Loading...
Quantum Pk & Village S (MPMD 17-002) DEVELOPMENT ORDER OF THE CITY COMMISaiuN OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: Quantum Park & Village South — Retail Bldg. 1 (MPMD 17-002) APPLICANT: Dale Lyon, Olen Development Corp. APPLICANT'S ADDRESS: 7 Corporate Plaza Drive, Newport Beach, CA 92660 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: June 20, 2017 APPROVAL SOUGHT: Request for Master Site Plan Modification approval for Retail Building 1 of the Quantum Park & Village South Mixed Use Pod, including request for PID (Planned Industrial Development) district waiver approval to reduce the side setback along the west side of the building by 10 feet, from 15 feet to 5 feet, project located at 1080 Gateway Boulevard, in the PID (Planned Industrial Development) zoning district. LOCATION OF PROPERTY: 1080 Gateway Boulevard JUSTIFICATION: SEE EXHIBIT "B" ATTACHED HERETO. THIS MATTER was presented to the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the approval sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the approval sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant _✓HAS HAS NOT established by substantial competent evidence a basis for the approval requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included." 4. The Applicant's request is hereby ,, RANTED subject to the conditions referenced in paragraph 3 above. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other: /VV'AJ • DATED: 6 /1-7 t City Clerk S:\Planning\SHARED\WP\PROJECTS\Quantum Park&Village\Quantum Town Center South\M PMD 17-002\DO.doc EXHIBIT "D" Conditions of Approval Project Name: Quantum Park & Village South (Retail Building 1) File number: MPMD 17-002 Reference: 2nd review plans identified as a Master Site Plan Modification with an April 11, 2017 P & Z date stamp DEPARTMENTS INCLUDE REJECT ENGINEERING / PUBLIC WORKS / FORESTRY/ UTILITIES Comments: None, all previous comments addressed at DART meeting. X FIRE Comments: 1. Please demonstrate that the remotest portion of the building is within 200 feet of the nearest fire hydrant. If a new fire hydrant is required, X it shall be a Sigelock model, per Utilities Standard Detail W-9. POLICE Comments: None, all previous comments addressed at DART meeting. X BUILDING DIVISION Comments: None, all previous comments addressed at DART meeting. X PARKS AND RECREATION Comments: None X PLANNING AND ZONING Comments: 2. It is the applicant's responsibility to ensure that the application requests are publicly advertised in accordance with Ordinance 04- X 007 and Ordinance 05-004 and a copy of the affidavit provided to the City Clerk and Planning & Zoning Department. 3. A portion of the patio along the northwest side of the property appears to encroach into a 25 foot wide utility easement. Please provide consent for, and hold harmless agreement from, the X easement holder or relocate the improvements outside of the easement. Quantum Park &Village South (Retail Building 1) MPMD 17-002 COA Page 2 of 2 DEPARTMENTS INCLUDE REJECT 4. As a condition of approval of the site plan and waiver request, the applicant shall submit a recorded release for the two (2) platted X easements, prior to issuance of any permits. 5. Approval of the new pier dock is subject to approval of the agency with jurisdiction of the water body. X 6. Any existing landscaping depicted within the north landscape buffer in poor condition or missing shall be replaced with like-size material. X 7. Applicants who wish to utilize City electronic media equipment for recommended PowerPoint presentations at the public hearings must X notify the project manager in Planning and Zoning and submit a CD of the presentation at least one week prior to the scheduled meeting. COMMUNITY REDEVELOPMENT AGENCY Comments: N/A X PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: None X CITY COMMISSION CONDITIONS Comments: To be determined. 1 ,d S:\Planning\SHARED\WP\PROJECTS\Quantum Park&Village\Quantum Town Center South\Master Site Plan Modification 17-002\COA post P&D.doc EXHIBIT A. LOCATION MAP „"` '" .yam�'t, ,:!,,,,r 7 ,':: 4 �a .' y'. 'g . ' , —NW 4th Ave - Y'" ,If„::," � `^ NW 24th Ave 3tea, . .. ' 14X , • ''s'' • _.»� . • ` LLL ddk"< 'X. r t+aya•srM . a • • 1fu Pyr R ,,. d b t�id""ix R �k. -. Gateway Blvd RETA fL z BLDG 1 x� -° cr * ''' x a'�ry-ry wig * •..+_:: , .;`.F*` "sa feiss.;a . . 'L : , Pikihn zzz- • ,,,',J. 1 c J` 4 3 p a_ k/1.:,' '* .r, : y f • :„ 4.<, p{� 7 r as : y kf n r.r L»a: * `' ¢� '.A ''1 X44 ? ? i ff.sem„' •$' ' a'''' *'F••a' '•P l S` '' r • ;i `,^ ^,' w .- b x c a,,.E S k., g.. ;•,,,,,,i,•-:' # •z x, • �', ,..• i4. _,;.;•„.,--,:4';'4111r1='...-',,., 4,,. 'r' '.:.'..:111;... r , ,x 7 i p { ^ � ,4s¢ a' 'x '',401i.,'"i� yfy(` x i t° `,z .• r er 4 y,-ey' t ,f`�y_ '4 T: S. 1 1. ".?; , •J , ± • t" mak#i d fP,.,!.. ._ J {wr ft „• .�, '_»t .: ,s£, a>a 4' fit, _ ' " �. 4t;. .1 ,f- w,f ,4�. „,,,,-.:7,.,,,,c ,'' IVA'' i `1", `"'d e;: W; s"` a", 'r '. `> `a" ,k i� 'e'�W Y r.' "x w ';'7,7. ,',,•...4 „ f r,2' .,'� '1 tah sn. ,, 7`l trf , '4''' u,. 4; r * ;4 '.g hr `a e a,. ','"'..• 'r• 'ra s, ,. :7 , Y. . r, r,, : ,«. y' j - 10.x, xx` a'< ^i !'_,. p '”, 'kk'aY • ': i, !" �.i'i^�., Qu s' � • • x,z l..:q y „ ^ 'x-4,.-,,,'0,1''':T' W •'-'-f •.---'==j f-` ,3-, ia.• f 'i- Y r » n k.,.,a`f..,.* t`r1 S -3i,!''' y • k`3' ci;-'77' { ;'°§`'a.f X'"' -'"i '`K;4.4...,,,',;',.. k .. ==,...-=4e; %, . t. sY w 1 M fNs3 „ 'i i+ , ''•.,1=,`;„••=.'' xI. w '. ' ..'', ej,s 4 , 4 P..1. � v1`;'44 abs r ' 4, , a ., at �y'" .,:‘• =- 44' ,-j�lA-'%•;`,".0+; 4. '4 „� .� , ; „ • d 48<40, _, a' »°' V r :;.4,41.14r:,"1.l 14.'411',;‘'.• :,11."',.',,•".1.,.:.!`,1,,4'.2.'"'1 c• ,,• [p{,x+ .`e'£? b <1, 1,19'I. 4;;,,,,,,,4'"'',41.,4„.1:+.t ,,,... '4":, ?,e .,ybr .,, v g r , N I w'AM P 0 S 0 N °. 0 0.0125 0.025 0.05 0.075 0.1 Miles RI )ONES y ■■ W i' ARCNITEC URE 1 O ! . ,, mil .....„....,_,____ .....1 r„,... ..„ :,„... ,...,51,..., - U �1III .iy. IY 4• �_� � �\r‘V V?. � I�� • .� I U I I I I I 1101 I I L� ...... .:........ �� ��n �� �:.:u � i-� I � ��� ~-no111 `i �. `�� �" — — • - _71c.. ..______/ I I —Itit nl111111�III u� aye I .T�r �r..- A —- ��_ - _ ,, . ► rnnl IRI `� Al:" ' 16 � A x111111111icirliroir ° o ,mic _ _ , _„ _ Q U .._.. "..,;4*:0/4 • 111 is�, 1/....„0„,r ,, -------____•____,_____, . .. —._ __ // / r„u Maw. �,� ,'! * * 17: NOT PART OF CALCULATION (n `i •t % . * r.r .awl 3 � 4, *+' :::."'”' Z _,.-..._._ � SITE PLAN :rALL.l.o I _ r...N 8TE DATA Li *DENOTES FAIR NOOSING RESIDENTIAL Os � _ '"1"22 "m0 ' "°' **DENOTES ADA ACCOESSIBLE COMMERCIAL r{� " -• =rig- (.'--' 6' . ate" WWW TABLE SOT SECTION SW N9-31.A116 SUBMITTED FOR PERm1TT1NO AL OwEOM OOO�T CODES O.NOTC o7,9,N EDfIpN 4.. e �• + ..m .MrMsr io Eli w ,MJ, I;. c. WTI AREA 10 011crAMA.A.,71 APARTMENT BLW~tP•1IS OA LFGEI�O ACCESSIBEC TAAvEECTN TOnrait o s w.rw w. U .P.RiMENi ECDO1 Q MEET REGULFFHA ATIONS ESPECIFIED IN .Fir. .. •ASITE PLAN r rrrr w SP-1 t GENERAL NOTE PROJECT LOCATION MAP KEY SITE MAP SITE NOTES `' "` owaM DESIGN 103711q%. :2Z& '-'7' a� � �Illr �,jlr .�,.W,.. .,.,.,.,.,....—.«.amd..,.,,La.a. INC 1 MIA _ \ �VV �� 4.i CM 1"Y �Z,AriC ;' ._`. ._._.______- _—_�. --i_ -- MBA ars" -- GATEWAY BLVD. J trr. µ m5c — l QUANTUM PARK m •401 �, AL BO,7,4 EACH - _ wt as a / �,,,,'T17 PUT Y6 R[PUT♦ ..RA:',.'1:.;'::: 1111; 4 stair S93)x _ 0i \ IN d 8 •....... lr.m., , - 1 ,,,i4r. . alit ,-..:,..--t.,....„. , _ ,_ y ;" .fix ' ' r" -�- j®. a ,'�7 .oma ah a „rfi _ ' 6,4 .. \\ til i= f .\ Cil 1 � � �`ir I REVIEW SET ������.....1„.„.**.-. (ar ow.r,".1.11)==, :., A _ 12/022016 \ ._________ • ::PI-' l' \ Ilii �� 1101 14.11\140) NN ! -. ,,-- • / /,qtr \OW* f� �� ii �I "� \ SITE PLAN �/�� VIII �, \syn po V •• I - •pNESIGN 0 AMIIIIIIIIIIII . -If 2 1111111t111111 111111111111111111111111111i . I. 1 Eta riZ ,,..iter.m..11 i,1111111/11111111!7111111111111111 - ---11111111111 7 1 .------ riga%iitio.7-Vi g ...'.. ."....... Z. ... 11 An 1......,...ru...,...,,a, vanam.....,........ ........,.,. 4.1 :'' : I i 1 ;1471WITZT. 2 'MBA 0 . 4,,,,k"';'14,"ft,'•:-.,„i,LA_ - x ..... m•• .'III m m ••=m•m 1 x. m m m m• 4d - 41S.111111 pii 01 Eitspr. la .l: II , ! arz .) =,, Unfinished Future IL uuJ i ! Eir,I \ l!eltaurant 1 in, ilklik 0 ',,,, 431 .0 .....?‘/........ . ..—. ....1!C) . . /4* i 1 e • • ?" ,, 4,:7'NFileetS7 li 1 t t = ,-2 Covered :1911' -0,---fair,T, im 0' I Outdoor Patio t.t.1%,"tr.;, ['A '......=':.—— .. 4...••=- -sorer••••• - l'llil Elk I 1Sit IL AMIN. IM 1 II os .; . g r"---- ... ___ ,.... , I 11'0 I 9 fiAH I ' t II,in I—•.0 Hill%i IV REVIEW SE I 12/02/2016 '- — is 11.11O1 c 1 0 vil rr.avezirae, r .;1'1'1'1'1'1'1'1',: w 70000<*l_ 2 figgigikrxrp 111111111 \ PROPOSED FLOOR PLA \ ,.."..A A—2 SC.I lie•l'-ef / 1111 FNECSIGN \ __ _ WIMM --114PrAr-0 II-.V'"/..I" la-17-7.-0--kma7.saginVa ;177%W I I 747111111(116:11 - Elmintazum ineueffliir mek,„ TCBA ...„...........0.... ..„......- ql iiiiii 0 , ,...,..., _ iiiiiiiiiiiiiiiii--7---;1,- ...............imiummwr-7,---7.- COLOR.CHART ,.., ,.. -... V MIIIIII ii :77--.775/117,---,---T022 4° "7"----111111 0 sw RURAL UrE F.1.4.1._ IfT,-..72.....,,,_,..,,_.= liglili <> 5W CHAPEL HILL M ...7.77.46:4-74:2:.:"-. ,:e 0 SW MeD,EVAL GOLD+iiiirsa. 1 ........ .., ,,,,- ,,,ri 5W MARK BROWN 4111 WEST (REAR) ELEVATION Lo - <> 5W ALPINE,ORP5T i - 2 : 0. - 5W PINE TOP 0 L,J j H _ r1 I „.1.,,., /— , ,,,,4".:”.%.,4,1'CZ-4.................... 1 I I 1 1' rtrZ M 'All ,,se # —,81,... .. . '........' II.N-'1'1111111. ....---1- I...0- R,EVIEW SET -A II 7725- .....-- ...,,_, .,. ....— NI 41 hi o I i2/02/2, 016 sz.o.,..,... -T... . • . .c..c.e....,. - ..ig 2' ''...' 'Al, , , . e .9.:." L....., 1,„,„.„.....,....21 r ^- W 4, ,.....-0 --;.:1 .. 17547— ,...,,,„„_.,.. 0 0 EAST (FRONT) ELEVATION WALL,SCONCWE AXE I/4.14 .ta, A-4 ,00.02016V...•.., 0 NIRA INC.'GP.' ._........o..,_ ,n.....,.,„L,....... * - - --7--- -. , -: AVAT:A P4 f .11A.'ffr.A 7.Af I__A-71 - --1--,a, -7-- --r2- ....a r.„A.......... ______,,,„4„,...,,,,, .......A....r....... ---.41 El nti___-------, ___1.-..g...........-...-..... ........-7-.4.-...T.,---;...-.0 ...,....._ - 17_ ,,, I :.;,....y........= AR Vil:Iri II- 1 ,I '11 II II " , , ,--.- ..,,.. .. , 1 1 11 II il 1, ' --------'-- r-— ' , i il il 1J , . ...., is J, 1 il ILL 1 5. _ _ TE -.' r-- - COLOR CHART CO44.12VERLO CO.Der_x ve lal.,,•I1 t t 0 SW RURAL LIFE i z ,-. :: 0 SW C,IAML,IILL 0 SOUTH (LEFT SIDE FACING LAKE) ELEVATION 2 <> SW MEDIEVAL GOLD 0 SW MARK BROWN <> SW ALPINE FOREST < . = ":1 0 SW Pit&TOP . 4> gf...==-Iti,iiala7,,,:&4!,;r 01 <> BLACK Kinv=r-- -4 ,, _ REVIEW SET -44-4' 12/02/2016 :LI',,,,u- ,,,,':41.2,,z,, . SZNA6e AR/A ,..: :44T''''''':'5'j:_llir'' \ ., ...., 4:1. •. . 41-V4ms-— Ent,,, 0 • AAA:rAr-, 1 • /—'3!1-::',1,1- 0 .$8 1 ' , ' • i „,.,,,,, ; I,k.,7-„_:Sj__,_..,r;P,.#i,„,1:1.:-,,,-S-,,,L.,-1„7 _ 0 NORTH (RIGHT SIDE FACING STREET) ELEVATION A-4.1 ‘,..,....,..,,,,,....., DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO. PZ 17-027 TO: Chair and Members Planning & Dev(elll ment Board 1 THRU: Michael Rumpfl Director of Planning and Zoning FROM: Ed Breese Principal Planner DATE: May 12, 2017 PROJECT: Quantum Park & Village South — Retail Bldg. 1 (MPMD 17-002) REQUEST: Request Master Site Plan Modification for Retail Building 1 of the Quantum Park&Village South Mixed Use Pod, including request for PID (Planned Industrial Development) district waiver to reduce the side setback along the west side of Retail Building 1 from 15 feet to 5 feet, on 14.27-acres located at 1080 Gateway Boulevard, in the PID (Planned Industrial Development)zoning district. Property Owner: Secured Holdings, Inc. Applicant/Agent: Dale Lyon, Olen Development Corp. Location: 1080 Gateway Boulevard (see Location Map— Exhibit"A") REQUEST The applicant is requesting Master Site Plan Modification approval of the Quantum Park&Village South project for the build-out of the last remaining Parcel,depicted as Retail Building 1.As the site was approved as a Mixed Use Pod within the PID (Planned Industrial Development) district, any modifications are deemed Master Site Plan Modifications, either minor or major, depending on the magnitude of change requested.This request is to increase the building footprint of Retail Building 1 from 4,000 square feet to 4,025 square feet,which typically would be treated as a Minor Master Site Plan Modification, requiring only staff review and approval. However, since the applicant is also requesting a PID Waiver to reduce the west setback from 15 feet to 5 feet along Retail Building 1, City Commission approval is required. BACKGROUND The subject Mixed Use Pod consists of 14.27-acres located immediately west of High Ridge Road, on the south side of Gateway Boulevard. Retail Building one is located at the NW corner of the site on a 0.92-acre parcel. According to Sheet SP-1, the Master Site Plan consists of approximately 81,000 square feet of retail/office/restaurant/mixed use, and 137 dwelling units. As previously noted, these requests are to increase the building footprint of Retail Building 1 from 4,000 square feet to 4,025 square feet,and application for a PID Waiver to reduce the required west setback from 15 feet to 5 feet along Retail Building 1. Page 2 Memorandum No. PZ 17-027 MPMD 17-002 west setback from 15 feet to 5 feet along Retail Building 1. ANALYSIS The applicant is proposing to construct on the last vacant parcel of the Quantum Park & Village South development. The property owner has long considered the construction of a restaurant on this parcel, with a large dining terrace overlooking the water body to the west and south. As the dining terrace is proposed to be roofed, the roof and columns/supports are required to meet the approved setback of 15 feet, however the roof overhang may extend into a setback by no more than three (3) feet. As the columns/supports are proposed at five (5) feet from the west property line, a waiver request of 10 feet has been submitted. As part of staffs review, it was noted that there are two (2)drainage easements depicted on the plat on the Retail Building 1 parcel.There is also a plat note stating that no buildings shall be placed closer than 15 feet from any easement. This note would adversely impact the building's placement. However, in 2012/2013, the applicant dedicated two (2) new drainage easements to the Quantum Park Overlay Dependent District (QPODD) in exchange for the release of the existing easements, in order to accommodate the proposed development of the parcel. Unfortunately, the release of the platted drainage easements were not recorded by the QPODD at the same time. As a result, staff is recommending a condition of approval that any approval of the site plan and waiver request be subject to the applicant's submittal of a recorded release of the two(2) platted easements. In addition, there is a five(5)foot wide irrigation easement belonging to the QPODD that was granted by the applicant in 2013, located along the west and south sides of the parcel. According to the agreement, the applicant is ultimately responsible for any improvements placed within said easement. The applicant, in their Justification Statement, states that the project as designed would bring a high quality restaurant to Gateway Boulevard and draw increased visitation and investment to the area. Additionally, the applicant indicates that the outdoor dining experience along the water allows for the enjoyment of the outdoors and if the waiver was not approved, the outdoor dining area would shrink by 50%and the restaurant would become primarily an indoor experience.The applicant goes on to note that granting of the waiver would "not reduce public safety, parking or other important building requirements". Lastly,the applicant notes that the granting of the waiver request would not adversely impact water run-off, as it would be captured and directed into the storm drainage system and that the lake maintenance would not be impeded, as the maintenance is conducted on the area between the water's edge and the existing retaining wall. The proposed waiver of 10 feet, from a 15 foot setback to a 5 foot setback along the west side of the building,would not adversely impact adjacent residents or businesses, as the building will abut one of the Quantum Park lakes. Certainly, as the applicant notes, the outdoor dining ambiance is greatly increased as a result of the larger covered terrace. Since no apparent adverse impacts are foreseen with the reduced setback, staff is in support of the request. RECOMMENDATION Staff has reviewed this request for a Master Site Plan Modification and recommends APPROVAL, including the approval of the associated PID waiver for the minimum setback requirements,subject to satisfying all comments indicated in Exhibit"D"—Conditions of Approval. Any additional conditions recommended by the Board or approved by the City Commission shall be documented accordingly in the Conditions of Approval. S:\Planning\SHARED\WP\PROJECTS\Quantum Park&Village\Quantum Town Center South\MPMD 17-002\Staff Report.doc