.; , D Al „ "aooa Dai oiDODD D P,vorMGlMa,xED ",,.oD .F am ",x WW,of DM M. —T MIX o - r �AS1.10 SPA FIE- SUBMITTAL 1 MASTER SITE PLAN 06/20/2017 I-S O-O' „ 5 2 - LEGEND b c 4� Ga 3 RR Blanc w� { Xj �ysc E "e x @ 3s'4 ®b_ I _` - - -'-- i _..� .., m,.• _ �A EAST CO I£ - R _ - --- ----------- $e Y8bce OV k $� CINN a I v IL P _ _ d g I 1 _ 1 , � Flit o I rspsror 'I � N[w¢4WRE I I �'" r - o I � os: � F Q - $'$ - -v : f'3��d m w w U I _ —- _--�- ' I �� t" 7 w w z > I br* w pp , - z a z lb A 4u- PE 3RD STFEET I i I I _____________, _... r. r___ _______________ ______ _________ - -. -.. ... . -... -. - _ - -. - - -. I I I - —. _. I I A 1 I I I I SITE Pt AN I I I a /zo/zot� rro SPA RE- SUf3MFTTAL �cAS1.11 1 SITE PLAN 06/20/2017 r - av o I 1 I I 1 BU[LDING No.l — i —, SOUT ZOWR L P� —EZ- EA eFl w :ELEVATION NOTE5 W cr) w w 0 cr a. ffi a0 lPAEN7 LEGEND SPA RE-SURWITAL 06/2012017 17 4 F-A tE Tc X, LIA CA rl -n-amia'-, cz lz FT p el 4., r �Ljl e-A i 3, E vA r RTI m r � VA T-A A w . '7� T 7_ J7 P4 F A �? � ._.".� "� � �"1 � -t � ­ J. g- w _NF(;. f_ ry __Im j -7-7 jr - r �Ljl e-A i 3, E vA r RTI m r � VA T-A A w . '7� T 7_ J7 P4 F A �? � ._.".� "� � �"1 � -t � 3 t Z LU - N NOTES LU 5- z w 0 'AUNT LEGEND autoacrai SPA RE-SUBMrrTAL A3.00 061201 NORTP PARCEL CODE COMPLIANCE DATA -- LEGEND ------ NORTH east ocean ave. north parcel �r PLANT L15T- 5HPUE55 (CONT.) - === ===� ===� - -- � - -- -- planting plan --' ^ . ~� m 1 U Q ui z O I— z O m w I R r, I 1 North Parcel 51te Area: 141,108 sF Pervlo 1 Area 21,413 sF (151.) hpervlous Area: 125,635 (851.) ®North Parcel Public 5pace Required: 11= 1,411 ar Slte Area (147,108 sr) x 0.01= 1,411 sF North Parcel Public 5pace Provided: 9,100 sF EM North Parcel Open 59ace Requo-ed: 2 %- 2.942 SF 51te Area (141108 sr) x 0.02- 2,942 eF North Parcel Open 5pace P —lded: 21,180 5F NOR rH pervi inpervious, public, O � open space vi llages le � dave bodker east ocean ave. ter* YC�2CbfB� �&It� IIC. s io„ north parcel ., su_2 -6311 � -6311 — aynton b tlo Sao yno°°°aea L -6